HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND REGULATION FEBRUARY 13, 2014 MIT COURSE 11.S946 “ELECTRICITY , ECONOMICS, AND THE ENVIRONMENT” Bruce Biewald, Founder and CEO Synapse Energy Economics [email protected]
39

HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Jul 19, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

HOW THE ELECTRIC GRID

WORKS: DISPATCH,

PLANNING, AND REGULATION

FEBRUARY 13, 2014 MIT COURSE 11.S946 “ELECTRICITY,

ECONOMICS, AND THE ENVIRONMENT”

Bruce Biewald, Founder and CEO

Synapse Energy Economics

[email protected]

Page 2: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

1. THE GRID

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 2

Page 3: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 3

North American Electric Reliability

Corporation Interconnections

Source: Fagan, Bob, Jeremy Fisher, and Bruce Biewald, July 19, 2013, “An Expanded Analysis of the Costs and

Benefits of Base Case and Carbon Reduction Scenarios in the EIPC Process: Preliminary Results,” Synapse

Energy Economics, Inc., prepared for The Sustainable FERC Project.

3

Page 4: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 4

EIPC transmission build-out for wind, Scenario 1

4

Page 5: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

NERC regions and balancing authorities

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 5

Page 6: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Regional Transmission Organizations

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 6

Source: ISO/RTO Council (IRC)

Page 7: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Electric industry structure

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 7

Page 8: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Wholesale markets

• Energy (and reserves)

• Day ahead, hour ahead, real time

• Capacity

• Financial hedge for both sides

• Ancillary services

• All of the other stuff to make the grid reliable

• Reserves, regulation, black-start, voltage support, etc.

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 8

Page 9: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

New England Electric Generation Fuel Mix

9 www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved.

Source: Avoided Energy Supply Costs in New England: 2013 Report. Synapse Energy

Economics for the Avoided-Energy-Supply-Component Study Group, July 2013.

Page 10: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

U.S. Electric Generation Fuel Mix

10 www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved.

Source: Toward a Sustainable Future for the U.S. Power Sector: Beyond Business as Usual

2011. Synapse Energy Economics for the Civil Society Institute, November 2011.

Page 11: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

2. DISPATCH

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 11

Page 12: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Typical load on a summer day

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 12

Page 13: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Typical load on a winter day

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 13

Page 14: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Available resources, stacked by operating cost

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 14

Page 15: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Understanding supply option limitations

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 15

Page 16: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Understanding supply option limitations

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 16

Page 17: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 17

Generation displaced by EE in Chicago and New Jersey

17

50% -25%

150MW_BaseDSM_CE

50% -25%

150MW_BaseDSM_MidE

Source: Synapse model runs based on materials from J. Buonocore, P. Luckow, G. Norris, J. Spengler, B. Biewald, J. Fisher,

and J. Levy, “Public Health and Climate Impacts Offset by Energy Efficiency and Renewable Energy Measures.”

Unpublished.

Page 18: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 18

U.S. quarterly generation by fuel type

18

Source: EIA Form 923, 2001 - 2013

0

20

40

60

80

100

120

140

160

180

200

Ja

n 2

00

1

Ju

l 2

00

1

Ja

n 2

00

2

Ju

l 2

00

2

Ja

n 2

00

3

Ju

l 2

00

3

Ja

n 2

00

4

Ju

l 2

00

4

Ja

n 2

00

5

Ju

l 2

00

5

Ja

n 2

00

6

Ju

l 2

00

6

Ja

n 2

00

7

Ju

l 2

00

7

Ja

n 2

00

8

Ju

l 2

00

8

Ja

n 2

00

9

Ju

l 2

00

9

Ja

n 2

01

0

Ju

l 2

01

0

Ja

n 2

01

1

Ju

l 2

01

1

Ja

n 2

01

2

Ju

l 2

01

2

Ja

n 2

01

3

Ju

l 2

01

3

Ne

t G

en

era

tio

n (

TW

h)

Coal

Natural Gas

Nuclear

Hydro

OtherRenewables

Oil andOther

Page 19: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

3. PLANNING

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 19

Page 20: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Incremental summer capacity

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 20

“Other Renewables” includes wind, solar, and geothermal.

“Oil and Other” includes fuel oil, petroleum coke, tires, waste heat, and other miscellaneous resources.

Source: EIA 860 2001-2013. Note that 2013 data is preliminary and only available through November

2013.

Page 21: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 21

U.S. generating capacity by type

21

Source: EIA Form 860, 2001 – 2012, Electric Power Monthly

0

50

100

150

200

250

300

350

400

450

2013200319931983197319631953

Cu

mu

lative

Su

mm

er

Ca

pa

city (

GW

)

Coal

Natural Gas

Nuclear

Hydro

OtherRenewables

Oil and Other

Page 22: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Energy efficiency forecasts

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 22

Page 23: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Minnesota Power’s 2009 electric utility forecast

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 23

Page 24: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Environmental Compliance Obligations

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 24

Page 25: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Commodity Prices

Review of CO2 price

assumptions are

critical.

Does price include

“allowances.” If so,

what assumptions

underlie those

allowances? Does it

rise faster than

inflation? Or much,

much slower?

Zero is a strong

forecast.

25 www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved.

Page 26: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 26

Schiller 4 and 6 net revenue

Source: Synapse. Economic Analysis of Schiller Station Coal Units. 2011.

Page 27: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Poor electric system planning practice

• Passive attitude toward information

• Rely on out-of-date construction cost estimates

• Consider only “existing” environmental regulations

• Ignore CO2 price, or treat it “at the end” as a sensitivity

case

• Assume existing plants continue to operate

• Overly constrain alternatives such as renewables and

energy efficiency

IMPRUDENT!

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 27

Page 28: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Good electric system planning practice

• Actively seek out relevant information

• Rely on up-to-date and realistic construction cost estimates

• Anticipate reasonably likely future environmental regulations

• Include reasonable CO2 price forecast in the reference case, and analyze high and low sensitivities

• Evaluate continued operation vs. retirement options for existing plants

• Include full consideration of alternatives

PRUDENT

www.synapse-energy.com | ©2014 Synapse Energy

Economics Inc. All rights reserved. 28

Page 29: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

4. RELIABILITY

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 29

Page 30: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Requirement: reserves and reliability

• Planning Reserve: Reserve requirements to provide

capacity adequacy based on rigorous analysis of system

characteristics and proper treatment of intermittent

resources

• Planning reserve margin of approx. 12 – 18%

• Operating Reserve: Short term (day ahead, week ahead)

requirements

• Spin, non-spin, and regulation (and load-following)

• Covers contingency requirements and forecast uncertainties

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 30

Page 31: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Illustrative Lead Duration Curve (8,760 hours)

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 31

Page 32: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

General characteristics of utility systems that

affect reliability and reserves requirements

1. Load shape

2. Forced outage rates

3. Maintenance outage requirements

4. Number and size of generating units

5. Transmission interties with neighboring utilities

6. Availability and effectiveness of intervention procedures

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 32

Page 33: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

NERC anticipated reserve margins for summer 2012

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 33

Page 34: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

LOLE and reserve margin

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 34

Page 35: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Reliability: where did “1 in 10” standard

come from?

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 35

Page 36: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

5. RATEMAKING

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 36

Page 37: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Utility ratemaking

• Regulated Monopoly Economics

• Electric utility prices are not set by “the market.” They are

set by state public utility commissions in “rate cases”

• Fuel, O&M, purchased power, and administrative costs

are passed through as expenses

• Power plant investments are put into “ratebase” and

recovered over time with an allowed administratively

determined return on equity

• Plant investment that is not prudently incurred should be

removed from rates

• Plan investment that is not “used and useful” should be

removed from rates

37 www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved.

Page 38: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 38

Utility incentives:

Old coal plants have significant investment in rate base

38

Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Good Planning IRP and CPCN,” slide 19.

• Data from data

collected from 52 coal

plants owned by 11

utilities

• Average plant age

weighted by capacity:

~47 years

• Average plant

capacity: ~675 MW

• Average unrecovered

plant balance:

~$336/kW

• Average unrecovered

balance as a

percentage of Total

Plant Balance: 50%

Page 39: HOW THE ELECTRIC GRID WORKS: DISPATCH, PLANNING, AND …€¦ · Source: Presentation by Bruce Biewald, August 8, 2013, “Synapse 2013 Technical Training. Session 3: Components of

Presence or absence of State IRP rules

and procurement plan filing requirements

www.synapse-energy.com | ©2014 Synapse Energy Economics Inc. All rights reserved. 39