The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009 The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009 Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project NCER July 22, 2009 NCER July 22, 2009 Mike Rogalski, P.E. Mike Rogalski, P.E. Chief, HHD Project Branch Chief, HHD Project Branch
18
Embed
Herbert Hoover Dike (HHD), Florida Major Rehabilitation ... · Herbert Hoover Dike (HHD) •• Lake Okeechobee is 720 squaresquare-m- iles miles ––twice the size of twice the
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
The Challenges and
Opportunities of
Managing a Large
Program
NCER July 22, 2009
The Challenges and
Opportunities of
Managing a Large
Program
NCER July 22, 2009
Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project
Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project
Parallel Phases and ActivitiesParallel Phases and Activities
Major Rehabilitation Report and
Supplemental Environmental Impact Statement
Landside Rehabilitation
Design
Piping Cut-off Wall
Design
Community Outreach and Involvement
InterimRisk Reduction Design
Existing CulvertAnalysis andRehabilitation
Multiple On-goingConstruction
Contracts
Real EstateAcquisition
CoordinationInternal
Communicationsand Reporting
Risk Reduction
Herbert Hoover Dike - Organization StructureHerbert Hoover Dike - Organization Structure
DR-H Branch Chief
Senior Project Manager
Engineer
Technical Lead
HHD Resident
Engineer
Planning Technical
Lead
PM Support
Budget Analyst
Program Support
PM Forward
Project Manager
Community
Outreach
Reach 1
Culverts
Interim Risk
ReductionTechnical Lead
•Reach 2&3 MRR
•System Analysis
•SEIS
Reach 1A
Design Lead
Reach 1C
Design Lead
Engineering
During
Construction
Lead
Reach 2&3 MRR
Design Lead
Reach 1B
Design Lead
Reach 1
Seepage Berm
Reach 1
CWTO #2
Reach 1
CWTO #3 Reach 1
CWTO #4
Reach 1D
Design Lead
Culverts Reduction
Reach 1
Quarry Fill
Landside Design CriteriaLandside Design Criteria
•• Geotechnical engineering design is the initial criterion Geotechnical engineering design is the initial criterion
for analysisfor analysis
•• Each design is ranked based on reliability, resiliency Each design is ranked based on reliability, resiliency
and redundancyand redundancy
•• Other factors in the determining design solution Other factors in the determining design solution --
•• Geotechnical engineering design is the initial criterion Geotechnical engineering design is the initial criterion
for analysisfor analysis
•• Each design is ranked based on reliability, resiliency Each design is ranked based on reliability, resiliency
and redundancyand redundancy
•• Other factors in the determining design solution Other factors in the determining design solution --•• Other factors in the determining design solution Other factors in the determining design solution --•• Other factors in the determining design solution Other factors in the determining design solution --
• Initial cost
• Operations and maintenance
• Community resources
• Visual and human interest
• Flora and fauna
• Social factors
• Land use
• Initial cost
• Operations and maintenance
• Community resources
• Visual and human interest
• Flora and fauna
• Social factors
• Land use
Environmental and Public
Involvement Processes
Environmental and Public
Involvement Processes
•• Public meeting during review of Public meeting during review of
Program Manager’s PerspectiveProgram Manager’s Perspective
•• What worksWhat works–– Competent staff and strong PM supportCompetent staff and strong PM support
–– AccountabilityAccountability
–– Identification of resource needsIdentification of resource needs
–– Culture of identifying problems AND solutionsCulture of identifying problems AND solutions–– Culture of identifying problems AND solutionsCulture of identifying problems AND solutions
–– Continuous and organized communicationContinuous and organized communication
–– A healthy budgetA healthy budget
•• What we need to improveWhat we need to improve–– CommunicationCommunication
–– Garnering support from CorpsGarnering support from Corps--wide programswide programs
–– Ability to resolve scarcity of resourcesAbility to resolve scarcity of resources