Page 1
SSCCCCTT AAnnnnuuaall CCoonnccrreettee SSeemiminnaarr 22000077
HiHigghh PPeerforformrmaannccee CoConnccreretete iinn
HoHonngg KKoonngg--SShheennzzhheenn WWeessteternrn CoCorrirriddoorr
2288tthh FFeebbrruuaarryy 22000077
Page 2
Location Plan of HKSWCLocation Plan of HKSWC
HKSWCHKSWC
HongKongHongKong
IslandIsland
ShenzhenShenzhen
LantauLantau
IslandIsland
KowloonKowloon
ChekChekLapLapKokKok
Page 3
DEEP BAYDEEP BAYSHEKOUSHEKOUSHEKOU DongjiaotouDongjiaotouDongjiaotou
Mainland ChinaMainland China
Hong Kong SAR
Lok Ma
Chau
Man Kam To
HONG KONGHONG KONG--SHENZHENSHENZHEN WESTERN CORRIDORWESTERN CORRIDOR
Total length: 5.5km (3.5km within HK waters)
DEEP BAY LINKDEEP BAY LINK
HK
SA
R B
ound
ary
Sha Tau Kok
Page 4
OOvveerrvviieeww
•• FFoouurrtthh vveehhiiccuullaarr bboouunnddaarryy ccrroossssiinngg bbeettwweeeenn HHKKSSAARR
aanndd tthhee MMaaiinnllaanndd
•• TToottaall lleennggtthh :: 55..55kkmm ((DDiivviiddeedd bbyy BBoouunnddaarryy ooff HHKKSSAARR))
•• HHKKSSAARR sseeccttiioonn :: 33..55kkmm,, SShheennzzhheenn sseeccttiioonn :: 22kkmm
•• DDuuaall 33--llaannee eelleevvaatteedd ccaarrrriiaaggeewwaayy wwiitthh hhaarrdd sshhoouullddeerrss
•• CCaabbllee--SSttaayyeedd BBrriiddggee aatt nnaavviiggaattiioonn cchhaannnneell
Page 5
Approach Viaduct: ElevationApproach Viaduct: Elevation && SectionSection
pier with sliding bearings and deck movement joint
pier with sliding bearings
pier monolithic with deck
Page 6
Approach ViaductApproach Viaduct
Page 9
210m
13 nos.
99m
74.585m
74.585m
To Hong Kong
To Shenzhen
~123m
~33m
1
5
HK
SA
R B
ound
ary
Pier 0 (Interface Pier with Mainland
Pier 1
Pier 3 (Interface Pier with Approach
Viaducts) Tower
Pier 2 (Anchor Pier)
portio n o f SWC) EElleevvaattiioonn ooff tthhee CCaabbllee--SSttaayyeedd BBrriiddggee
Page 10
Computer generated perspective viewComputer generated perspective view
Page 11
Counterweight
~23MN ~3.3MN Anchor Pier
Counterweigh t Unit:
• Adopt heavy aggregate to achieve min. 31.5 kN/m3
Page 13
Durability Assessment
• Concrete design documents reviewed included: – BS 5400 – BS EN206 – BS 8500 – SDMHR – GEO Publication No. 1/96 ‘Pile design & construction’ – BRE SD1 ‘Concrete in aggressive ground’ – CS TR 40 ‘The use of GGBS and PFA in concrete’ – CS TR 41 ‘Microsilica in concrete’
Page 14
Durability Assessment Recommendations
• Concrete bored piles and pile caps: – C45 – PF A 40% – Max . w/c ratio 0.38 – Min . cove r to rebars : 75m m for pile s and pil e cap s in
water , 50m m fo r pil e cap s fully submerged below seabed o r ground
Page 15
Durability Assessment Recommendations
• Concrete piers: – C50 (C60 for Cable-Stayed Bridge tower & piers) – PFA 35% – Microsilica 8% – Max. w/c ratio 0.35 – Min. cover to rebars: 75mm for external faces (60mm
for tower external faces which have painting), 40mm for internal faces
Page 16
Durability Assessment Recommendations
• Concrete deck: – C50 – PFA 35% – Microsilica 8% – Max. w/c ratio 0.35 – Min. cover to rebars: 50mm for external faces, 40mm
for internal faces
Page 17
LetLet’’s now go to thes now go to the construction partconstruction part
Hong KongHong Kong--Shenzhen Western CorridorShenzhen Western Corridor