Top Banner
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453
12

HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

Jan 18, 2016

Download

Documents

Brooke Davis
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

HiRadMat –Users Meeting

6/2/2015

Adrian Fabich

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453

Page 2: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 2

HiRadMat remainder

HRM-TB 2. Feb. 2015

• HRMT 10 – WTHIMBLE– Preparing for PIE

• HRMT 14 – LCMAT– Exp. Cubicle hosted in build 954– Mobile table 02 to be recuperated– Use again for HRMT23

• HRMT 09 – LCOL– Exp. Cubicle hosted in build 954– Mobile table 02 to be recuperated, to be returned to HRM

• HRMT 12 – LPROT– Hosted in TNC – cool-down– Recuperated “today” – EDMS 1471655– Table 04 returned to HiRadMat

• WANF blocks– Disposal scheduled January 2016– Preparations to be discussed with DGS/RP now

Page 3: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 3

Feed-throughs - status• Infrastructure installation removed

– (water cooled) cabling– Water piping– Cable trays

• Drilling w7-8, completed until 19th Feb. 2015• Cabling between TNC and TT61

– NE48 x 6– Additional star point in TT61– Electricity available– ? Specifications of the transparent feed-through window?– Additional users’ needs?

• submit to [email protected] for optimisation

6/2/2015

Page 4: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 4

Demin. water

• Nous avons 35kW de puissance de refroidissement disponible au niveau des tables avec un débit max de 3m3/h à 27°C.

• Nous pouvons avoir une pression max à l’entrée de la table à 9 bars.

6/2/2015

Page 5: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 5

HiRadMat beam times in 2014/2015

6/2/2015

• 15 proposals received– including 2 parasitic experiments

– HiRadMat Scientific And Technical Committee• 9 proposals fully approved• Proposals received most recently will be reviewed in the coming months

Accumulated SPS cycle time • 2012: 48 hours• 2014: 8 hours (estimate)• 2015: 75 hours (estimate)

BLMTPSG4GlassyC windowsBPM diamondBerrylium samplesSupra sextupoleCollimator jawsRotating collimatorAD targetUA9 crystalMicrophoneHigh power targetFiber BLMTDICollimator materials

Page 6: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 6

Proposals

6/2/2015

proposal # name index HRM-SB HRM-TBproposed beam time

1401 BLM2 19 Jan-151402 TPSG4 25 Aug-151403 GlassyC 15.12 May-151404 dBM 17 Dec-141405 BeGrid 24 Nov-151406 SextSC Jan-161407 Jaws 23 Jul-151408 RotColl 21 Sep-151409 RodTarg Apr-151410 CRY2 Nov-151411 MicOpt 20 Feb-151412 PTarg 22 Jun-15

fiber BLM Mar-151420 TDI 15.12 Oct-151421 MultiMat Feb-16

Page 7: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 76/2/2015

• 7 HRM slots• Every 4-5 weeks

Page 8: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 8

Scheduling

6/2/2015

Slots every 4-5 weeks– limited by RP aspects– HRM personnel resources

• Overall interest being scheduled end 2015– Highest intensities available– Readiness of experimental HW

Page 9: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 9

Assigned beam slots

6/2/2015

confirmed

Page 10: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 10HRM-TB 2. Feb. 2015

Page 11: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 11

Users’ BPM

6/2/2015

• Requested so far by– proposal 1409 – RodTarg– HRMT24 – BeGrid– proposal 1420 TCDI/TDI– Proposal 1410 - UA9

Name of Exp. Name of Exp.2 Name of Exp.3 Name of Exp.4HRMT27 HRMT24 TCDI/TDI (proposal 1420) UA9 (proposal 1410)

Beam intensity (N of Protons) 1E11 (min) - 2E12 (max) (total=3E13) 1.22E13 (min) - 4.9E13 (max) (total 2E14) 5E9 (min) - 3.46E13 (max) (total=4E14) 1E9 (min) - 4.9E13 (max) (total=5E14)Expected resolution (microns) 150 50/100 100 100Typical Beam size (mm^2) 1.5x1.5 0.3x0.3 0.31x0.31 0.5x0.5Comments 0.9 us pulse length Min. pulse intensity: 1 bunch for alignment Min. pulse intensity: 1 bunch for alignment

36 number of bunches Max. pulse intensity: 288 bunches Max. pulse intensity: 288 bunches

bunch intensity as low as 8.3E9 p/bunch Max. pulse intensity depends on availability of high-intensity bunches (4.9E13 assumes bunches a la 1.7E11)

min pulse intensity: 1 bunch

Page 12: HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

A. Fabich 12

BPM requirements

6/2/2015

• ABSOLUTE beam position ~0.1 mm– wrt to experimental setup (metrology)– As close as possible to the experimental setup – just upstream– Integrated in an (typical) experimental setup – on the mobile table

• ONLINE• Single bunch resolution

In the full range of the beam parameter space• 1-288 bunches/pulse• 1010-1011 ppb

• Provision/maintenance by BE/BI based on standard equipment/procedures

• Available by August 2015 for commissioning

Write-up to be discussed in week Requirements will be presented to BI techn. Board on 19th Feb.