    Houston Airport

    MarriottJuly 2013

  • 7/29/2019 Houston Airport Marriott

    2/22

    Introduction to Host

    S&P 500 and Fortune 500 company

    Largest lodging REIT, $18 billion total market value

    Portfolio of irreplaceable assets in premier markets:

    Consolidated Portfolio + Joint Ventures: 145 hotels

    4 hotels in Houston Houston Airport Marriott, JW Houston Galleria,

    Houston Marriott Texas Medical Center and The St. Regis Houston

    11 airport hotels

    Hotels managed by best operators under strongestbrand names

    2

  • 7/29/2019 Houston Airport Marriott

    3/22

    Host Credentials

    Manage over $500 million annual capital investmentplan (over $3.1 billion since 2007)

    Technical specialists in design, architecture,

    engineering, procurement, project management,estimating and sustainability

    Strategic relationships + scale ensure favorable pricing

    and quality workmanship from vendors, suppliers,consultants and contractors

    3

  • 7/29/2019 Houston Airport Marriott

    4/22

    Lobby / Great Room Elements

    State-of-the-art, high-energy lobby to elevate thecustomer experience

    3-meal-a-day dining / lobby bar concept

    Expansive lobby seating area

    New guest reception experience

    Relocate and upgrade fitness facility

    4

  • 7/29/2019 Houston Airport Marriott

    5/22

    Conceptual Lobby Layout

    5

    BEFORE

  • 7/29/2019 Houston Airport Marriott

    6/22

    Conceptual Lobby Layout

    6

    BAR

    PANTRY

    BUFFETBAR LOUNGE

    RESTAURANT

    DINING

    SERV.

    LOBBY LOUNGE

    ADDITIONAL

    SEATING

    ADDITIONAL

    SEATING REGISTRATION AFTER

  • 7/29/2019 Houston Airport Marriott

    7/22

    Reception Desk

    7

  • 7/29/2019 Houston Airport Marriott

    8/22

    Lobby Lounge - Feature Wall

    8

  • 7/29/2019 Houston Airport Marriott

    9/22

    Bar Concept

    9

  • 7/29/2019 Houston Airport Marriott

    10/22

    Design Inspiration

    10

  • 7/29/2019 Houston Airport Marriott

    11/22

    Restaurant Concept

    11

  • 7/29/2019 Houston Airport Marriott

    12/22

    Feature Wall

    12

  • 7/29/2019 Houston Airport Marriott

    13/22

    Public Area & Grand Stair Concept

    13

  • 7/29/2019 Houston Airport Marriott

    14/22

    Tram Level Concept

    14

    Existing Tram Level

    Tram Level Design Concept

  • 7/29/2019 Houston Airport Marriott

    15/22

    Guestroom

    15

    Before: Existing typical king guestroom

    After: Typical king guestroom (Chicago Marriott OHare)

  • 7/29/2019 Houston Airport Marriott

    16/22

    Comparable Renovations

    16

    Chicago Marriott OHareLobby / Great Room

  • 7/29/2019 Houston Airport Marriott

    17/22

    Recent Renovations

    17

    Chicago Marriott Suites OHare

  • 7/29/2019 Houston Airport Marriott

    18/22

    Recent Renovations

    18

    Washington Dulles

    Airport MarriottGreat Room

  • 7/29/2019 Houston Airport Marriott

    19/22

    Business Terms

    40-year lease

    $40.5 million capital investment

    $6.0 million within first year $34.5 million within 42 months

    Rent = 10% of gross revenue

    Minimum annual rent is $1,560,000

    No additional hotels in the terminal complex within10 years from the effective date

    19

  • 7/29/2019 Houston Airport Marriott

    20/22

    Community Impact

    175-200 jobs created during renovation

    Industry day MWBE construction goal (and ACDBE concession goal)

    LEED concepts and comprehensive sustainability program

    Recycling construction and packaging waste Installation of energy and water saving devices Use of recycled products

    Donate beds, furniture and other materials to localcharities

    20

  • 7/29/2019 Houston Airport Marriott

    21/22

    Renovation Plan

    21

    Anticipated Construction Schedule

    Building Exterior / Grounds 3Q 2014

    Building Systems 3Q 2014

    Rooms 4Q 2014

    Lobby / Great Room 1Q 2015

    Elevators and Escalators 1Q 2015

    Ballrooms and Meeting Rooms 2Q 2016

  • 7/29/2019 Houston Airport Marriott

    22/22