1 Health Based Asset Management © rjd
25

Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

Aug 19, 2018

Download

Documents

LamPhuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

1

Health Based Asset Management

© rjd

Page 2: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

2 ©

Symptoms Targeted Diagnostics

Physical Routine Screenings

Emergency Targeted Diagnostics

Health Care Proactive and Reactive Approaches

rjd

Page 3: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

3 ©

What is the health of the assets ?

Is it important to know ? How do we assess ?

rjd

Page 4: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

4 ©

What is the health of the Assets ?

Is it important to know ? How do we assess ? rjd

Page 5: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

5 Fuse Box

Asset Health Find & repair these problems or let them fail ?

Aerial Electrical Cable © rjd

Page 6: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

6

Reactive & Proactive Approaches

Reactive: Run to failure – Break / Fix

Preventive: Scheduled tasks that minimize risk of failure.

Predictive/Health-Based: Systematic monitoring to assess machine health

© rjd

Page 7: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

7

Predictive $7-9

Preventive $11-13

Reactive $17-18

Annual Maintenance Cost Per Horsepower

Health Monitoring

Source: ISA’s InTech Magazine, December 1987, pages 29-32: © rjd

Benefit: $$$$$ / Reliability

Page 8: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

8 Operating Equipment Asset Management Handbook Compiled by John Mitchell Penn State Applied Research laboratory © rjd

Right Balance

Page 9: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

9 ©

Effective Maintenance programs are guided by the consequences of asset failure.

• Safety & Environmental • Operational • Economical

Asset Failures

rjd

Page 10: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

10 Operating Equipment Asset Management Handbook Compiled by John Mitchell Penn State Applied Research laboratory © rjd

Cost

Page 11: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

11 Maintenance Effort

Failure Consequences

Severe

Major None or Insignificant

$

$$$$$

©

Asset Failures

rjd

Page 12: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

12 ©

None or Insignificant

Severe

Major

(Reactive)

(Reactive)

Maintenance Effort

Failure Consequences

Asset Maintenance / Failure Matrix

Excessive Maintenance

*Reliability Focused Maintenance

Crisis Maintenance

Adequate Maintenance

1 2

3 4 (Proactive)

(Proactive)

rjd

Page 13: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

13

Potential - Failure Curve Reliability Centered Maintenance - John Moubray

Time

Health Condition

Normal

Point of failure

Start of failure

Failure detection with human senses

Failure detection with diagnostic equipment

© rjd

Page 14: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

14

• Instrument verification • Infrared inspections • Ultrasonic leak detection • Vibration analysis • Motor testing and inspection • Motor starter inspections • Protective relay testing • Stationary battery testing • Transformer inspection • Insulating & Lubricating oil testing • Wire-to-water efficiencies • Precision alignment • Power quality monitoring

Health/Condition Assessment & Diagnostic Programs

© rjd

Page 15: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

15

• Tank Inspections • Hydrant inspection & flushing • Valve exercising • Pipe inspections • Pipe cleaning • Corrosion monitoring • Corrosion protection • Large meter testing • Hydraulic monitoring • Leak monitoring • Pressure & control valve PM’s • Backflow device testing

© rjd

Health/Condition Assessment Programs

Page 16: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

16

$100,000

Repair cost if allowed to fail Repair cost of scheduled repair Difference Benefit: Est. savings (avoided costs)

The Cheap Fix

$117,000 $17,000 $100,000

PAW Facilities: July - December, 1999

© rjd

Page 17: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

17 ©

Six Patterns of Failure

A Infant and age related failure with wear out zone - 4% of failures

age

B Age related failure with wear out zone - 2% of failures

age

C Slowly increasing probability of failure (fatigue) - 5% of failures

age

Reliability Centered Maintenance - John Moubray rjd

Page 18: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

18 ©

Six Patterns of Failure

D Few failures when new-then constant probability of failure - 7% of failures

age

F Infant mortality, then constant probability of failure - 68% of failures

age

E Constant probability of failure at all ages-random failure - 14% of failures

age

Reliability Centered Maintenance - John Moubray rjd

Page 19: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

19 ©

Age

Failure Pattern “B”

2% of failures

Constant probability of failure - failure at wear out zone

B Useful Life

Reliability Centered Maintenance - John Moubray rjd

Page 20: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

20 ©

Lighting – Failure Pattern “B”

rjd

Page 21: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

21 ©

Battery – Failure Pattern “B”

rjd

Page 22: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

22 ©

F

Infant mortality, then constant probability of failure

Age

Failure Pattern “F”

68% of failures

Reliability Centered Maintenance - John Moubray rjd

Page 23: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

23 ©

Root Causes

• Characteristic of certain devices

• Poor design or manufacturing quality

• Incorrect installation or operation

• Unnecessary & excessively invasive maintenance

• Poor maintenance practices or workmanship

rjd

Page 24: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

24

Extended Life? Reliability? Efficiency?

Quality?

Do You Want

Asset Health

© rjd

Page 25: Health Based Asset Management - Pennsylvania Section · Reliability Centered Maintenance - John Moubray . Time . Health Condition . Normal . Point of . failure . Start of ... Reliability

25

You Must Employ Health Based Programs

© rjd