Top Banner
a generation ahead by design Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage Facility By: Joy Russell VP Corporate Business Development C.I.S. A Partnership of Holtec and ELEA for Consolidated Interim Storage
17

Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

Jul 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage Facility

By: Joy Russell

VP Corporate Business Development

C.I.S.A Partnership of Holtec and ELEA

for Consolidated Interim Storage

Page 2: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

Why Consolidated Storage?

Holtec Overview

ELEA Overview

Holtec’s Proposed

Technical Solution

Timeline

Conclusion

2

Contents

Page 3: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

3

Some Storage Is In The Most Densely Populated Areas of U.S.

D&D Plant Sites Want to Turn Them Back To Green Fields

Transportation of SNF & HLW is Proven Safe—Thousands of Tons

Radioactivity Decreases Rapidly with Time. Gamma & Heat Decay

Breach of Contracts - DOE Required To Take SNF In 1998

‒ Settlement Fund Will Pay Out $20 Billion by 2020 From Treasury

‒ After 2020 Will Pay $500 Million Per Year Until CIS or Repository

Dispels Arguments There Are No Solutions For SNF

Why Consolidated Interim Storage?

Page 4: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

4

Established in USA since 1986

Annual Revenues: Over $500

Million USD

Backlog: 6.0 Billion USD

Over 1000 employees

No history of long-term debt

Self financed company growth –

D&B (5A2)

Power Generation Technologies

61 Patents plus 29 Pending

1,000,000 Square Feet of

Manufacturing-USA

Corporate Technology Center

Marlton, NJ

Headquarters

Jupiter, FL

Turtle Creek, PAOrrvilon, OH

Holtec International Company Overview

Page 5: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

5

Heat Transfer Equipment In-pool Spent Fuel Storage Racks

Spent Fuel and Non-Fuel Waste

Dry Storage and Transport Casks

Dry Spent Fuel Loading Equipment Vertical Air Cooled CondensersTechnical and Consulting Services

A Global Leader in Power Generation Technologies

Page 6: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

6

101 nuclear plants worldwide rely on Holtec’s dry storage technology

for their storage and transport needs; 59 domestic, 42 international

Holtec’s Worldwide Dry Storage and Transport Experience

Page 7: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

Holtec’s Dry Storage &Transport Expertise

Holtec offers a complete line of equipment for dry fuel storage and transportation

101 plants worldwide (59 in the U.S.) are under contract for use of Holtec’s dry storage systems

Over 770 Holtec canisters have been successfully loaded

– This number grows by 70-90 canisters per year

Holtec’s experience includes PFS & Ukraine’s Central Storage

7

Page 8: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

8

Who is the EDDY-LEA Alliance?

Alliance of the Cities of Carlsbad &

Hobbs and the Counties of Eddy &

Lea

Formed Under the Local Economic

Development Act (LEDA) for

Economic Development Purposes

in 2006 & to Respond to Global

Nuclear Energy Partnership

(GNEP) Proposal from DOE

ELEA purchased 1,000 acres of

land approximately halfway

between Carlsbad and Hobbs,

N.M. for potential use

Page 9: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

Why the ELEA Site?

Land studied extensively during Global Nuclear Energy Partnership (GNEP) process

Remote location

Geologic stability

Dry area

Infrastructure present, including rail

Preexisting robust scientific and nuclear operations workforce

STRONG CONSENT FROM AREA

9

Page 10: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

10

Page 11: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

11

R

E

T

R

I

E

V

A

B

L

E

Holtec’s Proposed Technical Solution

HI-STORM UMAX (Holtec International STORage Module Universal

MAXimum security)

Complete physical protection by storing the fuel below grade in

reinforced vertical silos

Corrosion-Resistant

Stainless Steel Spent

Fuel Canister

Steel

Liner

Steel/Concrete

Lid

Reinforced Concrete

Base Mat

Reinforced Concrete

Top Pad

Page 12: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

HI-STORM UMAX = Safe & Secure

Safety: Utilizes the sub grade

during storage for superior radiation

protection to workers and public and

to the stored contents from dangers

presented by earthquakes and other

extreme environmental phenomena

such as hurricanes, tornado borne

missiles, earthquakes, tsunamis

Security: The above ground

height of the HI-STORM UMAX is

below waist height making the

facility visibly inconspicuous &

provides a clear, unobstructed view

of the entire facility from any

location12

Page 13: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

HI-STORM UMAX ISFSI Location at San Onofre Site

HI-STORM UMAX has already been

constructed at Ameren Missouri's

Callaway Nuclear Plant

In December 2014, Southern

California Edison selected the HI-

STORM UMAX for storing the used

nuclear fuel from the

Decommissioned San Onofre NPP

HI-STORM UMAX was selected

because it is robust, can withstand

the enhanced earthquake

conditions, low sight line, and was

flexible in layout design

ISFSI

Completed HI-STORM UMAX ISFSI at Callaway

HI-STORM UMAX = Economical & Proven

Page 14: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

Phase 1 includes design, licensing, construction and operation of the

storage facility as a pilot site to store:

– the entire complement of Holtec canisters currently deployed at Independent

Spent Fuel Storage Installations (ISFSI) around the country,

– a prospective client, Wolf Creek, which can avail itself of the ELEA CIS

facility without having to establish an onsite ISFSI, and

– all canisters from shutdown plants and near term shutdown plants

(Connecticut Yankee, Humboldt Bay, Kewaunee, La Crosse, Maine Yankee,

Millstone Unit 1, Oyster Creek, Rancho Seco, SONGS, Trojan, Yankee

Rowe, and Zion).

– Phase 1 includes design, licensing, construction and operation of the storage

facility as a pilot site to store:

Phase 2 includes further expansion of cask contents in HI-STORM

UMAX to include all other canisters deployed at presently operating

ISFSIs in the U.S.14

Approach to Establish the CIS

Page 15: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

15

Submit an amendment to the HI-STORM UMAX docket # 72-

1040 that will expand the allowable contents

Submit a site-specific license application for the CIS on the

ELEA site

The ELEA site specific licensing application will invoke the HI-

STORM UMAX FSAR by reference

Approach to Licensing

Page 16: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

16

Letter of Intent Submitted to NRC ……….Aug 3, 2015

Pre-Application Meeting with NRC………...Dec 1, 2015

Application Submittal to NRC……………….Jun 1, 2016

Safety Evaluation Report…………………….Oct 30, 2018

License Issued…………………………………Jan 30, 2019

Construction Phase I Begins………………..Apr 1, 2019

Operations Begin……………………………...Apr 1, 2020

Preliminary Licensing & Construction Schedule

Page 17: Holtec & ELEA, LLC’s Vision for a Consolidated Interim Storage … · 2015-09-15 · Dry Spent Fuel Loading Equipment Vertical Air Cooled Condensers Technical and Consulting Services

a generation ahead by design

17

CIS is a viable short-term solution for SNF

The ELEA NM Site can be made available in Five years

There are no technical impediments

Holtec UMAX System is Certified by the NRC

Benefits to NM are measured in Revenues and Jobs

Conclusions