A. Zoccoli - PRC open session 16-May-2002 HERA-B A. Zoccoli Università and INFN - Bologna PRC open session 16 th May 2002
Jan 03, 2016
A. Zoccoli - PRC open session 16-May-2002
HERA-B
A. Zoccoli
Università and INFN - Bologna
PRC open session 16th May 2002
A. Zoccoli - PRC open session 16-May-2002
Outline
Status of the 2000 data analysis
Detector and trigger:
present status
results of 2001 data analysis
2002/3 Physics program
Summary
A. Zoccoli - PRC open session 16-May-2002
Run 2000 Analysis Topics
Statistics Minimum Bias: 2 million events (C, Al, Ti, W targets) DiLepton trigger: 0.45 million events DI-
0.90 million events DI-e
Minimum biasno trigger
Ks0 & production cross section.
Inclusive particle productions. polarization
Trigger Topic
Lepton pair:e+ e- ECAL pretrig Muon pretrig+ SLT tracking
bb production cross section Fraction of J/from c
Inclusive J/ xf & pt distributions J/production cross section
IR ~ 5 MHz
A. Zoccoli - PRC open session 16-May-2002
Minimum Bias: V0 production V0 Cross section
K0
0
K0s & mass distr.
K0s & nuclear dependence
K0
0
0
A. Zoccoli - PRC open session 16-May-2002
Dilepton trig. : Prompt J/ (Muon)
PID: likelihood from MUON detector and RICH
Trigger tracks confirmed by reconstruction
Cf
f
xAdx
dN)1( Xf:
622
))/(1( ot ppAdp
dN
t
pt :
A. Zoccoli - PRC open session 16-May-2002
x
ee
MAGNET
ECAL
Dilepton trig. : Prompt J/ (Electron)
Particle ID: E/P +
bremsstrahlung
Trigger tracks confirmed by reconstruction:
Total number of J/ in the sample: nP= 5710380ST280SYS
BR=0.340.020.02
A. Zoccoli - PRC open session 16-May-2002
In 2002:- First measurement of c suppression in nuclear matter.- Study of production ratios between J/c and ‘.- Disentangle the 2 c states (?)
Fraction of J/from c c J/
M=M(J/)-M(J/) (GeV/c2)
En
trie
s /
25
MeV
/c2
ee
C
C
Ti
Ti
AllAll
)/J(
)/J(Br)(R cc
c
Preliminary results:
Rc =(Carbon)
Rc =(Titanium)In agreement with previous p-N experiments.
A. Zoccoli - PRC open session 16-May-2002
The HERA-B (bb) MeasurementPrinciple of the measurement:
b J/ X + - X b J/ X e+ e- X
Look at the chain: via detached J/ vertices.
l+
J/Bz
X
l-
IW
upstream | downstream
Normalization on the inclusive prompt J/ cross section. Systematic error minimization
A. Zoccoli - PRC open session 16-May-2002
The Muon Channel: b-cuts
UNBINNED LIKELIHOOD FIT (due to low statistics):- Sig. shape from MC,- BKG shape from data.
Mass spectrum upstream and downstream:
Cuts applied: z > 7.5 z Imp. Param. to wire Iw > 35 m Imp. Param. to primary vtx Ip> 160 m
REAL
MC
BKGS
Optimization procedure:
2.21.51.9Bn
+ - invariant mass ( GeV/c2 )
En
trie
s / 1
00 M
eV/c
2
A. Zoccoli - PRC open session 16-May-2002
The Electron Channel: b-cuts
3.93.2
8.6B
n
UNBINNED LIKELIHOOD FIT (due to low statistics):- Sig. shape from MC,- BKG shape from data.
Cuts applied: z > 0.5 cm e Imp. Param. wire Iw > 200 m , orMin. dist. @ ZW to any other track > 250 m
REAL
MC
BKGS
Optimization procedure:
Mass spectrum upstream and downstream:
e+e- invariant mass ( GeV/c2 )
En
trie
s / 1
00 M
eV/c
2
A. Zoccoli - PRC open session 16-May-2002
(bb) Determination
Simultaneous fit to e+e- & +- (in acceptance):
QCD calculations and experimental results:
Extrapolation to the Hera-B acceptance:
5.7 1.5 1.3 nb/nucl.E789:727
1743 nb/nucl.E771:
TOT(bb) = nb/nucleon(syst)67(stat)
141232
A. Zoccoli - PRC open session 16-May-2002
Summary of 2000 analysis
The analyses on Dilepton and Minimum Bias data taken during the 2000 run are well advanced.
Understanding of the detector, of the efficiencies, of the performances, etc.
Preparation of the analysis codes in view of the 2002/3 run.
Papers on bb cross section (almost final), production of J/from c , V0 production cross section and J/decayspectra are in preparation.
A. Zoccoli - PRC open session 16-May-2002
2002/3 Detector Configuration
Thinnerbeampipe:500m 300m
No magnet tracker! Motivation to reduce material:- Improve calorimeter performance. e.g. 1.5x better resolution on (c - J/) mass difference- Influence on tracking shown to be small at 5 - 10 MHz interaction rate.- (being kept in a safe place in case of possible future use)
A. Zoccoli - PRC open session 16-May-2002
Status & actions during the shutdownVDS Fully operational in 2000. Detector modules repaired.
ITR Installation of missing chambers. Dead chambers repaired.Noise reduction (improved grounding).
OTR Dead HV groups repaired and HV stability improved Noise reduction Higher efficiency expected.
RICH Fully operational in 2000.
ECAL Reduction of common noise (grounding improved) better E resolution.
MUON Dead channels repaired.Noise reduction higher efficiency expected.
The HERA-B detector was operational in 2000 run. Many improvements during the shutdown. Partially checked in the short run end of 2001.
Status of detector components
New improved grounding scheme on all chambers:
reduction of pick-up lower fluctuation of raw data
Old
New
ADC counts
ADC counts
Beforemagnet
Aftermagnet
Itr in 2002
Stations
Wid
th o
f R
aw D
ata
[AD
C]
~ 3% of dead channels vs ~15% in 2000.
Effect of Dead HV groups Repair, geometrical efficiency:
Noise reduction
Higher efficiency expected To be measured in the near future
OldThreshold
Otr in 2002
100
90
ADC pedestals in the new ECAL run configuration:
Better performances in PId To be measuerd in the near future
Ecal noise situation
December 2001
2000 Run
A. Zoccoli - PRC open session 16-May-2002
Status of First Level TriggerThe First Level trigger was not fully commissioned in 2000.
Low efficiency due to both trigger and detector performances.
Main activities: Optical Links: despite large effort, will remain the most critical HW
item Flt Algorithm fully optimized. Processor logic fully verified (vector test). Detector mapping ready, verification in progress Online software improved system New RICH multiplicity veto system available
Waiting for data to check the performance !
A. Zoccoli - PRC open session 16-May-2002
December 2001 dataMinimum Bias (int. Trig.): ~500k events only ~10 hours RUN !
Charged tracksChecks on reconstruction and alignment, comparison with 2000 data:
K0
0
Inclusive distributions K0s & mass distr.
2000
2001
KS width already smaller than in 2000!
A. Zoccoli - PRC open session 16-May-2002
December 2001 data - II
More data welcome !
NeutralsChecks on reconstruction and calibration:
Inner Middle Outer
0 seen in the Outer. After one calibration iteration (out of three). Width very close to that of 2000.
A. Zoccoli - PRC open session 16-May-2002
2002/3 Physics Program
Base line physics program for next run:
A) Detailed measurement of atomic numberdependence of charmonium production- Extend existing measurements of J/ and ’ to negative xF.- First measurement of atomic number dependence of c.
B) Improved bb cross section measurement-Systematics limit at 15% (normalization).- Cross section from full reconstructed B mesons
A. Zoccoli - PRC open session 16-May-2002
Additional topics: - Charmonium spectroscopy – Drell-Yan - Measurement of production - Open charm production - Strangeness production in nuclear matter - polarization
Expected event yields: 2002/3 2000 J/( & e ) ~4 106 ~1 104
c J/~3 105
~1 102
´ ~1 105 ~4 101
Targets: primarily C, W (but also installedTi, Al & Pd) Acceptance in the range -0.4 < xf < 0.3
2002/3 Physics Program – II
A. Zoccoli - PRC open session 16-May-2002
Summary
The analysis of 2000 data is approaching completion.
Improved performance of the HERA-B spectrometer and understanding of the trigger. first data look promising trigger ready to be tested
Physics program: very large statistics of charmonium states expected in the next run.
A. Zoccoli - PRC open session 16-May-2002
Summary
HERA-B is anxiously waiting for new data to come.
A. Zoccoli - PRC open session 16-May-2002
A. Zoccoli - PRC open session 16-May-2002
Systematic checks (e-channel)DECAY LENGTH
LIKELIHOOD FIT:
MC =0.810.03 cm
RD =1.000.30 cm
BKG=0.360.13 cm
Different background optimisation:
Upstream
Downstream
Dz
(cm
)
Mass (ee) (GeV/c2)
Bkg
Bkg Bkg
A. Zoccoli - PRC open session 16-May-2002
Status & actions during the shutdownVDS Fully operational in 2000. Detector modules repaired.
ITR Installation of missing chambers. Dead chambers repaired.Noise reduction (improved grounding).
OTR Dead HV groups repaired. Noise reduction Higher efficiency due to lower threshold
cut.
RICH Fully operational in 2000.
ECAL Reduction of common noise (grounding improved) better E resolution.
MUON Dead channels repaired.Noise reduction lower threshold, higher efficiency.
The HERA-B detector was operational in 2000 run. Many improvements during the shutdown. Partially checked in the short run end of 2001.
Status of detector components
A. Zoccoli - PRC open session 16-May-2002
New improved grounding scheme on all chambers:
reduction of pick-up lower fluctuation of raw data
Old
New
ADC counts
ADC counts
Beforemagnet
Aftermagnet
Itr in 2002
Stations
Wid
th o
f R
aw D
ata
[AD
C]
A. Zoccoli - PRC open session 16-May-2002
~ 3% of dead channels vs ~15% in 2000.
Effect of Dead HV groups Repair, geometrical efficiency:
Noise reduction
Higher efficiency expected To be measured in the near future
OldThreshold
Otr in 2002
100
90
A. Zoccoli - PRC open session 16-May-2002
ADC pedestals in the new ECAL run configuration:
Better performances in PId To be measuerd in the near future
Ecal noise situation
December 2001
2000 Run