LEADING GLOBAL ENGINEERING SDN BHD

1

1.Equlization tank leaking

2. Blower room wall crack

Comments Actions

Page 2: hihui

LEADING GLOBAL ENGINEERING SDN BHD

2

3. Provide one more collection bin at primary screen chamber

5.Provide 1 nos grit ceollection bin for grit classifier

4.Provide 2 nos collection bin at secondary screen chamber as per state in As-built drawing.

Page 3: hihui

LEADING GLOBAL ENGINEERING SDN BHD

3

7.Screening plants surrounding fencing, such as trim tree and grass (up to 5ft outside fencing)

8.Sludge drying bed crack

6.Staircase at sludge holding tank crack.

Page 4: hihui

LEADING GLOBAL ENGINEERING SDN BHD

4

9.To clean up chlorination chamber tank, SBR tank, incoming chamber from algae and litter (maintainance)

10.To paint staircase handrailing at primary screen chamber.

11.Spare part:To supply as per guidleline in MSIG Vol. IV page 160

Page 5: hihui

LEADING GLOBAL ENGINEERING SDN BHD

5

12.No access at equalization tank, 5m minimum access and screening, MSIG vol. IV figure 4.3 surrounding plant.

13.To install sump (near SHT) properly follow As-built drawing.

14.To clean up screw conveyor (fine screen)

On site construction according approve drawing.

Shall monitor next inspection.

Page 6: hihui

LEADING GLOBAL ENGINEERING SDN BHD

6

15.To extend both side of the screw container

16.To install FRP plate at distribution chamber properly

17.Grit pump motor no.1 single phase, to replace with 3 phase.

Install with SPAN approval.

Page 7: hihui

LEADING GLOBAL ENGINEERING SDN BHD

7

18.Thickener motor no 1 & 2 single phase to replace with 3-phase.

19.To provide control diagram for each equipment provide.

20.Beacon light not function

Install with SPAN approval.

Page 8: hihui

LEADING GLOBAL ENGINEERING SDN BHD

8

21.Buffer zone area not clear In As-Built drawing. To enlarge STP area which indicate buffer zone.

22.To install plate at final effluent discharge to avoid backflow.

23.To extend I-beam until outside blower room to lift up equipment purpose.

Buffer zone indicates in as built drawing.

Page 9: hihui

LEADING GLOBAL ENGINEERING SDN BHD

9

24.To clear outstanding bill for both TNB and PBA during construction period until plant take over. To provide both statement bill.

25.To provide access to TNB meter reading (cement or tar)

26.To provide access (staircase) at gate valve area between EQ tank and SBR chamber.

Page 10: hihui

LEADING GLOBAL ENGINEERING SDN BHD

10

27.To provide accessories such as stainless steel rakes, rubbish bin, and display M&E electrical diagram.

28.To install compound lighting plate properly. Gap between plate and ground.

Already provided.