Hillsborough County Public Works Project Deliverable Checklist , Hillsborough County Project Manager , Consultant Project Manager Resubmittal # Date: To: From: Hillsborough County CIP # Project Name: Submittal Stage: (Check Box for items submitted) ☐ Executed Scope ☐ Responses to Comments ☐ Permit Documentation ☐ Notes to Reviewer ☐ Geometry Calculations ☐ PER ☐ Drainage Report / Calculations ☐ Roadway Plans ☐ Stormwater Model Files ☐ Signing & Marking Plans ☐ Structural Calculations ☐ Signalization Plans ☐ Traffic Analysis Report ☐ Lighting Plans ☐ Signal Warrant Study ☐ Utility Notification Letters ☐ Structure Plans ☐ Lighting Design Analysis Report ☐ Utility Schedule ☐ Geotechnical Design Report ☐ Pavement Design ☐ ROW Survey Files ☐ Design Exceptions ☐ Topographic Files ☐ Legal Descriptions ☐ Design Criteria ☐ Parcel Sketch ☐ Supplemental Specifications ☐ Meeting Minutes ☐ Title Search ☐ DGN or DWG Plan Files ☐ Drainage Plans ☐ QA/QC Mark Up Plans/Reports The current estimated construction cost is $ The prior estimated construction cost was $ The cost differential is $ , a change of from the prior estimate This difference is explained as follows: I certify all documents “checked” above are included in the delivery of this phase submittal. Consultant Project Manager Signature Print Name Date I certify all documents “checked” above have been delivered to Hillsborough County. Hillsborough County Project Manager Signature Print Name Date Version 4 - 02/27/2020 ☐ ITS Plans ☐ Opinion of Probable Costs ☐ Bridge Hydraulics Report ☐ ☐ Water Quality Model ☐ Typical Section Package ☐ Landscaping Plans ☐ Design Documentation Report