RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA OGGI GARDEN INN (HGI) LUGLIO 2007 LUGLIO 2010
41

Hilton Garden Inn Venice: costruito con Sistema REP®

Aug 04, 2015

Download

Education

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA OGGI GARDEN INN (HGI)

LUGLIO 2007 LUGLIO 2010

Page 2: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA OGGI GARDEN INN (HGI)

STATO DI FATTO PIANO TIPOLUGLIO 2007

PROGETTO REALIZZATO PIANO TIPOLUGLIO 2010.IN VERDE LE PARTI CON ELEMENTI STRUTTURALI TECNOSTRUTTURE.

Page 3: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA OGGI GARDEN INN (HGI)

PROGETTO REALIZZATO – PIANO INTERRATO LUGLIO 2010. IN VERDE LE PARTI CON ELEMENTI STRUTTURALI TECNOSTRUTTURE.

Page 4: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA OGGI GARDEN INN (HGI)

REALIZZAZIONE OPERE CON PRODOTTI TECNOSTRUTTURE. OBIETTIVI:

RIDUZIONE TEMPI DI REALIZZAZIONE.

MEDESIME GARANZIE ALLA RESISTENZA AL FUOCO.

RAPPORTO VANTAGGIOSO TEMPI / COSTI.

POSSIBILITA' DI SFRUTTARE IL MAGGIORSPAZIO INTERNO IN RELAZIONE AI MINORIINGOMBRI STRUTTURALI.

Page 5: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

• Specifica tempo impiegato per esecuzione dei solai

• PARCHEGGIO INTERRATO MQ. 2600 GIORNI 60 N.C. DA APRILE A MAGGIO 2009.

• SOLAI IN ELEVAZIONE MQ. 3160 GIORNI 90 N.C. DA LUGLIO A OTTOBRE 2009.

Page 6: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -

OGGI GARDEN INN (HGI)

• Specifica solai nella parte nuova realizzata con sistemi brevettati TECNOSTRUTTURE

SOLAIOSPESSORE SOLAIO

SOVRACCARICOKN\MQPER. ACC.

TRAVI PILASTRI TIPO SOLAIO

CLASSEREI

SUPERFICIEMQ.

NOTE

PARCHEGGIOINTERRATO 38 25 5 REP® CLS.

H 58 IN OPERA ALVEOLARE 30+8 REI 90 MQ. 2600

LUCE MAX

7,50 ML.

ZONA SERIVI HOTEL INTERRATO

25 2 4 ------- IN OPERA PREDALLE 4+16+5

REI 120REI 180 MQ. 560

1° LIVELLOCAMERE 23 3 2 SETTI IN

OPERA PREDALLE

4+14+5 MQ. 470

SALA CONGRESSI 30 2 4 REP® NOR

H. 27 IN OPERA PREDALLE 5+20+5 REI 90 MQ. 410 LUCE MAX

7,50 ML.

COPERTURA SALA CONGRESSI

30 2 2 REP® NOR H. 27

PREDALLE 5+20+5 REI 90 MQ. 410 LUCE MAX

7,50 ML.

DA 2° LIVELLO A COPERTURA 23 3 2 REP® NOR

H. 20PDTI®

CM. 20X20PREDALLE

4+15+4 MQ. 3160 LUCE MAX6,00 ML.

Page 7: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

POSIZIONE MARTINETTI OLEODINAMICI

POSIZIONE DEI TRASDUTTORI DI SPOSTAMENTO

SCHEMA CARICO E APPLICAZIONE POSIZIONE TRASDUTTORI DI SPOSTAMENTO

ZONA BAR

Page 8: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

POSIZIONE MARTINETTI OLEODINAMICI

POSIZIONE DEI TRASDUTTORI DI SPOSTAMENTO

SCHEMA CARICO E APPLICAZIONE POSIZIONE TRASDUTTORI DI SPOSTAMENTO

ZONA CAMERE

Page 9: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

SCHEMA TRAVI SOLAIO PARCHEGGIO INTERRATO.

Page 10: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

Page 11: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

SCHEMA SOLAIO PARCHEGGIO INTERRATO.

Page 12: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

SCHEMA SOLAIO ZONA SERVIZI HOTEL INTERRATI.

Page 13: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

SCHEMA SOLAIO ZONA BAR.

Page 14: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

SCHEMA SOLAIO COPERTURA SALA CONGRESSI.

Page 15: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

SCHEMA TRAVI E SOLAIO 1° PIANO CAMERE.

Page 16: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

SCHEMA TRAVI E SOLAIO CAMERE DA 2° PIANO A COPERTURA.

Page 17: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

Page 18: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

CASSERATURA PILASTRI IN OPERA PARCHEGGIO INTERRATOMARZO 2009

CASSERATURA PILASTRI IN OPERA PARCHEGGIO INTERRATOAPRILE 2009

Page 19: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA OGGI GARDEN INN (HGI)

POSA TRAVI REP® CLS H.58 PARCHEGGIO INTERRATOAPRILE 2009.

PARTICOLARI DI POSA TRAVI REP® CLS H.58 PARCHEGGIO INTERRATO

Page 20: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

POSA TRAVI REP® CLS H. 58 CM.PARCHEGGIO INTERRATOAPRILE 2009.

POSA SOLAIO ALVEOLARE H. 30+8 CM.PARCHEGGIO INTERRATOAPRILE 2009.

Page 21: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA OGGI GARDEN INN (HGI)

POSA SOLAIO ALVEOLARE H. 30+8PARCHEGGIO INTERRATOAPRILE 2009.

POSA SOLAIO ALVEOLARE H. 30+8PARCHEGGIO INTERRATOMAGGIO 2009.

Page 22: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

GETTO SETTI SU ZONA SERVIZI INTERRATI HOTELMAGGIO 2009.

VISTA FINALE PARCHEGGI INTERRATIPILASTRI – TRAVI – SOLAIOLUGLIO 2009.

Page 23: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

VISTA STRUTTURA PDTI®

PRIMA COLONNALUGLIO 2009.

VISTA STRUTTURA PDTI®PRIMA COLONNALUGLIO 2009.

Page 24: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

PARTICOLARE ATTACCO A TERRA PILASTRO PDTI®LUGLIO 2009.

PARTICOLARE ATTACCO TRAVE REP® E PILASTRO PDTI®.LUGLIO 2009.

Page 25: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

PARTICOLARE PILASTRO PDTI® CON APPOGGI TRAVI SU COLONNA CENTRALELUGLIO 2009. PARTICOLARE PILASTRO PDTI® CON

APPOGGI TRAVI COLONNA LATERALELUGLIO 2009.

Page 26: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

PILASTRO PDTI CENTRALE CON TRAVE REP®

LUGLIO 2009.

Page 27: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

STRUTTURA CON PILASTRI PDTI® E TRAVI REP®

ZONA CAMERELUGLIO 2009

Page 28: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

Page 29: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

TRATTAMENTI CON PRODOTTI INTUMESCENTI SU STRUTTURE IN FERRO PER SODDISFARE LA CLASSE REI PREVISTA DALLA NORMATIVA.

Page 30: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

• SEQUENZA DELLA REALIZZAZIONE CON PRODOTTI

• TECNOSTRUTTURE

Page 31: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 02 LUGLIO 2008

Page 32: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 02 GIUGNO 2009

Page 33: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 02 LUGLIO 2009

Page 34: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 23 LUGLIO 2009

Page 35: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 27 AGOSTO 2009

Page 36: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 25 SETTEMBRE 2009

Page 37: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 20 OTTOBRE 2009

Page 38: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 24 GENNAIO 2010

Page 39: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 14 APRILE 2010

Page 40: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 11 AGOSTO 2010

Page 41: Hilton Garden Inn Venice: costruito con Sistema REP®

RISTRUTTURAZIONE ED AMPLIAMENTO EX HOTEL CAPITOL MESTRE VENEZIA -OGGI GARDEN INN (HGI)

FOTO DEL 31 AGOSTO 2010