This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment
HIGHLAND REDEVELOPMENTMARCH 12, 2013
PKG STALLS (GARAGE) =
PKG STALLS (GARAGE) =PKG STALLS (SURFACE) =
1,995
42033
2,145
453
PKG RATIO = 1:270sf
PKG RATIO = 1:270sf
POTENTIAL OVER-STREET CONNECTION(S) IF NEEDED BY BIG TENANT(S)150PKG STALLS (SURFACE) =
TOTAL PARKING =
TOTAL PARKING =
TOTAL S.F. (BUILDINGS A-E) = 579,700 sf
TOTAL S.F. (BUILDING F & RETAIL) = 122,200 sf
stg design, inc.office parcel proposal
Source(s): STG Design, 2013.
5001000
n
Feet
2MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment
HIGHLAND MALL REDEVELOPMENTJAN 9, 2013
MASTER PLAN STUDY
OUTDOOR SEATING
OPEN PLAZA: RETAIL OPPORTUNITY ON BOTH SIDES
OFFICE ABOVE RETAIL
ON-STREET PARKING
Source(s): STG Design, 2013.
stg design, inc.office parcel proposal
3MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment