MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost Roadway Projects 11-00001-00 TxDOT Bastrop US 290 1 Mile East of FM 696 8.864 Miles East of FM 696 Widen to a 4-lane divided. 2018 $50,303,707.00 11-00002-00 TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and seal coat. 2017 $1,441,999.00 11-00003-00 TxDOT Bastrop US 290 FM 2104 Lee County Line Widen to 4-Lane Divided 2018 $29,872,318.00 11-00005-00 TxDOT Bastrop SH 21 1.187 Miles West of SH 95 0.668 Miles West of SH 95 Construction of 2 New 2 Lane Frontage Roads along the Colorado River Bridge and Convert the Existing 2 Lane 2 Way to 2 Lane One Way Frontage Roads along SH 21 2019 $35,832,668.00 11-00006-00 City of Smithville Bastrop SH 95 Smithville High School LP 230 at Fawcett Street Widen SH 95. 2019 $3,800,000.00 CAMPO 2040 Regional Transportation Plan
126

Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

Jul 07, 2019

Download

Documents

Ngo Ngo
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

11-00001-00 TxDOT Bastrop US 290 1 Mile East of FM 696 8.864 Miles East of FM 696

Widen to a 4-lane divided. 2018 $50,303,707.00

11-00002-00 TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and seal coat. 2017 $1,441,999.00

11-00003-00 TxDOT Bastrop US 290 FM 2104 Lee County Line Widen to 4-Lane Divided 2018 $29,872,318.00

11-00005-00 TxDOT Bastrop SH 21 1.187 Miles West of SH 95 0.668 Miles West of SH 95

Construction of 2 New 2 Lane Frontage Roads along the Colorado River Bridge and Convert the Existing 2 Lane 2 Way to 2 Lane One Way Frontage Roads along SH 21

2019 $35,832,668.00

11-00006-00 City of Smithville Bastrop SH 95 Smithville High School LP 230 at Fawcett Street Widen SH 95. 2019 $3,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 2: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

11-00007-00 Bastrop County Bastrop SH 21 SH 71 Caldwell County Line Construct MAD-4 or Super 2 2023 $5,646,000.00

11-00008-00 TxDOT Bastrop SH 71 west of Colorado River east of Loop 150 E Construct 4-lane freeway with 3-lane frontage roads

2015 $45,400,000.00

11-00009-00 Smithville Bastrop SH 95 Loop 230 Smithville High School Add continuous turn lane and sidewalks (both sides)

2015 $4,200,000.00

11-00010-00 Elgin Bastrop FM 1100 Travis County Line SH 95 Construct MAD-4 2040 $24,200,000.00

11-00011-00 City of Bastrop Bastrop Blakely Lane Extension Blakely Lane Jessica Place Plan alignment and construct extension of Blakely Lane east of Burleson Crossing to connect to Jessica Place in Riverside Grove between Hawthorne Street and Cedar Street as a curb and gutter roadway with a storm sewer system and sidewalk.

2021 $1,200,000.00

CAMPO 2040 Regional Transportation Plan

Page 3: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

11-00012-00 City of Bastrop Bastrop Hasler Boulevard Marie Street Hwy 304. Plan alignment and construct extension of Hasler Boulevard west of Marie Street to connect to Hwy 304 at Hunters Point Drive. Curb and gutter roadway with sidewalk. Collector Street 45 feet wide (FOC-FOC), approximately 5,800 LF. Shown as a Future Major C

2019 $2,900,000.00

11-00013-00 City of Bastrop Bastrop Mesquite Street Mesquite Street Reids Bend (CR 41) Re-construct Mesquite Street west to connect to Reids Bend (CR 41)

2025 $2,900,000.00

11-00014-00 Bastrop County Bastrop Arterial Street Improvement Program

. - $5,100,000.00

11-00015-00 City of Bastrop Bastrop Arterial Street Improvement Program

. - $25,900,000.00

11-00016-00 Smithville Bastrop Arterial Street Improvement Program

. - $4,600,000.00

CAMPO 2040 Regional Transportation Plan

Page 4: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

11-00017-00 TxDOT Bastrop SH 71 Intersection at FM 1209 Construct overpass. 2024 $26,000,000.00

11-00018-00 TxDOT Bastrop SH 71 Intersection at Pope Bend Road

Construct overpass. 2024 $26,000,000.00

11-00019-00 TxDOT Bastrop FM 812 Travis County Line SH 21 Improve 2-lane roadway to MAD-4. 2025 $10,000,000.00

11-00020-00 TxDOT Bastrop SH 71 Intersection at Tucker Hill Lane

Construct overpass. 2021 $24,000,000.00

11-00021-00 Bastrop County Bastrop FM 1704 FM 969 TX 71 Extend FM 1704 south of FM 969 and connect to Colorado Dr. via a new bridge across the Colorado River; upgrade Colorado Dr. to an arterial from bridge to SH 71

2040 $20,433,000.00

CAMPO 2040 Regional Transportation Plan

Page 5: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

11-00022-00 Bastrop County/City of

Bastrop

Bastrop SH 304 SH 304 at Shiloh Rd. Lovers Lane 0.3 Miles South of SH 71

Construct new road connecting SH 304/ Shiloh Rd intersection with Lovers Lane via a new bridge across the Colorado River - includes a connection to Margie's Way.

2040 $8,400,000.00

11-00023-00 Bastrop County Bastop Old Lexington Road/ FM 3000

0.365 Miles West of Racoon Road

FM 696 Realign Old Lexington Rd. and upgrade to minor arterial; extend Old Lexington Rd. to FM 696 to the east

2040 $3,406,000.00

11-00024-00 Bastrop County Bastrop New Road 2.267 Miles East of Wolf Lane

SH 71 0.277 Miles West of SH 304

Construct a new arterial road connecting SH 71 to Pearce Lane/FM 535

2040 $9,111,000.00

11-00025-00 Bastrop County/City of

Bastrop

Bastrop Shiloh Rd SH 20 SH 304 Upgrade Shiloh Rd. to a collector from SH 20 to SH 304

2040 $1,382,000.00

11-00026-00 TxDOT Bastrop SH 21 Caldwell County Line SH 71 PROVIDE SUPER 2 PASSING LANES 2018 $4,656,528.00

CAMPO 2040 Regional Transportation Plan

Page 6: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

11-00027-00 TxDOT Bastrop US 290 1.0 Miles East of FM 696 8.864 Miles East of FM 696

Reconstruct existing 4-Lane undivided roadway to a 4-Lane divided roadway

2019 $44,456,558.53

11-00028-00 TxDOT Bastrop US 290 FM 2104 Lee C/L Reconstruct existing 4-Lane undivided roadway to a 4-Lane divided roadway

2019 $29,000,875.67

11-00029-00 TxDOT Bastrop US 290 8.864 Miles East of FM 696 9.12 Miles East of FM 696

Reconstruct existing 4-Lane undivided roadway to a 4-Lane divided roadway

2019 $2,119,101.19

11-00030-00 TxDOT Bastrop SH 71 At FM 1209 Construct 2-Lane Overpass 2021 $46,381,883.25

11-00031-00 TxDOT Bastrop SH 71 At Pope Bend Rd. Construct 2-Lane Overpass 2020 $33,293,974.25

CAMPO 2040 Regional Transportation Plan

Page 7: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

11-00032-00 TxDOT Bastrop SH 71 Travis / Bastrop County Line

.65 Miles East of Tucker Hill Lane

Construct Overpass and Add 2 Lane One-Way Eastbound And Westbound Frontage Roads

2020 $24,535,803.38

11-00034-00 TxDOT Bastrop SH 21 0.668 Miles West of SH 95 0.268 Miles West of SH 95

Convert Existing 2-Lane Two-Way Frontage Roads To 2-Lane One Way Frontage Roads

2019 $17,475,675.12

11-00035-00 City of Bastrop Bastrop CS Bastrop State Park Chestnut Street at Loop 150

Construct Multi-Use Path 2020 $1,628,302.97

11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane

2021 $8,985,397.00

12-00000-00 City of Smithville Bastrop SL 230 SH 95 to Olive Street Bluebonnet Circle to Webb Street

ADA sidewalks. 2018 $591,093.00

CAMPO 2040 Regional Transportation Plan

Page 8: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

12-00001-00 City of Bastrop Bastrop CS Bastrop State Park LP 150 at Chestnut Street Construct multi-use path. 2019 $1,450,000.00

12-00002-00 City of Bastrop Bastrop VA Old Austin Highway Walnut Street Complete 1.8 mile ''River Loop'' shared-use path along Loop 150, SH 71, Water St, and Main St

2019 $812,000.00

21-00001-00 TxDOT Burnet US 281 RM 2147 East .466 Mi North of SH 71 Add Center Left Turn Lane and Shoulders

2018 $9,502,732.00

21-00002-00 Burnet County Burnet Arterial Street Improvement Program

. - $87,700,000.00

21-00003-00 City of Burnet Burnet Arterial Street Improvement Program

. - $11,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 9: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

21-00004-00 Marble Falls Burnet Arterial Street Improvement Program

. - $12,000,000.00

21-00005-00 TxDOT Burnet US 281 Intersection at SH 71 Reconstruct interchange. 2025 $55,000,000.00

21-00006-00 Burnet County Burnet SH 29 RM 243 North Williamson County Line Reconstruct from 4-lane to four 11-foot lanes, 12-foot continuous turn lane and 5-foot shoulders

2021 $5,568,000.00

21-00007-00 Burnet County Burnet US 281 SH 71 Blanco County Line Reconstruct from 4-lane to four 12-foot lanes, 14-foot continuous turn lane and 10-foot shoulders

2021 $6,032,000.00

21-00008-00 Burnet County Burnet US 281 Nature Heights Drive Lantana Drive Construct curb and gutter, sidewalks and shoulders

2021 $1,430,000.00

CAMPO 2040 Regional Transportation Plan

Page 10: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

21-00009-00 Burnet County Burnet Wirtz Dam Road RM 1431 RM 2147 Engineering and Design of Bridge and Approaches

2019 $2,981,250.00

21-00009-01 Burnet County Burnet Wirtz Dam Road RM 1431 RM 2147 New twp-lane bridge and approaches 2023 $16,000,000.00

21-00010-00 Burnet County Burnet SH 71 Spur 191 Blanco County Line Reconstruct from 4-lane to four 12-foot lanes, 14-foot continuous turn lane and 10-foot shoulders

2021 $9,720,000.00

21-00011-00 Burnet County,TxDOT

Burnet US 281 At RM 1431 Intersection Improvements 2021 $1,620,000.00

31-00001-00 Hays County Caldwell SH 80 CR 266 .215 Mi E of CR 266 Install left turn lane 2019 $932,226.00

CAMPO 2040 Regional Transportation Plan

Page 11: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

31-00002-00 Caldwell County Caldwell CS SH 142 Clear Fork Street Engineering for a 4-lane roadway. 2019 $200,000.00

31-00003-00 TxDOT Caldwell SH 80 SH 21 FM 1984 Complete gap in shoulder for bicycle travel.

2019 $5,400,000.00

31-00004-00 Caldwell Caldwell SH 21 Hays County Line SH 130 Widen to 4 lanes 2025 $12,500,000.00

31-00005-00 Caldwell Caldwell SH 80 FM 1979 SH 130 Widen to 4 lanes 2025 $55,900,000.00

31-00006-00 Caldwell Caldwell SH 80 County Line Road FM 1979 Widen to 6 lanes with raised median 2035 $100,400,000.00

CAMPO 2040 Regional Transportation Plan

Page 12: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

31-00007-00 Caldwell Caldwell SH 142 SH 80 Yarrington Road Extension

Widen to 4 lanes 2025 $8,800,000.00

31-00008-00 Caldwell Caldwell SH 142 Yarrington Road Extension FM 150 Extension Widen to 4 lanes 2025 $40,300,000.00

31-00009-00 Caldwell Caldwell SH 142 FM 150 Extension SH 130 MAD 4 2025 $104,000,000.00

31-00010-00 Lockhart Caldwell FM 2001 Expansion / Silent Valley Rd

.14 Miles south of SH 142 Silent Valley Rd Northward extension of City Line Road from a point .14 miles south of SH 142 to intersect Silent Valley Road

2040 $1,200,000.00

31-00011-00 Lockhart Caldwell City Line Road Extend City Line Rd from Clear Fork St

FM 20 Construct new roadway 2035 $7,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 13: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

31-00012-00 Lockhart Caldwell City Line Road Extend City Line Rd south and southeast from FM 20 to and along MLK Jr Industrial Blvd

US 183 Construct new 4-lane arterial 2035 $5,600,000.00

31-00013-00 Lockhart Caldwell City Line Road SH 142 Clear Fork Rd Rehab and widen to 4 lanes 2035 $3,600,000.00

31-00014-00 Lockhart Caldwell CR 214 / Graham Road

Connect CR 215 US 183 via CR 214 Alternate to New Roadway 85 2035 $5,600,000.00

31-00015-00 Lockhart Caldwell E MLK Jr Industrial Blvd Extend E MLK Jr Industrial Blvd

FM1322 New MAU-4 2040 $2,200,000.00

31-00016-00 Lockhart Caldwell N Mockingbird Lane Extend Mockingbird Ln Silent Valley Rd. New MAU-4 2040 $10,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 14: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

31-00017-00 Lockhart Caldwell New Roadway 30 US 183 flood events Proposed alternative to FM 1322 2035 $11,700,000.00

31-00018-00 Lockhart Caldwell New Roadway 34 FM 1322 CR 203. Construct new roadway 2035 $3,800,000.00

31-00019-00 Lockhart Caldwell New Roadway 46 CR 215 CR 213/Robin Ranch Rd Construct new roadway 2035 $3,500,000.00

31-00020-00 Lockhart Caldwell New Roadway 47 CR 221 SH 130 at Plum Creek U-turn bridge

Construct new roadway 2035 $10,900,000.00

31-00021-00 Lockhart Caldwell San Jacinto Street FM 20 MLK Jr Industrial Blvd Construct new roadway 2035 $7,700,000.00

CAMPO 2040 Regional Transportation Plan

Page 15: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

31-00023-00 Caldwell Caldwell Arterial Street Improvement Program

. - $8,900,000.00

31-00024-00 Lockhart Caldwell Arterial Street Improvement Program

. - $6,600,000.00

31-00025-00 TxDOT Caldwell SH 21 Hays County Line Bastrop County Line Provide super 2 passing lanes. 2022 $14,900,000.00

31-00026-00 TxDOT Caldwell SH 21 Hays County Line Bastrop County Line PROVIDE SUPER 2 PASSING LANES 2018 $4,889,356.00

31-00028-00 Hays County, TxDOT Hays FM 110 SH 80 SH 21 Construct New 2 Lane Roadway and Shoulders

2019 $25,894,771.00

CAMPO 2040 Regional Transportation Plan

Page 16: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

31-00030-00 Hays County, TxDOT Hays FM 110 Hays County Line SH 80 Construct New 2 Lane Roadway and Shoulders

2019 $5,006,408.00

31-00033-00 CAMPO Caldwell FM 150/Yarrington Road

SH 21 (Hays) SH 130 (Caldwell) Design and Engineering for 7-Mile Extension of FM 150, 10-mile Extension of Yarrington Road

2019 $121,933,935.00

35-00001-00 Caldwell County Caldwell US 183 US 183 North of Luling US 183/SH 80 South of Luling

Alternatives analysis for relief route. 2017 $225,000.00

41-00001-00 Travis Travis IH 35 Yarrington Road RM 150 Mill, Seal, and TOM 2017 $1,811,693.00

41-00002-00 Hays County Hays IH 35 .741 Miles N. of Posey Road

Comal County Line Replace Bridges and Approaches 2020 $34,205,103.00

CAMPO 2040 Regional Transportation Plan

Page 17: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00005-00 City of Wimberley/Hays

County

Hays RM 12 .13 Miles North of RM 3237

.12 Miles South of RM 3237

Intersection improvements including adding turn lanes and pedestrian crossings

2019 $238,167.00

41-00006-00 Hays County Hays SH 80 .215 Mi W of CR 266 CR 266 Install left turn lane 2019 $932,226.00

41-00007-00 TxDOT Hays SH 21 .114 Mi West of FM 2001 Caldwell County Line Repair, Level-up, Widen and Overlay 2017 $5,387,294.00

41-00008-00 City of Wimberley/Hays

County

Hays RM 3237 RM 12 .22 Miles East of RM 12 Intersection improvements including adding turn lanes and pedestrian crossings

2019 $238,167.00

41-00009-00 City of San Marcos Hays CS LP 82 Commanche Street Intersection, signal, and bicycle and pedestrian improvements.

2017 $2,603,345.00

CAMPO 2040 Regional Transportation Plan

Page 18: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00011-00 Hays County Hays FM 2770 .955 Miles South of SL 4 1.414 Miles South of SL 4 Add left turn lane and shoulders. 2019 $2,250,000.00

41-00012-00 CTRMA/TxDOT Hays SH 45 Travis County Line FM 1626 Construction of a 4-lane tolled freeway (Project may be phased)

2017 $41,500,000.00

41-00013-00 Hays County Hays FM 2001 IH 35 SH 21 Widen to a 4-lane divided roadway by add two lanes and shoulders.

2017 $34,626,340.00

41-00014-00 TxDOT Hays SH 123 IH 35 DeZavalla Construct Sidewalks 2018 $815,000.00

41-00015-00 City of San Marcos Hays CS Hopkins Street from Moore Street

Bishop Street Reconstruct Hopkins Street from Bishop Street to Moore Street per the City's Complete Streets Policy.

2018 $3,050,000.00

CAMPO 2040 Regional Transportation Plan

Page 19: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00016-00 City of San Marcos Hays CS Hopkins Street from CM Allen Pkwy

Thorpe Road Design and construct multi-use bike/ped facility that connects existing Crosstown hike and bike trails to existing facility.

2020 $2,800,000.00

41-00017-00 City of Kyle Hays Dorman Lane At FM 1626 Feasibility study for proposed improvements at the intersection.

2017 $150,000.00

41-00018-00 TxDOT Hays IH-35 - Hays County SH 45 SE Posey Rd. IH-35 Improvement Projects 2020 $1,500,000,000.00

41-00019-00 Buda Hays IH-35 / OSR Connector Old San Antonio Rd IH-35 New 2-lane undivided 2018 $100,000.00

41-00020-00 Hays Hays US 290 W Blanco County Line RM 165 MAD-4 2030 $25,900,000.00

CAMPO 2040 Regional Transportation Plan

Page 20: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00021-00 Hays Hays US 290 W RM 165 NF 2. MAD-4 2030 $25,900,000.00

41-00022-00 Hays Hays US 290 W RM 12 Nutty Brown Rd MAD-6 2035 $21,800,000.00

41-00023-00 San Marcos Hays Loop 82 LBJ Dr IH-35 (Two way) MAD-4 2035 $1,200,000.00

41-00024-00 San Marcos Hays Loop 82 (Phase 1) Guadalupe St/Grove St LBJ Dr (One way) MAD-4 2035 $200,000.00

41-00025-00 San Marcos Hays Loop 82 / Aquarena Springs Dr

IH-35 Sessom Dr. MAD-4 2035 $5,100,000.00

CAMPO 2040 Regional Transportation Plan

Page 21: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00026-00 San Marcos Hays Loop 82 / Guadalupe University Dr Grove St (One way SB) MAD-4 2035 $3,800,000.00

41-00027-00 San Marcos Hays Loop 82 / LBJ University Dr Grove St (One way NB) MAD-4 2035 $2,400,000.00

41-00028-00 San Marcos Hays Loop 82 / University Dr Sessom Dr Guadalupe St. MAD-4 2035 $2,000,000.00

41-00029-00 Hays Hays SH 21 Caldwell County Line CR 159 (Yarrington) MAD-6 2030 $40,400,000.00

41-00030-00 Hays Hays SH 21 CR 159 (Yarrington) SH 80 MAD-6 2030 $32,200,000.00

CAMPO 2040 Regional Transportation Plan

Page 22: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00032-00 Hays Hays SH 80 SH 21 Caldwell County Line MAD-6 2030 $2,100,000.00

41-00033-00 San Marcos Hays SH 80 IH-35 SH 21. MAD-4 2035 $3,600,000.00

41-00034-00 San Marcos Hays SH 80 / E Hopkins Moore St Loop 82. MAD-4 2035 $1,200,000.00

41-00035-00 San Marcos Hays SH 80 / E Hopkins Loop 82 CM Allen. MAD-4 2035 $500,000.00

41-00036-00 San Marcos Hays SH 80 / E Hopkins CM Allen IH-35. MAD-4 2035 $3,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 23: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00037-00 San Marcos Hays SH 80 / Old RR 12 RM 12/Wonder World Dr Holland St MAD-4 2035 $7,200,000.00

41-00038-00 San Marcos Hays SH 80 / Old RR 12 Holland St Lindsey. MAD-4 2035 $2,200,000.00

41-00039-00 San Marcos Hays SH 80 / Old RR 12 / Moore St

Lindsey Hopkins. MAD-4 2035 $700,000.00

41-00040-00 Hays Hays SH 80 at Old Bastrop Hwy (CR 266)

East of Old Bastrop Hwy (CR 266)

East of Old Bastrop Hwy (CR 266)

Construct center left-turn lanes 2016 $1,500,000.00

41-00041-00 Hays Hays SH 123 Wonder World Dr Guadalupe County Line MAD-6 2025 $10,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 24: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00042-00 San Marcos Hays SH 123 IH-35 FM 621. MAD-6 2025 $6,600,000.00

41-00043-00 San Marcos Hays SH 123 FM 621 Wonder World Dr MAD-6 2030 $700,000.00

41-00044-00 Hays Hays FM 110 E - Phase 1 Interim

IH-35 N SH 123. MAD-2 2015 $61,500,000.00

41-00045-00 Hays Hays FM 110 E - Phase 2 Ultimate

IH-35 N Turnersville Rd Extension (NF 1)

MAD-4 2030 $4,500,000.00

41-00046-00 Hays Hays FM 110 E - Phase 2 Ultimate

Turnersville Rd Extension (NF1)

SH 123 MAD-4 2030 $26,600,000.00

CAMPO 2040 Regional Transportation Plan

Page 25: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00047-00 Hays Hays FM 150 Extension / NF 17 (Kyle)

FM 150 Kyle Loop. MAD-4 2025 $10,400,000.00

41-00048-00 Hays Hays FM 150 W RM 12 RM 1826. MAD-4 2025 $5,700,000.00

41-00049-00 Hays Hays FM 150 W RM 1826 FM 3237. MAD-4 2025 $15,600,000.00

41-00050-00 Hays Hays FM 150 W FM 3237 Kyle Loop SW MAD-4 2025 $12,500,000.00

41-00051-00 Hays Hays FM 150 W Kyle Loop SW FM 2770 MAD-4 2025 $3,100,000.00

CAMPO 2040 Regional Transportation Plan

Page 26: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00052-00 Kyle Hays FM 150 W / Center St Rebel Dr IH-35. MAD-2 2025 $11,000,000.00

41-00054-00 Hays Hays FM 165 US 290 Blanco County Line MAU-2 2030 $23,100,000.00

41-00055-00 Hays Hays FM 621 / Staples Rd SH 123 Guadalupe Line. MAU-2 2025 $14,800,000.00

41-00056-00 Hays Hays FM 967 FM 1626 Main St. MAD-2 2020 $13,800,000.00

41-00057-00 Hays Hays FM 967 FM 1826 FM 1626. MAU-4 2025 $17,400,000.00

CAMPO 2040 Regional Transportation Plan

Page 27: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00058-00 Hays Hays FM 967 / S. Loop 4 / S. Main St

Main St W Goforth. MAU-4 2020 $1,700,000.00

41-00059-00 Hays Hays FM 967 / S. Loop 4 / S. Main St

W Goforth IH-35. MAU-4 2020 $700,000.00

41-00060-00 Buda Hays FM 1626 0 FM 967 Widen to 4-lane divided 2013 $49,300,000.00

41-00061-00 Hays Hays FM 1626 FM 967 FM 2770. MAD-4 2015 $40,000,000.00

41-00062-00 Hays Hays FM 1626 SH 45 SW IH-35. MAD-6 2030 $49,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 28: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00063-00 Hays Hays FM 2439 / Hunter Rd Bishop RM 12/Wonder World Dr

MAD-2 2020 $3,600,000.00

41-00064-00 San Marcos Hays FM 2439 / Hunter Rd SH 80 Bishop. MNR-2 2020 $4,400,000.00

41-00065-00 Hays Hays FM 2439 / Hunter Rd Centerpoint Rd Comal County Line MAD-4 2025 $5,200,000.00

41-00066-00 Buda Hays FM 2770 FM 1626 Main St. Widen to 4-lane undivided 2024 $20,400,000.00

41-00067-00 Kyle Hays FM 2770 FM 1626 FM 150. MAD-4 2025 $20,500,000.00

CAMPO 2040 Regional Transportation Plan

Page 29: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00068-00 Hays Hays RM 12 FM 150 W Winters Mill Pkwy MAD-2 2025 $61,000,000.00

41-00069-00 Hays Hays RM 12 FM 3237 RM 32. MAD-2 2025 $24,500,000.00

41-00070-00 Hays Hays RM 12 Fitzhugh Rd FM 150 W MAD-4 2025 $5,800,000.00

41-00071-00 Hays Hays RM 12 FM 2439/Hunter Rd SH 123 MAD-6 2025 $4,500,000.00

41-00072-00 Hays Hays RM 12 Winters Mill FM 3237. MAD-2; designate as BR 12 2025 $11,700,000.00

CAMPO 2040 Regional Transportation Plan

Page 30: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00073-00 Hays Hays RM 12 RM 32 Old RR 12/SH 80 PKWY-4 2025 $96,200,000.00

41-00074-00 Wimberley Hays RM 12 and FM 3237 Intersection Improvement

RM 12 - north and south of FM 3237 - FM 3237

east of RM 12 Engineering, design and right-of-way purchase to add turn lanes and pedestrian crossings

2016 $400,000.00

41-00075-00 Hays Hays RM 32 Comal County Line RM 12 MAD-2 2030 $25,900,000.00

41-00076-00 Buda Hays RM 967 Goforth Rd IH-35. Widen to 4-lane undivided 2017 $17,300,000.00

41-00077-00 Hays Hays RM 1826* SH 45 SW Nutty Brown Rd Improve to MAD-4 2025 $13,600,000.00

CAMPO 2040 Regional Transportation Plan

Page 31: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00078-00 Hays Hays RM 1826 Nutty Brown Darden Hill. MAD-4 2025 $5,800,000.00

41-00079-00 Hays Hays RM 1826 Darden Hill Rd FM 150 (W) MAD-4 2025 $5,800,000.00

41-00080-00 Hays Hays RM 2325 Blanco County Jacob's Well. MAD-2 2025 $39,600,000.00

41-00081-00 Hays Hays RM 2325 Jacob's Well Wimberley City Limits MAD-2 2025 $12,100,000.00

41-00082-00 Hays Hays RM 3237 RM 12 Flite Acres Rd MAD-2 2025 $2,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 32: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00083-00 Hays Hays RM 3237 Flite Acres Winters Mill. MAD-2 2025 $3,100,000.00

41-00084-00 Hays Hays RM 3237 Winters Mill FM 150. MAD-2 2025 $2,100,000.00

41-00085-00 Hays Hays Bebee Rd IH-35 SH 21 Improve to MAD-2 2025 $36,600,000.00

41-00086-00 Kyle Hays Bunton/Goforth Road IH-35 Frontage Road Lehman Road Construct 3-lane road with continuous left turn lane up to 900' west of Brandi Circle.  From 900' west of Brandi Circle transition to existing 2-lane roadway.  Sidewalk along one side of the road.

2015 $5,000,000.00

41-00087-00 Kyle Hays Burleson Road Miller Street IH-35 Frontage at new connecting location

Construct 3-lane road with continuous left turn lane.  Sidewalk along one side of the road.

2016 $8,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 33: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00088-00 Buda Hays Cabela's Dr Main St Manchaca Springs Rd New 2-lane undivided 2024 $4,000,000.00

41-00089-00 Kyle Hays Center St Old Stagecoach FM 150. Widen to 4 lanes 2035 $7,900,000.00

41-00090-00 Hays Hays Centerpoint Rd RM 12 FM 2439. New MAD-4 2025 $14,500,000.00

41-00091-00 Hays Hays Centerpoint Rd / CR 234

IH-35 Old Bastrop Hwy. Improve to MAD-4 2025 $3,500,000.00

41-00092-00 Hays Hays Centerpoint Rd / CR 234

FM 2439 IH-35. Improve to MAD-4, dedicate right-of-way for railroad overpass

2025 $2,900,000.00

CAMPO 2040 Regional Transportation Plan

Page 34: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00093-00 Hays Hays Centerpoint Rd / CR 234

Old Bastrop Beback Inn Rd MAD-4 2025 $2,700,000.00

41-00094-00 Hays Hays Craddock Ave / NF 8 N LBJ Dr. Lime Kiln/River Ridge MAU-4 2025 $9,800,000.00

41-00095-00 Buda Hays Dacy Ln Hillside Terrace Bebee Rd. MAU-4 2025 $11,400,000.00

41-00096-00 Hays Hays Dacy Ln / Goforth Rd Bebee IH-35. MAU-4 2025 $11,400,000.00

41-00097-00 Hays Hays Darden Hill Rd / CR 162

FM 150 FM 1826. Improve to MAD-2 2025 $24,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 35: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00098-00 San Marcos Hays E River Ridge Pkwy IH-35 SH 21. MAD-4 2035 $16,800,000.00

41-00099-00 Hays Hays Elder Hill Rd / CR 170 RM 12 FM 150. Improve to MAU-2 2025 $7,800,000.00

41-00100-00 Hays Hays Fitzhugh Rd / CR 101 RM 12 Travis County Line Improve to MAU-4 2025 $5,500,000.00

41-00101-00 Buda Hays Garison Road Main St. Manchaca Springs Rd. Reconstruct/extend 2-lane undivided with sidewalks

2025 $6,500,000.00

41-00102-00 Buda Hays Garlic Creek Dr (new N/S)

SH 45 RM 967. New 4-lane divided 2025 $26,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 36: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00103-00 Kyle Hays Goforth Road Brent Boulevard Bunton Creek Road Construct 4-lane road. Sidewalk along one side of the road.

2016 $10,100,000.00

41-00104-00 Kyle Hays Goforth Road IH-35 Frontage Road Brent Boulevard Construct 3-lane road with continuous left turn lane.  Sidewalk along one side of the road.

2016 $10,100,000.00

41-00105-00 Buda Hays Hillside Terrace IH-35 Old Goforth Rd.. Widen to 4-lane divided, add sidewalks

2020 $3,600,000.00

41-00106-00 Buda Hays Hillside Terrace Old Goforth Rd FM 2001 Widen to 4-lane divided, add sidewalks

2020 $6,400,000.00

41-00108-00 San Marcos Hays Hopkins Street Reconstruction

Moore Street Bishop Street. Reconstruct Hopkins Street from Moore Street to Bishop Street to the City's Complete Street policy. Reconstruct the street, multi-use path, sidewalks, curb and gutter. The project will connect the Heritage Historical District with the City's Downtown Cen

$9,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 37: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00109-00 Hays Hays Jacobs Well Rd / NF 25

FM 2325 Wayside Dr. New MAU-2 2025 $13,800,000.00

41-00110-00 Hays Hays Kohlers Xing FM 2770 IH-35. New MAD-4 2025 $5,500,000.00

41-00111-00 Hays Hays Kyle Loop W NF 17 Old Stagecoach Rd MAD-4 2025 $15,500,000.00

41-00112-00 Hays Hays Kyle Loop W Old Stagecoach Rd IH-35. MAD-4 2025 $4,100,000.00

41-00113-00 Hays Hays Kyle Loop W FM 1626 NF 17. MAD 5 2025 $10,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 38: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00114-00 Kyle Hays Kyle Marketplace Frontage Road Reliever

North Burleson Street, east of the Union Pacific RR

City Lights Drive Construct 3-lane road. Sidewalk along one side of the road.

2016 $4,100,000.00

41-00115-00 Hays Hays Kyle Parkway IH-35 at FM 1626 SH 21 MAD-4 2030 $15,800,000.00

41-00116-00 Kyle Hays Lehman Road E RM 150 Goforth Road Construct 2-lane road with dedicated left turn lanes at cross streets and widen to 4 lanes at the Goforth Rd. intersection.  Sidewalk along one side of the road.

2016 $8,300,000.00

41-00117-00 Buda Hays Main St Sequoyah St Sequoyah St. Traffic signal warrant and potential signal

2018 $100,000.00

41-00118-00 Buda Hays Main St IH-35 Turnersville Rd. New 4-lane divided 2020 $2,400,000.00

CAMPO 2040 Regional Transportation Plan

Page 39: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00119-00 Buda Hays Main St IH-35 Firecracker Dr. Widen to 6-lane divided 2025 $31,700,000.00

41-00120-00 Buda Hays Main St Cabela's Dr IH-35. Widen to 6-lane divided 2027 $1,200,000.00

41-00121-00 Buda Hays Manchaca Springs Rd RM 967 IH-35 at Turnersville New 4-lane divided 2025 $61,100,000.00

41-00122-00 Hays Hays Marketplace Ave FM 967 IH-35 at Burleson Rd New MAD-4 2025 $6,500,000.00

41-00123-00 Hays Hays McCarty Ln / CR 233 FM 2439/Hunter Rd IH 35 Improve to MAD-4 2035 $2,300,000.00

CAMPO 2040 Regional Transportation Plan

Page 40: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00124-00 Hays Hays NF 2 (Dripping Springs) US 290 W US 290 Bypass MAU-4 2025 $8,300,000.00

41-00125-00 Hays Hays NF 6 (San Marcos) RM 12 FM 1102. New MAD-4 2025 $18,300,000.00

41-00126-00 Hays Hays NF 10 (Dripping Springs)

RM 12 US 290 SE Bypass MAU-4 2025 $3,000,000.00

41-00127-00 Hays Hays NF 12 (Driftwood) Elder Hill Rd FM 150 at RM 1826 New MAD-2 2025 $15,300,000.00

41-00128-00 Hays Hays NF 18 / Roger Hanks Ext.

US 290 W RM 12 New MAD-2 2025 $5,100,000.00

CAMPO 2040 Regional Transportation Plan

Page 41: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00129-00 Hays Hays Nutty Brown Rd / CR 163

US 290 RM 1826. Improve to MAD-4 2025 $8,600,000.00

41-00130-00 Buda Hays Old FM 2001 FM 2001 Old Goforth Rd. Reconstruct with TWLTL and sidewalks 2018 $1,800,000.00

41-00131-00 Kyle Hays Old Stagecoach Post Rd FM 150. MAU-2 2025 $13,700,000.00

41-00132-00 Hays Hays Posey Rd / CR 235 FM 2439 IH-35. Improve to MAD-4 2025 $1,500,000.00

41-00133-00 Hays Hays Posey Rd / CR 235 IH-35 Old Bastrop Hwy. Improve to MAD-4 2025 $2,500,000.00

CAMPO 2040 Regional Transportation Plan

Page 42: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00134-00 Hays Hays Post Rd / CR 140 IH-35 Aquarena Springs Rd. Improve to MAU-4 2035 $17,400,000.00

41-00135-00 San Marcos Hays River Ridge Pkwy Lime Kiln Rd Post Rd MAU-2 2025 $10,200,000.00

41-00136-00 San Marcos Hays River Ridge Pkwy Post Rd IH-35. MAD-4 2025 $8,600,000.00

41-00137-00 San Marcos Hays River Road RR Overpass & Road

Wal-Mart Aquarena Springs Dr. Construct RR overpass to replace existing underpass and construct 4-lane section

2015 $14,000,000.00

41-00138-00 Buda Hays Robert Light Blvd FM 2770 Main St/FM 967 New 4-lane divided with railroad overpass

2015 $16,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 43: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00139-00 Buda Hays Robert Light Blvd FM 1626 FM 2770. New 4-lane divided 2018 $27,100,000.00

41-00140-00 Hays Hays Robert S. Light Blvd. Phase 1 Interim

FM 1626 FM 967. Construct new MAD-2 with RR overpass 2020 $13,100,000.00

41-00141-00 Hays Hays Robert S. Light Blvd. Phase 2 Ultimate

FM 1626 FM 967. MAD-4 2025 $18,800,000.00

41-00142-00 Hays Hays Sawyer Ranch Rd / CR 164

US 290 Darden Hill Rd Improve to MAD-4 2025 $36,000,000.00

41-00143-00 Hays Hays Shadow Creek Blvd Hillside Terrace Bebee Rd. New MAD-2 2035 $35,900,000.00

CAMPO 2040 Regional Transportation Plan

Page 44: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00144-00 Hays Hays Turnersville Rd Extension SH 45 SE FM 2001 New MAD-4 2025 $11,300,000.00

41-00145-00 Hays Hays Turnersville Rd Extension FM 2001 FM 110. MAD-6 2025 $15,500,000.00

41-00146-00 Hays Hays Windy Hill Rd IH-35 Turnersville Rd extension. Improve to MAD-2 2025 $24,100,000.00

41-00147-00 Hays Hays Winter's Mill Parkway RM 12 FM 3237. MAU-4 2025 $3,900,000.00

41-00148-00 Hays Hays Yarrington Rd / CR 159 FM 110 SH 21. Improve to MAD-4 2025 $7,900,000.00

CAMPO 2040 Regional Transportation Plan

Page 45: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00149-00 Buda Hays Arterial Street Improvement Program

. - $700,000.00

41-00150-00 Hays Hays Arterial Street Improvement Program

. - $13,600,000.00

41-00151-00 Kyle Hays Arterial Street Improvement Program

. - $23,700,000.00

41-00152-00 San Marcos Hays Arterial Street Improvement Program

. - $677,200,000.00

41-00153-00 TxDOT Hays RM 150 IH 35 RM 150 at Arroyo Ranch Road

Realign Roadway (MAD-4) on new location.

2025 $200,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 46: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00154-00 TxDOT Hays SH 21 Caldwell County Line SH 71 Provide super 2 passing lanes. 2022 $5,377,000.00

41-00155-00 TxDOT Hays SH 21 SH 80 Caldwell County Line Provide super 2 passing lanes. 2022 $185,900,000.00

41-00157-00 TxDOT Hays IH 35 At SH 123 ADD SHLDS, AUX LNS, RAMP IMPRVMTS, PVMT REHAB, FRTG RD INTER SECT IMPROVMT, BIKE & PED IMPRVMTS

2018 $99,874,153.00

41-00158-00 TxDOT Hays SH 21 SH 80 Caldwell County Line PROVIDE SUPER 2 PASSING LANES 2018 $8,265,337.00

41-00161-00 TxDOT Hays IH 35 Loop 82 South of Loop 82 Reconstruct Ramps 2020 $2,011,599.37

CAMPO 2040 Regional Transportation Plan

Page 47: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00162-00 TxDOT Hays IH 35 South of SH 80 North of RM 12 Add Shoulders, Aux Lanes, Ramp Improvements, Pavement Rehabilitation, Frontage Rd Intersection Improvements

2021 $121,072,254.00

41-00163-00 TxDOT, Hays County Hays RM 967 0.130 Miles North of Robert S Light

0.141 Miles South of Robert S Light

Add Left Turn Lane And Shoulders 2019 $1,299,894.65

41-00164-00 TxDOT Hays SH 123 IH 35 Dezavalla Dr Construct Sidewalks 2020 $700,000.00

41-00165-00 TxDOT, Hays County Hays CR RM 967 at Robert S. Light Blvd.

FM 1626 Construct A Single-Lane Two Way Roadway And A Grade-Separated Crossing With The Union Pacific Railroad

2019 $18,763,724.78

41-00166-00 City of San Marcos Hays Hopkins St Moore Street Bishop Street Reconstuct Roadway With Multi-Use Path, Sidewalks, And Curb And Gutter

2019 $11,912,885.48

CAMPO 2040 Regional Transportation Plan

Page 48: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00167-00 City of San Marcos Hays Hopkins St CM Allen Parkway Thorpe Rd. Construct Multi-Use Bike/Ped. Facility 2020 $2,513,939.73

41-00168-00 City of San Marcos Hays VA Nine Intersections On_Guadalupe,

Hopkins, Gary & LBJ Streets

Install Countdown Pedestrian Signals, Audible Walk Signals and ADA Ramps

2019 $209,065.00

41-00169-00 City of San Marcos Hays VA East of Hopkins St. West of IH 35 SBFR San Marcos River Shared Use Path 2019 $2,739,313.89

41-00170-00 City of Dripping Springs

Hays CS US 290 Mighty Tiger Trl. Construct 6-foot sidewalk on Sportsplex Drive

2019 $440,129.42

41-00171-00 Hays County, TxDOT Hays FM 2001 IH 35 SH 21 Widen To 4-Lane Divided Roadway By Adding Two Lanes And Shoulders

2019 $48,410,281.76

CAMPO 2040 Regional Transportation Plan

Page 49: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00172-00 Hays County, TxDOT Hays FM 110 SH 21 800' East Of Ih 35 Nbfr Construct New 2 Lane Roadway and Shoulders

2019 $23,424,700.00

41-00173-00 Hays County, TxDOT Hays FM 110 SH 123 CR 245 (Redwood Road) Construct Two Lanes And Shoulders 2019 $10,981,789.31

41-00174-00 Hays County, TxDOT Hays FM 110 FM 621 Caldwell County Line Construct Two Lanes And Shoulders 2019 $13,922,512.62

41-00175-00 Hays County, TxDOT Hays FM 110 CR 245 (Redwood Road) FM 621 Construct Two Lanes And Shoulders 2019 $3,894,057.82

41-00187-00 City of Buda Hays RM 967 (Main St.) Austin St. China/Ash St Intersection improvements 2019 $2,260,000.00

CAMPO 2040 Regional Transportation Plan

Page 50: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00188-00 City of Buda Hays FM 2001 Overpass Road/FM 2001 FM 119/Old Goforth Road

Construct a 10-foot wide multi-use path for pedestrian and bicycle traffic along the east side of FM 2001 and Overpass Road

2020 $500,000.00

41-00189-00 Hays County Hays Lime Kiln Road Post Road Hilliard Road Realignment and Intersection Improvements at Windermere Road

2019 $7,555,500.00

41-00190-00 Hays County Hays RM 967 FM 1626 Oak Forest Drive Widen roadway with center turn lane and shoulder enhancements

2019 $7,274,000.00

41-00191-00 Hays County Hays US 290 Intersection at Trautwein Rd. Intersection improvements 2019 $1,690,000.00

41-00192-00 Hays County Hays FM 110 East of SH 123 East of I-35 at Yarrington Construct new two-lane roadway 2019 $118,380,000.00

CAMPO 2040 Regional Transportation Plan

Page 51: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00193-00 Hays County Hays FM 110 Intersection at SH 123 New Grade Seperated Overpass 2019 $7,279,000.00

41-00194-00 Hays County Hays FM 621 De Zavala Drive CR 266/ Old Bastrop Hwy

Widen 2-Lane Roadway to Include a Center Turn Lane and Shoulder Enhancements

2019 $6,872,000.00

41-00195-00 Hays County Hays FM 2001 Sun Bright Blvd. FM 2001 Upgrade from a 2-Lane to a 4-Lane Divided Roadway with New Traffic Signals and Bicycle/Pedestrian Improvements

2019 $11,278,000.00

41-00196-00 City of Kyle Hays FM 150 Burleson Street Kohlers Crossing Relocation of the UP Rail-Siding in downtown Kyle where it crosses FM 150 to north of FM 1626.

2020 $15,209,034.00

41-00197-00 City of San Marcos Hays Wonder World Drive At Hunters Rd Intersection Improvements 2019 $700,000.00

CAMPO 2040 Regional Transportation Plan

Page 52: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

41-00198-00 Hays County Hays RM 3237 RM 12 RM 150 Construct turn-lanes at intersections and new roundabout

2020 $9,470,000.00

41-00199-00 TxDOT Hays IH 35 River Ridge Parkway Loop 82 Add 1-lane northbound exit ramp to River Ridge, relocate northbound entrance ramp from Loop 82, add 1 auxiliary lane northbound from south of Loop 82 to River Ridge Pkwy.

2020 $20,048,349.00

42-00001-00 City of San Marcos Hays CS San Marcos Visitors Center Aquarena Spring Drive Reconstruct an existing pedestrian path into a shared use path to accommodate bicycles.

2017 $2,793,655.00

51-00001-01 CTRMA Travis SL 1 US 183 RM 2222 Add direct connectors with transitions 2019 $167,385,494.00

51-00001-02 CTRMA/TxDOT Travis US 183 Williamson County Line SL 1 Widen From 3 To 4 General Purpose Lanes

2019 $60,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 53: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00001-03 CTRMA Travis US 183 N Williamson County Line SL 1 Add two express lanes in each direction

2019 $135,639,969.00

51-00004-00 TxDOT Travis IH 35 At Wells Branch Pkwy Operational improvements-interchange 2020 $38,273,484.00

51-00005-00 TxDOT Travis IH 35 At Williams Drive Reconstruct interchange 2020 $61,853,480.00

51-00006-00 TxDOT Travis SH 71 At Ross Road & At Kellam Road

Construct overpass 2020 $64,034,594.00

51-00007-00 TxDOT Travis SH 130 US 290 SH 71 Add one lane in each direction 2018 $121,537,069.00

CAMPO 2040 Regional Transportation Plan

Page 54: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00008-00 TxDOT Travis SH 130 SH 45 US 290 Add one lane in each direction 2018 $90,576,967.00

51-00009-00 TxDOT Travis SL 1 North of Slaughter South of LaCrosse Grade Separation of Main Lanes with 2 through-lanes in each direction.

2019 $77,897,229.00

51-00010-00 TxDOT Travis IH 35 South of Holly Street North of Oltorf Add CDs, Aux Lanes, ramp improvements, pavement rehab

2018 $204,605,169.00

51-00011-00 TxDOT Travis IH 35 At Parmer Lane Reconstruct intersection. 2018 $38,768,253.00

51-00012-00 TxDOT Travis IH 35 Rundberg Lane US 183 Add shoulders, auxiliary lanes, ramp improvements

2017 $187,176,718.00

CAMPO 2040 Regional Transportation Plan

Page 55: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00013-00 TxDOT Travis IH 35 US 183 US 290 East Operational Improvements to Ramps and Direct Connectors

2017 $86,798,275.00

51-00014-00 CTRMA/TxDOT Travis VA Various Locations in MPO Area

Operation of the Highway Emergency Response Operator (HERO) patrol service

2017 $5,750,000.00

51-00015-00 City of Elgin Travis VA Various Locations in the City of Elgin in Travis and Bastrop Counties

Construct Sidewalks 2017 $1,498,944.00

51-00016-00 City of Rollingwood Travis VA Various streets in Rollingwood

Add bike striping and construct walking trail

2017 $150,256.00

51-00017-00 City of Austin Travis CS North Lamar at Palmer Lane

US 183 Construct sidewalks 2017 $1,770,000.00

CAMPO 2040 Regional Transportation Plan

Page 56: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00018-00 City of Austin Travis CS East 7th Street East 4th Street Construct Sabine Street Pedestrian and Bicycle Promenade

2017 $3,370,000.00

51-00019-00 City of Austin Travis CS 200' South of East 12th Street

MLK Station Widen trail, install new bridge, and improve crossing for bikes and pedestrians.

2017 $1,490,877.00

51-00020-00 City of Lago Vista Travis VA Bar K Ranch Road at FM 1431

Frontier Cove Construct sidewalks and traffic calming. 2019 $558,959.00

51-00021-00 City of Austin Travis VA Various Locations Install pedestrian safety devices citywide.

2017 $2,997,061.00

51-00022-00 Travis County Travis FM 969 FM 3177 FM 973 Widen FM 969, an existing 4-lane undivided arterial, to provide for a continuous left-turn lane, shoulders, and a sidewalk on one side of the roadway.

2019 $18,128,600.00

CAMPO 2040 Regional Transportation Plan

Page 57: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00022-01 Travis County Travis FM 969 FM 973 Hunters Bend Road Widen FM 969, an existing 2-lane undivided arterial, to provide for two additional travel lanes, a continuous left turn lane, shoulders, and a sidewalk on one side of the roadway

2020 $10,917,185.00

51-00023-00 CTRMA/TxDOT Travis SH 45 Hays County Line Loop 1 Construction of a 4-lane tolled freeway (Project may be phased)

2017 $67,420,000.00

51-00024-00 CTRMA/TxDOT Travis US 183 At Colorado River Construct a bicycle and pedestrian path.

2018 $4,800,000.00

51-00025-00 CARTS Travis VA Travis-Hays County Purchase of 6 heavy duty 30-foot buses.

2018 $2,100,000.00

51-00026-00 TxDOT Travis FM 969 Tannehill Lane FM 3177/Decker Lane Pedestrian facility. 2018 $1,034,149.00

CAMPO 2040 Regional Transportation Plan

Page 58: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00028-00 TxDOT Travis FM 974 Samsung Blvd. .02 Miles East of Harris Ranch

Reconstruct Roadway 2018 $5,978,085.00

51-00029-00 Travis County Travis VA Various Locations Construct new sidewalk on both sides of Elroy Road within SH 130 right-of-way and a shared use path on FM 973 from Moores Bridge Road to Elroy Road.

2020 $1,278,570.00

51-00030-00 City of Austin Travis CS Northern Walnut Creek Trail

West of Lamar Blvd. to IH 35

Construct bike/ped trail. 2019 $2,332,193.00

51-00031-00 Travis County Travis VA Proposed Wildhorse Connector

Travis County East Metro Park

Construct Shared Use Path. 2019 $3,176,784.00

51-00032-00 City of Pflugerville Travis Rowe Lane SH 130 Martin Lane Widen existing two-lane roadway to include turn lanes, additional shoulders, and drainage improvements.

2017 $0.00

CAMPO 2040 Regional Transportation Plan

Page 59: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00033-00 City of Pflugerville Travis Weiss Lane Cele Road Cameron Road Reconstruct from MUD2 to MAD4 from Cele Road to Wilbarger Creek. South of Wilbarger Creek will be improved MUD2.

2017 $542,000.00

51-00034-00 Travis County Travis FM 2304 FM 1626 Ravencroft Drive Construct four-lane, divided arterial with bicycle lanes and sidewalks.

2018 $12,000,000.00

51-00035-00 CTRMA Travis US 290 At SH 130 Develop and construct two tolled direct connectors at the US 290/SH 130 interchange

2018 $88,900,000.00

51-00035-01 TxDOT Travis US 290 At SH 130 Develop and construct one Central Texas Turnpike Systemdirect connector at the US 290/SH 130 Interchange

2018 $41,100,000.00

51-00036-00 TxDOT Travis IH-35 - Travis County SH 45 N SH 45 SE IH-35 Improvement Projects 2020 $1,940,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 60: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00037-00 CTRMA Travis US 183 N Loop 1 N RM 620 2 Express Lanes in each direction 2019 $225,700,000.00

51-00038-00 CTRMA Travis US 183 S US 290 Boggy Creek. 6 tolled mainlanes and 4 to 6 continuous, non-tolled access road lanes, project may be phased.

2016 $332,300,000.00

51-00039-00 CTRMA Travis US 183 S Boggy Creek SH 71. 6 tolled mainlanes and 4 to 6 continuous, non-tolled access road lanes and operational improvements on SH 71.

2018 $319,700,000.00

51-00040-00 TxDOT Travis US 290 W West of RM 1826 Loop 1 Construct six-lane controlled access highway and frontage roads

2019 $461,576,000.00

51-00041-00 Travis Travis US 290 W RM 1826 Nutty Brown Rd Widen to MAD-6 2040 $17,500,000.00

CAMPO 2040 Regional Transportation Plan

Page 61: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00042-00 CTRMA Travis Loop 1 Cesar Chavez Slaughter. 2 Express Lanes in each direction - MoPac South

2020 $352,800,000.00

51-00043-00 TxDOT Travis SH 71 W US 290 W Silvermine Dr. Construct four-lane divided highway with direct connects

2019 $83,727,000.00

51-00044-00 Travis Travis FM 812 FM 973 N Maha Loop Rd Improve to MAD-4 2038 $28,000,000.00

51-00045-00 Travis Travis FM 812 Maha Loop Rd Travis County Line Widen to MAD-4 2040 $11,300,000.00

51-00046-00 Travis Travis FM 969 FM 3177 Hunters Bend. Improve to MAD-4 2017 $18,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 62: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00047-00 Travis Travis FM 969 Hunters Bend Webberville City Limit Improve to MAD-4 2038 $49,700,000.00

51-00048-00 Travis Travis FM 973 FM 973 Relocation SH 71 E Widen to MAD-4 2040 $61,200,000.00

51-00049-00 Travis Travis FM 973 SH 71 E FM 812 Widen to MAD-4 2040 $26,500,000.00

51-00050-00 Travis Travis FM 973 FM 812 US 183. Widen to MAD-4 2040 $16,200,000.00

51-00051-00 Travis Travis FM 973 Relocation US 290 FM 973. New MAD-4/Improve to MAD-4 2020 $20,500,000.00

CAMPO 2040 Regional Transportation Plan

Page 63: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00052-00 Travis Travis FM 973 to Blake Manor Rd. Connector

FM 973 Blake Manor Rd New MAD-4 2020 $12,000,000.00

51-00053-00 Travis Travis FM 1626 Manchaca Rd 0.2 miles south of Brodie Ln

Improve to MAD-4 2018 $12,200,000.00

51-00054-00 Travis Travis FM 1626 IH-35 Manchaca Road. Widen to MAD-4 2040 $15,300,000.00

51-00055-00 Travis Travis FM 3238 (Hamilton Pool Rd)

east side of Pedernales River

RM 12 Improve to MAD-2 2018 $23,100,000.00

51-00056-00 Travis Travis FM 3238 (Hamilton Pool Rd)

RM 12 SH 71 W Improve to MAD-2 2025 $40,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 64: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00057-00 Travis Travis RM 620 Anderson Mill Rd. SH 71 W Widen to MAD-6 2025 $52,000,000.00

51-00058-00 Travis Travis RM 620 Bypass 620 RR 2222. 3 lanes, 2-lane west, 1 east 2020 $8,000,000.00

51-00059-00 Travis Travis RM 1826 US 290 W Slaughter Lane Improve to MAD-4 2022 $7,900,000.00

51-00060-00 Travis Travis RM 1826* Slaughter Lane SH 45 SW Improve to MAD-4 2040 $17,200,000.00

51-00061-00 Travis Travis RM 2222 McNeil 620 Bypass. Widen to MAD-6 2020 $12,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 65: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00062-00 Travis Travis RM 2244 Walsh Tarlton Redbud Trail. Widen to MAD-4 2020 $6,000,000.00

51-00063-00 Austin Travis Arterial A US 290 Samsung Blvd. New MAD-4, new alignment 2020 $25,500,000.00

51-00064-00 Travis Travis Arterial B FM 969 Harold Green Rd New 2-lane minor arterial 2022 $11,400,000.00

51-00065-00 Travis Travis Arterial C FM 969 Deaf Smith Blvd New 2-lane minor arterial 2022 $7,100,000.00

51-00066-00 Travis Travis Bee Creek Rd Highlands Blvd SH 71 Improve to MAD-4 2015 $9,500,000.00

CAMPO 2040 Regional Transportation Plan

Page 66: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00067-00 Austin Travis Berkman Dr 51st St E Manor Rd New MND-2 and Widen to MND-2 2020 $2,900,000.00

51-00068-00 Travis Travis Blake-Manor Rd FM 973 Taylor Ln. Improve to MAD-4 2018 $13,800,000.00

51-00069-00 Travis Travis Blake-Manor Rd Taylor Ln Burleson-Manor Rd Improve to MAD-4 2030 $13,500,000.00

51-00070-00 Travis Travis Braker Ln FM 973 Taylor Ln New MAD-4 2018 $20,000,000.00

51-00071-00 Travis Travis Braker Ln FM 3177 SH 130 New MAD-4 2025 $36,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 67: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00072-00 Travis Travis Braker Ln 1 mile east of Dessau Rd Harris Branch Pkwy New MAD-4 / Improve Blue Goose to MAD-4

2030 $20,800,000.00

51-00073-00 Travis Travis Braker Ln Taylor Ln Burleson-Manor Rd. New MAD-4 2030 $12,300,000.00

51-00074-00 Travis Travis Burleson-Manor Rd Blake-Manor Rd FM 969 Widen to 4 lanes 2038 $25,500,000.00

51-00075-00 Travis Travis Burleson-Manor Rd FM 969 SH 71 New 2-lane minor arterial undivided 2038 $53,200,000.00

51-00076-00 Travis Travis Cameron Rd Gregg-Manor Rd Gregg Ln. New MAD-4 / Improve to MAD-4 2017 $18,400,000.00

CAMPO 2040 Regional Transportation Plan

Page 68: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00077-00 Travis Travis Cameron Rd Pflugerville East Rd Gregg-Manor Rd Widen to 4 lanes 2018 $17,600,000.00

51-00078-00 Austin Travis Congress Ave North Bluff Dr South Boggy Creek Improve to MAD-4 2019 $12,600,000.00

51-00079-00 Travis Travis CR 137 / Arterial A (Pflugerville)

CR 138 Rowe Ln. Widen to 4 lanes 2030 $9,700,000.00

51-00080-00 Travis Travis Deaf Smith Blvd Arterial C Northbound frontage of SH 130

New 2-lane minor arterial 2023 $9,500,000.00

51-00081-00 Travis Travis Decker Ln Williamson County Line Pecan St Widen to MAD-4 2040 $39,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 69: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00082-00 Travis Travis Decker Ln Pecan St. Wells Branch Pkwy Widen to MAD-4 2040 $6,800,000.00

51-00083-00 Travis Travis Decker Ln Wells Branch Pkwy Gregg Manor Rd New MAD-4 and Widen to MAD-4 2040 $10,600,000.00

51-00084-00 Travis Travis Dessau Rd Northtown/Wells Branch FM 734. Widen to 6 lanes 2038 $30,800,000.00

51-00085-00 Travis Travis Dunlap Rd. FM 969 S Dunlap Road Improve to MAD-2 2023 $9,600,000.00

51-00086-00 Pflugerville Travis E Pflugerville Pkwy Colorado Sand Weiss Ln, SH 130 underpass

2 lane minor arterial undivided 2017 $7,300,000.00

CAMPO 2040 Regional Transportation Plan

Page 70: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00087-00 Travis Travis Elroy Rd Ross Rd Fagerquist Rd. Improve to MAD-4 2017 $17,500,000.00

51-00088-00 Travis Travis Fagerquist Rd Elroy Rd Four Daughters Rd Improve to MAD-4 2030 $13,100,000.00

51-00089-00 Travis Travis Ferguson Ln Rundberg Ln Arterial A. New MAD-4 / Improve to MAD-4 2022 $16,800,000.00

51-00090-00 Travis Travis Fitzhugh Rd US 290 W County Line Improve to MAD-2 2030 $12,200,000.00

51-00091-00 Travis Travis Flint Rock Road City of Lakeway Jack Nicklaus Drive Widen to MAD-4 2016 $2,500,000.00

CAMPO 2040 Regional Transportation Plan

Page 71: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00092-00 Travis Travis Flint Rock Road Jack Nicklaus Drive Serene Hills Drive Expand roadway to meet county standards for MNR-2

2016 $5,100,000.00

51-00093-00 Travis Travis Four Daughters Road SH 71 E FM 812 New MAD-4 2030 $66,000,000.00

51-00094-00 Travis Travis Frate Barker Rd Brodie Ln Manchaca Rd. Widen to MAD-4 2020 $8,500,000.00

51-00095-00 Travis Travis Grand Ave Pkwy Greenlawn Blvd Bratton Lane. New MAD-4 / Improve to MAD-4 2030 $4,500,000.00

51-00096-00 Travis Travis Greenlawn Blvd IH-35 N Anderson Mill Rd New MAD-4 and widen to MAD-4 2040 $5,400,000.00

CAMPO 2040 Regional Transportation Plan

Page 72: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00097-00 Travis Travis Gregg-Manor Rd SH 130 US 290 E New MAD-4 / improve to MAD-4 2030 $24,900,000.00

51-00098-00 Austin Travis Grove Blvd Montopolis Hogan Ave. New MAD-4 2019 $7,600,000.00

51-00099-00 Pflugerville Travis Heatherwilde Blvd / Wilke Ln

SH 45 Wilke Ln. MAD-4 2014 $8,300,000.00

51-00100-00 Travis Travis Hewitt Ln Frate Barker Rd FM 1626 Improve to MNR-4 2020 $5,500,000.00

51-00101-00 Travis Travis Hidden Lake Blvd Kelly Ln Pflugerville Rd. New MAD-4 2025 $18,100,000.00

CAMPO 2040 Regional Transportation Plan

Page 73: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00102-00 Travis Travis Hodde Ln Rowe Ln Cele Rd. Improve to MAD-4 2038 $18,700,000.00

51-00103-00 Travis Travis Howard Ln Cameron Rd SH 130. New MAD-4 2016 $19,000,000.00

51-00104-00 Austin Travis Howard Ln McNeil Rd Loop 1 N Improve to MAD-6 2030 $18,600,000.00

51-00105-00 Travis Travis Jake's Hill Rd Rowe Ln Kelly Ln. New MAD-4 2030 $15,700,000.00

51-00106-00 Travis Travis Jesse Bohls Rd Weiss Ln Cameron Rd. New MAD-4 / Improve to MAD-4 2023 $23,900,000.00

CAMPO 2040 Regional Transportation Plan

Page 74: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00107-00 Pflugerville Travis Kelly Ln Moorlynch Ave Weiss Ln. Widen to 4-lane divided major arterial with bicycle and pedestrian accommodations

2015 $7,700,000.00

51-00108-00 Travis Travis Kelly Ln Weiss Lane FM 973. New MAD-4 and Widen to MAD-4 2040 $25,100,000.00

51-00109-00 Travis Travis Lohman Ford Rd FM 1431 Sylvester Ford Rd Widen to MAD-4 2040 $28,500,000.00

51-00110-00 Travis Travis Lohman Ford Rd Sylvester Ford Rd Point Venture Widen to MNR-4 2040 $16,600,000.00

51-00111-00 Travis Travis Maha Loop Rd SH 71 Pearce Ln (Phase 1) New MAD-2 2016 $15,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 75: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00112-00 Travis Travis Maha Loop Rd SH 71 Pearce Ln (Phase 2) Improve to MAD-4 2025 $12,000,000.00

51-00113-00 Travis Travis Maha Loop Rd Pearce Ln FM 812. New MAD-4/Improve to MAD-4 2030 $37,600,000.00

51-00114-00 Travis Travis Maha Loop Rd FM 812 Slaughter Ln (Moore Rd) New MAD-4 and Widen to MAD-4 2040 $7,100,000.00

51-00115-00 Travis Travis Maha Loop Rd Slaughter Ln (Moore Rd) Maha Loop Rd New MAD-4 and Widen to MAD-4 2040 $15,100,000.00

51-00116-00 Travis Travis McKinney Falls Pkwy William Cannon Dr Slaughter Ln New MAD-4 and widen to MAD-4 2020 $5,900,000.00

CAMPO 2040 Regional Transportation Plan

Page 76: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00117-00 Travis Travis McKinney Falls Pkwy (Palmer Rd)

SH 45 Turnersville Rd. Widen to MAD-4 2030 $4,000,000.00

51-00118-00 Austin Travis McNeil Dr US 183 Howard Ln. Widen to 6 lanes 2030 $29,300,000.00

51-00119-00 Austin Travis McNeil Rd 700' north of SH 45 McNeil Dr/Howard Ln Improve to MAD-6 2030 $26,100,000.00

51-00120-00 Travis Travis Melber Ln Kelly Ln Cameron Rd. New MAD-4 2038 $33,700,000.00

51-00121-00 Travis Travis Moore Rd (Slaughter) FM 973 Maha Loop Rd Improve to MAD-4 2030 $25,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 77: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00122-00 Travis Travis Old Kimbro Rd US 290 E Littig Rd Improve to MAD-4 2021 $12,800,000.00

51-00123-00 Travis Travis Palmer Rd FM 1327 SH 45. Improve to MAD-4 2030 $5,200,000.00

51-00124-00 Travis Travis Parmer Lane US 290 E Braker. New MAD-4 2016 $14,700,000.00

51-00125-00 Travis Travis Parsons Rd Littig Rd Lockwood Rd. New MAD-4 / Improve to MAD-4 2021 $18,700,000.00

51-00126-00 Travis Travis Pearce Ln FM 973 Maha Loop Rd Improve to MAD-4 2024 $28,990,000.00

CAMPO 2040 Regional Transportation Plan

Page 78: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00127-00 Travis Travis Pearce Ln Maha Loop Rd Wolf Ln Improve to MAD-4 2030 $28,880,000.00

51-00128-00 Pflugerville Travis Pflugerville East Rd (Pecan Street)

SH 130 Weiss Ln. MAD-2 2015 $4,600,000.00

51-00129-00 Travis Travis Pflugerville Rd Weiss Ln Cameron Rd. Widen to 4 lanes 2023 $3,200,000.00

51-00130-00 Austin Travis Pleasant Valley Rd Onion Creek Dr CR 105/Turnersville Rd New MAD-4 / Improve to MAD-4 2030 $46,700,000.00

51-00131-00 Austin Travis Pleasant Valley Rd Existing Pleasant Valley Rd SH 71 New MAD-4 2030 $4,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 79: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00132-00 Travis Travis Puryear Rd 1 mile west of IH-35 IH-35 New MAD-6 2038 $10,500,000.00

51-00134-00 Travis Travis Ross Rd SH 71 Elroy Rd. Widen to 4 lanes 2038 $29,700,000.00

51-00135-00 Travis Travis Ross Rd Elroy Rd McAngus. New 2-lane minor arterial divided 2038 $5,500,000.00

51-00136-00 Pflugerville Travis Rowe Ln SH 130 CR 137. 2 lane minor arterial undivided 2017 $2,100,000.00

51-00137-00 Travis Travis Rowe Ln City of Pflugerville Hodde Ln Widen to MAD-4 2040 $15,200,000.00

CAMPO 2040 Regional Transportation Plan

Page 80: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00138-00 Travis Travis Rowe Ln Hodde Ln Decker Ln. New MAD-4 and Widen to MAD-4 2040 $1,300,000.00

51-00139-00 Austin Travis Rundberg Ln FM 1325 Metric Blvd. New MAD-2 2021 $27,000,000.00

51-00140-00 Travis Travis Slaughter Ln Pleasant Valley Rd McKinney Falls Pkwy New MAD-4 2020 $16,100,000.00

51-00141-00 Travis Travis Slaughter Ln McKinney Falls Pkwy FM 973 New MAD-4 2030 $32,500,000.00

51-00142-00 Travis Travis Taylor Ln Lockwood Rd FM 969. Improve to MAD-4 2038 $39,200,000.00

CAMPO 2040 Regional Transportation Plan

Page 81: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00143-00 Travis Travis Thaxton Rd Slaughter Lane FM 1327. Improve to MAD-4 2025 $36,500,000.00

51-00144-00 Pflugerville Travis Weiss Lane Cele Road Kelly Ln. 2 lane minor arterial undivided 2017 $3,700,000.00

51-00145-00 Travis Travis Weiss Lane Cele Road Cameron Rd. New MAD-4 / Improve to MAD-4 2030 $36,700,000.00

51-00146-00 Travis Travis Wells Branch Pkwy Immanuel Cameron. New MAD-4 / Improve to MAD-4 2020 $10,000,000.00

51-00147-00 Travis Travis Wells Branch Pkwy Cameron SH 130. New MAD-4 2023 $7,400,000.00

CAMPO 2040 Regional Transportation Plan

Page 82: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00148-00 Travis Travis Wells Branch Pkwy SH 130 Fuchs Grove Rd New MAD-4 2030 $17,800,000.00

51-00149-00 Austin Travis Westgate Blvd Cohoba Dr Cameron Loop. New MAD-4 2020 $4,000,000.00

51-00150-00 Travis Travis Wild Horse Connector FM 973 Parmer LN. New MAD-4 2019 $16,000,000.00

51-00151-00 Austin Travis William Cannon Dr Running Water Dr McKinney Falls Pkwy Improve to MAD-4 2018 $7,400,000.00

51-00152-00 Travis Travis William Cannon Dr McKinney Falls Pkwy US 183 S New MAD-4 2018 $9,500,000.00

CAMPO 2040 Regional Transportation Plan

Page 83: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00153-00 Austin Travis William Cannon Dr Pleasant Valley Rd .5 miles east Widen to MAD-6 2020 $8,600,000.00

51-00154-00 Travis Travis William Cannon Dr / FM 812

US 183 S FM 812 New MAD-4 2038 $15,800,000.00

51-00155-00 Austin Travis Arterial Street Improvement Program

. - $2,647,400,000.00

51-00156-00 Bee Cave Travis Arterial Street Improvement Program

. - $4,500,000.00

51-00157-00 Lakeway Travis Arterial Street Improvement Program

. - $14,600,000.00

CAMPO 2040 Regional Transportation Plan

Page 84: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00158-00 Manor Travis Arterial Street Improvement Program

. - $7,900,000.00

51-00159-00 Pflugerville Travis Arterial Street Improvement Program

. - $216,400,000.00

51-00160-00 Travis Travis Arterial Street Improvement Program

. - $95,900,000.00

51-00161-00 Westlake Hills Travis Arterial Street Improvement Program

. - $20,500,000.00

51-00162-00 Travis County Travis FM 1625 McKenzie Road Intersection with 183 Realign Roadway and Relocate Highway Intersection.

2017 $1,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 85: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00163-00 TxDOT Travis SH 130 SH 71 SH 45 SE Operational improvements. 2025 $10,000,000.00

51-00164-00 Travis County Travis SH 71 Intersection at Navarro Creek

Extend Westbound Left Turn Lane. 2017 $190,000.00

51-00165-00 TxDOT Travis SH 71 Ross Road Kellam Road Construct overpass. 2021 $64,000,000.00

51-00166-00 TxDOT Travis IH 35 Onion Creek Parkway SH 45 E Ramp Reversal 2019 $7,665,756.00

51-00181-00 CARTS Travis Eastside Bus Plaza At 101 Shady Lane, Austin TX

Design and construction of Eastside Bus Plaza

2019 $5,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 86: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00182-00 TxDOT Travis IH 35 Grand Ave Parkway SH 45N Reverse NB Ramps and Add Auxilary Lanes

2020 $8,867,049.82

51-00183-00 TxDOT Travis IH 35 At Wells Branch Pkwy Operational Improvements-Interchange 2020 $45,693,659.49

51-00184-00 TxDOT Travis IH 35 At Parmer Lane Reconstruct Intersection 2019 $38,896,539.00

51-00185-00 TxDOT Travis US 290 West of RM 1826 SL 1 Reconstruct 4-lane to 6-lane controlled access highway and 2-lane frontage roads in each direction.

2020 $455,252,841.00

51-00186-00 TxDOT Travis SH 71 East of Riverside Dr. US 183 Construct 3-Lane Eastbound Frontage Rd along SH 71 and 1-Lane Direct Connector from 183S to 71E

2022 $3,182,180.00

CAMPO 2040 Regional Transportation Plan

Page 87: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00187-00 TxDOT, City of Austin

Travis SL 360 At Westlake Drive Grade Separate Intersection 2022 $66,804,217.60

51-00188-00 TxDOT, City of Austin

Travis SL 360 At Spicewood Springs Road Grade Separate Intersection 2022 $62,628,954.01

51-00190-00 CTRMA, TxDOT Travis US 183 Williamson County Line SL 1 Add 2 Express Lanes In Each Direction 2019 $141,678,012.28

51-00191-00 TxDOT Travis SH 71 SH 71/US 183 Interchange Presidential Blvd. Construct 3 Lane Eastbound Frontage Road along SH 71 and 1-Lane Direct Connector from 183S to 71E

2021 $36,580,974.39

51-00192-00 TxDOT Travis US 183 0.46 Miles South of Thompson Ln

0.07 Miles SW of Airport Commerce Dr

Construct 1 Lane Southbound Frontage Road along US 183 that Merges with US 183S-71W Direct Connector

2021 $6,244,813.84

CAMPO 2040 Regional Transportation Plan

Page 88: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00193-00 TxDOT Travis SH 71 At Ross Road and Kellam Road

Construct 2-Lane Overpass 2020 $66,319,352.26

51-00194-00 TxDOT Travis SH 71 .85 Miles West ef Tucker Hill Lane

Travis / Bastrop County Line

Construct Overpass and Add 2 Lane One-Way Eastbound And Westbound Frontage Roads

2021 $14,204,359.39

51-00195-00 TxDOT Travis SH 71 US 290 West Silvermine Road Reconstruct 4-lane existing to 4-lane divided highway with 1 eastbound and 1 westbound direct connector.

2020 $89,506,859.00

51-00196-00 City of Austin Travis CS Northern Walnut Creek Trail Ph 2:

West of Lamar Blvd to IH 35

Const Bike/Ped Trail West Of Lamar To Ih 35

2019 $2,294,317.44

51-00197-00 Travis County Travis Blake Manor Rd Proposed Wildhorse Connector

Travis County East Metro Park

Construct a new shared use path 2020 $3,176,784.00

CAMPO 2040 Regional Transportation Plan

Page 89: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00199-00 Travis County Travis FM 1625 0.22 Miles South of Mckenzie Road

US 183 and Mckenzie Rd. Intersection

Realign roadway and relocate intersection

2019 $1,383,452.31

51-00200-00 Travis County Travis FM 1626 West of Brodie Lane Manchaca Rd. (FM 2304) Reconstruct an existing 2-lane arterial to a 4-lane arterial with a continuous left turn lane with 5 foot wide shoulders and 6 foot wide sidewalks on both sides.

2019 $11,200,000.00

51-00202-00 Travis County Travis FM 2304 Ravenscroft Drive FM 1626 Reconstruct an existing 2-lane divided arterial to a four-lane divided arterial with bicycle lanes and sidewalks.

2019 $12,177,962.89

51-00203-00 CTRMA Travis SL 1 US 183 RM 2222 Add 1 Lane Direct Connectors With Transitions

2019 $174,836,696.00

51-00214-00 City of Austin Travis Burnet Road W Koenig Ln Mopac Corridor-wide system safety and mobility improvements

2018 $53,200,000.00

CAMPO 2040 Regional Transportation Plan

Page 90: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00216-00 City of Austin Travis E. MLK Blvd. US 183 Decker Ln Corridor-wide system safety and mobility improvements

2018 $7,900,000.00

51-00217-00 City of Austin Travis North Lamar US 183 Howard Lane Corridor-wide system safety and mobility improvements

2018 $66,930,000.00

51-00218-00 City of Austin Travis South Lamar Boulevard Riverside Dr US 290 Corridor-wide system safety and mobility improvements

2018 $36,200,000.00

51-00219-00 City of Austin Travis Airport Boulevard Manor Rd US 183 Full street reconstruction 2018 $65,200,000.00

51-00220-00 City of Austin Travis South Lamar Panther Trail US 290 Full street reconstruction 2018 $15,400,000.00

CAMPO 2040 Regional Transportation Plan

Page 91: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00221-00 City of Austin Travis William Cannon Running Water Drive McKinney Falls Pkwy Convert existing two-lane to four-lane divided roadway with shared use path and intersection improvements

2019 $21,364,000.00

51-00222-00 City of Austin Travis West Rundberg Lane Burnet Road Metric Blvd. Extend current roadway as a four-lane major divided arterial with sidewalks, bike lanes, and new signalized intersection

2019 $16,790,668.00

51-00223-00 City of Austin Travis VA Home Depot Boulevard MoPac Expressway and William Cannon Drive

Violet Crown Trail North: Construct 1.2 mile 12-foot wide natural composite trail

2019 $2,731,250.00

51-00224-00 City of Austin Travis VA Decker and Lindell Lane Ben E. Fisher Park Austin to Manor Phase II Urban Trail: Construct 12-foot concrete trail from Lindell Ln to Manor, Texas (approximately 2.9 miles)

2019 $7,800,000.00

51-00225-00 City of Austin Travis Lakeline Blvd Lyndhurst Blvd Parmer Lane Expand Current 2-Lane Roadway with 2 Additional Travel Lanes and Upgrade Bicycle Facilities and Sidewalks

2019 $23,100,000.00

CAMPO 2040 Regional Transportation Plan

Page 92: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00226-00 City of Austin Travis VA Construct 10 pedestrian hybrid beacons within the City of Austin

2019 $1,668,000.00

51-00227-00 City of Austin Travis Slaughter Lane Mopac Expressway Brodie Lane Convert existing four-lane to six-lane divided roadway with shared use path and intersection improvements

2019 $22,875,000.00

51-00228-00 City of Austin Travis Braker Lane Dawes Place Samsung Blvd. Extend roadway as a four-lane divided roadway with bicycle and pedestrian facilities

2020 $23,350,000.00

51-00229-00 Travis County Travis Braker Lane North Samsung Blvd. Harris Branch Parkway Widen current and extend roadway as a four-lane divided roadway with bicycle and pedestrian facilities

2020 $22,715,790.00

51-00230-00 Travis County Travis Pearce Lane Kellam Road Travis/Bastrop County Line

Widen existing two-lane facility to a four-lane divided arterial with bike lanes and sidewalks

2022 $25,520,000.00

CAMPO 2040 Regional Transportation Plan

Page 93: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

51-00231-00 Travis County Travis RM 1826 US 290 West Travis County Line Improve current 2-lane facility to a 4-lane divided arterial with bicycle and pedestrian facilities

2019 $49,240,000.00

51-00232-00 TxDOT Travis RM 620 SH 71 Aria Dr/Cavalier Dr. Upgrade existing four-lane roadway to a six-lane divided roadway

2022 $37,039,200.00

51-00233-00 TxDOT Travis RM 620 Aria Dr/Cavalier Dr. Oak Grove Blvd. Upgrade existing four-lane roadway to a six-lane divided roadway

2022 $60,827,900.00

51-00234-00 Travis County Vail Divide Circa Terra Dr RM 3238 Extend existing MAD-4 on a new alignment to RM 3238.

2022 $8,700,000.00

54-00038-00 TxDOT Travis RM 2222 RM 620 Bonaventure Dr. Construct New 3 Lane Connector Road with Intersection and Operational Improvements at RM 620 and Bonaventure Dr.

2019 $14,268,229.00

CAMPO 2040 Regional Transportation Plan

Page 94: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

54-00039-00 TxDOT Travis RM 2222 Bonaventure Dr. Ribelin Ranch Rd. Reconstruct from a Four-Lane Roadway to a Six-Lane Divided Roadway

2018 $18,405,875.00

54-00098-00 City of Austin Travis VA N/A N/A Procure and install vehicle detection at 400 signalized intersections within the City of Austin

2019 $12,400,000.00

54-00099-00 City of Austin Travis VA N/A N/A Expand the Traffic Monitoring System including 275 CCTV cameras and video management system within the City of Austin

2019 $1,550,000.00

54-00100-00 City of Austin Travis VA City-wide City-wide Implementation of an Emergency Vehicle Preemption (EVP) and Transit Signal Priority (TSP) system including enhancements to the City's Advanced Transportation Management System (ATMS) as well as related signal and communication system upgrades.

2019 $8,060,000.00

61-00001-00 City of Cedar Park Williamson Bell Blvd. North of Cypress Creek Road

South of Cedar Park Drive

Realign 0.8 mile section of US 183 (Bell Boulevard) onto the Old Highway 183 alignment

2018 $20,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 95: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00002-00 CTRMA Williamson US 183A Hero Way SH 29 Construct 4-lane tolled expressway 2020 $269,700,000.00

61-00002-01 CTRMA Williamson US 183A Hero Way SH 29 Construct 6-lane tolled expressway 2027 $338,800,000.00

61-00003-00 TxDOT/CTRMA Williamson US 183 N RM 620/SH 45 Travis County Line Widen from 3 to 4 general purposes lanes

2019 $69,262,963.00

61-00004-00 CTRMA Williamson US 183 N RM 620/SH 45 Travis County Line Add two express lanes in each direction.

2019 $146,883,539.00

61-00005-00 TxDOT Williamson IH 35 At FM 3406 Bridge replacement and intersection improvements

2017 $21,046,790.00

CAMPO 2040 Regional Transportation Plan

Page 96: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00006-00 TxDOT Williamson IH 35 SH 45 Westinghouse Mill, Seal, and Inlay 2017 $7,555,651.00

61-00007-00 Williamson Williamson RM 620 Wyoming Springs Drive Deep Wood Drive Reconstruct existing 4-lane roadway to a 6-lane divided roadway

2017 $7,294,164.00

61-00008-00 City of Hutto Williamson CS Limmer Loop at FM 1660 Cottonwood Creek Elementary

Construct sidewalks. 2017 $841,928.00

61-00010-00 City of Cedar Park Williamson CS 800' west of US 183 500' east of Parmer Lane Shared use path adjacent to roadway 2018 $466,115.00

61-00011-00 City of Cedar Park/TxDOT

Williamson RM 1431 Market Street Cottonwood Creek Trail Reconstruction of MAD-4 to MAD-6 arterial.

2017 $17,492,470.00

CAMPO 2040 Regional Transportation Plan

Page 97: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00012-00 Williamson County/TxDOT

Williamson FM 1660 CR 101 North of Hutto US 79 Interim 2-lane roadway on new alignment. MAD-4 at build-out.

2020 $18,319,901.00

61-00013-00 Williamson County/TxDOT

Williamson FM 1660 US 79 FM 3349 Interim 2-lane roadway on new alignment. MAD-4 at build-out.

2020 $15,452,681.00

61-00014-00 TxDOT Williamson RM 620 Cornerwood Drive Wyoming Springs Drive Mill, overlay and re-strip existing 4-lane divided roadway to a 6-lane divided.

2018 $2,600,000.00

61-00015-00 City of Georgetown Williamson CS 2nd Street Morrow Street Reconstruct the North and South Austin Avenue Bridges.

2019 $9,163,749.00

61-00016-00 Williamson County Williamson IH 35 At CR 305 Bridge replacement. 2017 $9,200,000.00

CAMPO 2040 Regional Transportation Plan

Page 98: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00017-00 Williamson County Williamson IH 35 At Ronald Reagan Blvd. Bridge replacement. 2017 $20,000,000.00

61-00018-00 Williamson County Williamson IH 35 Bud Stockton Loop FM 972 Convert existing northbound and southbound two-way frontage roads to two-lane one-way frontage roads and remove and replace existing entrance and exit ramps.

2017 $15,700,000.00

61-00019-00 Williamson County Williamson SW Bypass At RM 2243 Reconstruct intersection. 2017 $21,700,000.00

61-00020-00 Williamson County Williamson University Boulevard FM 1460 SH 130 Reconstructing the existing 2-lane to 4-lane divided.

2017 $11,700,000.00

61-00021-00 Williamson County Williamson SH 130 FM 685 US 79 New northbound two-lane frontage road.

2019 $7,300,000.00

CAMPO 2040 Regional Transportation Plan

Page 99: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00022-00 Williamson County Williamson SH 130 US 79 Limmer Loop New northbound frontage road and bridge.

2019 $2,612,000.00

61-00023-00 Williamson County Williamson SH 130 US 79 Limmer Loop New southbound two-lane frontage road.

2019 $3,200,000.00

61-00024-00 TxDOT Williamson IH-35 - Williamson County

SH 45 N SH 195 N IH-35 Improvement Projects 2020 $815,000,000.00

61-00025-00 Round Rock Williamson US 79 IH-35 A. W. Grimes Boulevard Reconstruct to a 6 lane divided roadway with sidewalks

2030 $14,400,000.00

61-00026-00 Williamson Williamson US 183 N FM 970 FM 3405. Widen from 4 lanes to 4 lanes with median (future frontage roads)

2018 $17,100,000.00

CAMPO 2040 Regional Transportation Plan

Page 100: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00027-00 Williamson Williamson US 183 N FM 3405 SH 29. Widen from 4 lanes to 4 lanes with median (future frontage roads)

2018 $40,900,000.00

61-00028-00 Williamson Williamson FM 734 / Parmer Ln RM 1431 Brushy Creek. Widen from 4 lanes with median to 6 lanes with median

2015 $14,400,000.00

61-00029-00 Williamson Williamson FM 734 / Parmer Ln Brushy Creek Spectrum Dr. Widen from 4 lanes with median to 6 lanes with median

2015 $4,000,000.00

61-00030-00 TxDOT Williamson FM 1660 SH 29 FM 3349 Widen from 2 lanes to 4 lanes with median

$82,300,000.00

61-00031-00 Williamson Williamson FM 3405 US 183 RM 2338. Widen from 2 lanes to 4 lanes 2015 $24,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 101: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00032-00 Cedar Park Williamson RM 620 Pecan Park Blvd Anderson Mill Road Improve to MAD-6 2025 $25,000,000.00

61-00033-00 Williamson Williamson RM 1431 Sam Bass IH-35. Reconstruct and widen to 6 lane divided

2025 $39,800,000.00

61-00034-00 Cedar Park Williamson RM 1431 / Whitestone Blvd Reconstruction and

Widening

Cottonwood Creek Trail Market Street Reconstruct and widen to a six lane arterial roadway with a raised center median, turn lanes, wide outer lanes and shared use path. The project will also reconstruct and elevate the Spanish Oak Creek bridge

$12,900,000.00

61-00035-00 Round Rock Williamson A.W. Grimes Blvd Westinghouse Road University Boulevard. Reconstruct to a MAD-4 with sidewalks 2018 $6,700,000.00

61-00036-00 Georgetown Williamson Airport Dr IH-35 Berry Creek Drive. Improve to Principal Arterial Divided; upgrade from 2-lane to 4 DIV

2025 $33,300,000.00

CAMPO 2040 Regional Transportation Plan

Page 102: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00037-00 Round Rock Williamson Arterial A (Kenny Fort Blvd)

Joe DiMaggio Blvd 1000' S of US 79 Widen from 2 lanes with median to 6 lanes with median

2018 $2,900,000.00

61-00038-00 Round Rock Williamson Arterial L Chisholm Trail Road Mays Street Construct new MAD-4 with sidewalks and IH-35 crossing

2035 $26,200,000.00

61-00039-00 Leander Williamson Brushy Creek Trail Leander Station 183A trail. Trail/Pedestrian bridge -connects rail to trail

2016 $3,300,000.00

61-00040-00 Hutto Williamson Carl Stern Blvd FM 1660 Old FM 1660 Relo Construct 2-lane undivided collector 2025 $3,700,000.00

61-00041-00 Williamson Williamson Chandler Rd SH 130 FM 1660. Widen from 2 lanes with median to 6 lanes with median

2015 $15,300,000.00

CAMPO 2040 Regional Transportation Plan

Page 103: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00042-00 Round Rock Williamson CR 112 FM 1460 Kenney Fort Boulevard Reconstruct to a MAD-4 with sidewalks 2030 $9,000,000.00

61-00043-00 Hutto Williamson CR 119 CR 100 CR 164. Construct 4-lane minor arterial with a CTL

2022 $10,500,000.00

61-00044-00 Hutto Williamson CR 132 CR 134 FM 3349. Reconstruct from a 2-lane minor arterial to a 2-lane collector

2024 $3,500,000.00

61-00045-00 Hutto Williamson CR 164 CR 108 CR 119. Reconstruct from a 2-lane principal arterial undivided to a 2-lane minor arterial with a CTL

2030 $1,800,000.00

61-00046-00 Jarrell Williamson CR 237 Ronald Reagan Blvd CR 216 Reconstruct 2 lanes to 4 lanes with median

2015 $9,100,000.00

CAMPO 2040 Regional Transportation Plan

Page 104: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00047-00 Leander Williamson CR 273 / Mel Mathis Ave

CR 272 RM 2243 Widen from 2 lanes to 4 lanes $6,600,000.00

61-00048-00 Jarrell Williamson CR 313 Geode Ln CR 332 Reconstruct 2 lanes to 4 lanes with median

2015 $5,700,000.00

61-00049-00 Jarrell Williamson CR 332 CR 313 CR 313 – CR 3001. Reconstruct 2 lanes to 4 lanes with median

2015 $2,900,000.00

61-00050-00 Jarrell Williamson CR 332 FM 487 FM 487 – CR 313. Reconstruct 2 lanes to 4 lanes with median

2015 $6,300,000.00

61-00051-00 Round Rock Williamson Creek Bend Boulevard Sam Bass Road Brightwater Blvd Construct a new MAD-4 with sidewalks 2017 $10,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 105: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00052-00 Round Rock Williamson Creek Bend Boulevard FM 1431 Old Settlers Blvd Construct a new MAD-4 with sidewalks 2035 $21,900,000.00

61-00053-00 Georgetown Williamson D.B. Wood Rd Oak Ridge Parkway SH 29 Improve to Principal Arterial Divided; upgrade from 2-lane to 4 DIV

2020 $19,900,000.00

61-00054-00 Williamson Williamson DB Wood Rd Williams Dr Cedar Breaks Rd Widen from 2 lanes to 4 lanes with median

2015 $8,400,000.00

61-00055-00 Round Rock Williamson Deepwood Drive Sam Bass Road RM 620 Construct new MAD-4 with sidewalks 2030 $14,400,000.00

61-00056-00 Round Rock Williamson Gattis School Road Greenlawn Boulevard A.W. Grimes. Reconstruct to a MAD-6 with sidewalks 2025 $11,800,000.00

CAMPO 2040 Regional Transportation Plan

Page 106: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00057-00 Round Rock Williamson Gattis School Road A.W. Grimes Deepwood Drive. Reconstruct to a MAD-6 with sidewalks 2025 $10,300,000.00

61-00058-00 Round Rock Williamson Gattis School Road Deepwood Drive Kenney Fort Boulevard Reconstruct to a MAD-6 with sidewalks 2030 $27,000,000.00

61-00059-00 Round Rock Williamson Gattis School Road Mays Street Greenlawn Boulevard. Reconstruct to a MAD-6 with sidewalks 2035 $32,800,000.00

61-00060-00 Round Rock Williamson Gattis School Road Kenney Fort Boulevard Red Bud Lane Reconstruct to a MAD-6 with sidewalks 2035 $26,200,000.00

61-00061-00 Georgetown Williamson Georgetown Inner Loop (Phase I)

IH-35 N IH-35 S. Widen from 2 lanes to 4 lanes with median

2015 $29,600,000.00

CAMPO 2040 Regional Transportation Plan

Page 107: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00062-00 Williamson Williamson Gupton Way Dr Park Street Brushy Creek. Widen to 4 lanes 2018 $4,400,000.00

61-00063-00 Leander Williamson Hero Way CR 270 Ronald Reagan Blvd Construct 4-lane minor arterial divided with sidewalks on both sides

2020 $8,500,000.00

61-00064-00 Austin Williamson Howard Ln SH 45/RM 620 McNeil Rd New MAD-6 2030 $22,700,000.00

61-00065-00 Round Rock Williamson Kenney Fort Boulevard Segment 2

Forest Creek Drive Gattis School Road Construct new MAD-6 with sidewalks and shared use path

2018 $8,400,000.00

61-00066-00 Round Rock Williamson Kenney Fort Boulevard Segment 3

Gattis School Road SH 45 Construct new MAD-6 with sidewalks and shared use path

2018 $8,400,000.00

CAMPO 2040 Regional Transportation Plan

Page 108: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00067-00 Round Rock Williamson Kenney Fort Boulevard Segment 4

Old Settlers Blvd Chandler Creek Drive Construct new MAD-4 with sidewalks and shared use path

2025 $9,600,000.00

61-00068-00 Round Rock Williamson Kenney Fort Boulevard Segment 5

CR 112 Old Settlers Blvd Construct new MAD-4 with sidewalks and shared use path

2025 $10,300,000.00

61-00069-00 Round Rock Williamson Kenney Fort Boulevard Segment 6

University Boulevard CR 112. Construct new MAD-4 with sidewalks and shared use path

2030 $12,600,000.00

61-00070-00 Austin Williamson Lyndhurst Lakeline Blvd SH 45/RM 620 New MND-4 2020 $4,600,000.00

61-00071-00 Round Rock Williamson Mays Street Westinghouse Road Teravista Drive. Construct new MAD-4 with sidewalks 2017 $8,600,000.00

CAMPO 2040 Regional Transportation Plan

Page 109: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00072-00 Williamson Williamson Mays Street University Boulevard Paloma Drive. Reconstruct/Construct new MAD-4 with sidewalks

2025 $22,200,000.00

61-00073-00 Georgetown Williamson Northwest Blvd Extension

Fontana Drive Spur 152 (Austin Ave) Construct new bridge over IH-35 - Principal Arterial Divided

2018 $10,000,000.00

61-00074-00 Leander Williamson Old 2243 Broad St Bagdad Rd. Construct 4-lane minor arterial undivided - engineering underway

2015 $5,800,000.00

61-00075-00 Leander Williamson Old 2243 Bagdad Rd Lakeline. Construct 4-lane minor arterial undivided - engineering underway

2017 $4,900,000.00

61-00076-00 Round Rock Williamson Old Settlers Boulevard Sam Bass Road Chisholm Trail Road Widen to a MAD-4 with sidewalks 2018 $4,400,000.00

CAMPO 2040 Regional Transportation Plan

Page 110: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00077-00 Austin Williamson Pearson Ranch Rd Avery Ranch Blvd SH 45/RM 620 New MAD-4 2020 $11,300,000.00

61-00078-00 Georgetown Williamson Rabbit Hill / Mays Street Ext

Terra Vista Parkway Westinghouse. Construct new principal arterial divided 2016 $8,300,000.00

61-00079-00 Round Rock Williamson Red Bud Lane CR 117 US 79. Reconstruct to a MAD-4 with sidewalks 2030 $18,000,000.00

61-00080-00 Round Rock Williamson Red Bud Lane US 79 Forest Creek Drive Reconstruct to a MAD-4 with sidewalks 2035 $17,500,000.00

61-00081-00 Round Rock Williamson Red Bud Lane Forest Creek Drive Gattis School Road Reconstruct to a MAD-4 with sidewalks 2035 $17,500,000.00

CAMPO 2040 Regional Transportation Plan

Page 111: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00082-00 Williamson Williamson Ronald Reagan Blvd at IH-35 Construct new 6-lane Overpass 2040 $23,200,000.00

61-00083-00 Round Rock Williamson Sam Bass Rd Old Settlers Blvd Creek Bend Blvd Widen to a MAD-2 with sidewalks 2030 $9,800,000.00

61-00084-00 Round Rock Williamson Sam Bass Rd Creek Bend Blvd Meadows Drive Widen to a MAD-2 with sidewalks 2030 $13,500,000.00

61-00085-00 Leander Williamson San Gabriel Blvd CR 270 Ronald Reagan Blvd Construct 4-lane minor arterial divided - original Williamson County alignment

2018 $41,100,000.00

61-00086-00 Leander Williamson San Gabriel Pkwy W Nameless/FM 2243 Bagdad Rd. Construct 4-lane road with median on a new location.

2014 $3,300,000.00

CAMPO 2040 Regional Transportation Plan

Page 112: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00087-00 Georgetown Williamson SE Inner Loop IH-35 Sam Houston. Improve to Principal Arterial Divided, widen to 4 lanes from 2 in Freeway ROW (Continuation of SW Bypass/Sam Houston)

2030 $3,300,000.00

61-00088-00 Williamson Williamson Shell Rd SH 195 Williams Dr. Widen from 2 lanes to 4 lanes with median

2014 $17,300,000.00

61-00089-00 Georgetown Williamson Southwest Bypass SH 29 RR 2243 (Leander Road) New Principal Arterial Divided - 2-lane construction in freeway ROW

2020 $22,100,000.00

61-00090-00 Round Rock Williamson University Boulevard IH-35 Sunrise Road. Reconstruct to a MAD-6 with sidewalks and shared use path

2017 $10,800,000.00

61-00091-00 Round Rock Williamson University Boulevard FM 1460 Kenney Fort Boulevard Reconstruct to a MAD-4 with sidewalks 2030 $18,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 113: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00092-00 Round Rock Williamson University Boulevard Kenney Fort Boulevard CR 110 Reconstruct to a MAD-4 with sidewalks 2030 $12,600,000.00

61-00093-00 Round Rock Williamson University Boulevard Sunrise Road FM 1460. Reconstruct to a MAD-6 with sidewalks and shared use path

2035 $43,800,000.00

61-00094-00 Georgetown Williamson Westinghouse Road IH-35 FM 1460. Improve to Principal Arterial Divided, widen from 4 lanes to 6 lanes

2020 $23,100,000.00

61-00095-00 Georgetown Williamson Wolf Ranch Parkway SH 29 SW Bypass. Construct new collector undivided 2020 $4,200,000.00

61-00096-00 Round Rock Williamson Wyoming Springs Drive Sam Bass Road Brightwater. Construct new MAD-4 with sidewalks and shared use path

2035 $27,300,000.00

CAMPO 2040 Regional Transportation Plan

Page 114: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00097-00 Cedar Park Williamson Arterial Street Improvement Program

. - $169,800,000.00

61-00098-00 Georgetown Williamson Arterial Street Improvement Program

. - $2,000,000.00

61-00099-00 Hutto Williamson Arterial Street Improvement Program

. - $700,000.00

61-00100-00 Leander Williamson Arterial Street Improvement Program

. - $68,700,000.00

61-00101-00 Round Rock Williamson Arterial Street Improvement Program

. - $2,300,000.00

CAMPO 2040 Regional Transportation Plan

Page 115: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00102-00 Taylor Williamson Arterial Street Improvement Program

. - $89,700,000.00

61-00103-00 Williamson Williamson Arterial Street Improvement Program

. - $1,904,900,000.00

61-00104-00 TxDOT Williamson SH 130 IH 35 SH 45 Operational improvements. 2025 $82,000,000.00

61-00105-00 Williamson CR 104 - Phase 2 Ronald Rd SH 130. Extend the CR 104 improvements with a two-lane section with a center turn lane section to Ronald Lane and then a two-lane section with shoulders to SH 130.

2015 $5,000,000.00

61-00106-00 Williamson CR 175 Extension - Phase 2B

RM 2243 CR 179. Reconstruction of a two-lane roadway to a four-lane divided section with a raised median.

2015 $10,000,000.00

CAMPO 2040 Regional Transportation Plan

Page 116: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00108-00 TxDOT, Williamson County

Williamson IH 35 At Theon Road (Ronald Reagan Blvd)

Replace Bridge Overpass and Tie-In Approaches

2019 $15,843,676.75

61-00109-00 TxDOT, Williamson County

Williamson IH 35 Corn Hill (Bud Stockton Lp) Underpass

FM 972 Overpass Convert Existing 2-Lane NB and SB 2-Way Frontage Roads To 2-LN One-Way Frontage Roads And Replace Existing Ramps

2019 $13,782,378.46

61-00110-00 TxDOT Williamson IH 35 South of Lakeway Drive South of Williams Drive Add 3-Lane One-Way NB Frontage Road

2020 $41,699,815.94

61-00111-00 TxDOT Williamson IH 35 At Williams Dr Reconstruct Interchange 2020 $78,642,336.97

61-00112-00 Georgetown Williamson IH 35 At Northwest Blvd. Construct New Overpass Crossing IH 35 At Northwest Boulevard

2019 $2,979,768.65

CAMPO 2040 Regional Transportation Plan

Page 117: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00113-00 TxDOT Williamson IH 35 FM 3406 RM 1431 Widen NB Frontage Rd To 3 Lanes With Associated Paving, Grading, Drainage And Driveway Improvements

2019 $11,118,575.77

61-00114-00 TxDOT Williamson US 183 RM 620/SH 45 Travis County Line Widen From 3 To 4 General Purpose Lanes

2019 $60,000,000.00

61-00116-00 City of Cedar Park Williamson US 183 Cedar Park Dr South of Buttercup Creek Blvd

Relocation of 4-Lane US 183 to 4-Lane Old Hwy 183

2019 $15,352,849.75

61-00117-00 City of Liberty Hill Williamson SL 332 SH 29 CR 279 Liberty Hill Downtown Bike/Ped Loop 2019 $1,645,868.05

61-00118-00 TxDOT Williamson US 79 IH 35 East of FM 1460 Add One Lane In Each Direction 2022 $38,074,706.25

CAMPO 2040 Regional Transportation Plan

Page 118: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00119-00 TxDOT, City of Round Rock

Williamson RM 620 Deepwood Drive IH 35 (Dot No. 439705H) Construct New 4-Ln Overpass At Georgetown Rr And Lake Creek With Roundabout And Collector Roads

2019 $40,940,473.16

61-00120-00 City of Cedar Park Williamson VA 800' West of US 183 500' East of Parmer Lane Shared Use Path: Adjacent To Roadway

2019 $490,560.76

61-00121-00 Williamson County Williamson VA Heritage Trail at Creekside Plaza

1.1 Miles NW Along Brushy Creek

Construct 10-Ft Wide Shared Use Path In Round Rock With Pedestrian Bridge

2019 $1,701,515.86

61-00123-00 Williamson County, TxDOT

Williamson FM 1660 CR 101 North of Hutto US 79 Upgrade roadway from 2-lane undivided to a 4-lane undivided

2020 $16,953,989.59

61-00124-00 Williamson County, TxDOT

Williamson FM 1660 US 79 FM 3349 Construct New Location Roadway 2020 $15,556,056.47

CAMPO 2040 Regional Transportation Plan

Page 119: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00125-00 City of Georgetown Williamson FM 971 SS 158 (Austin Avenue) Gann Street/River Haven Drive

Upgrade From 2 Lane To 4 Lane Urban Section

2020 $4,075,570.73

61-00127-00 City of Cedar Park Williamson New Hope Drive Ronald Reagan Blvd. CR 175/Sam Bass Rd. Widen existing roadway and extend as a new four-lane divided roadway with bicycle and pedestrian facilities

2020 $19,699,300.00

61-00128-00 City of Georgetown Williamson RM 2243 (Leander Rd) Norwood Drive SW Bypass Upgrade to a four-lane divided with new traffic signals and pedestrian improvements

2021 $7,233,000.00

61-00129-00 City of Georgetown Williamson Williams Drive IH-35 Jim Hogg Drive Intersection improvements and access management

2019 $1,576,600.00

61-00130-00 City of Round Rock Williamson University Boulevard A.W. Grimes (FM 1460) SH 130 Reconstruct two-lane facility with shoulders to four-lane divided roadway with left-turn lanes

2019 $11,900,000.00

CAMPO 2040 Regional Transportation Plan

Page 120: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

61-00131-00 City of Round Rock Williamson Kenney Fort Blvd Forest Creek Drive SH 45 North Construction of a new limited access six-lane divided major arterial with shared use path

2019 $27,430,180.00

61-00132-00 City of Round Rock Williamson Gattis School Road Sonoma Trail Red Bud Lane Widen from four to six-lanes including intersection improvements, raised median and turn-lanes

2020 $22,120,000.00

61-00133-00 TxDOT, City of Austin

Williamson FM 734 RM 1431 SH 45 Reconstruct Existing 4-Lane Divided Roadway to a 6-Lane Divided Roadway

2022 $62,473,700.00

61-00134-00 Williamson County Williamson RM 2243 183A IH 35 Design and Engineering of a New Location Roadway

2019 $158,300,000.00

62-00004-00 City of Cedar Park Williamson VA Parmer Lane Brush Creek Road Construct 3-mile shared-use path along Brushy Creek North Fork

2021 $3,957,518.00

CAMPO 2040 Regional Transportation Plan

Page 121: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

62-00005-00 City of Leander Williamson S. West Drive Horseshoe Dr. Lion Dr Construct .23 mile sidewalk on South West Drive

2019 $244,610.00

71-00001-00 CTRMA Hays / Travis SH 45 SW Loop 1 S FM 1626 Construction of a 4-lane tolled freeway (Project may be phased; shared use path where feasible

2015 $108,100,000.00

71-00002-00 Hays Hays / Travis RM 12 FM 3238 Fitzhugh Rd. MAD-2 2025 $11,600,000.00

71-00003-00 Elgin Travis / Bastrop

Arterial Street Improvement Program

. - $4,500,000.00

71-00004-00 Hays Travis / Hays SH 45 SW-E FM 1626 IH-35 S. Environmental and preliminary engineering analysis for a new freeway (Design only)

2025 $2,900,000.00

CAMPO 2040 Regional Transportation Plan

Page 122: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

71-00005-00 Cedar Park Travis / Williamson

Anderson Mill Rd Zeppelin Drive Cypress Creek Rd Widen to MAD-4 2025 $6,000,000.00

71-00006-00 Cedar Park Travis / Williamson

Anderson Mill Rd RM 1431 Lime Creek Rd Improve roadway to MAD-4 2025 $15,000,000.00

71-00007-00 Austin Travis / Williamson

Anderson Mill Rd Loop 1 Grand Ave Pkwy New MAD-4 2031 $15,200,000.00

71-00008-00 TxDOT Hays, Caldwell

SH 80 SH 21 FM 1984 Complete Gap in Shoulder For Bicycle Travel

2020 $6,262,703.77

71-00009-00 Capital Metro Travis North Lamar/Airport Blvd

Airport Blvd N. Lamar Grade seperation of Metrorail Red Line and N. Lamar Blvd.

2019 $5,872,181.58

CAMPO 2040 Regional Transportation Plan

Page 123: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

71-00010-00 CAPCOG VA N/A N/A Regional Commute Solutions Program 2019 $312,500.00

71-00011-00 City of Austin, Capital Metro

VA N/A N/A Smart Trips Austin 2019 $225,000.00

71-00012-00 Capital Metro VA N/A N/A MetroRideShare Vanpool Program 2019 $90,350.00

73-00001-00 CARTS Travis VA Shady at E. Cesar Chavez Construction of a bus plaza and passenger terminal

2019 $5,000,000.00

74-00007-00 TxDOT VA N/A N/A Continue and expand the HERO Program within Hays, Travis and Williamson Counties

2019 $24,461,363.00

CAMPO 2040 Regional Transportation Plan

Page 124: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

74-00008-00 TxDOT Travis Loop 360 Loop 1 (MoPac) SH 71 ITS Deployment Including ITS Surveillance, Weather and Travel Information Dessimination and Connections to Regional ITS Communication Network

2020 $8,274,044.00

74-00009-00 TxDOT RM 620/SH 71 US 183 US 290 ITS Deployment 2019 $15,581,173.00

74-00010-00 TxDOT RM 2222 Loop 360 I-35 ITS Deployment 2019 $5,809,800.00

74-00011-00 TxDOT SH 71 SH 130 Norwood Lane ITS Deployment 2019 $1,223,200.00

74-00012-00 TxDOT FM 734 (Parmer) SH 45-N US 290-E ITS Deployment 2019 $9,144,100.00

CAMPO 2040 Regional Transportation Plan

Page 125: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

75-00001-00 CAMPO FM 1626/RM 957 Intersection

Land use and transportation nodal analysis

2021 $200,000.00

75-00002-00 CAMPO Garlic Creek Parkway Corridor and connectivity analysis 2021 $350,000.00

75-00003-00 CAMPO Travis Bergstrom Spur N/A N/A Feasibility analysis of an abandoned rail corridor

2019 $350,000.00

75-00004-00 CAMPO Hays US 290/RM 12 & Mercer District

Land use, corridor and node analysis 2022 $450,000.00

75-00005-00 CAMPO VA Development of regional TDM strategies

2019 $360,000.00

CAMPO 2040 Regional Transportation Plan

Page 126: Highway Projects (2040 RTP) · 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn lane 2021 $8,985,397.00

MPO ID Sponsor(s) County Roadway Limits (From) Limits (To) Description Let Year Total Cost

Roadway Projects

75-00006-00 CAMPO Hays San Marcos - Southwestern Hays Subregional Study

Land use, corridor and node analysis 2022 $1,000,000.00

CAMPO 2040 Regional Transportation Plan