High Voltage System outside Drawer Tilecal upgrade meeting at Stockholm (3-5 June 2013 François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard, Marie-Lise Mercier, Eric Sahuc. Summary of previous progresses Present status Tests and next steps 1
High Voltage System outside Drawers. Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard, Marie-Lise Mercier, Eric Sahuc. Summary of previous progresses Present status Tests and next steps. 1. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
High Voltage System outside Drawers
Tilecal upgrade meeting at Stockholm (3-5 June 2013)François Vazeille
on behalf of Roméo Bonnefoy, Christian Fayard, Marie-Lise Mercier, Eric Sahuc.
Summary of previous progresses· Present status· Tests and next steps
1
Summary of previous progresses
· Several options reported since a long time HV regulation inside/outside Drawers
[Tilecal meetings: February 2008, November 2009, September 2012]
Þ Choice of the outside option 3: - Re-cycling of HV cards inside a special crate put in the electronics room. - Design of HV bus cards sharing the individual HV’s (with noise killers). - Use of multiconductor cables to supply the HV bus cards.
· Clermont-Ferrand proposition to develop an outside option, but ready to provide all the information on the present ATLAS inside option.
2
New HV Bus boards (no active components)
12 channels.- A 4-layer printed circuit: External layers as shielding, Internal layers to distribute the HVs.- Noise killers everywhere.- New HV connectors (more robust), but 8 weeks delivery delay
New HV regulation crate: ¼ of the total space (4 Modules later)
HV
LV’s
Individual Hvout:SUBD25 connectors
CANBUS
Rear
Front
3
Present status
HV Bus boardsready to equip 3 trains of Mini-Drawers
A cable tray will run3 different cable lengths
towards Drawers 2, 3 and 4(Fixation holes made here)
4
Regulationcrate
HVSource Operational DCS
Various cable lengths
- 1m long.- 4 times 20 m long (175)- 100 m long, to reproduce ATLAS.
5
Tests and next steps
· Clermont-Ferrand tests HV tests in progress, with a PMT Block lighted by a blue LED Noise measurements for different cable lengths. Results the next time.
· CERN tests - Mini-Drawer handling/connection tests in building 175 using Slider and Basket, in the same time as mechanics tests. - HV tests in building 175, once the Clermont-Fd tests will be fully efficient. - Equipment of a Demonstrator in Building 175.