Top Banner
Cooling and dehumidification  The dehumidification can be achieved by the following methods : 1-Using electric heater. 2-Using heating coil. 3-Using gas reheat method.
5

Heating Coil

Apr 06, 2018

Download

Documents

m_salah20202000
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Heating Coil

8/3/2019 Heating Coil

http://slidepdf.com/reader/full/heating-coil 1/5

Cooling and

dehumidification The dehumidification can be achieved by thefollowing methods :

1-Using electric heater.2-Using heating coil.3-Using gas reheatmethod.

Page 2: Heating Coil

8/3/2019 Heating Coil

http://slidepdf.com/reader/full/heating-coil 2/5

Gas Reheat FeatureHow It Works

 The hot gas reheat feature (St. St. HeatExchanger), is designed to control humidity at aspecific level in the conditioned space. This isusually required when the outside temperature

is cool and humid; it controls humidity withoutexpending additional energy to reheat thecooled air. With conventional systems, thecooled and dehumidified air would require the

use of a heater to bring the temperature to thedesired level. Hot as reheat s stems rec cles

Page 3: Heating Coil

8/3/2019 Heating Coil

http://slidepdf.com/reader/full/heating-coil 3/5

AirConditioni

ng

Lecture

3

dry-bulbtem erature

humi

dity

ratio

  w  e   t

 -   b  u   l   b

    t  e  m

  p  e  r  a   t  u  r  e 70 %

50 %

30 %

28 ⁰C

26 ⁰C

22 ⁰C

Comfort

Zone

Sometimes thecustomer requiresa certain relativehumidity &temperature (ex:

26oC &50%RH) andto achieve this aheater or heatingcoil must be used.

Page 4: Heating Coil

8/3/2019 Heating Coil

http://slidepdf.com/reader/full/heating-coil 4/5

Conditioned

Space SE R

Supply Duct

OHeating CoilCooling Coil

FanDamper

 configuration

Page 5: Heating Coil

8/3/2019 Heating Coil

http://slidepdf.com/reader/full/heating-coil 5/5

ADP

dry-bulbtemperature

   w  e   t  -    b   u    l    b

 

   t  e   m   p  e

  r  a   t   u

  r  e

SR

ADP

(A/C)

spa

celoa

d

line

(A/C)load

line

Normal cooling

O

M

Cooling with dehumidification

dry-bulbtemperature

   w  e   t

  -    b   u    l    b

 

   t  e   m   p  e

  r  a   t   u

  r  e

S

R

Heating

process

By hot gas

reheat.

spaceload

line

(A/C)

loadline

O

M26 ⁰C

70 %50 %

50 %

26 ⁰C

26 ⁰C 70 % 26 ⁰C