Top Banner
HES HKS meeting 21/Apr/2011 T.Gogami
10

HES HKS meeting

Feb 23, 2016

Download

Documents

kenda

HES HKS meeting. 21/Apr/2011 T.Gogami. Contents. Stricter TDC cut of KTOF Improvement Analysis time Number of Kaon Check for all targets . DC hit info. selection with TOF. Gravity. CUT. Particle direction. ~17%. Selective region. Maximum gradient. ~8%. CUT. Minimum gradient. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HES HKS meeting

HES HKS meeting21/Apr/2011

T.Gogami

Page 2: HES HKS meeting

Contents

• Stricter TDC cut of KTOF– Improvement• Analysis time• Number of Kaon

– Check for all targets

Page 3: HES HKS meeting

DC hit info. selection with TOF

Selective region Maximum gradient

Minimum gradient

Particle direction

Gravity

CUT~8%

~17%

Procedure in “h_dc_tofcut.f”1. Get KTOF1X & 2X hit counter information2. Make combination of 1X and 2X hit counter if those two are in

same group (grouping) 3. Determine cut conditions on KDC1 & KDC24. Select Hit wires in KDC and Reorder them

CUT

Page 4: HES HKS meeting

Check works of the code

• GREEN region Selective region• RED markers & lines Selected hit wires• BLACK markers & lines Rejected hit wires

v v’ u u’

x x’

v v’ u u’

x x’

KDC1 KDC2particle particle

Page 6: HES HKS meeting

Multiplicity improvement history

Multiplicities just before tracking stage

DC hit selection wit TOFs Stricter TDC cut of TOFsOriginal

Page 7: HES HKS meeting

Multiplicity improvement history

Multiplicity went down !• Analysis time

– 20% reduction for 52Cr• Number of Kaon (RUN:77124, 52Cr)

– 56 70 90 130

Applied TDC cut

DC TOF cut Matrix DC TOF cut ‘ (TDC cut)

Page 8: HES HKS meeting

Checked KTOF TDC of all targets

• Modified parameter files– e05115replay/PARAM/• hhodo.param.75884• hhodo.param.75886• hhodo.param.75921• hhodo.param.76092• hhodo.param.76118• hhodo.param.76376• hhodo.param.76646

Correct coincidence window

Page 9: HES HKS meeting

Summary and to do• Summary

– Stricter TDC cut of KTOFs• Stricter KDC hit wires selection

– Analysis time : 20% reduction for 52Cr– Number of Kaon : 2 times more compared to rev.456

• Checked for all targets

• To do– Λ’s Cross section check for CH2 and H2O targets

If consistent result shows upMatrix

– E05-115– E01-011

– Tracking– Parameter optimization

• Residual– Documents

• RA• 授業料免除• 学振

– Germany• Departure date : 6/May/2011

Page 10: HES HKS meeting

End

17/Apr/2011