Top Banner
High Speed Railway Fastening System Technology Anyang Railway Equipment Co., Ltd
113

High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Jul 15, 2021

Download

Documents

atrailfasteners

About Us Anyang Railway Equipment Co., Ltd was founded in 2001, it has 18 modern professional production lines, 800 employers, more than 1,000 sets of various equipment, professional equipment, inspection, testing, and test equipment. It has cast, rolling, elastic clips, fish plate, baffle, rubber, anti-corrosion, heat treatment, standard parts, screw spikes, gauge rods, etc 12 production workshops. Since its establishment, Anyang Railway Equipment Co., Ltd has become a key international player in the Railway fixing construction materials market, it has been supplying millions of components to global industry leaders in the railway sector. In 2008, participated in the drafting of China Railway Industry Standards. In 2011, built telegraph pole factory and railway sleepers factory in Sudan, which can produce fasteners 1,200,000 sets/year and sleepers 500,000 pcs/ year. In 2013, Designed the sleeper and fastening system for Melbourne Metro Line and got an Approval Certificate issued by MTM SME GROUP. In 2015, an American sales branch was established. In 2019, joint venture company-- Vossloh (Anyang) Track Material Co., Ltd was established. Main Products Railway fastening systems: E-clip rail fastening system, SKL clip rail fastening system, Nabla clip rail fastening system, KPO clip rail fastening system, fast rail fastening system, etc. Rail fasteners: rail fish plates, rail tie plates, elastic rail clips, screw spikes, rail bolts, rail anchors, rails pads, rail shoulders, etc. Rail joints: standard rail joints, joggled rail joints, compromised rail joints and fish bolts, etc. Railway Sleeper: Railway composite sleeper(railroad synthetic sleeper) Certificate ISO9001: 2015 CRCC Certificate for conventional rail systems, urban transport systems, railway fastening products etc. Utility model patent certificate for fastening systems for metro line and tram. Customized Customized for various product and international standards such as AREMA railway standard, BS railway standard, UIC railway standard, DIN railway standard, South American railway standard, South Africa railway standard, etc. We can provide goods according to drawings and technical requirements. Our Vision Our vision is to provide solutions and products that are characterized by high quality and long service life under all kinds of different load stresses and climate conditions. We are a team of over 800 employees working across over 20 global locations, we are a passionate team, continuously progressing and working together to put the customer first, we would like to contribute what we can do every day. In order for global customers to use safer, more reliable, and more durable railway materials, we are always ready to face the challenges of our railway infrastructure customers.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd

Page 2: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Rail fasteners:

It is the part used to connect the rail and sleeper on the track. The function is to fix the rail on the sleeper, maintain the gauge and prevent the rail from moving vertically and horizontally relative to the sleeper.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 3: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Fastening systems for high-speed railways are divided into two categories, one is ballasted track fasteners, and the other is ballastless track fasteners.

Ballasted rails mainly adopt three types of fasteners: spring clip type-IV, spring clip type-V and spring clip type-FC. According to the basic form of the rail, they are divided into shoulder and non-baffle fasteners, spring clip type-IV and spring clip type-FC is a sleeper without shoulder fastener, and the elastic type-V is a sleeper with a shoulder fastener.

The ballastless track mainly uses WJ-7, WJ-8, W300-1 and SFC fasteners. According to the form of ballastless bed, it is divided into non-shoulder and shoulder fasteners. WJ-7 and SFC are Fasteners without shoulders, WJ-8 and W300-1 are fasteners with shoulders.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 4: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Spring clip type-IV fasteners (hereinafter referred to as fasteners) are composed of spring clips, rail shoulders, rail insulators and rubber pads.

spring clip

insulator

rubber pad

shoulder

Spring clip type-IV fasteners

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 5: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Spring Clip(type- Ⅳ)There are three types of sping clips: C4 type, JA type and JB type. Generally, C4 spring clips are installed, and JA and JB spring clips are installed at the rail joints. The diameter of C4 spring clips is 20 mm, and the diameter of JA and JB spring clips is 18 mm. The anti-corrosive paint for JA spring clips is gray, and it is used with the insulating gauge blocks of No. 7, 8 and 9 joints; the anti-corrosion paint for JB spring clips is black, and it is used with No. 10, 11, 12 and 13 joints. Equipped with rail insulators.

φ20mm

C4 Spring Clip

φ18mm φ18mm

JA Spring Clip JB Spring Clip

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 6: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Rail ShouldersThis part is embedded in the sleeper in advance, and the embedding accuracy should meet thesize requirements of the following figure.

170.5mm~172.5mm

34.2mm~35.8mm

27.2mm~28.8mm

Foot distance between outside of two shoulders 1682.5mm~1685mm

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 7: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Rail InsulatorsRail insulators (hereinafter referred to as gauge blocks) are divided into two types, namely rail insulators G4 are used in general areas and rail insulators G4J are used at rail joints. Each rail insulator has 7 specifications, namely 7th , 8th, 9th, 10th, 11th, 12th and 13th. 9th and 11th are used in the standard gauge. Except for the rail insulators of 7th, 8th and 9th connectors which are not black, the other gauge blocks are all black.

Different thickness dC o r r e s p o n d i n g t o different numbers

d

Joint Insulators

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 8: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Special Note: This fastener cannot be used to adjust the height of the rail by inserting the height-adjusting pad.

The use of this fastener must

not install a height-adjusting pad

under the rail to avoid residual

deformation or even breakage of

the sping clip.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 9: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Fastener laying sequence and requirementsPreparation before installationPrepare 9th and 11th insulators, and appropriately prepare 8th, 10th and 12th insulators to prepare for adjusting the gauge when the gauge is not suitable; at the same time, properly prepare the corresponding number of joint gauge blocks. To prepare for rail joints.Prepare C4 spring clips, and prepare JA and JB spring clips appropriately for rail joints. The buried position of the rail shoulders in the upper track sleeper must be accurate. Sleepers where the embedded position ofthe rail shoulder is skewed, upturned or embedded height, the distance between the two shoulders on thesame side, or the bottom corner distance of the two outer shoulder does not meet the requirements, shallnot be used on the track.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 10: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Remove the mud from the sleeper bearing rail surface between the two rail shoulders and the mortar in the holes of the rail shoulders.

Remove the mud from the sleeper bearing rail surface between the two rail shoulders

Remove the mortar in the holes of the rail shoulders.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 11: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Remove the sludge from the bottom of the rail

Remove mud from the bottom of the rail

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 12: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The middle picture shows the wrong orientation of the rubber pad, and the right picture shows the correct orientation.

Fastenerlaying sequence and requirementsLaying rubber padsPlace the rubber pad between the two rail shoulders, and the center line of the notch on both sides of the rubber pad should be aligned with the center line of the rail shoulders.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 13: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Laying the rails

Install the gauge block

Install 9th and 11th insulators, and the ears of the insulators should be fastened to the rail shoulders. If due to manufacturing deviations of rails, sleepers, and insulators, the insulators with the specified numbers cannot meet the gauge requirements or the insulators cannot be installed in place, they can be

replaced according to the actual situation, and no violent knocks are allowed to make them fit in.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 14: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

No violent knocks are allowed to make them fit in.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 15: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Joint insulators G4J

Special note: joint insulator G4J should be used at the rail joint

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 16: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Install spring clipsBefore installing the spring clips, the rails, rubber pads, sleeper bearing rail surfaces, and insulators

buckling rail surfaces should be closely attached to the upper surface of the rail bottom.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 17: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Special tools should be used when installing the spring clips.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 18: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The position of the middle limb of the elastic clilp should be placed flat and upright, and should not be skewed. Don't pull hard during installation, the force must be moderate, and the fulcrum and the force point must be correct.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 19: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

If you encounter difficulty in positioning individual spring clips, you can tap the tail of the spring clips with a small hammer while using the installation tool to make them in place.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 20: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The position of the spring clip is based on the distance between the inner side of its small arc and the end of the rail shoulder by 8-10 mm.

distance is 8~10mm

Must not be tight or too far apart.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 21: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Special Note:JA and JB spring clips should be installed at the rail joints. The gray JA type spring clip is used with the non-black 7th, 8th, 9th insulators, and the black JB type spring clip is used with the black 10th, 11th and 12th insulators.

Install joint spring clips and insulators at rail joints

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 22: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The gray JA-type spring clips are used with the non-black insulators of 7th, 8th, 9th joints.

The black JB spring clip is used with the black 10th, 11th, 12th joint insulators.

+

+

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 23: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Installation adjustmentCheck the gauge. If there is any problem, use a special tool (same as the installation tool) to remove the spring clip.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 24: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Check according to the gauge adjustment amount, select the appropriate gauge block model to install according to the following table.

Standard Gauge 1435mm+Gauge Adjustment

b

d

a c d

d

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 25: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Gauge Adjustment(mm)

Left Rail 右 股 钢 轨

Outside a Inside b Inside c Outside d

-8 13 7 7 13

-7 12 8 7 13

-6 12 8 8 12

-5 11 9 8 12

-4 11 9 9 11

-3 10 10 9 11

-2 10 10 10 10

-1 9 11 10 10

0 9 11 11 9

+1 8 12 11 9

+2 8 12 12 8

+3 7 13 12 8

+4 7 13 13 7

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 26: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Change gauge block

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 27: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Fastener maintenance requirementsAt the early stage of operation, attention should be paid to observe the use of sleepers and fasteners. When sleepers are found to be empty, high, low, and level irregular or triangular pits, they should be tamped in time, and height-adjusting pads should not be used for rail height-adjusting operations.

If it is found that the gauge block is broken, the rubber pad is broken or the elastic clip is broken during use, it should be replaced in time.

When carrying out the stress relief of the seamless track, the spring clip must be removed with a special tool (same as the installation tool). After the stress is relieved, check whether the positions of the rubber pad and the gauge block are correct. If there is any misalignment, install the spring clip after adjustment.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 28: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

V-type Spring Clip Fastener (hereinafter referred to as fasteners) are composed of screw spikes, flat washers, spring clips, gauge baffles, under-rail pads and rail dowels. In addition, for the needs of rail height adjustment, it also includes height adjustment pad.

V-type Spring Clip Fastener Components

screw spike

flat washer

gauge baffle

spring clip

rubber pad

dowel

height-adjusting pad

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 29: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Spring Clip and Under Rail Pad

There are two types of spring clips: W2 spring clips used in general areas and X3 spring clips that may be used on bridges. The diameter of W2 spring clips is 14 mm and the diameter of X3 spring clips is 13 mm. In addition, as a spare part, I-type fasteners and A-type spring clips may be used at rail joints.

The under-rail pad is divided into two types: the rubber pad RP5 used in general sections and the composite pad CRP5 that may be used on the bridge.

When it is necessary to reduce the line resistance on the bridge, the X3 elastic clip and the composite pad can be used. At this time, the longitudinal resistance of the rail for a single set of fasteners is 4kN.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 30: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

use in general areas

use in bridge areas

+φ14mm

W2 spring clip rubber pad RP5

+φ13mm

X3 spring clip composite pad CRP5

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 31: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Gauge BaffleThere are seven types of gauge baffle G5, namely 2#, 3#, 4#, 5#, 6#, 7#, 8#.

4# and 6# are used in the standard gauge.

Different distances d correspond to different numbers

dTake 6# as an example to illustrate the product mark

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 32: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Railway DowelsThe component is pre-embedded in the sleeper, the embedding accuracy should meet the requirements, and the top surface of the dowel should be flush with the sleeper bearing rail surface. After the dowel is buried, it should be covered with a plastic (or other material) cover to prevent rainwater and mud from entering.

covered with a plastic (or other material) cover to prevent rainwater and mud from entering

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 33: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Height Adjustment PadThe height adjustment pad TD5 is divided into four specifications of 1 mm, 2 mm, 5mm and 8 mm according to the thickness, and is placed between the pad under the rail and the sleeper bearing rail surface.

U n d e r - r a i l H e i g h t Adjustment Pad

d

1mm

2mm5mm8mm

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 34: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Fastener laying sequence and requirements

Preparation before installationAccording to 1.1, select and prepare the appropriate type of spring clip(W2 or X3 type) and the appropriate

type of under-rail pad (rubber pad RP5 or composite pad CRP5).

Properly prepare spring clips for I-type fasteners and A-type spring clips for rail joints.

According to the selection, prepare 4# and 6# gauge baffles, and appropriately prepare 3#, 5# and 7# gauge

baffles to prepare for adjusting the gauge when the gauge is not suitable.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 35: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

a b c d

Standard Gauge 1435mm+Gauge Adjustment

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 36: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1·1Gauge Adjustment

(mm)Left Rail Right Rail

Outside a Inside b Inside c Outside d

-8 8 2 2 8

-7 7 3 2 8

-6 7 3 3 7

-5 6 4 3 7

-4 6 4 4 6

-3 5 5 4 6

-2 5 5 5 5

-1 4 6 5 5

0 4 6 6 4

+1 3 7 6 4

+2 3 7 7 3

+3 2 8 7 3

+4 2 8 8 2

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 37: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Properly prepare the height-adjusting pad for the purpose of adjusting the height of the rail.Remove the mud from the bearing rail surface and the bottom of the sleeper.

Remove mud from the bottom of the rail

Remove silt and debris from sleepers

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 38: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Remove the plastic (or other material) cover on the dowels.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 39: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Installation sequence in normal installation stateLaying under-rail padsPlace the under-rail pad in the middle of the bearing rail surface, and the flange of the pad should buckle the bearing rail surface.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 40: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The under-rail pads are not allowed to be offset

The flange of the rubber pad under the rail should buckle the bearing rail surface

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 41: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Laying the rails

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 42: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Install the gauge baffle

Install 4# and 6# gauge baffles. The gauge baffles should be placed between the two ears of the pad under the rail. If due to manufacturing deviations of rails, sleepers and gauge baffles, the gauge baffle with the specified number cannot meet the gauge requirements or the gauge baffle cannot be installed in place, it can be replaced according to the actual situation.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 43: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 44: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Install spring clips

screw spikes

The threaded part is coated with railway special protective grease

flat washers

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 45: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

tightentighten

Nut torque:Tightening torque of W2 spring bar is about 160 N·mThe tightening torque of X3 elastic strip is about 95 N·m

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 46: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The lower jaw in the middle of the spring clip is in contact with the rail

Lower jaw in the middle of the spring clip

High Speed Railway Fastening System Technology

Page 47: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Special note: At the rail joints, when it is difficult to install the W2 and X3 spring clips on the small gauge baffle, you should install the spring clips type I fasteners and type A spring bars.

A-type spring clip

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 48: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Installation sequence for heightened stateAdjust the gauge and orbitIf there is a small amount of unevenness in the height and level of the rail, consider putting in a height-adjusting pad. At this time, the steel rail should be lifted, and the height-adjusting pad should be placed under the pad under the rail and the edge ears of the pad should be clamped to the gauge baffle.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 49: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The height-adjusting pad shouldbe placed under the rail pad

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 50: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Special reminder: The height-adjusting pad must not be placed on the under-rail pad, the total thickness of the put-in height-adjusting pad shall not be greater than 10 mm, and the number of the height-adjusting pad shall not exceed 2 pcs.

The total thickness of the height-adjusting pads placed in must not be greater than 10mm, and the number of height-adjusting pads must not exceed 2 pcs.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 51: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The gauge baffle should be placed between the ears of the height-adjusting pad and the under-rail pad, and shall not be pressed against the height-adjusting pad and the under-rail pad.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 52: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Maintenance requirementsAt the early stage of operation, attention should be paid to observe the use of fasteners and sleepers. If the fasteners are loosened due to residual compression of the under-rail pad, they should be re-tightened in time. When there are empty sleepers, uneven height and level, or triangular pits, the starting tamping should be carried out in time. If there is a small amount of height and unevenness that are difficult to carry out the starting tamping operation, the height-adjusting pad can be inserted.Special reminder: The total thickness of the height-adjusting pad should not be greater than 10 mm.If the fastener parts are found to be damaged during use, they should be replaced in time.Before starting the tamping operation of the large-scale road maintenance machinery, all the height-adjusting pads should be removed. After the starting tamping operation is completed, if there is a small amount of unevenness in the height and level of the individual section of the rail, the height-adjusting pad can be placed in accordance with 2.3.When it is necessary to remove the screw spikes, avoid mud and dirt from entering the dowels.

High Speed Railway Fastening System Technology

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 53: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1. WJ-7 type fastener components and description

WJ-7 type fasteners (hereinafter referred to as fasteners) are composed of T-bolts, nuts, flat washers, spring bars, insulating blocks, iron tie plates, under-rail pads, insulating cushion pads, heavy spring washers, flat spacers, anchor bolts and rail dowels. In addition, in order to adjust the height of the steel rail, it also includes height adjustment pad under rail and height adjustment pad under iron tie plates.

Assembly and laying of WJ-7 type fasteners

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 54: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

flat washer

sping clip

nut

T- bolt

insulator

anchor bolt

heavey spring wahser

flat spacer

rubber pad

dowel

iron tie plate

insulating cushion padheight-adjusting pad under iron tie plate

height-adjusting pad under rail

Page 55: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1.1 Spring clips and under-rail pads

There are two types of spring clips, namely the W1 type used in general sections and the X2 type that may be used on the bridge. The diameter of the W1 spring clip is 14mm, and the diameter of the X2 spring clip is 13mm.

The under-rail pads are divided into two types: A and B. Type A is used for passenger dedicated lines that take into account freight, and Type B is used for passenger dedicated lines. Each type is divided into two types: rubber pads used in general sections and composite pads that may be used on bridges. Kind.

When the line resistance needs to be reduced on the bridge, X2 elastic clips can be used with composite plates. At this time, the rail longitudinal resistance of a single group of fasteners is 4kN.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 56: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

use in general sections

W1 spring clip rubber pad

+φ14mm

X2 spring clip composite pad

+

possible use on bridgeφ13mm

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 57: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1.2 DowelThe component is embedded in the sleeper or track slab in advance, and the embedding accuracy should meet the requirements, and the top surface of the dowel should be flush with the bearing surface of the sleeper or track slab. After the dowel is buried, it should be covered with a plastic (or other material) cover to prevent rainwater and mud from entering.

cover with plastic (or other materials) to prevent ainwater and mud from entering

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 58: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1.3 Height adjustment pad The height-adjusting pad is divided into two types, the height-adjusting pad under rail and height-adjusting pad under

iron tie plate, which are respectively placed between the under-rail pad and the iron tie plate, between the iron tie plate and the insulating cushion pad. The height-adjusting pad under rail is divided into four specifications according to the thickness of 1 mm, 2 mm, 5 mm and 8 mm; the height-adjusting pad under the iron tie plate is divided into two specifications of 5 mm and 10 mm according to the thickness.

height-adjusting pad under rail pad

d

1mm

2mm

8mm

5mm

10mmheight-adjusting pad under iron tie plate d

5mm

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 59: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2 Fastener laying sequence and requirements2.1 Preparations before installation2.1.1 According to 1.1, select and prepare suitable types of spring clips (Type W1 or X2) and suitable types of under-

rail pads (type A and type B rubber pads or composite pads).2.1.2 Properly prepare the height-adjusting pads under the rail to prepare for minor adjustment of the height of the rail.

Remove the sludge and debris on the bearing rail surface of the sleeper or track plate. Remove the sludge at the bottom of the rail.

2.1.3 Remove the mud from the bearing surface of the sleeper or track slab and the bottom of the rail.

Remove silt and debris on the bearing surface of sleepers or track slabs

remove mud from the bottom of the rail

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 60: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2.1.4 Remove the plastic (or other material) cover on the dowel.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 61: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2.2 Installation sequence in normal installation stateStep 1: Place the insulating cushion pad Lay an insulating cushion pad to align the hole of the pad with the hole of the dowel.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 62: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 2: Place the iron tie plate Place the iron tie plate so that the rail bottom slope faces the inner side of the track (in the direction of the arrow on

the iron tie plate). The center of the bolt hole of the iron tie plate should be aligned with the center of the dowel.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 63: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The following picture shows the effect picture after installing two iron tie plates on a single sleeper.

inside of rail

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 64: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

long sideshort side long side short side

Step 3: Place the long side short side long side of the flat spacer. Place the flat spacer on the iron spacer, and make the flat spacer face inward from the longer side of the center of the

circular hole.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 65: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 4: Place heavy spring washers and anchor bolts Put the anchor bolts on the spring washers, and coat the threaded part with railway special protective grease, and

screw them into the dowel. Before tightening the anchor bolts, adjust the position of the iron tie plate so that the marking line on the iron tie plate is aligned with the marking line on the flat cushion block.

railway special protective grease

spring washer

1

anchor bolt

2

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 66: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

3 Screw into the dowel and tighten

The marking lines on the iron tie plate and the flat spacer should be aligned

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 67: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 5: Place the pad under the rail Place the under-rail pad on the supporting rail surface of the iron pad.

Take the rubber pad as an example. The picture on the left shows the wrong orientation of the rubber pad, and the picture on the right shows the correct orientation.

Incorrect installation of rubber pad position Correct installation of rubber pad position

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 68: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 6: Place the rails

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 69: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 7: Place the insulator Place the insulator between the rail and the shoulder of the iron tie plate, and don't knock it into place.

21

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 70: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 8: Place T-bolts

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 71: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Insert the head of the T-bolt into the bottom of the iron tie plate and rotate it 90°, and then lift it up so that the shaped head is completely embedded in the groove. The specific process is as follows:(1) The head of the T-bolt is inserted into the iron tie plate at the angle shown in the figure below.

(2) After inserting the T-bolt head into the iron tie plate, rotate the T-bolt 90° in a clockwise direction, and the bolt head is to the predetermined position.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 72: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 9: Place the spring clips

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 73: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 10: Place the flat washer and tighten the nut. When tightening the nut, the threaded part of the T-bolt should be oiled.

The fastening of the spring clip shall be based on the contact of the lower jaw at the front end of the spring clip with the insulator (see the figure below).

lower jaw in the middle of the spring clip

Nut torque:W1 spring clip about 120 N·mX2 spring clip about 80 N·m

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 74: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2.3 Installation and adjustment2.3.1 Adjust the gauge and track direction

16mmguage 1435mm

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 75: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

(1) Check the gauge and track direction. If there is any discomfort, adjust the gauge as follows.

3

1

2

1. Loosen the anchor bolts;2. Use the redirector to move the iron pad horizontally to adjust, after confirming that the gauge and track direction are appropriate;3. Tighten the anchor bolts with a torque of 300~350N·m.

jamming

(2) If jamming occurs, follow the steps below.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 76: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

At the early stage of operation, attention should be paid to observe the empty rails and the height and unevenness of the rails. If the above conditions are found, the slabs should be put into the rails and raised in time. If the fastener is loose due to the compression residual deformation of the under-rail pad, it should be re-tightened in time.

2.3.2 Adjust the height of the rail During the operation period, if the height and level of the rail are uneven due to the creep of the bridge or the sinking

of the foundation, the height-adjusting pad can be set under the rail. When the height adjustment exceeds 10mm, the height-adjusting pad can be installed under the iron pad.

1 Flat pad U-turn

continue to move the iron pad2

3

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 77: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

a Raise under the rail Special reminder: The height-adjusting pad under the rail shall not be placed on the under-rail pad, the total

thickness of the height-adjusting pad under the rail shall not be greater than 10mm, and the number of height-adjusting pads under the rail shall not exceed two pices, and the thinnest height-adjusting rail pad shall be placed at the bottom to prevent the height-adjusting pad under rail from escaping.

rubber pad under rail

iron pad

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 78: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

b Height adjust under iron pad

Insulating cushion pad

iron pad

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 79: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

The total thickness shall not exceed 20mmThe total number of height-adjusting pad

under iron pad shall not exceed two pieces

Special Reminder:The total number of height-adjusting pad under iron pad shall not exceed two pieces, the total thickness shall not exceed 20mm

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 80: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

height-adjusting pad under rail

height-adjusting pad under tie plate

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 81: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2.4 Maintenance requirements2.4.1 T-bolts should be regularly oiled to prevent the bolts from corroding.2.4.2 Keep the fastener system clean.

In particular, prevent the drainage port of the cushion plate (the position of the red circlein the picture above) from being blocked

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 82: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1 WJ-8 type fastener component composition and description

WJ-8 type fasteners (hereinafter referred to as fasteners) are composed of screwl spikes, flat washers, spring bars, insulating blocks, gauge baffles, under-rail pads, iron pads, elastic pads under the iron pads and dowels. In addition, in order to adjust the height and position of the steel rail, it also includes a fine adjustment pad under the rail and a height-adjusting pad under iron pads.

Assembly and laying of WJ-8 type fasteners

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 83: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

screw spike

flat washer

fine-tuning pad

iron tie plate

height-adjusting pad under iron tie platesdowel

elastic pad under iron tie plates

baffle plate

spring clip

rubber pad

insulator

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 84: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1.1 Spring bars and under-rail padsThere are two types of spring bars, namely the W1 type used in general sections and the X2 type that may be used on the bridge. The diameter of the W1 spring bar is 14 mm, and the diameter of the X2 spring bar is 13 mm.There are two types of under-rail pads: rubber pads used in general sections and composite pads that may be used on bridges.When it is necessary to reduce the line resistance on the bridge, X2 elastic strips can be used with composite backing plates. At this time, the longitudinal resistance of the rails of each group of fasteners is 4 kN.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 85: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

φ14mm

+

W1 spring clip rubber pad

+φ13mm

X2 spring clip composite pad

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 86: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1.2 Gauge baffleThere are two types of gauge baffles: WJ8 gauge baffles for general sections and WJ8 joint gauge baffles for rail joints. WJ8 gauge baffles for general sections are divided into eleven specifications of 2#, 3#, 4#, 5#, 6#, 7#, 8#, 9#, 10#, 11#, 12#. 7# gauge baffle is used for standard rails, among which three specifications of 10#, 11#, 12# can be used at the rail joints.

n

m

different distance m, n corresponds to differentnumber

Take 7# as an example to illustrate the product identification

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 87: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

WJ8 joint gauge baffles are divided into eight specifications, 2#, 3#, 4#, 5#, 6#, 7#, 8#, 9#, and 7# is used for standard gauge.

Take 7# as an example to illustrate the product identification

1.3 InuslatorThere are two types of insulators: Type I and Type II. Generally, type I is used for sections, and type II insulators are used for rail joints.

d

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 88: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

I-type insulator mark

II- type insulator mark

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 89: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1.4 Elastic pad under iron tie plateThe elastic tie plate under the iron tie plate is divided into two types: A and B. A Elastic pads are used for passenger dedicated lines that take into account freight; B Elastic pads are used for passenger dedicated lines.

S2 screw spike

S3 screw spike

101mm

116mm

1.5 Screw SpikeThere are two types of spiral spikes: S2 and S3. S2 is used when the height of the rail is less than 15 mm, and S3 is used when the height of the rail is greater than 15 mm.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 90: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1.6 The dowel is covered with plastic (or other materials) to prevent rainwater and mud from entering

The component is embedded in the sleeper or track slab in advance, and the embedding accuracy should meet therequirements, and the top surface of the dowel should be flush with the bearing surface of the sleeper or track slab. After the dowel is buried, it should be covered with a plastic (or other material) cover to prevent rainwater and mud from entering.

Cover with plastic (or other materials) to prevent rainwater and mud from entering

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 91: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

1.7 Height-adjusting padThe height-adjusting pad is divided into two types: the under-rail pad and the iron-tie plate, and between the elastic pad under iron tie plate with the sleeper or the rail bearing surface of the rail plate. The under-rail fine-tuning tie plate is divided into four specifications according to the thickness of 1 mm, 2mm, 5 mm and 8mm; the iron tie plate is divided into two specifications according to the thickness of 10 mm and 20 mm, and height-adjusting pad under the iron tie plate should be used as a pair.

height-adjusting pad under rail

d1mm2mm

8mm5mm

d10mm

20mm

height-adjusting pad under iron tie p late

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 92: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2 Fastener laying sequence and requirements

2.1 Preparations before installation2.1.1 According to 1.1, select and prepare suitable types of spring clips (type W1 or X2) and suitable types of

under-rail pads (rubber pads or composite pads). At the same time, properly prepare under-rail fine-tuning pads with thicknesses of 1 mm and 2 mm.

2.1.2 Prepare Type I insulating block and properly prepare Type II insulating block for use in rail joints.2.1.3 Select and prepare 7# gauge baffles, and appropriately prepare 6# and 8# gauge baffles and joint gauge

baffles of the same model.2.1.4 Select and prepare the elastic tie plate (type A or B) under the iron tie plate according to 1.4.2.1.5 Select and prepare S2 screw spikes.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 93: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2.1.6 Remove the mud from the sleeper or the bearing surface of the track slab and the bottom of the rail.

Remove mud from the bottom of the rail

Remove silt and debris from sleepers

2.1.7 Remove the plastic (or other material) cover on the dowel.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 94: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2.2 Installation sequence in normal installation stateStep 1: Place the elastic tie plate under the iron tie plateLay an elastic tie plate under the iron tie plate at the middle position of the rail support to align the tie plate hole with the dowel hole.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 95: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 2: Place the iron tie plate. The bolt hole center of the iron tie plate should be aligned with the center of the rail dowel.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 96: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 3: Place the rail pad in the middle of the tie plate, and the flange of the rail pad should buckle the tie plate.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 97: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 4: Install a gauge baffle of appropriate specifications according to Table 1. The arc boss of the gauge baffle should be placed in the groove of the sleeper or the bottom of the rail groove of the track plate.

m

n

m

n

m

n

m

n

Standard Gauge 1435mm+Gauge Adjustment

a b c d

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 98: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Table 1Gauge adjustment

(mm)

Left Rail Right Rail

Outer gauge baffle Inner gauge baffle Inner gauge baffle Outer gauge baffle

-10 12 2 2 12

-9 11 3 2 12

-8 11 3 3 11

-7 10 4 3 11

-6 10 4 4 10

-5 9 5 4 10

-4 9 5 5 9

-3 8 6 5 9

-2 8 6 6 8

-1 7 7 6 8

0 7 7 7 7

+1 6 8 7 7

+2 6 8 8 6

+3 5 9 8 6

+4 5 9 9 5

+5 4 10 9 5

+6 4 10 10 4

+7 3 11 10 4

+8 3 11 11 3

+9 2 12 11 3

+10 2 12 12 2

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 99: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 100: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Note: When installing the gauge baffle, do not violently knock the gauge baffle into place. After putting it in place, pay attention to the gap between it and the sleeper or track plate, and the two front supports should be closely attached to the supporting rail surface.

Step 5: Laying the rails.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 101: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 6: Place the insulators.

Note:When placing the insulating block, do not knock it into place.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 102: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 7: Place the spring clip.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 103: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Step 8: Cover the screw spike with a flat washer and coat the threaded part with railway-specific protective grease, then screw it into the sleeve and tighten the elastic clip. The fastening of the elastic clip shall be based on the contact of the lower jaw of the front end of the elastic clip with the insulator.

1

screw spikes

The threaded part is coated with railway special protective grease

flat washer

2

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 104: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

3

tightentighten

Nut torque:Tightening torque of W1 spring clip is about 160 N·mTightening torque of X2 spring clip is about 110 N·m

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 105: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Special note: WJ8 joint gauge baffle and type II insulators should be used at the rail joint.

The lower jaw of the front end of the spring clip is in contact with the insulator

lower jaw in the middle of the spring clip

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 106: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2.3 Installation adjustment2.3.1 Check the gauge and track direction. If there is any problem, you should replace the gauge baffle with a different

number according to Table 1.

2.3.2 Check the empty hoisting, height and level of the rails. If there is any problem, please refer to Table 2 to put in an appropriate thickness adjustment pad.

Special reminder: The under-rail fine-tuning pad shall not be placed on the under-rail pad, and the total thickness of the pad shall not be greater than 10 mm, and the total shall not exceed two pieces.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 107: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Table 2 unit:mm

Rail height adjustment Fine-tuning the total thickness of the tie plate under the rail

Lower the thickness of theiron tie plate

0 0 0

1 ~ 10 1 ~ 10 0

11 ~ 20 1 ~ 10 10

21 ~ 30 1 ~ 10 20Put in the fine-tuning pad under the rail

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 108: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

放入垫板的总

厚不得大于

10 mm,总数

不超过两块。

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 109: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2.4 Maintenance requirements

2.4.1 At the early stage of operation, attention should be paid to observe the use of fasteners. If the fasteners are loosened due to the residual compression of the elastic tie plate under the iron tie plate, they should be re-tightened in time. When it is found that the rail is empty and the height is uneven, the height adjustment pad should be inserted in time. When the height of the rail relative to the normal state is greater than 15 mm, the S3 spiral spike should be used. Put in the iron tie plate to raise the baffle plate.

Special reminder: Each pair of iron tie plate is composed of two pieces, which are inserted from the side. The iron tie plate can only be used in a single pair, not stacked. When the height of the rail relative to the normal state is greater than 15 mm, the S3 screw spike should be used.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 110: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Put in the iron tie plate to raise the baffle plate

When the height of the rail relative to the normal state is greater than 15 mm, the S3 screw spike should be used.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 111: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

2.4.2 If the fastener parts are found to be damaged during use, they should be replaced in time.2.4.3 When it is necessary to remove the screw spikes, avoid mud and dirt from entering the rail dowels.

The irontie plate can only be used in a single pair, not stacked.

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 112: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Thank You!

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/

Page 113: High Speed Railway Fastening System Technology--Anyang Railway Equipment Co., Ltd

Company: ANYANG RAILWAY EQUIPMENT CO., LTDAddress: Simenquan Village, Longquan Town, Longan District, Anyang City, Henan Province, China

Contact Person: Ms. Xu YanliMobile Phone: 0086-15003728689WhatsApp: 0086-15003728689WeChat: Yanli81Website: https://www.at-railfasteners.com/Facebook: https://www.facebook.com/atrailfasteners/Linkedin: https://www.linkedin.com/in/atrailfasteners/Twitter: https://twitter.com/atrailfasteners

Anyang Railway Equipment Co., Ltd https://www.at-railfasteners.com/