Top Banner
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010
13

HO Upgrade: QC and Production Preparation in India

Jan 13, 2016

Download

Documents

posy

HO Upgrade: QC and Production Preparation in India. Shashi Dugad India-CMS Meeting, BARC 30 July 2010. 2009 version of SiPM control board fabricated and assembled in Jan 2010 I t was tested at FNAL by Sergey…. worked flawlessly. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HO Upgrade: QC and Production Preparation in India

1

HO Upgrade: QC and Production Preparation in India

Shashi Dugad

India-CMS Meeting, BARC

30 July 2010

Page 2: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

22

– 2009 version of SiPM control board fabricated and assembled in Jan 2010

• It was tested at FNAL by Sergey…. worked flawlessly.

– Order for production version has been placed with same company in June-2010

• Pilot production PCB fabrication is in process• Pilot production boards will be tested at FNAL/CERN

after which bulk order for fabrication for all 3 rings can be given.

– Plan to make control boards for entire HO in India• Quality control of all boards to be done at CRL, Ooty

SiPM Control Board Status

DUGAD
Page 3: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

3

SiPM Control Board

Fabricated in Indian company by CRL, Ooty in Jan.2010

Page 4: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

4

Quality Control of SiPM Board

– QC testing of SiPM boards at CRL, Ooty• Standalone DAQ

• External amplifiers (developed by Princeton) will be used for SiPM readout (no QIE Electronics)

• 3 preamp boards required for testing were fabricated by Princeton (Chris etal.) in April-2010. Will be read out via VME.

• Prototype test stand for QC set up.

• Team: Arjan, Rajesh, Shashi

Page 5: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

5

Test Setup developed at CERN with Cascade-Amplifier as Front End

Team: A. Heering, B. Rajesh, Shashi

Page 6: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

6

Results from CERN-B28 Setup

Page 7: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

7

Summary of B28 Results

Page 8: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

8

Quality Control of SiPM at CRL, Ooty

• Standalone DAQ at CERN and Ooty developed with VME readout under Linux

• Trigger rate of > 1kHz achieved with good data integrity

• Prototype system with Princeton’s amplifier works well (single p.e. resolution)

• This working prototype framework will be expanded to further automate quality control of SiPM boards

Page 9: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

9

I2C Box

Slow Control

Amp Bias Monitor

Data Taking SETUP at CRL, Ooty

9

Page 10: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

10

First results – Day 1LED + Pedestal Distributions

Pedestal

LED

Tail

10

Page 11: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

1111

Amplifier Bias voltage 9.5 ( file No 220)

1 pixel ~ 5.2 counts

1 pixel ~ 4.91 counts

11

Page 12: HO Upgrade: QC and Production Preparation in India

• The I2C cable shielded with Aluminum foil and the I2C box kept away from the control card• Amplifiers mounted on Perspex and bias connected for all 3 cards

Data taking setup

12

Page 13: HO Upgrade: QC and Production Preparation in India

Shashi Dugad, ECR Meeting, 28 July 2010

13

Summary

• Pilot production version of Control board will be ready within a month after receiving all files (Gerbers & assembly) from FNAL

• Production and QC of all control boards and SiPM mounting board to be carried out at CRL, Ooty

• Good progress on the quality control setup at CRL, Ooty

• Data taking at CRL, Ooty able to resolve single p.e. after modifying mounting arrangement for amplifiers