HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics
34

HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Dec 21, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

HEB Mixers for Band 6 – CDR

H. Merkel, S. Cherednichenko,

P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg

The Millimeter Wave Lab

Dept. of Microelectronics

Page 2: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Introduction

• Deliverables:– 2 CQM , 04-03

– 4 FM, 04-03

– 4 FS, 04-04

• Comments:– 6 Low and 6 High built and integrated simultaneously

– Massive Collaboration between JPL and Chalmers

– 6 High mixer qualified by similarity

– All 6H documentation is (for the time being) generic

Page 3: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Collaboration

• JPL and Chalmers form a joint group to deliver mixers for 6L and 6H

• The mixer block will be a refined Chalmers design• The HEB is a NbN HEB made at Chalmers• Mixer blocks will be built at JPL• All integration except the lens integration will be

done at JPL• Most qualification testing is done by JPL• Acceptance testing is done by Chalmers

Page 4: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Collaboration 2Mech. production (mount) JPL

IF board production JPLboardcomponentsintegrationtesting

DC board production JPLboardcomponentsintegrationtesting

HEB devices CTH/MSPU

HEB qual.program CTH/MSPU

Lenses CTH

Lens AR coating CTH

Connectors to boards JPLwires / semirigidsconnectorsmounting

Assemblymech / electrical JPLdevice / lens CTH bonding needed at CTH

Qualification testingPerformance tests CTH characterizationHealth test CTH room tempFull performance test (incl. Beam pattern)CTHCooling cycles JPLVibration JPLBake-out JPLConfidence test CTHFunctional test one noise temperature at a single frequency

Procurement

Mech. production (mount) JPL

IF board production JPLboardcomponentsintegrationtesting

CD board production JPLboardcomponentsintegrationtesting

HEB devices Chalmers/MSPU

HEB qual.program Chalmers/MSPU

Lenses procured by Chalmers

Lens AR coating organized by Chalmers

Conncectors to boards JPLwires / semirigidsconnectorsmounting

Assemblymech / electrical JPLdevice / lens Chalmers

Acceptance testing ChalmersPerformance testsHealth testFull performance test (incl. Beam pattern)Cooling cyclesVibrationBake-out

Procurement

QM FM

Page 5: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Collaboration 3

• Metric interface drawings + Documentation generated by JPL– Internal (nonmetric) drawings generated within JPL

and will stay within JPL

• Hardware to be made by JPL– Process details stay within JPL, in case of reworking,

process details may become interfaces and be transferred to Chalmers.

• Assembly at Chalmers• Up to now: works extremely well

Page 6: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Requirements

Output power data on solid state LO – Solved for 6L, – News for 6H?– Expect measured data in 12-2002

Page 7: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

1: Requirements and Interfaces

     

• Specifications:– Ready to be signed

The

CD

R B

oard

Que

stio

n L

ist

Page 8: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

     

The

CD

R B

oard

Que

stio

n L

ist

1: Requirements+Interfaces

• Interfaces are frozen• Environment definitions frozen• Design currently updated to meet all critical points

– Lens fixture solved– Board clamping solved– No alumina, more elastic TMM10A substrates

Page 9: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

1: Requirements+Interfaces

• Experience with DM testing at SRON shows:– Common understanding of which parameters

are important for HEB characterization is required

– Rules how to handle HEB mixers (by SRON or ESA) must be elaborated T

he C

DR

Boa

rd Q

uest

ion

Lis

t

Page 10: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Documentation Status for Band 6

The Millimeter Wave Lab

Dept. of Microelectronics

Page 11: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Documentation Status

• BA ready for sign-off

• Spec 6L ready for sign-off

• BA with JPL requires SRON BA to be signed!

• Spec 6H generic issue,

• PID– completed, drawings by JPL ready

Page 12: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Documentation Status

• DVM ok

• Compliance matrix ok

• Failure modes/ single point failures:– More input needed if necessary and in which

form to be documented (more details in a few minutes)

Page 13: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

7: Documentation

• 1.Is all of the above (requirements, interfaces, design and performance, qualification, verification, AIT, business commitments, planning) adequately documented conform the HIFI CDR data-package definition document – Yes.

• and placed under Configuration Control– Yes

 

The

CD

R B

oard

Que

stio

n L

ist

Page 14: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

More preemptive answers...

The Millimeter Wave Lab

Dept. of Microelectronics

Page 15: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

2: QM/FM Detail Design and Performance    

• FMECA– Loss of LO power, reduced critical current, reduced

critical temperature of the HEB, changed IF amplifier impedance can partially be cured by different biasing regime

– Failure of the ESD protection caps reduces protection but is not fatal to the device

– All other failure modes are non recoverable• Lens breaking, solder joints separate, cracks in PCB, electrical

component failure, bond wire breaking

The

CD

R B

oard

Que

stio

n L

ist

Page 16: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

2: QM/FM Detail Design and Performance

• External drawings are metric

• Assembly/Manufacturing drawings will be nonmetric [JPL requirement]

• Some details are currently under investigation together with JPL

The

CD

R B

oard

Que

stio

n L

ist

Page 17: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

2: QM/FM Detail Design and Performance

• Detail design under completion– IF board redesign for improved filtering still

under test– IF board RF properties ok now– Lens design [extension length] again in

question, this does not affect qualification– Lens holder: positive feedback from JPL– TMMA10e simply screwed to mixer block

Page 18: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

3: AIV /QA planning and Implementation

• AI Procedures are redefined to fit into the work package split

• Qual program for the block JPL

• Acc. program for the block Chalmers

• QA program for the mixer Chalmers

The

CD

R B

oard

Que

stio

n L

ist

Page 19: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

3: AIV /QA planning and Implementation

• 3.Have Test Plans and- (detail) Procedures been completed for all Functional-, Performance and Environmental tests.– yes

• GSE is improving, there are more resources now since two labs are involved– New vacuum chamber at Chalmers under

construction

The

CD

R B

oard

Que

stio

n L

ist

Page 20: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

4: Product Assurance

• 1.Is the definition and planning of the PA activities technically adequate and consistent.– Yes.

• 2.Has a state of implementation readiness for the post-CDR phase been achieved.– PA is running on the films and on the HEB. – PA for the mixer blocks is done by JPL

The

CD

R B

oard

Que

stio

n L

ist

Page 21: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Programmatics for Band 6

The Millimeter Wave Lab

Dept. of Microelectronics

Page 22: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

5: ”Programmatics”• 1.Are all deliverables funded,

– Yes

• has a supplier been identified and has the supplier accepted.– Yes [additional procurement loopholes thanks to JPL]

• 2.Does the planning include adequate margins for the following contingencies:

     Delays due to all critical items– There is no space for any delays

      Delays due to AIV contingencies– AIV works on the spot. Success-oriented design

The

CD

R B

oard

Que

stio

n L

ist

Page 23: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

5: ”Programmatics”

• 3.Planning consistent.– Delivery dates are possible to be met in this

constellation

• 4.Long Lead Items– How to deal with CPPA for the 6H parts?– Maximum possible involvement of CPPA

even for 6H

The

CD

R B

oard

Que

stio

n L

ist

Page 24: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

5: ”Programmatics”

• 5. Manpower/ Resources Planning– Group fusion yields sufficient manpower– No signed-off BA yet but it is ready for sign-

off.

The

CD

R B

oard

Que

stio

n L

ist

Page 25: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

5: ”Programmatics”

• 6.Is the Manufacturing Readiness for QM and FM (tooling, facilities) progressing consistent with the project planning– Yes.

• 7. Is the maturing of QM and FM Assembly and Integration preparations, -tooling, -support equipment and -facilities consistent with the project planning.– Yes.T

he C

DR

Boa

rd Q

uest

ion

Lis

t

Page 26: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Planning

• Due to time pressure CQM/FM/FS programs run parallel

• No feedback between programs possible independently how they are laid out

Page 27: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Schedule

See Jonathan’s nice Schedule OH

Page 28: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Personnel

• Same old stuff... – 100% Sergey– 50% Pourya– 100% Therese– 15% Erik– 15% Gunnar– 40% Harald– 100% Vladimir

Page 29: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Open Issues for Band 6

The Millimeter Wave Lab

Dept. of Microelectronics

Page 30: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Open Issue

•CPPA delivery dates

Page 31: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Open Issues

• KIP/MIP?– According to p-CDR not applicable– According to the 1...5 CDR applicable– What to do with inspection points?

Page 32: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Open Issues

• Definition of IF subbands?– 1 GHz bands (as for bands 1...5)– Or 25% of 2.4GHz 0.6GHz subbands?

How to define the allowed IF ripple?

Page 33: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

6: Critical Items, Key Issues, Recovery and Risk

• 1.Has the feasibility of all design-and performance critical items been established.– Yes.

• 2.Has the feasibility of all technology development critical items been established.– Yes

The

CD

R B

oard

Que

stio

n L

ist

Page 34: HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

6: Critical Items, Key Issues, Recovery and Risk

• 3.Have all technical-,planning- and resource risk elements been identified as Key Issues and have credible back-up or recovery scenarios been put forward consistent with the S/S, Unit and subunit planning– On some issues. There is no backup for any

design faults detected during CQM phase. The

CD

R B

oard

Que

stio

n L

ist