Anne Inman, P.E. Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013 Hot Topics Federal Standards for the Oil and Gas Industry
19

Hot Topics Federal Standards for the Oil and Gas Industry

Feb 12, 2016

Download

Documents

kineks

Hot Topics Federal Standards for the Oil and Gas Industry. Anne Inman, P.E. Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013. New and Revised Federal Requirements. New NSPS OOOO Revised NESHAP HH and HHH Proposed August 23, 2011 - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hot Topics  Federal Standards for the  Oil and Gas Industry

Anne Inman, P.E.Air Permits Division

Texas Commission on Environmental QualityEnvironmental Trade Fair 2013

Hot Topics Federal Standards for the

Oil and Gas Industry

Page 2: Hot Topics  Federal Standards for the  Oil and Gas Industry

New◦NSPS OOOO

Revised◦NESHAP HH and HHH

Proposed August 23, 2011 Final Published August 16, 2012 Effective Date October 15, 2012

New and Revised Federal Requirements

Page 3: Hot Topics  Federal Standards for the  Oil and Gas Industry

Affected Facilities◦Natural gas well completions◦Storage vessels◦Compressors◦Pneumatic controllers◦Glycol dehydrators ◦Gas plants fugitives and treatment units

NSPS OOOO, NESHAP HH AND HHH

Page 4: Hot Topics  Federal Standards for the  Oil and Gas Industry

Focuses on reducing VOCs from hydraulically fractured natural gas wells during the flowback period. Phased Requirements for Green

Completions Exceptions for Wildcat, Delineation,

and Low Pressure Wells Includes Pre-completion Notification

and Annual Reporting Requirements

Fracked Natural Gas Wells

Page 5: Hot Topics  Federal Standards for the  Oil and Gas Industry

Jurisdiction? Any New Guidance? How Do I Notify?

Well Completion/Flowback Notification is now done through e-mail using a form that can be found on our website.

Well Completion / Flowback Notification

Common Questions

Page 6: Hot Topics  Federal Standards for the  Oil and Gas Industry

Well Completion/Flowback Notification Form

Page 7: Hot Topics  Federal Standards for the  Oil and Gas Industry

Applicable Statewide or Just at the Wellhead?

Temporary Tanks(<180 days)

After Controls?Potential to Emit (PTE) is on a Per Tank

BasisOnce In – Always In?

Common Tank Questions

Page 8: Hot Topics  Federal Standards for the  Oil and Gas Industry

Centrifugal & Reciprocating Compressors (Manufactured, Initially Installed but Not Relocated)

New and Replacement Pneumatic Controllers From Gas Wells to Processing Plants

Additional Requirements Summary

Page 9: Hot Topics  Federal Standards for the  Oil and Gas Industry

Sweetening Units & Fugitives at Gas Plants Glycol Dehydrators (Small and Large at

Major Sites)

Additional Requirements Summary

(cont’d)

Page 10: Hot Topics  Federal Standards for the  Oil and Gas Industry

August 23, 2011 Applicability Based on New or Modified

August 23, 2011 ApplicabilityBased on New or Modified

Hydraulically Fractured Natural Gas Well Completion (Flowback)

Tanks

Centrifugal Compressors With Wet Seals

Reciprocating Compressors

Small and Large Dehydrators

Page 11: Hot Topics  Federal Standards for the  Oil and Gas Industry

October 15, 2012 Applicability

Reciprocating Compressors Rod Packing Tracking

o 3-year, or

o 26,000 run-time hours

Continuous Bleed Pneumatic Controllers at Gas Plants With No Bleed Controllers

October 15, 2012 Applicability

Well Flowback Emissions to Flare (or Voluntary to REC)

Centrifugal Compressors (Wet Seals) Controlled 95%

Page 12: Hot Topics  Federal Standards for the  Oil and Gas Industry

October 12, 2012 Applicability (cont’d)

Fugitives at Gas Plants LDAR (500 ppm)

Sweetening Units at Gas Plants (Up to 99.9%)

New Small Dehydrators (Value)

New Large Dehydrators (95%)

ALL No Exceptions for Start-up, Shut-downs, or Malfunctions (VOC and SO2)

Page 13: Hot Topics  Federal Standards for the  Oil and Gas Industry

October 15, 2013 Applicability

October 15, 2013 Applicability

Continuous Bleed Pneumatic Controllers at Wellhead to Gas Plants With Low Bleed Controllers

Tank VOC Reduction 95%

Page 14: Hot Topics  Federal Standards for the  Oil and Gas Industry

January 15, 2015 Applicability

January 15, 2015 Applicability

Gas Well Flowback Emissions to REC and Flare (100% Capture/Control)

Page 15: Hot Topics  Federal Standards for the  Oil and Gas Industry

October 15, 2015 Applicability

October 15, 2015 Applicability

Existing Small Dehydrators (Value)

Existing Large Dehydrators (95%)

Page 16: Hot Topics  Federal Standards for the  Oil and Gas Industry

If New Site/New EquipmentShow compliance with or non-applicability of NSPS OOOO in application using PI-7-CERT or APD-CERT

If Existing Site/EquipmentUse APD-CERT to show compliance with or non-applicability of NSPS OOOO

Applicability Forms

Page 17: Hot Topics  Federal Standards for the  Oil and Gas Industry

Enforceable Limit Control/Destruction Efficiency Claims Operating Hours

Why/When Do I Need to Certify?

Page 18: Hot Topics  Federal Standards for the  Oil and Gas Industry

www.texasoilandgashelp.org [email protected] Air Permits Main line: (512) 239-1250 Small Business and Environmental

Assistance: 1-800-447-2827 or www.TexasEnviroHelp.org

Where to Find More Information