सेप्िटक टैंक चतुरिनर्माण - बनावट सम्बन्धी गाइड मम्टी बुिनयाद बीम मुंडेर िपल्लर यह ढांचा कंक्रीट का बना है िजसमे
4

how it is calculated? यह किस प्रकार के निर्माण के लिए है?

Dec 31, 2016

Download

Documents

donhu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • -

  • 3

    14

    21

    -

    1 3 2

    3 4

    6

    7

    8

    5

  • Chatur Nirmaan - structure manual

    SEPTIC TANK

    MUMTY

    BEAM

    PARAPET

    COLUMN

    The structure is RCC (reinforced cement concrete) frame made of rcc columns, beams and slabs with brick infill

  • Chatur Nirmaan - structure manual

    3

    remove props under slabs only after 14 days of casting

    next slab to be cast min after 21 days of the previous slab

    cure the slab for 7 days

    1 the foundation should be at least 3 deep 2 all columns should be the same size, like a table should have same size legs

    3 beams are needed to support the slabs at each floor

    4 a strong house requires a tie beam at the plinth level

    6 Time for curing

    7 waterproofing on the terrace and plaster outside is compulsory to avoid seepage

    8 if you dont have a public sewage supply and want to build a toilet, then you must build a septic tank

    5 the stirrups should be more closely spaced at all junctions and should be bint at 45