*Divisi 6 - Pekerasan Aspal
AHSP
ANALISA HARGA SATUAN PEKERJAAN
PROYEK:
NAMA PAKET:
NO. MATA PEMBAYARAN: 6.3 (5)No. Mata Pembayaran sesuai
Spesifikasi versi Prasarana Wilayah
JENIS PEKERJAAN: Laston (AC) - WC Superpave
SATUAN PEMBAYARAN: M2
KOEFFISIENHARGAJUMLAH
NO.KOMPONENSATUANKUANTITASSATUANHARGA
(Rp.)(Rp.)
A.TENAGA
1.Pekerja(L01)Jam0.02753,250.0089.25
2.Mandor(L03)Jam0.00276,500.0017.85
JUMLAH HARGA TENAGA107.10
B.BAHAN
1.Agregat Kasar(M03)M30.0460107,714.494,956.98
2.Agregat Halus(M04)M30.0290111,660.383,241.44
3Filler Added(M05)Kg2.450660.00147.03Aspal
4Aspal(M10)Kg6.41552,512.0016,115.7450.52%
JUMLAH HARGA BAHAN24,461.18
C.PERALATAN
1.Wheel Loader(E15)Jam0.0016173,787.47270.42
2.AMP(E01)Jam0.00271,295,624.883,557.91
3.Genset(E12)Jam0.0027125,701.34345.19
4.Dump Truck(E09)Jam0.0132100,637.531,325.76
5.Asp. Finisher(E02)Jam0.0020196,092.09390.18
6.Tandem Roller(E17)Jam0.0026103,729.55272.97
7Pnm. Tyre Roller(E18)Jam0.0015114,427.23167.29
8Alat BantuLs11,000.001,000.00
JUMLAH HARGA PERALATAN7,329.72
D.JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
)31,898.00
E.OVERHEAD & PROFIT15.0% x D4,784.70
F.HARGA SATUAN PEKERJAAN ( D + E )36,682.70
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga
Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2Kuantitas satuan adalah kuantitas setiap komponen untuk
menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
habis dipakai dan operator.
4Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak
yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Koef Qty
MENGHITUNG KOEFFISIEN KUANTITAS BAHAN, ALAT DAN TENAGA
NO. MATA PEMBAYARAN: 6.3 (5)No. Mata Pembayaran sesuai
Spesifikasi versi Prasarana Wilayah
JENIS PEKERJAAN: Laston (AC) - WC Superpave
SATUAN PEMBAYARAN: M2
No.U R A I A NKODEKOEF.SATUANKETERANGAN
I.ASUMSI
1Menggunakan alat berat (cara mekanik)---
2Lokasi pekerjaan : sepanjang jalan---
3Kondisi existing jalan : sedang---
4Jarak rata-rata Base Camp ke lokasi pekerjaanL20.0KM
5Tebal Lapis (AC-WC) padatt0.05M
6Jam kerja efektif per-hariTk7.00Jam
7Faktor kehilanganmaterial :- AgregatFh11.10-
- AspalFh21.05-
8Komposisi campuran AC-WC :
- Coarse AgregatCA56.97%Gradasi harus -
- Fine AgregatFA35.94%memenuhi -
- Filler - AddedFF1.90%Spesifikasi
- Asphaltminimum 5 %As5.20%
9Berat jenis bahan :
- AC-WCD12.35ton / M3
- Coarse Agregat & Fine AgregatD21.60ton / M3
- Filler addedD32.00ton / M3
- AsphaltD41.03ton / M3
II.URUTAN KERJA
1Wheel Loader memuat Agregat dan Aspal ke dalam
Cold Bin AMP.
2Agregat dan aspal dicampur dan dipanaskan dengan
AMP untuk dimuat langsung kedalam Dump Truck
dan diangkut ke lokasi pekerjaan.
3Campuran panas AC dihampar dengan Asphalt Finisher dan
dipadatkan dengan Tandem & Pneumatic Tire Roller.
4Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparaan dengan menggunakan Alat Bantu.
III.PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.BAHAN
1.a.Agregat Kasar= (CA x (D1 x t M3) x Fh1) :
D2(M03)0.0460M3
1.b.Agregat Halus= (FA x (D1 x t M3) x Fh1) :
D2(M04)0.0290M3
1.c.Filler added= (FF x (D1 x t M3) x Fh1)(M05)2.4506Kg
1.d.Aspal= (AS x (D1 x t M3) x Fh2)(M10)6.4155Kg
2.ALAT
2.a.WHEEL LOADER(E15)
Kapasitas bucketV2.30M3
Faktor bucketFb0.90-
Faktor efisiensi alatFa0.76-
Waktu SiklusTs1 :
- Muat- T11.50menit
- Lain lain- T20.50menit
Ts12.00menit
NO. MATA PEMBAYARAN: 6.3 (5)No. Mata Pembayaran sesuai
Spesifikasi versi Prasarana Wilayah
JENIS PEKERJAAN: Laston (AC) - WC Superpave
SATUAN PEMBAYARAN: M2
No.U R A I A NKODEKOEF.SATUANKETERANGAN
Kap. Prod. / jam =D2 x V x Fb x Fa x 60Q1642.67M2
D1 x t x Ts1
Koefisien Alat/M2= 1 : Q1(E15)0.0016Jam
2.b.ASPHALT MIXING PLANT (AMP)(E01)
Kapasitas produksiV56.30ton / Jam
Faktor Efisiensi alatFa0.76-
Kap.Prod. / jam =V x FaQ2364.15M2
D1 x t
Koefisien Alat/M2= 1 : Q2(E01)0.0027Jam
2.c.GENERATORSET ( GENSET )(E12)
Kap.Prod. / Jam = SAMA DENGAN AMPQ3364.15M2
Koefisien Alat/M2= 1 : Q3(E12)0.0027Jam
2.d.DUMP TRUCK (DT)(E09)
Kapasitas bakV16.00ton
Faktor Efisiensi alatFa0.76-
Kecepatan rata-rata bermuatanv140KM / Jam
Kecepatan rata-rata kosongv250KM / Jam
Kapasitas AMP / batchQ2b1.00ton
Waktu menyiapkan 1 batch AC-WCTb0.80menit
Waktu SiklusTs2 :
- Mengisi Bak= (V : Q2b) x TbT112.8menit
- Angkut= (L : v1) x 60 menitT230.0menit
- Tunggu + dump + PutarT315menit
- Kembali= (L : v2) x 60 menitT424menit
Ts282menit
Kap.Prod. / jam =V x Fa x 60Q475.91M2
D1 x Ts2 x t
Koefisien Alat/M2= 1 : Q4(E09)0.0132Jam
2.e.ASPHALT FINISHER(E02)
Kapasitas produksiV77.70ton / jam
Faktor efisiensi alatFa0.76-
Kap.Prod. / jam =V x FaQ5502.57M2
D1 x t
Koefisien Alat/M2= 1 : Q5(E02)0.0020Jam
2.f.TANDEM ROLLER(E17)
Kecepatan rata-rata alatv3.00Km / Jam
Lebar efektif pemadatanb1.00M
Jumlah lintasann6lintasan
Faktor Efisiensi alatFa0.76-
JENIS PEKERJAAN: 6.3 (5)No. Mata Pembayaran sesuai Spesifikasi
versi Prasarana Wilayah
JENIS PEKERJAAN: Laston (AC) - WC Superpave
SATUAN PEMBAYARAN: M2
No.U R A I A NKODEKOEF.SATUANKETERANGAN
Kap. Prod. / jam =(v x 1000) x b x t x FaQ6380.00M2
n x t
Koefisien Alat/M2= 1 : Q6(E17)0.0026Jam
2.g.PNEUMATIC TIRE ROLLER(E18)
Kecepatan rata-ratav6.00KM / jam
Lebar efektif pemadatanb1.20M
Jumlah lintasann8lintasan
Faktor Efisiensi alatFa0.76-
Kap.Prod./jam =(v x 1000) x b x t x FaQ7684.00M2
n x t
Koefisien Alat/M2= 1 : Q7(E18)0.0015Jam
2.h.ALAT BANTU
- Rambu = 2 buahLump Sum
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
- Tongkat Kontrol ketebalan hanparan
3.TENAGA
Produksi menentukan : Asphalt Mixing Plant (AMP)Q2364.15M2 /
Jam
Produksi AC-WC / hari = Tk x Q2Qt2,549.07M2
Kebutuhan tenaga :
- PekerjaP10orang
- MandorM1orang
Koefisien Tenaga / M2 :
- Pekerja= (Tk x P) / Qt(L01)0.0275Jam
- Mandor= (Tk x M) / Qt(L03)0.0027Jam
HDS-Upah
DAFTAR
HARGA DASAR SATUAN UPAH
HARGADATA H.S.
No.U R A I A NKODESATUANSATUANSEBELUMNYA
( Rp.)( Rp.)
1.PekerjaL01Jam3,250.002,500.00
2.TukangL02Jam3,900.002,850.00
3.M a n d o rL03Jam6,500.003,250.00
4.OperatorL04Jam6,500.003,250.00
5.Pembantu OperatorL05Jam2,600.002,000.00
6.Sopir / DriverL06Jam6,500.003,250.00
7.Pembantu Sopir / DriverL07Jam2,600.002,000.00
8.MekanikL08Jam6,500.003,250.00
9.Pembantu MekanikL09Jam2,600.002,000.00
10.Kepala TukangL10Jam6,500.003,250.00
11.
12.
Status Data : Tgl. ..
HDS-Bahan
DAFTAR
HARGA DASAR SATUAN BAHAN
Tentative
HARGA
No.U R A I A NKODESATUANSATUANKETERANGAN
( Rp.)
1.P a s i rM01M344,300.00Base Camp
2.Batu KaliM02M356,200.00Lokasi Pekerjaan
3.Agregat KasarM03M3107,714.49Base Camp
4.Agregat HalusM04M3111,660.38Base Camp
5.F i l l e rM05Kg60.00Proses/Base Camp
6.Batu Belah / KerakalM06M358,200.00Lokasi Pekerjaan
7.G r a v e lM07M346,200.00Base Camp
8.Material Tanah TimbunanM08M32,500.00Borrow Pit
9.Material PilihanM09M36,500.00Quarry
10.Asphalt CementM10KG2,512.00Base Camp
11.Kerosen / Minyak TanahM11LITER1,000.00Base Camp
12.Semen / PC (40kg)M12Zak29,000.00Base Camp
M12Kg725.00Base Camp
13.Besi BetonM13Kg7,500.00Lokasi Pekerjaan
14.Kawat BetonM14Kg9,000.00Lokasi Pekerjaan
15.Kawat BronjongM15Kg9,500.00Lokasi Pekerjaan
16.S i r t uM16M339,900.00Lokasi Pekerjaan
17.Cat Marka (Non Thermoplas)M17Kg20,000.00Lokasi Pekerjaan
Cat Marka (Thermoplastic)M17Kg25,000.00Lokasi Pekerjaan
18.P a k uM18Kg3,500.00Lokasi Pekerjaan
Berlanjut ke halaman berikut
DAFTAR
HARGA DASAR SATUAN BAHAN
Tentative
HARGA
No.U R A I A NKODESATUANSATUANKETERANGAN
( Rp.)
19.Kayu PerancahM19M3625,000.00Lokasi Pekerjaan
20.B e n s i nM20LITER2,500.00Pertamina
21.S o l a rM21LITER1,912.00Pertamina
22.Minyak Pelumas / OlieM22LITER14,000.00Pertamina
23.Plastik FilterM23M215,000.00Lokasi Pekerjaan
24.Pipa Galvanis Dia. 3"M24Batang75,000.00Lokasi Pekerjaan
25.Pipa PorusM25M'12,500.00Lokasi Pekerjaan
26.Material Agr.Base Kelas AM26M396,963.33Base Camp
27.Material Agr.Base Kelas BM27M355,082.87Base Camp
28.Material Agr.Base Kelas CM28M385,237.70Base Camp
29.Material Agr.Base Kelas C2M29M3-Tidak tersedia
30.GeotextileM30M26,500.00Lokasi Pekerjaan
31.Aspal EmulsiM31Kg1,600.00Base Camp
32.Gebalan RumputM32M25,000.00Lokasi Pekerjaan
33.ThinnerM33LITER4,500.00Lokasi Pekerjaan
34.Glass BeadM34Kg15,000.00Lokasi Pekerjaan
35.Pelat Rambu (Eng. Grade)M35BH75,000.00Lokasi Pekerjaan
Pelat Rambu (High I. Grade)M35BH100,000.00Lokasi Pekerjaan
36.Rel PengamanM36M'50,000.00Lokasi Pekerjaan
Berlanjut ke halaman berikut
DAFTAR
HARGA DASAR SATUAN BAHAN
Tentative
HARGA
No.U R A I A NKODESATUANSATUANKETERANGAN
( Rp.)
37.Beton K-250M37M3514,245.58Lokasi Pekerjaan
38.Beton K-225M38M3474,315.13Lokasi Pekerjaan
39.Baja Tulangan (Polos)M39aKg7,500.00Lokasi Pekerjaan
Baja Tulangan (Ulir)M39bKg7,500.00Lokasi Pekerjaan
40.KapurM40M3120,000.00Hasil Proses
41.ChippingM41M3107,714.49Base Camp
Kg57.15Base Camp
42.CatM42Kg20,000.00Base Camp
43.Pemantul Cahaya (Reflector)M43Bh.4,750.00Base Camp
44.Pasir UrugM44M339,300.00Base Camp
45.ArbocellM45Kg.22,000.00Base Camp
46.Pipa Baja BergelombangM46Kg7,500.00Lokasi Pekerjaan
47.Beton K-125M47M3319,099.00Lokasi Pekerjaan
48.Baja StrukturM48Kg5,500.00Pelabuhan
49.Tiang Pancang BajaM49M'1,681,625.16Lokasi Pekerjaan
50.T. Pancang Beton PratekanM50M32,500,000Pelabuhan
51.Kawat LasM51Dos60,000.00Lokasi Pekerjaan
52.Pipa BajaM52Kg4,500.00Pelabuhan
53.Minyak FluksM53Liter1,250.00Base Camp
54.AsbutonM54Kg450.00Base Camp
DAFTAR
HARGA DASAR SATUAN BAHAN
KHUSUS HARGA ASPAL EDISI FEBRUARI 2003
(SUMBER DATA : PEMDA DKI JAKARTA)
Tentative
HARGA
No.U R A I A NKODESATUANSATUANKETERANGAN
( Rp.)
I.ASPAL CURAH
1.CALTEXM 10-aKg2,750.00Base Camp
2.ESSOM 10-bKg2,512.00Base Camp
3.SHELLM 10-cKg2,285.00Base Camp
4.BPM 10-dKg2,044.00Base Camp
5.PERTAMINAM 10-eKg2,275.00Base Camp
II.DRUM
1.CALTEXM 10-fKg3,000.00Base Camp
2.ESSOM 10-gKg3,488.00Base Camp
3.SHELLM 10-hKg2,512.00Base Camp
4.NIOC (EX IRAN)M 10-iKg2,345.00Base Camp
5.PERTAMINAM 10-jKg2,700.00Base Camp
Catatan : Harga Aspal Curah +/- USD 240,- / kg.
HS Komp Bhn
ITEM PEMBAYARAN: AGREGAT KELAS A
JENIS PEKERJAAN: PENGADAAN AGREGAT KELAS A
SATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUAN
No.U R A I A NKODEKOEFISIENSATUANKETERANGAN
IASUMSI
$1Bahan dasar (Batu dan Pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
$2Kegiatan dilakukan di dalam lokasi Base Camp
$3Proporsi campuran (Spesifikasi) :- Agregat HalusAh45.00%
- Agregat KasarAk55.00%
$4Hasil produksi Alat Pemecah Batu :- Agregat HalusH30.00%
- Agregat KasarK70.00%
$5Berat Jenis Bahan :- Batu / GravelD11.80Ton/M3
- PasirD21.67Ton/M3
- Batu PecahD31.80Ton/M3
$6Harga Satuan Bahan Dasar :- Batu KaliRp156,200.00Rp./M3
- PasirRp244,300.00Rp./M3
$7Biaya Operasi Alat :- Pemecah Batu (Stone
Crusher)Rp3357,580.05Rp./Jam
- Wheel LoaderRp4130,095.21Rp./Jam
$8Kapasitas Alat :- Pemecah Batu (Stone
Crusher)Cp130.00Ton/Jam
- Wheel LoaderCp21.50M3Kap. Bucket
$9Faktor Efisiensi Alat :- Pemecah Batu (Stone
Crusher)Fa10.70-
- Wheel LoaderFa20.83-
$10Faktor Kehilangan MaterialFh1.10-
IIMETHODE PELAKSANAAN
$1Wheel Loader mengangkut batu/gravel dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.
$2Batu/gravel dipecah dengan Alat Pemecah Batu
(Stone Crusher) sehingga menghasilkan Agregat
Kasar dan Agregat Halus.
$3Wheel Loader melakukan pencampuran (blending)
Agregat Kasar, Agregat Halus dan Pasir menjadi
Agregat Kelas A.
IIIPERHITUNGAN
III.1.HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHER
1.a.Kerja Stone Crusher memecah gravel :
- Waktu kerja Stone CrusherTst1.00Jam
- Produksi Stone Crusher 1 jam= (Fa1 x Cp1) :
D3Qb11.67M3/JamBatu pecah
- Kebutuhan batu/gravel 1 jam= (Fa1 x Cp1) : D1Qg11.67M3/Jam
1.b.Kerja Wheel Loader melayani Stone Crusher :
- Kap. Angkut / rit = (Fa2 x Cp2)Ka1.25M3
- Waktu Siklus (Muat, Tuang, Tunggu, dll)Ts2.00menit
- Waktu kerja W.Loader memasok gravel
= {(Qg : Ka) x Ts} : 60 menitTw0.31Jam
1.c.Biaya Produksi Batu Pecah / M3
= {(Tst x Rp3) + (Tw x Rp4)} : QbBp34,132.86Rp./M3
1.d.Harga Satuan Batu Pecah Produksi St.Crusher / M3
= {(Qg : Qb) x Fh x Rp1} + BpHSb95,952.86Rp./M3
Berlanjut
ITEM PEMBAYARAN: AGREGAT KELAS A
JENIS PEKERJAAN: PENGADAAN AGREGAT KELAS A
SATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUAN
Lanjutan 1
No.U R A I A NKODEKOEFISIENSATUANKETERANGAN
III.2.HARGA SATUAN AGREGAT KASAR
Harga Satuan Agregat Kasar diambil sama dengan
Agregat Batu Pecah Produksi Stone Crusher
Harga Satuan Agregat Kasar / M3HSAk95,952.86RupiahDi Luar
PPN
III.3.HARGA SATUAN AGREGAT HALUS
Dianggap Agregat produksi Stone Crusher yang lolos
saringan # 4 (4.75 mm) belum memenuhi Spesifikasi
sehingga perlu dicampur lagi dengan pasir 10 %
3.a.Agregat Hasil Stone Crusher= 90 % x
HSbHs191,155.21Rupiah
3.b.P a s i r= 10 % x Rp2Hs22,215.00Rupiah
3.c.Waktu pencampuran (blending) dengan Wheel
LoaderTc0.033Jam/M3
3.d.Biaya Pencampuran= Tc x Rp4Hs34,293.14Rupiah
Harga Satuan Agregat Halus / M3
= Hs1 + Hs2 + Hs3HSAh97,663.36RupiahDi luar PPN
III.4.PROSES PENCAMPURAN AGREGAT KELAS A
Untuk setiap 1 M3 Agregat Kelas A, diperlukan :
4.a.- Agregat Kasar= Ak x 1 M3Vk0.550M3
- Agregat Halus= Ah x 1 M3Vh0.450M3
- Total volume batu pecah = Vk + VhVa1.000M3
4.c.Waktu pencampuran (blending) oleh Wheel
LoaderTc0.033Jam/M3
III.5.HARGA SATUAN BAHAN AGREGAT KELAS A
5.a.Agregat Kasar= Vk x HSAkHs152,774.07Rupiah
5.b.Agregat Halus= Vh x HSAhHs243,948.51Rupiah
5.c.Biaya Pencampuran= Tc x Rp4Hs34,336.51Rupiah
5.d.Harga Satuan Agregat Kelas A / M3
= Hs1 + Hs2 + Hs3HSAA101,059.09RupiahDi luar PPN
ITEM PEMBAYARAN: AGREGAT KELAS B
JENIS PEKERJAAN: PENGADAAN AGREGAT KELAS B
SATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUAN
No.U R A I A NKODEKOEFISIENSATUANKETERANGAN
IASUMSI
$1Bahan dasar (Batu dan Pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
$2Kegiatan dilakukan di dalam lokasi Base Camp
$3Proporsi campuran (Spesifikasi) :- Agregat HalusAh25.00%
- Agregat KasarAk75.00%
$4Hasil produksi Alat Pemecah Batu :- Agregat HalusH30.00%
- Agregat KasarK70.00%
$5Berat Jenis Bahan :- Batu / GravelD11.80Ton/M3
- PasirD21.67Ton/M3
- Batu PecahD31.80Ton/M3
$6Harga Satuan Bahan Dasar :- Batu KaliRp156,200.00Rp./M3
- PasirRp244,300.00Rp./M3
$7Biaya Operasi Alat :- Pemecah Batu (Stone
Crusher)Rp3357,580.05Rp./Jam
- Wheel LoaderRp4130,095.21Rp./Jam
$8Kapasitas Alat :- Pemecah Batu (Stone
Crusher)Cp130.00Ton/Jam
- Wheel LoaderCp21.50M3Kap. Bucket
$9Faktor Efisiensi Alat :- Pemecah Batu (Stone
Crusher)Fa10.70-
- Wheel LoaderFa20.83-
$10Faktor Kehilangan MaterialFh1.10-
IIMETHODE PELAKSANAAN
$1Wheel Loader mengangkut batu/gravel dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.
$2Batu/gravel dipecah dengan Alat Pemecah Batu
(Stone Crusher) sehingga menghasilkan Agregat
Kasar dan Agregat Halus.
$3Wheel Loader melakukan pencampuran (blending)
Agregat Kasar, Agregat Halus dan Pasir menjadi
Agregat Kelas B.
IIIPERHITUNGAN
III.1.HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHER
1.a.Kerja Stone Crusher memecah gravel :
- Waktu kerja Stone CrusherTst1.00Jam
- Produksi Stone Crusher 1 jam= (Fa1 x Cp1) :
D3Qb11.67M3/JamBatu pecah
- Kebutuhan batu/gravel 1 jam= (Fa1 x Cp1) : D1Qg11.67M3/Jam
1.b.Kerja Wheel Loader melayani Stone Crusher :
- Kap. Angkut / rit = (Fa2 x Cp2)Ka1.25M3
- Waktu Siklus (Muat, Tuang, Tunggu, dll)Ts2.00menit
- Waktu kerja W.Loader memasok gravel
= {(Qg : Ka) x Ts} : 60 menitTw0.31Jam
1.c.Biaya Produksi Batu Pecah / M3
= {(Tst x Rp3) + (Tw x Rp4)} : QbBp34,132.86Rp./M3
1.d.Harga Satuan Batu Pecah Produksi St.Crusher / M3
= {(Qg : Qb) x Fh x Rp1} + BpHSb95,952.86Rp./M3
Berlanjut
ITEM PEMBAYARAN: AGREGAT KELAS B
JENIS PEKERJAAN: PENGADAAN AGREGAT KELAS B
SATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUAN
Lanjutan 1
No.U R A I A NKODEKOEFISIENSATUANKETERANGAN
III.2.HARGA SATUAN AGREGAT KASAR
Harga Satuan Agregat Kasar diambil sama dengan
Agregat Batu Pecah Produksi Stone Crusher
Harga Satuan Agregat Kasar / M3HSAk95,952.86RupiahDi Luar
PPN
III.3.HARGA SATUAN AGREGAT HALUS
Dianggap Agregat produksi Stone Crusher yang lolos
saringan # 4 (4.75 mm) belum memenuhi Spesifikasi
sehingga perlu dicampur lagi dengan pasir 10 %
3.a.Agregat Hasil Stone Crusher= 90 % x
HSbHs191,155.21Rupiah
3.b.P a s i r= 10 % x Rp2Hs22,215.00Rupiah
3.c.Waktu pencampuran (blending) dengan Wheel
LoaderTc0.033Jam/M3
3.d.Biaya Pencampuran= Tc x Rp4Hs34,293.14Rupiah
Harga Satuan Agregat Halus / M3
= Hs1 + Hs2 + Hs3HSAh97,663.36RupiahDi luar PPN
III.4.PROSES PENCAMPURAN AGREGAT KELAS B
Untuk setiap 1 M3 Agregat Kelas B, diperlukan :
4.a.- Agregat Kasar= Ak x 1 M3Vk0.750M3
- Agregat Halus= Ah x 1 M3Vh0.250M3
- Total volume batu pecah = Vk + VhVa1.000M3
4.c.Waktu pencampuran (blending) oleh Wheel
LoaderTc0.033Jam/M3
III.5.HARGA SATUAN BAHAN AGREGAT KELAS B
5.a.Agregat Kasar= Vk x HSAkHs171,964.64Rupiah
5.b.Agregat Halus= Vh x HSAhHs224,415.84Rupiah
5.c.Biaya Pencampuran= Tc x Rp4Hs34,336.51Rupiah
5.d.Harga Satuan Agregat Kelas B / M3
= Hs1 + Hs2 + Hs3HSAA100,716.99RupiahDi luar PPN
PERHITUNGAN HARGA SATUAN KOMPONEN BAHAN
JENIS BAHAN: AGREGAT KASAR & AGREGAT HALUS
SATUAN: M3
No.U R A I A NKODEKOEFISIENSATUANKETERANGAN
IASUMSI
$1Bahan dasar (Batu dan Pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
$2Kegiatan dilakukan di dalam lokasi Base Camp
$3Hasil produksi Alat Pemecah Batu :- Agregat HalusH45.37%
- Agregat KasarK54.63%
$4Berat Isi Bahan :- Batu / GravelD11.40Ton/M3Berongga
- PasirD21.80Ton/M3Berongga
- Batu PecahD31.60Ton/M3Berongga
$5Harga Satuan Bahan Dasar :- Batu KaliRp156,200.00Rp./M3
- PasirRp244,300.00Rp./M3
$6Biaya Operasi Alat :- Pemecah Batu (Stone
Crusher)Rp3474,177.32Rp./Jam
- Wheel LoaderRp4173,787.47Rp./Jam
$7Kapasitas Alat :- Pemecah Batu (Stone
Crusher)Cp130.0Ton/Jam
- Wheel LoaderCp22.30M3Kap. Bucket
$8Faktor Efisiensi Alat :- Pemecah Batu (Stone
Crusher)Fa10.76-
- Wheel LoaderFa20.76-
$9Faktor Kehilangan MaterialFh1.10-
$10Agregat Halus masih perlu dicampur dengan pasir
IIMETHODE PELAKSANAAN
$1Wheel Loader mengangkut batu/gravel dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.-
$2Batu/gravel dipecah dengan Alat Pemecah Batu
(Stone Crusher) sehingga menghasilkan Agregat Batu
Pecah Kasar dan Halus.-
$3Agregat Halus dicampur dengan pasir menggunakan Loader-
IIIPERHITUNGAN
III.1.HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHER
1.a.Kerja Stone Crusher memecah gravel :
- Waktu kerja Stone CrusherTst1.00Jam
- Produksi Stone Crusher 1 jam= (Fa1 x Cp1) :
D3Qb14.25M3/JamBatu pecah
- Kebutuhan batu/gravel 1 jam= (Fa1 x Cp1) : D1Qg16.29M3/Jam
1.b.Kerja Wheel Loader melayani Stone Crusher :
- Kap. Angkut / rit = (Fa2 x Cp2)Ka1.75M3
- Waktu Siklus (Muat, Tuang, Tunggu, dll)Ts2.00menit
- Waktu kerja W.Loader memasok gravel
= {(Qg : Ka) x Ts} : 60 menitTw0.31Jam
1.c.Biaya Produksi Batu Pecah / M3
= {(Tst x Rp3) + (Tw x Rp4)} : QbBp37,063.06Rp./M3
1.d.Harga Satuan Batu Pecah Produksi St.Crusher / M3
= {(Qg : Qb) x Fh x Rp1} + BpHSb107,714.49Rp./M3
Berlanjut
PERHITUNGAN HARGA SATUAN KOMPONEN BAHAN
JENIS BAHAN: AGREGAT KASAR & AGREGAT HALUS
SATUAN: M3
Lanjutan 1
No.U R A I A NKODEKOEFISIENSATUANKETERANGAN
III.2.HARGA SATUAN AGREGAT KASAR
Agregat Kasar Produksi Stone Crusher =54.63%K54.63%
(Tertahan saringan # 4 = 4,75mm)
Harga Satuan Agregat Kasar / M3 =(K x HSb) /
KHSAk107,714.49RupiahDi Luar PPN
III.3.HARGA SATUAN AGREGAT HALUS
Dianggap Agregat produksi Stone Crusher yang lolos
saringan # 4 (4,75 mm) belum memenuhi Spesifikasi
sehingga perlu dicampur lagi dengan pasir sebanyak =Pst3.00%
3.a.Agregat Halus Produksi Stone Crusher =45.37%H45.37%
Harga Agregat Halus Prod. Stone Crsh.=(H x HSb) /
HHs1107,714.49Rupiahper 1 M3
3.b.Pasir tambahan= Pst x Rp2Hs21,329.00Rupiahper (Pst) M3
3.c.Waktu pencampuran (blending) dengan Wheel
LoaderTc0.033Jam/M32 menit/m3
3.d.Biaya Pencampuran= ( 1 + Pst) M3 x Tc x
Rp4Hs35,966.70Rupiah
Harga Satuan Agregat Halus / M3
= ( Hs1 + Hs2 + Hs3 ) / ( 1 + Pst )HSAh111,660.38RupiahDi luar
PPN
ITEM PEMBAYARAN: AGREGAT KELAS C
JENIS PEKERJAAN: PENGADAAN AGREGAT KELAS C
SATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUAN
No.U R A I A NKODEKOEFISIENSATUANKETERANGAN
IASUMSI
$1Bahan dasar (Batu dan Pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
$2Kegiatan dilakukan di dalam lokasi Base Camp
$3Komposisi campuran :- Batu PecahAb60.00%
- SirtuAs40.00%
$4Hasil produksi Alat Pemecah Batu :- Agregat HalusH30.00%
- Agregat KasarK70.00%
$5Berat Jenis Bahan :- Batu / GravelD11.80Ton/M3
- SirtuD21.67Ton/M3
- Batu PecahD31.80Ton/M3
$6Harga Satuan Bahan Dasar :- Batu /
GravelRp146,200.00Rp./M3
- SirtuRp244,300.00Rp./M3
$7Biaya Operasi Alat :- Pemecah Batu (Stone
Crusher)Rp3357,580.05Rp./Jam
- Wheel LoaderRp4130,095.21Rp./Jam
$8Kapasitas Alat :- Pemecah Batu (Stone
Crusher)Cp130.00Ton/Jam
- Wheel LoaderCp21.50M3Kap. Bucket
$9Faktor Efisiensi Alat :- Pemecah Batu (Stone
Crusher)Fa10.70-
- Wheel LoaderFa20.83-
$10Faktor Kehilangan MaterialFh1.10-
IIMETHODE PELAKSANAAN
$1Wheel Loader mengangkut batu/gravel dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.
$2Batu/gravel dipecah dengan Alat Pemecah Batu
(Stone Crusher) sehingga menghasilkan Agregat
Kasar dan Agregat Halus.
$3Wheel Loader melakukan pencampuran (blending)
Agregat Batu Pecah dan Sirtu menjadi Agregat
Kelas C.
IIIPERHITUNGAN
III.1.HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHER
1.a.Kerja Stone Crusher memecah gravel :
- Waktu kerja Stone CrusherTst1.00Jam
- Produksi Stone Crusher 1 jam= (Fa1 x Cp1) :
D3Qb11.67M3/JamBatu pecah
- Kebutuhan batu/gravel 1 jam= (Fa1 x Cp1) : D1Qg11.67M3/Jam
1.b.Kerja Wheel Loader melayani Stone Crusher :
- Kap. Angkut / rit = (Fa2 x Cp2)Ka1.25M3
- Waktu Siklus (Muat, Tuang, Tunggu, dll)Ts2.00menit
- Waktu kerja W.Loader memasok gravel
= {(Qg : Ka) x Ts} : 60 menitTw0.31Jam
1.c.Biaya Produksi Batu Pecah / M3
= {(Tst x Rp3) + (Tw x Rp4)} : QbBp34,132.86Rp./M3
1.d.Harga Satuan Batu Pecah Produksi St.Crusher / M3
= {(Qg : Qb) x Fh x Rp1} + BpHSb84,952.86Rp./M3
Berlanjut
ITEM PEMBAYARAN: AGREGAT KELAS C
JENIS PEKERJAAN: PENGADAAN AGREGAT KELAS C
SATUAN PEMBAYARAN: M3URAIAN ANALISA HARGA SATUAN
Lanjutan 1
No.U R A I A NKODEKOEFISIENSATUANKETERANGAN
III.2.PROSES PENCAMPURAN AGREGAT KELAS C
Untuk setiap 1 M3 Agregat Kelas C, diperlukan :
2.a.Volume batu pecah produksi Stone Crusher
( Ab X 1 M3 )Vp0.600M3
2.b.Volume sirtu( As X 1 M3 )Vs0.400M3
2.c.Waktu pencampuran (blending) oleh Wheel
LoaderTc0.033Jam/M3
III.3.HARGA SATUAN BAHAN AGREGAT KELAS C
3.a.Batu Pecah= Vp x HSbHs150,971.71Rupiah
3.b.Pasir= Vs x Rp2Hs217,720.00Rupiah
3.c.Biaya Pencampuran= Tc x Rp4Hs34,336.51Rupiah
3.d.Harga Satuan Agregat Kelas C / M3
= Hs1 + Hs2 + Hs3HSAA73,028.22RupiahDi luar PPN
PPN7,302.82RupiahPPN = 10 %
HSAA80,331.04RupiahTermasuk PPN
HS Komp Alat
PERHITUNGAN BIAYA SEWA ALAT PER JAMDAFTAR BIAYA SEWA PERALATAN
PER JAM KERJA
BIAYA
No.U R A I A
NKODEKOEF.SATUANKET.No.URAIANKOHPKAPASITASHARGASEWAKET.
DEALATALAT/JAM
(di luar PPN)
A.URAIAN PERALATAN
1.Jenis PeralatanWHEEL LOADER 1.0-1.6 M3E151.ASPHALT MIXING
PLANTE0115030T/Jam$2,965,800,000$1,223,475Alat baru
2.TenagaPw105HP2.ASPHALT
FINISHERE02476Ton$619,513,000$146,233Alat baru
3.KapasitasCp1.5M33.ASPHALT
SPRAYERE0315800Liter$94,172,000$31,085Alat baru
4.Alat Baru :a. Umur EkonomisA5Tahun4.BULLDOZER 100-150
HPE04140-$608,261,000$188,460Alat baru
Klfks tugas sedangb. Jam Kerja Dalam 1
TahunW1,600Jam5.COMPRESSOR 4000-6500
L\ME0580-$175,492,000$73,120Alat baru
c. Harga AlatB397,485,000Rupiah6.CONCRETE MIXER 0.3-0.6
M3E0615500Liter$80,690,000$30,085Alat baru
5.Alat Yang Dipakai :a. Umur EkonomisA'5TahunAlat baru7.CRANE
10-15 TONE0715015Ton$741,925,000$220,850Alat baru
b. Jam Kerja Dalam 1 TahunW'1,600.0JamAlat baru8.DUMP TRUCK 3-4
M3E081006Ton$96,976,000$63,900Alat baru
c. Harga Alat (*)B'397,485,000RupiahAlat baru9.DUMP
TRUCKE091258Ton$103,987,000$74,875Alat baru
10.EXCAVATOR 80-140 HPE10800.5M3$551,711,000$153,620Alat
baru
B.BIAYA PASTI PER JAM KERJA11.FLAT BED TRUCK 3-4
M3E111004M3$96,976,000$63,900Alat baru
1.Nilai Sisa Alat= 10 % x BC39,748,500Rupiah12.GENERATOR
SETE12175125KVA$104,777,600$93,994Alat baru
13.MOTOR GRADER >100 HPE13125-$431,135,000$144,875Alat
baru
2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-14.TRACK LOADER
75-100 HPE14901.6M3$500,770,000$146,510Alat baru
(1 + i)^A' - 115.WHEEL LOADER 1.0-1.6
M3E151051.5M3$397,485,000$130,095Alat baru
3.Biaya Pasti per Jam :16.THREE WHEEL ROLLER 6-8
TE16558Ton$149,787,000$58,145Alat baru
a. Biaya Pengembalian Modal =( B' - C ) x
DE74,762.39Rupiah17.TANDEM ROLLER 6-8
T.E17508Ton$246,529,000$76,950Alat baru
W'18.TIRE ROLLER 8-10 T.E186010Ton$300,115,000$99,341Alat
baru
19.VIBRATORY ROLLER 5-8 T.E19757Ton$376,060,000$122,925Alat
baru
b. Asuransi, dll =0.002x B'F496.86Rupiah20.CONCRETE
VIBRATORE2010-$28,126,000$22,390Alat baru
W'21.STONE CRUSHERE2122030T/Jam$1,247,600,000$357,580Alat
baru
22.WATER PUMP 70-100 mmE226-$30,471,000$18,434Alat baru
Biaya Pasti per Jam =( E + F )G75,259.25Rupiah23.WATER TANKER
3000-4500 L.E231004000Liter$96,976,000$63,900Alat baru
24.PEDESTRIAN ROLLERE24110.98Ton$68,302,000$25,629Alat baru
C.BIAYA OPERASI PER JAM
KERJA25.TAMPERE2550.17Ton$18,013,000$15,695Alat baru
26.JACK HAMMERE263-$23,870,000$17,717Alat baru
1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x
MsH30,114.00Rupiah27.FULVI MIXERE2775-$160,069,000$67,925Alat
baru
28.CONCRETE PUMPE281008M3$112,500,000$65,517Alat baru
2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x
MpI22,050.00Rupiah29.TRAILER 20
TONE2917510Ton$166,250,000$104,628Alat baru
30.PILE DRIVER + HAMMERE30252.5Ton$70,000,000$29,703Alat
baru
3.Perawatan dan(12,5 % - 17,5 %) x B'K37,264.22Rupiah31.CRANE ON
TRACK 35 TONE3112535Ton$350,000,000$122,211Alat baru
perbaikan =W'32.WELDING SETE3240250Amp$17,500,000$24,154Alat
baru
33.BORE PILE MACHINEE33150200Meter$2,250,000,000$509,440Alat
baru
4.Operator= ( 1 Orang / Jam ) x U1L6,500.00Rupiah34.
5.Pembantu Operator= ( 1 Orang / Jam ) x U2M2,600.00Rupiah
Biaya Operasi per Jam =(H+I+K+L+M)P98,528.22Rupiah
D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S173,787.47Rupiah
E.LAIN - LAIN
1.Tingkat Suku Bungai20% / Tahun
2.Upah Operator / SopirU16,500Rp./Jam
3.Upah Pembantu Operator / Pmb.SopirU22,600Rp./Jam
4.Bahan Bakar BensinMb2,500Liter
5.Bahan Bakar SolarMs1,912Liter
6.Minyak PelumasMp14,000Liter
7.PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN BIAYA SEWA ALAT PER JAM
No.U R A I A NKODEKOEF.SATUANKET.
A.URAIAN PERALATAN
1.Jenis PeralatanASPHALT MIXING PLANTE01
2.TenagaPw150HP
3.KapasitasCp30T/Jam
4.Alat Baru :a. Umur EkonomisA10Tahun
b. Jam Kerja Dalam 1 TahunW1,500Jam
c. Harga AlatB2,965,800,000Rupiah
5.Alat Yang Dipakai :a. Umur EkonomisA'10TahunAlat baru
b. Jam Kerja Dalam 1 TahunW'1,500JamAlat baru
c. Harga Alat (*)B'2,965,800,000RupiahAlat baru
B.BIAYA PASTI PER JAM KERJA
1.Nilai Sisa Alat= 10 % x BC296,580,000Rupiah
2.Faktor Angsuran Modal =i x (1 + i)^A'D0.23852-
(1 + i)^A' - 1
3.Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =( B' - C ) x DE424,446.48Rupiah
W'
b. Asuransi, dll =0.002x B'F3,954.40Rupiah
W'
Biaya Pasti per Jam =( E + F )G428,400.88Rupiah
C.BIAYA OPERASI PER JAM KERJA
1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x
MsH143,020.00Rupiah
Bahan Bakar Pemanasan Material= 12 x 0.7Cp x
MsH2481,824.00RupiahKhusus AMP
2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI31,500.00Rupiah
3.Perawatan dan =(12,5 % - 17,5 %) x B'K296,580.00Rupiah
perbaikanW'
4.Operator= ( 1 Orang / Jam ) x U1L6,500.00Rupiah
5.Pembantu Operator= ( 3 Orang / Jam ) x U2M7,800.00Rupiah
Biaya Operasi per Jam =(H+I+K+L+M)P867,224.00Rupiah
D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )T1,295,624.88Rupiah
E.LAIN - LAIN
1.Tingkat Suku Bungai20% / Tahun
2.Upah Operator / SopirU16,500Rp./Jam
3.Upah Pembantu Operator / Pmb.SopirU22,600Rp./Jam
4.Bahan Bakar BensinMb2,500Liter
5.Bahan Bakar SolarMs1,912Liter
6.Minyak PelumasMp14,000Liter
7.PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN BIAYA SEWA ALAT PER JAM
No.U R A I A NKODEKOEF.SATUANKET.
A.URAIAN PERALATAN
1.Jenis PeralatanGENERATOR SETE12
2.TenagaPw175HP
3.KapasitasCp125KVA
4.Alat Baru :a. Umur EkonomisA5Tahun
Klfks tugas sedangb. Jam Kerja Dalam 1 TahunW1,600Jam
c. Harga AlatB104,777,600Rupiah
5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baru
b. Jam Kerja Dalam 1 TahunW'1,600.0JamAlat baru
c. Harga Alat (*)B'104,777,600RupiahAlat baru
B.BIAYA PASTI PER JAM KERJA
1.Nilai Sisa Alat= 10 % x BC10,477,760Rupiah
2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-
(1 + i)^A' - 1
3.Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =( B' - C ) x DE19,707.47Rupiah
W'
b. Asuransi, dll =0.002x B'F130.97Rupiah
W'
Biaya Pasti per Jam =( E + F )G19,838.44Rupiah
C.BIAYA OPERASI PER JAM KERJA
1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x
MsH50,190.00Rupiah
2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI36,750.00Rupiah
3.Perawatan dan(12,5 % - 17,5 %) x B'K9,822.90Rupiah
perbaikan =W'
4.Operator= ( 1 Orang / Jam ) x U1L6,500.00Rupiah
5.Pembantu Operator= ( 1 Orang / Jam ) x U2M2,600.00Rupiah
Biaya Operasi per Jam =(H+I+K+L+M)P105,862.90Rupiah
D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S125,701.34Rupiah
E.LAIN - LAIN
1.Tingkat Suku Bungai20% / Tahun
2.Upah Operator / SopirU16,500Rp./Jam
3.Upah Pembantu Operator / Pmb.SopirU22,600Rp./Jam
4.Bahan Bakar BensinMb2,500Liter
5.Bahan Bakar SolarMs1,912Liter
6.Minyak PelumasMp14,000Liter
7.PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN BIAYA SEWA ALAT PER JAM
No.U R A I A NKODEKOEF.SATUANKET.
A.URAIAN PERALATAN
1.Jenis PeralatanDUMP TRUCKE09
2.TenagaPw125HP
3.KapasitasCp8Ton
4.Alat Baru :a. Umur EkonomisA5Tahun
Klfks tugas sedangb. Jam Kerja Dalam 1 TahunW1,600Jam
c. Harga AlatB103,987,000Rupiah
5.Alat Yang Dipakai :a. Umur EkonomisA'5TahunAlat baru
b. Jam Kerja Dalam 1 TahunW'1,600.0JamAlat baru
c. Harga Alat (*)B'103,987,000RupiahAlat baru
B.BIAYA PASTI PER JAM KERJA
1.Nilai Sisa Alat= 10 % x BC10,398,700Rupiah
2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-
(1 + i)^A' - 1
3.Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =( B' - C ) x DE19,558.77Rupiah
W'
b. Asuransi, dll =0.002x B'F129.98Rupiah
W'
Biaya Pasti per Jam =( E + F )G19,688.75Rupiah
C.BIAYA OPERASI PER JAM KERJA
1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x
MsH35,850.00Rupiah
2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI26,250.00Rupiah
3.Perawatan dan(12,5 % - 17,5 %) x B'K9,748.78Rupiah
perbaikan =W'
4.Operator= ( 1 Orang / Jam ) x U1L6,500.00Rupiah
5.Pembantu Operator= ( 1 Orang / Jam ) x U2M2,600.00Rupiah
Biaya Operasi per Jam =(H+I+K+L+M)P80,948.78Rupiah
D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S100,637.53Rupiah
E.LAIN - LAIN
1.Tingkat Suku Bungai20% / Tahun
2.Upah Operator / Sopir / MekanikU16,500Rp./Jam
3.Upah Pembantu Operator / Pmb.Sopir /
Pmb.MekanikU22,600Rp./Jam
4.Bahan Bakar BensinMb2,500Liter
5.Bahan Bakar SolarMs1,912Liter
6.Minyak PelumasMp14,000Liter
7.PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN BIAYA SEWA ALAT PER JAM
No.U R A I A NKODEKOEF.SATUANKET.
A.URAIAN PERALATAN
1.Jenis PeralatanASPHALT FINISHERE02
2.TenagaPw47HP
3.KapasitasCp6Ton
4.Alat Baru :a. Umur EkonomisA6Tahun
Klfks tugas sedangb. Jam Kerja Dalam 1 TahunW1,600Jam
c. Harga AlatB619,513,000Rupiah
5.Alat Yang Dipakai :a. Umur EkonomisA'6TahunAlat baru
b. Jam Kerja Dalam 1 TahunW'1,600JamAlat baru
c. Harga Alat (*)B'619,513,000RupiahAlat baru
B.BIAYA PASTI PER JAM KERJA
1.Nilai Sisa Alat= 10 % x BC61,951,300Rupiah
2.Faktor Angsuran Modal =i x (1 + i)^A'D0.30071-
(1 + i)^A' - 1
3.Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =( B' - C ) x DE104,788.75Rupiah
W'
b. Asuransi, dll =0.002x B'F774.39Rupiah
W'
Biaya Pasti per Jam =( E + F )G105,563.15Rupiah
C.BIAYA OPERASI PER JAM KERJA
1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x
MsH13,479.60Rupiah
2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI9,870.00Rupiah
3.Perawatan dan(12,5 % - 17,5 %) x B'K58,079.34Rupiah
perbaikan =W'
4.Operator= ( 1 Orang / Jam ) x U1L6,500.00Rupiah
5.Pembantu Operator= ( 1 Orang / Jam ) x U2M2,600.00Rupiah
Biaya Operasi per Jam =(H+I+K+L+M)P90,528.94Rupiah
D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S196,092.09Rupiah
E.LAIN - LAIN
1.Tingkat Suku Bungai20% / Tahun
2.Upah Operator / SopirU16,500Rp./Jam
3.Upah Pembantu Operator / Pmb.SopirU22,600Rp./Jam
4.Bahan Bakar BensinMb2,500Liter
5.Bahan Bakar SolarMs1,912Liter
6.Minyak PelumasMp14,000Liter
7.PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN BIAYA SEWA ALAT PER JAM
No.U R A I A NKODEKOEF.SATUANKET.
A.URAIAN PERALATAN
1.Jenis PeralatanTANDEM ROLLER 6-8 T.E17
2.TenagaPw50HP
3.KapasitasCp8Ton
4.Alat Baru :a. Umur EkonomisA5Tahun
Klfks tugas sedangb. Jam Kerja Dalam 1 TahunW1,600Jam
c. Harga AlatB246,529,000Rupiah
5.Alat Yang Dipakai :a. Umur EkonomisA'5TahunAlat baru
b. Jam Kerja Dalam 1 TahunW'1,600JamAlat baru
c. Harga Alat (*)B'246,529,000RupiahAlat baru
B.BIAYA PASTI PER JAM KERJA
1.Nilai Sisa Alat= 10 % x BC24,652,900Rupiah
2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-
(1 + i)^A' - 1
3.Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =( B' - C ) x DE46,369.29Rupiah
W'
b. Asuransi, dll =0.002x B'F308.16Rupiah
W'
Biaya Pasti per Jam =( E + F )G46,677.45Rupiah
C.BIAYA OPERASI PER JAM KERJA
1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x
MsH14,340.00Rupiah
2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI10,500.00Rupiah
3.Perawatan dan(12,5 % - 17,5 %) x B'K23,112.09Rupiah
perbaikan =W'
4.Operator= ( 1 Orang / Jam ) x U1L6,500.00Rupiah
5.Pembantu Operator= ( 1 Orang / Jam ) x U2M2,600.00Rupiah
Biaya Operasi per Jam =(H+I+K+L+M)P57,052.09Rupiah
D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S103,729.55Rupiah
E.LAIN - LAIN
1.Tingkat Suku Bungai20% / Tahun
2.Upah Operator / SopirU16,500Rp./Jam
3.Upah Pembantu Operator / Pmb.SopirU22,600Rp./Jam
4.Bahan Bakar BensinMb2,500Liter
5.Bahan Bakar SolarMs1,912Liter
6.Minyak PelumasMp14,000Liter
7.PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN BIAYA SEWA ALAT PER JAM
No.U R A I A NKODEKOEF.SATUANKET.
A.URAIAN PERALATAN
1.Jenis PeralatanPNM. TIRE ROLLER 8-10 T.E18
2.TenagaPw60HP
3.KapasitasCp10Ton
4.Alat Baru :a. Umur EkonomisA5Tahun
b. Jam Kerja Dalam 1 TahunW1,800Jam
c. Harga AlatB300,115,000Rupiah
5.Alat Yang Dipakai :a. Umur EkonomisA'5TahunAlat baru
b. Jam Kerja Dalam 1 TahunW'1,800JamAlat baru
c. Harga Alat (*)B'300,115,000RupiahAlat baru
B.BIAYA PASTI PER JAM KERJA
1.Nilai Sisa Alat= 10 % x BC30,011,500Rupiah
2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-
(1 + i)^A' - 1
3.Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =( B' - C ) x DE50,176.18Rupiah
W'
b. Asuransi, dll =0.002x B'F333.46Rupiah
W'
Biaya Pasti per Jam =( E + F )G50,509.64Rupiah
C.BIAYA OPERASI PER JAM KERJA
1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x
MsH17,208.00Rupiah
2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI12,600.00Rupiah
3.Perawatan dan(12,5 % - 17,5 %) x B'K25,009.58Rupiah
perbaikan =W'
4.Operator= ( 1 Orang / Jam ) x U1L6,500.00Rupiah
5.Pembantu Operator= ( 1 Orang / Jam ) x U2M2,600.00Rupiah
Biaya Operasi per Jam =(H+I+K+L+M)P63,917.58Rupiah
D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S114,427.23Rupiah
E.LAIN - LAIN
1.Tingkat Suku Bungai20% / Tahun
2.Upah Operator / SopirU16,500Rp./Jam
3.Upah Pembantu Operator / Pmb.SopirU22,600Rp./Jam
4.Bahan Bakar BensinMb2,500Liter
5.Bahan Bakar SolarMs1,912Liter
6.Minyak PelumasMp14,000Liter
7.PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN BIAYA SEWA ALAT PER JAM
No.U R A I A NKODEKOEF.SATUANKET.
A.URAIAN PERALATAN
1.Jenis PeralatanSTONE CRUSHERE21
2.TenagaPw220HP
3.KapasitasCp30T/Jam
4.Alat Baru :a. Umur EkonomisA5Tahun
Klfks tugas sedangb. Jam Kerja Dalam 1 TahunW1,600Jam
c. Harga AlatB1,247,600,000Rupiah
5.Alat Yang Dipakai :a. Umur EkonomisA'5.0TahunAlat baru
b. Jam Kerja Dalam 1 TahunW'1,600JamAlat baru
c. Harga Alat (*)B'1,247,600,000RupiahAlat baru
B.BIAYA PASTI PER JAM KERJA
1.Nilai Sisa Alat= 10 % x BC124,760,000Rupiah
2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-
(1 + i)^A' - 1
3.Biaya Pasti per Jam :
a. Biaya Pengembalian Modal =( B' - C ) x DE234,659.32Rupiah
W'
b. Asuransi, dll =0.002x B'F1,559.50Rupiah
W'
Biaya Pasti per Jam =( E + F )G236,218.82Rupiah
C.BIAYA OPERASI PER JAM KERJA
1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x
MsH63,096.00Rupiah
2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI46,200.00Rupiah
3.Perawatan dan(12,5 % - 17,5 %) x B'K116,962.50Rupiah
perbaikan =W'
4.Operator= ( 1 Orang / Jam ) x U1L6,500.00Rupiah
5.Pembantu Operator= ( 2 Orang / Jam ) x U2M5,200.00Rupiah
Biaya Operasi per Jam =(H+I+K+L+M)P237,958.50Rupiah
D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S474,177.32Rupiah
E.LAIN - LAIN
1.Tingkat Suku Bungai20% / Tahun
2.Upah Operator / SopirU16,500Rp./Jam
3.Upah Pembantu Operator / Pmb.SopirU22,600Rp./Jam
4.Bahan Bakar BensinMb2,500Liter
5.Bahan Bakar SolarMs1,912Liter
6.Minyak PelumasMp14,000Liter
7.PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Formula failed to convert
Fh
FAKTOR KONVERSI UNTUK VOLUME BAHAN/MATERIAL ( Fh )
KONDISIKONDISI BAHAN/MATERIAL
JENIS BAHAN/MATERIALTANAHYANG AKAN DIKERJAKAN
SEMULAASLILEPASPADAT
ASLI11.110.95
PASIRLEPAS0.910.85
PADAT1.051.171
ASLI11.250.9
TANAH LIAT BERPASIRLEPAS0.810.72
PADAT1.111.31
ASLI11.250.9
TANAH LIATLEPAS0.710.63
PADAT1.111.591
ASLI11.181.08
TANAH CAMPUR KERIKILLEPAS0.8510.91
PADAT0.931.091
ASLI11.131.03
KERIKILLEPAS0.8810.91
PADAT0.971.11
ASLI11.421.29
KERIKIL KASARLEPAS0.710.91
PADAT0.771.11
ASLI11.651.22
PECAHAN CADAS ATAU BATU LUNAKLEPAS0.6110.74
PADAT0.821.351
ASLI11.71.31
PECAHAN GRANIT ATAU BATU KERASLEPAS0.510.77
PADAT0.761.31
ASLI11.751.4
PECAHAN BATULEPAS0.5710.8
PADAT0.711.241
ASLI11.81.3
BATUAN HASIL PELEDAKANLEPAS0.5610.72
PADAT0.771.381
SUMBER :
KAPASITAS & PRODUKSI ALAT-ALAT BERAT TABEL 1,
Ir. ROCHMANHADI, BADAN PENERBIT PU, 1983
(KOMATSU SPECIFICATIONS AND APPLICATION HANDBOOK EDITION 7 HAL.5
- 53)
Fa
FAKTOR EFISIENSI KERJA ALAT ( Fa )
PEMELIHARAAN ALAT
KONDISI OPERASI ALATBAIKBAIKSEDANGBURUKBURUK
SEKALISEKALI
BAIK SEKALI0.830.810.760.70.63
BAIK0.780.750.710.650.60
SEDANG0.720.690.650.60.54
BURUK0.630.610.570.520.45
BURUK SEKALI0.520.50.470.420.32
SUMBER :
KAPASITAS & PRODUKSI ALAT-ALAT BERAT TABEL 2,
Ir. ROCHMANHADI, BADAN PENERBIT PU, 1983
(KOMATSU SPECIFICATIONS AND APPLICATION HANDBOOK
EDITION 7, TABEL 1 JOB EFFICIENCY, HAL.5 - 6)
Buck Doz-Wheel
FAKTOR BUCKET UNTUK DOZER SHOVEL DAN WHEEL LOADER
KONDISI
PEMUATANJENIS MATERIALFAKTOR BUCKET
Pemuatan RinganPemuatan material/bahan dari stockpile atau
material yang telah dikeruk oleh excavator lain, dengan tidak
memerlukan lagi daya gali dan bahan dapat dimuat penuh ke dalam
bucket.1,00 0,80
Contoh : Pasir tanah berpasir, tanah colloidal dengan kadar air
sedang, dll.
Pemuatan SedangPemuatan dari stockpile tanah lepas yang lebih
sukar dikeruk dan dimasukkan kedalam bucket tetapi dapat dimuat
hampir penuh.0,80 - 0,60
Contoh :
Pasir kering, tanah berpasir, tanah campur tanah liat, tanah
liat, gravel yang belum disaring, pasir padat, dan sebagainya, atau
menggali dan memuat gravel lunak langsung dari bukit asli.
Pemuatan Agak SulitPemuatan batu belah atau batu cadas, tanah
liat yang keras, pasir campur gravel, tanah berpasir, tanah
colloidal yang liat, tanah liat dengan kadar air yang tinggi,
bahan-bahan tersebut telah ada pada stocpile/persediaan sulit untuk
mengisi bucket dengan0,60 - 0,50
Pemuatan yang SulitBatu bongkah besar-besar dengan bentuk yang
tidak beraturan dengan banyak ruangan di antara tumpukannya., batu
hasil ledakan, batu-batu bundar yang besar-besar, pasir campuran
batu-batu bundar tersebut, tanah berpasir, tanah campur lempung,
tanah liat yan0,50 - 0,40
SUMBER :
KAPASITAS & PRODUKSI ALAT-ALAT BERAT TABEL 4, HAL.14
Ir. ROCHMANHADI, BADAN PENERBIT PU, 1983
(KOMATSU SPECIFICATIONS AND APPLICATION HANDBOOK
EDITION 7, TABEL 3 BUCKET FACTOR, HAL.5 - 12)
Buck Excav
FAKTOR BUCKET UNTUK EXCAVATOR
KONDISIJENISFAKTOR
PEMUATANMATERIALBUCKET
Menggali dan memuat dari stockpile atau material yang telah
dikeruk oleh excavator lain, dengan tidak memerlukan lagi daya gali
dan bahan dapat dimuat munjung (penuh) ke dalam bucket.1,00
0,80
Contoh :
Pasir tanah berpasir, tanah colloidal dengan kadar air
sedang.
Penggalian danMenggali dan memuat stockpile tanah lepas yang
lebih sulit untuk digali dan dikeruk tetapi dapat dimuat hampir
munjung (penuh).
pemuatan sedangContoh :0,80 - 0,60
Pasir kering, tanah berpasir, tanah campur tanah liat, tanah
liat, gravel yang belum disaring, pasir padat, dan sebagainya, atau
menggali dan memuat gravel lunak langsung dari bukit gravel
asli.
Menggali dan memuat batu belah atau batu cadas, tanah liat yang
keras, pasir campur gravel, tanah berpasir, tanah colloidal yang
liat, tanah liat dengan kadar air yang tinggi, yang telah
di-stockpile oleh excavator lain, sulit untuk mengisi bucket
dengan0,60 - 0,50
Batu bongkah besar-besar dengan bentuk yang tidak beraturan
dengan banyak ruangan di antara tumpukannya., batu hasil ledakan,
batu-batu bundar yang besar-besar, pasir campuran batu-batu bundar
tersebut, tanah berpasir, tanah campur lempung, tanah liat yan0,50
- 0,40
SUMBER :
KAPASITAS & PRODUKSI ALAT-ALAT BERAT TABEL 4, HAL.21
Ir. ROCHMANHADI, BADAN PENERBIT PU, 1983
Penggalian dan Pemuatan Ringan
Penggalian dan pemuatan ringan
Penggalian dan pemuatan yang agak sulit
Penggalian dan pemuatan yang sulit
Posisi Excav
FAKTOR POSISI UNTUK EXCAVATOR
POSISI ALATKONDISI ALATFAKTOR POSISI
BAIKLUAS, LAPANG, DATAR1,00 0,90
SEDANGTERBATAS, AGAK MIRING0,90 0,70
SULITSEMPIT, MIRING0,70 0,50
Sudu Doz
FAKTOR SUDU UNTUK PENGGUSURAN DENGAN BULLDOZER
KONDISIJENISFAKTOR
PENGGUSURANMATERIALBUCKET
Penggusuran RinganPenggususran dapat dilaksanakan dengan sudu
penuh.1,00 0,90
Contoh :
Tanah lepas dengan kadar air rendah, tanah berpasir tak
dipadatkan, tanah biasa, bahan.material untuk timbunan persediaaan
(stockpile)
Penggusuran SedangTanah lepas tetapi tidak mungkin menggusur
dengan sudu penuh.0,90 0,70
Contoh :
Tanah bercampur kerikil atau split, pasir, batu pecah.
Penggusuran yang agak sulitKadar air tinggi dan tanah liat,
pasir bercampur kerikil, tanah liat yang sangat kering, dan tanah
asli.0,70 0,60
Penggusuran yang sulitBatu-batu hasil ledakan, batu-batu
berukuran besar-besar0,60 - 0,40
SUMBER :
KAPASITAS & PRODUKSI ALAT-ALAT BERAT TABEL 3
Ir. ROCHMANHADI, BADAN PENERBIT PU, 1983
(KOMATSU SPECIFICATIONS AND APPLICATION HANDBOOK
EDITION 7, TABEL 2, HAL.5 - 8)
Soal Studi Ks
CONTOH : STUDI KASUS 11912.79.54.752.361.180.60.30.150.075
JMF of AC-WC10093.5975.8745.3728.6720.8117.9513.529.585.65
Diketahui Job Mix Formula untuk Asphaltic Concrete Wearing
Course - Superpave mempunyai agregatC.Pt. Max100100905810
dengan persentase lolos saringan terhadap persyaratan
spesifikasi sebagai berikut :C.Pt. Min10090284
Fuller Curve10083.473.253.639.128.621.115.511.38.3
Restr Zone-139.131.623.115.5
Ukuran AyakanJMF AC-WCRestr Zone-239.125.619.115.5
SuperpaveBatasanFullerRestrictedTitikSpec Limits
110098.680.950.431.723.819.115.511.67.1
ASTM(mm)% berat yangSpesifikasi (%)Curve (%)Zone (%)KontrolSpec
Limits 210090.070.940.428.017.814.910.57.64.1
lolos ayakan
3/4"19100100100100
1/2"12.793.5990-98.683.490 - 100
3/8"9.575.8770.9-80.973.290
# 44.7545.3740.4-80.453.6
# 82.3628.6728-31.739.139.128 - 58
# 161.1820.8117.8-23.828.625.6-31.6
# 300.617.9514.9-19.121.119.1-23.1
# 500.313.5210.5-15.515.515.5
# 1000.159.587.6-11.611.3
# 2000.0755.654.1-7.18.3
Mix Design dengan cara Marshall menghasilkan angka kebutuhan
aspal (bitumen content) sebesar 5,2%.
Berdasarkan data di atas, diminta menghitung Harga Satuan AC-WC
Superpave untuk pekerjaan
pembangunan jalan baru atau peningkatan jalan dalam 3 alternatif
berikut :
a. Alternatif 1 : Jika Satuan Pembayaran Pekerjaan dalam M2,
termasuk didalamnya harga aspal.
b. Alternatif 2 : Jika Satuan Pembayaran Pekerjaan dalam Ton,
termasuk didalamnya harga aspal.
c. Alternatif 3 : Jika Satuan Pembayaran Pekerjaan dalam Ton,
harga aspal dipisahkan,
mengikuti cara pembayaran berdasarkan Spesifikasi Teknis versi
PT. Jasa Marga.
ANALISA KOMPONEN BAHAN
Tabel Perhitungan
Persentase Agregat Kasar, Agregat Halus dan Filler
Produk Stone Crusher
Berdasarkan data dari Job Mix Formula
Ukuran AyakanJMF AC-WCJMF AC-WC
SuperpaveSuperpaveKETERANGAN
ASTM(mm)% berat yang% berat yang
lolos ayakantertahan di ayakan
%
3/4"191000
1/2"12.793.596.41Agregat
3/8"9.575.8717.72Kasar
# 44.7545.3730.5054.63
# 82.3628.6716.70
# 161.1820.817.86
# 300.617.952.86Agregat
# 500.313.524.43Halus
# 1000.159.583.94
# 2000.0755.653.9439.72
5.655.65Filler
PROPORSI AGREGAT MENURUT LABORATORIUM :
1.Agregat Kasar ( > 4,75 mm)=54.63%
2.Agregat Halus ( < 4,75 mm dan > 0,075 mm)=39.72%
3.Filler ( < 0,075 mm)=5.65%
Total=100%
PROPORSI AGREGAT DALAM BAHASA LAPANGAN :Faktor
1.Agregat Kasar (Butir 5-10 mm & 10-15 mm)=60.09%1.1
2.Agregat Halus (Butir s/d 4,75 mm)=37.907%
3.Filler Added=2%
Total=100%
% agr thd
PROPORSI AGREGAT DALAM CAMPURAN :campuran =
1.Agregat Kasar (Butir 5-10 mm & 10-15 mm)=56.97%
2.Agregat Halus (Butir s/d 4,75 mm)=35.94%94.80%
3.Filler Added=1.90%
4.Aspal=5.20%
Total=100%
Soal Studi Ks
1001001001001919100100
93.5921009083.42045494512.712.798.59290
75.872909.573.20428479739.59.580.87270.872
45.3684.754.7553.58867312684.754.7550.36840.368
28.67582839.11751708439.139.131.6728
20.80561.181.1828.635698611831.625.623.805617.8056
17.9460.60.621.121703519823.119.119.114.946
13.5180.30.315.461991998715.515.515.461991998710.518
9.5820.150.1511.31884065810.150.1511.5827.582
5.6461048.28587635110.0750.0757.1464.146
JMF of AC-WC
C.Pt. Max
C.Pt. Min
Fuller Curve
Restr Zone-1
Restr Zone-2
Spec Limits 1
Spec Limits 2
Sieve Size
Percent Passing
AC-WC SUPERPAVE GRADING
Sheet10
1001001001001919100100
93.5921009083.42045494512.712.798.59290
75.872909.573.20428479739.59.580.87270.872
45.3684.754.7553.58867312684.754.7550.36840.368
28.67582839.11751708439.139.131.6728
20.80561.181.1828.635698611831.625.623.805617.8056
17.9460.60.621.121703519823.119.1