Top Banner
Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
20

Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.

Jan 03, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.

Health and Safety Executive

North & West Yorks

WWT

David Stewart

HM Principal Inspector, Construction Group, Leeds

Page 2: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.

Topics

Control of Asbestos Regulations 2012

RIDDOR

Fee for Intervention

Refurb’ Campaign – Feb/March 2012

Work plan 2012/13

Page 3: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.

Control of Asbestos Regulations 2012

• EU Directive on exposure to asbestos (Directive 2009/148/EC)

• 6th April 2012– What has stayed the same– What has changed

• Notification

• April 2015 – health surveillance

• Enforcement expectation

Page 4: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.

RIDDOR

• 6th April

• The trigger point has increased from over three days to over seven days incapacitation (not counting the day on which the accident happened).

• The deadline by which the over-seven-day injury must be reported has also increased to 15 days from the day of the day of the accident.

Page 5: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.

Fee For Intervention

• Material breach –when, in the opinion of the HSE Inspector, there has been a contravention of health and safety law that requires them to notify the duty holder, in writing, of that opinion.

• £124 per hour *

• October 2012 ?

Page 6: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.

Refurbishment campaign

Inspection initiative 20th Feb to 16th March

-Refurb’ & small sites

No of sites visited – 132 (3237)

No of Contractors seen – 175 (4080)

No of notices issued – 27 (581)

FFI dry run

Issues

-WAH, Fire Safety, Good Order, asbestos survey

Page 7: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 8: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 9: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 10: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 11: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 12: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 13: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 14: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 15: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 16: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 17: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 18: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 19: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.
Page 20: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds.

Work plan 2012/13

• Priority Areas– Asbestos– Small sites– Refurbishment– Major Projects – Timber Frame buildings– Temporary Demountable Structures