How to Assemble NG FRP Railing
Jul 13, 2015
Use 4” Split Tube Connectors to join Posts with the top rail.Use 8” Split Tube Connectors to join Posts with the mid rail.
Use pop-rivets to mount the kickplate to the posts. Cut Kickplate Corners and splices out the 2” Tubing (or FRP plate, or angle.)
The railing can be cut using standard power tools and a diamond tip blade. Use a 1.68” diameter core drill for the Split Tube Connectors.
Glue all components together using 2-part epoxy available at your local hardware store. Reinforce each connection using pop-rivets.
Call National Grating to order you NG Railing Components.
http://www.nationalgrating.com/