Proprietary 1© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Wednesday, May 12, 2010
Hitachi Power Systems America
Copyright © 2010, Hitachi Power Systems America, Ltd., All rights reserved.
FCURT Company Showcase Presentation
9:45 AM – 10:05 AM
Longboat Key Club and Resort
Longboat Key, Florida
Page 2
Proprietary 2© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Consolidated figures for FY 2008, ended March, 2009
Exchange rate: 101 yen to the US dollar
Revenue US $102 Billion (Power & Industrial Sector = 29%)
Head Office of Hitachi Ltd.
Stock Exchange Listings
of Hitachi Ltd.
Outside Japan: New York
In Japan: Tokyo, Osaka, Nagoya,
Fukuoka, Sapporo
Number of Employees 400,129
Consolidated Subsidiaries 943 manufacturing over 20,000 products
Tokyo, Japan
R&D Expenditure US $4.3 Billion (4.2% of revenue)
Hitachi, Ltd. Summary – as of March, 2009
Page 3
Proprietary 3© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Europe
Companies: 141
Employees: 11,056
Revenues: $9.2 Billion
Japan
Companies: 403
Employees: 260,677
Revenues: $60 Billion
Asia including China
Companies: 275
Employees: 107,647
Revenues: $19.5 Billion
North America
Companies: 79
Employees: 14,867
Revenues: $9.1 Billion
OtherCompanies: 45
Employees: 5,882
Revenues: $4.3 Billion
As of March 31, 2008 (Revenue as of March 31, 2009 in FY 2008)
Regional Headquarters in Americas, Europe, China, and Asia
Hitachi at a Glance
HITACHI Credit Rating
“BBB+” S&P Rating
“A3” Moody’s Rating
Page 4
Proprietary 4© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Hitachi Power Systems America Summary
Established in 2005
Headquartered in Basking Ridge, New Jersey
Fully Integrated Power Supplier
Steam Generators
Turbines
Air Quality Control Systems
After Market Services
Renewables
Nuclear
Single Point of Responsibility
Sales & Marketing
Technology
Project Execution
Engineering/Design
Procurement
Profit and Loss
Page 5
Proprietary 5© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
President & CEO
H. Bartoli
•Finance- S. Lee
•Legal – K. McEwen
•HR- L. DiDonato/J. Wladich
•IT – D. Kovalsky
QA/QC
T. Staed
Commercial & Strategic
Operations
M. Seshamani
Strategic Planning
Proposal Development
Cost Estimating
Project Operations
W. Buffa
Project Management
Project Control
Construction
Management
Procurement
Engineering
A. Kukoski
Engineering
Design
Service
BHK Engineering
R&D
Sales & Marketing
D. Brozek
Field Sales
Marketing
Product Sales
Nuclear Group
J. Yoshinari / T. DiFransico
Plant
Commissioning/Start-up
After Market
Services
B. Studley
HPSA Organization
Administration
S. Davidek
T. LaBar
Y. Ross
M. Hermo
H. Horwath
Page 6
Proprietary 6© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Renewables
FGD SCR
Nuclear Reactors
Hydro EquipmentSteam Generators
Vertically Integrated
Product Line-up for
Power Generation
Facilities
HPSA Charter – Total Energy Company
Turbines
Substation Equipment
Page 7
Proprietary 7© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Steam Generators
Utility Boilers
• Subcritical
• Supercritical
Turbines
Steam Turbines
• Subcritical
• Supercritical
• Nuclear
• Combined Cycle
Gas Turbines
• H-15
• H-25
Hydro Turbines
Products and Services for USA Market
Page 8
Proprietary 8© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Products and Services for USA Market
AQCS
WFGD
SCR
Catalyst
Low NOx Burners
Complete Air Quality Control Systems
EPC / Extended Scope
Turnkey Services
Wrap-around guarantees for total performance and schedule
Nuclear
Hitachi 40% owner of GEH focused on ABWR and ESBWR technology
EPC of ABWR project
Renewables / Energy Conservation
Wind
Solar
Hydro
Smart Grid
Carbon Capture Sequestration
Aftermarket Services for Boilers, Turbines (MD&A) and AQCS
Page 9
Proprietary 9© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Extended Scope and Wrap-Around Guarantees
More than 65% of high efficient power stations
can be supplied by Hitachi Companies
Boiler
Turbine/Generator
DeNOx
FGD
Engineering
BOP
I & C System
Civil works
Infrastructure
BOP others
Total Fossil
Plant Cost
FGD
ESP/FF
DeNOx
Boiler
Turbine/ Generator
Page 10
Proprietary 10© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Hitachi’s Value to North American Energy Business
EPCOR / Genesee Project 495 MW
MEC / Walter Scott, Jr. Energy Center 850 MW
EPCOR / Keep Hills Project 495 MW
Exelon Victoria County 2 x 1500 MW (ABWR)
Seminole / Palatka 1&2 2 x 750 MW (SCR Retrofit)
EPC Projects
EPCOR / Genesee Project 495 MW
MEC / Walter Scott, Jr. Energy Center 850 MW
EPCOR / Keep Hills Project 495 MW
Duke / Cliffside 825 MW
WE / Elm Road 2 x 660 MW
Boiler Projects
Page 11
Proprietary 11© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Hitachi’s Value to North American Energy Business
EPCOR / Genesee Project 495 MW
MEC / Walter Scott, Jr. Energy Center 850 MW
WE / Elm Road 2 x 660 MW
EPCOR / Keep Hills Project 495 MW
E.ON US / Trimble County 750 MW
CLECO / Rodemacher 600 MW
Chase / Las Brisas Energy Center 660 MW
Turbine Generators
CPS Energy / Spruce 750 MW
E.ON US / Trimble County 750 MW
LS Power / Sandy Creek 900 MW
WE / Elm Road 2 x 660 MW
Boiler Feed Pump Turbines
Page 12
Proprietary 12© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Hitachi’s Value to North American Energy Business
Minn. Power / Boswell AQCS Retrofit 375 MW
Ameren FGD Units (Alliance Agreement) 360-590 MW
Seminole / Palatka 1&2 SCR Retrofit 2 x 750 MW
Duke / Cliffside SCR 825 MW
PSE&G / Hudson SCR Retrofit 600 MW
East Kentucky SCR Retrofit 250 MW
E.ON US / Trimble County SCR System 750 MW
Confidential SCR Retrofit 3 x 850 MW
Multiple US Utilities Catalyst i.e. Southern and AEP
Fleet Contracts
AQCS
Significant Technology Presence in Market
NYPA / Gilboa 1160 MW
Over 11,000 MW of installed Hydro Turbines in the US
inclusive of 8,000 MW of Pump Storage Turbines
Hydro
Page 13
Proprietary 13© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Once-Through, Benson
853MW
5,579,000 lb/h
3,803 psig/ 1057 ゚F / 1103 ゚F
PRB
Boiler Type :
Generator Output :
Main Steam Flow :
Steam Conditions :
Commercial Operation : June 2007
Fuel :
MidAmerican Energy Company
Walter Scott, Jr. Energy Center Unit 4
Latest Hitachi Boilers in North America
GUARANTEE
VALUES
PERFORMANCE
TEST
Heat Rate 8,899 Btu/kWh 8,697 Btu/kWh
MW’s 790,000 814,904
Six supercritical variable pressure boilers awarded to Hitachi in North America in
the last eight years.Three already in operation.
Better Heat Rate / Output Guarantee
Power Plant of the Year 2007
Page 14
Proprietary 14© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Power Magazine Top Plant of the Year - 2009
2009 Power Magazine Top Plant Award
In 2006, Hitachi Power Systems America, Ltd. was awarded an EPC
contract through the competitive bidding process by Seminole Electric
Cooperative, Inc. (SECI) for the SCR System retrofit on both Units 1 and 2
(750MW each) located in Palatka, Florida. As a non-profit cooperative,
Seminole seeks the most cost effective solution to meet its long-term
objective of environmentally friendly and sustainable operation. Seminole
decided installing these SCR Systems would be the best option to meet
the Clean Air Interstate Rule requirements……..
Page 15
Proprietary 15© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
on behalf of the Seminole staff and our Member Cooperatives to thank you, the Hitachi Power Systems America staff, and your partners for a superb job in supporting and installing the Selective Catalytic Reduction (SCR) System
We, and our Members were pleased to learn that SGS’s Pollution Control
Project (in which the SCR installation was a major contributor) received a
prestigious award from Power Magazine as one of the world’s top coal-fired
plant projects; distinguishing itself as an industry leader
Power Magazine Top Plant of the Year
Page 16
Proprietary 16© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Seminole SCR Scope Depiction – SCR Area
Boiler
AIG
MixersSCR
Catalyst (Two Layers)
ESP
Diverter Damper Air Heater Upgrades
Seminole Unit 1 & 2 SCR Retrofit
HPSA Contract 52-1017-0000
Structural Steel
Existing: Green
New: Other Color
Page 17
Proprietary 17© Hitachi Power Systems America, Ltd. 2010. All rights reserved.
Seminole Unit 1 & 2 SCR Retrofit
HPSA Contract 52-1017-0000
All Shown Equipment is New
and in HPSA’s Scope
Seminole SCR Scope Depiction – U2A System
Page 18
Proprietary 18© Hitachi Power Systems America, Ltd. 2010. All rights reserved.Copyright © Hitachi,Ltd.2009 All rights reserved
SEMINOLE SCR RETROFIT
START
OF THE
FIRST
OUTAGE
Page 19
Proprietary 19© Hitachi Power Systems America, Ltd. 2010. All rights reserved.Copyright © Hitachi,Ltd.2009 All rights reserved
SEMINOLE SCR RETROFIT
Before
After (End of First Outage)
Page 20
Proprietary 20© Hitachi Power Systems America, Ltd. 2010. All rights reserved.Copyright © Hitachi,Ltd.2009 All rights reserved
SEMINOLE SCR SITE PHOTOS
PROGRESS WORK
OCCURING
BETWEEN
END OF FIRST OUTAGE
AND
START OF THE
SECOND OUTAGE
Page 21
Proprietary 21© Hitachi Power Systems America, Ltd. 2010. All rights reserved.Copyright © Hitachi,Ltd.2009 All rights reserved
SEMINOLE SCR SITE PHOTOS
PROGRESS WORK
OCCURING
BETWEEN
END OF FIRST OUTAGE
AND
START OF THE
SECOND OUTAGE
Page 22
Proprietary 22© Hitachi Power Systems America, Ltd. 2010. All rights reserved.Copyright © Hitachi,Ltd.2009 All rights reserved
SEMINOLE SCR SITE PHOTOS
COMPLETE
SCR
ERECTED
Page 23
Proprietary 23© Hitachi Power Systems America, Ltd. 2010. All rights reserved.Copyright © Hitachi,Ltd.2009 All rights reserved
SEMINOLE SCR SITE PHOTOS
COMPLETE
U2A SYSTEM
ERECTED
Page 24