BMB Jaber Hospital Plumbing Pumps Calculations CALCULATION SHEET Project Name: JABER HOSPITAL Date: Job No. Main Hospital Building 27/07/2011 090512 Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no: Cooling Tower Make Up Pump HPS-01 Sizing SJN Reference Calculations Output Cooling Tower Make-Up Pump HPS-1 Location: Basement (-9.53 level) Application: To pump water from HVAC Make UpTank(-9.53 level) to Cooling Tower at -2.0 level Pumps set : 3 pumps in one set, Three working ,each pump capacit 40 m3/hr(1 Set is working 1 Set standby) - Static Head = 23 m - Residual Pressu = 10 m ρ = 990 Kg/m³ @45° C - Friction Losses:- ɡ = 9.8 C = 150 For pipes Nodes Flow Rate (gpm) Velocity-V(m/sec) Fittings* Friction Losses(pa/mtr) Friction Losses in Pipe (Kp 1 - 2 150 174 529 1.88 11 E-90 53.57 270.54 182.23 49.30 2 TEE 18.28 3 G.V 6.39 0 E-45 0 1 C.V 18.3 49.30 * -The mentioned fitting are the fittings on this pipe segment. - G.V: Gate Valve, E-90: ninety degree Elbow. ** -LE : Equivelent Length for each fitting. - Total Length= LE+ Pipe Distance. - Total Friction Losses in pipes and = 49.30 Kpa = 0.49 Bar = 4.93 m '- Total Pump Head require = 23 + 10 + 4.93 = 37.93 m = 3.79 Bar = 37.93 M Say 38 mtr Selected pump 40 m3/hr @ 50 mtr head is sufficient Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C) 1.852 x (1 / D) 1.167 x (r g) m/sec 2 Pipe Size- D(mm) Distance- L (m) LE/ fitting** Total Length***
22
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 27/07/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Cooling Tower Make Up Pump HPS-01 Sizing SJNReference Calculations Output

Cooling Tower Make-Up Pump HPS-1Location: Basement (-9.53 level)Application: To pump water from HVAC Make UpTank(-9.53 level) to Cooling Tower at -2.0 level Pumps set : 3 pumps in one set, Three working ,each pump capacity is 40 m3/hr(1 Set is working 1 Set standby)- Static Head = 23 m- Residual Pressure = 10 m

ρ = 990 Kg/m³ @45° C

- Friction Losses:- ɡ = 9.8C = 150 For pipes

Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

1 - 2 150 174 529 1.88

11 E-90 53.57

270.54 182.23 49.30

2 TEE 18.283 G.V 6.390 E-45 01 C.V 18.3

49.30

* -The mentioned fitting are the fittings on this pipe segment.- G.V: Gate Valve, E-90: ninety degree Elbow.

** -LE : Equivelent Length for each fitting.- Total Length= LE+ Pipe Distance.

- Total Friction Losses in pipes and fittings = 49.30 Kpa = 0.49 Bar = 4.93 m'- Total Pump Head required = 23 + 10 + 4.93

= 37.93 m = 3.79 Bar= 37.93 M Say 38 mtr

Selected pump 40 m3/hr @ 50 mtr head is sufficient

Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C)1.852 x (1 / D)1.167 x ( r g)

m/sec2

Pipe Size-D(mm)

Total Length***

C26
da:
Page 2: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 27/07/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Transfer Pump TR-3 Sizing SJNReference Calculations Output

Transfer Pump TR-3Location: Basement (-9.53 level)Application: To pump water from Break Water tank(-9.53 level) to HVAC Make up Tank(-9.53 level)

Pumps set :- Static Head = 7 m- Residual Pressure = 10 m

ρ = 990 Kg/m³ @45° C

- Friction Losses:- ɡ = 9.8C = 150 For pipes

Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

1 - 2 200 153 397 0.79

7 E-90 42.7

216.8 26.37 5.720 TEE 01 G.V 2.11 C.V 19

5.72

* -The mentioned fitting are the fittings on this pipe segment.- G.V: Gate Valve, E-90: ninety degree Elbow.

** -LE : Equivelent Length for each fitting.- Total Length= LE+ Pipe Distance.Pressure drop in Sand filter = 7psi = 5 mtr

- Total Friction Losses in pipes and fittings = 5.72 Kpa = 0.06 Bar = 0.57 m'- Total Pump Head required = 7 + 10 + 0.57 + 5

= 22.57 m 15 2.26 Bar= 22.57= 22.57 M Say 23 mtr

Selected pump is 30m3/hr @ 25 mtr head is sufficient

4 pumps, Three working and one standby,each pump capacity is 30 m3/hr

Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C)1.852 x (1 / D)1.167 x ( r g)

m/sec2

Pipe Size-D(mm)

Total Length***

C26
da:
Page 3: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 27/07/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Transfer Pump TR-1 Sizing SJNReference Calculations Output

Transfer Pump TR-1Location: Basement (-9.53 level)Application: To pump water from Break Water tank(-9.53 level) to Potable & Fire Water Tank(-9.53 level)

Pumps set :- Static Head = 7 m- Residual Pressure = 10 m

ρ = 990 Kg/m³ @45° C

- Friction Losses:- ɡ = 9.8C = 150 For pipes

Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

1 - 2 150 61 397 1.41

3 E-90 18.3

109.6 107.09 11.741 TEE 9.21 G.V 2.11 C.V 19

11.74

* -The mentioned fitting are the fittings on this pipe segment.- G.V: Gate Valve, E-90: ninety degree Elbow.

** -LE : Equivelent Length for each fitting.- Total Length= LE+ Pipe Distance.Pressure drop in Sand filter = 7psi = 5 mtr

- Total Friction Losses in pipes and fittings = 11.74 Kpa = 0.12 Bar = 1.17 m'- Total Pump Head required = 7 + 10 + 1.17 + 5

= 23.17 m = 2.32 Bar= 23.17 Say 23.5 mtr=

Selected pump is 30m3/hr @ 25 mtr head is sufficient

4 pumps, Three working and one standby,each pump capacity is 30 m3/hr

Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C)1.852 x (1 / D)1.167 x ( r g)

m/sec2

Pipe Size-D(mm)

C26
da:
Page 4: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 27/07/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Transfer Pump TR-2 Sizing SJNReference Calculations Output

Transfer Pump TR-2Location: Basement (-9.53 level)Application: To pump water from Break Water tank(-9.53 level) to HVAC Make up Tank(-9.53 level)

Pumps set :- Static Head = 7 m- Residual Pressure = 10 m

ρ = 990 Kg/m³ @45° C

- Friction Losses:- ɡ = 9.8C = 150 For pipes

Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

1 - 2 150 110 397 1.41

6 E-90 36.6

176.9 107.09 18.941 TEE 9.21 G.V 2.11 C.V 19

18.94

* -The mentioned fitting are the fittings on this pipe segment.- G.V: Gate Valve, E-90: ninety degree Elbow.

** -LE : Equivelent Length for each fitting.- Total Length= LE+ Pipe Distance.Pressure drop in Sand filter = 7psi = 5 mtr

- Total Friction Losses in pipes and fittings = 18.94 Kpa = 0.19 Bar = 1.89 m'- Total Pump Head required = 7 + 10 + 1.89 + 5

= 23.89 m = 2.39 Bar= 23.89 Say 24 mtr

Selected pump 30m3/hr @ 25 mtr head is sufficient

4 pumps, Three working and one standby,each pump capacity is 30 m3/hr

Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C)1.852 x (1 / D)1.167 x ( r g)

m/sec2

Pipe Size-D(mm)

Total Length***

C26
da:
Page 5: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 17/9/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Booster Pump BP-3 Sizing SJNReference Calculations Output

Booster Pump BP-3Location: Basement at -9.53 Level Water Tank BuildingApplication: To pump water from basement to Residential building Pumps set : 3 pumps in one set are working each pump capacity is 20 m3/hr '@ 65 Mtr Head(1 Set is working 1 Set standby)- Static Head = 22.50 m- Residual Pressure = 10 hose bib at highest level(+12.2mtr)

water closet comes +8.7 level onwards to down, where avilable pressure is 19.5 psi, which is more than enough to operate the fliush valve of W.C

Total flow of three pumps = 60 m3/hr

= 264 gpm ρ = 1000 Kg/m³

ɡ = 9.8 C = 150 For copper pipes

Nodes Pipe Size(mm) Distance- L (m) Flow Rate (gpm) Velocity(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

A -B 102.2 6.4 132 1.01

E-90 0

7.77 91.23 0.71TEE 0

1 G.V 1.37C.V 0

B-C 130.8 11.5 132 0.62

E-90 0

20.6 27.43 0.571 TEE 9.1

G.VC.V

C-D 130.8 19.5 264 1.23

E-90 0

39.8 99.02 3.942 TEE 18.21 G.V 2.1

C.V

D-E 130.8 1 176 0.82

E-90 0

10.1 46.73 0.471 TEE 9.1

G.VC.V

E-F 130.8 1 88 0.41

E-90 0

19.2 12.94 0.252 TEE 18.2

G.VC.V

F-G 102.2 2 88 0.67

E-90 0

16.93 43.06 0.73TEE 0

2 G.V 2.741 C.V 12.19

G-H 130.8 1 88 0.41

E-90 0

19.2 12.94 0.252 TEE 18.2

G.VC.V

H-I 130.8 1 176 0.82

E-90 0

10.1 46.73 0.471 TEE 9.1

G.VC.V

Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C)1.852 x (1 / D)1.167 x ( r g)

m/sec2

C18
da:
Page 6: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 17/9/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Booster Pump BP-3 Sizing SJNReference Calculations Output

I-J 130.8 2 264 1.231 E-90 6.1

28.4 99.02 2.81

J-K 130.8 1 176 0.82

E-90 0

10.1 46.73 0.471 TEE 9.1

G.V

C.V

K-L 130.8 1 88 0.41

E-90 0

19.2 12.94 0.252 TEE 18.2

G.VC.V

L-M 102.2 2 88 0.67

E-90 0

4.74 43.06 0.20TEE 0

2 G.V 2.74C.V

M-N 130.8 1 88 0.41

E-90 0

10.1 12.94 0.131 TEE 9.1

G.VC.V

N-O 130.8 1 176 0.82

E-90 0

10.1 46.73 0.471 TEE 9.1

G.VC.V

O-P 130.8 2 264 1.23

E-90 0

20.2 99.02 2.002 TEE 18.2

G.VC.V

15 -14 130.8 775 264 1.23

27 E-90 132.3

936.8 99.02 92.761 TEE 9.11 G.V 2.11 C.V 18.3

14-13 130.8 173 264 1.23

4 E-90 19.6

201.7 99.02 19.971 TEE 9.1

G.VC.V

13 - 12 102.2 147 255 1.95

15 E-90 45.6

199 308.87 61.461 TEE 6.4

G.VC.V

12 - 11 102.2 9.7 255 1.95

4 E-90 12.16

28.26 308.87 8.731 TEE 6.4

G.V 0

C.V

11 - 10 73.6 22.1 155 2.29

3 E-90 6.9

33.6 607.89 20.431 TEE 4.6

G.V 0

C.V

10- 9 61.4 3 130 2.76

E-90

6.65 1061.08 7.061 TEE 3.65

G.V

C.V

Page 7: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 17/9/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Booster Pump BP-3 Sizing SJNReference Calculations Output

9 - 8 61.4 2 124 2.63

E-90

5.65 972.17 5.491 TEE 3.65

G.VC.V

8 -7 61.4 6.5 112 2.38

E-90

10.15 805.15 8.171 TEE 3.65

G.V

C.V

7 -6 61.4 2 102 2.16

E-90

5.65 677.10 3.831 TEE 3.65

G.VC.V

6 - 5 61.4 6.5 94 1.99

E-90

10.15 582.04 5.911 TEE 3.65

G.VC.V

5 -4 61.4 2 84 1.78

E-90 0

5.65 472.59 2.671 TEE 3.65

G.V 0C.V

4- 3 61.4 6.5 74 1.57

E-90 0

10.15 373.72 3.791 TEE 3.65

G.V 0C.V

3- 2 40.8 1 29 1.39

E-90 0

4.04 482.76 1.951 TEE 3.04

G.V 0C.V

2- 1 20.4 12 3 0.58

2 E-90 1.2

13.48 211.50 2.85TEE 0

1 G.V 0.28C.V

258.79

- Total Friction Losses in pipes and fittings = 258.79 kpa = 25.88 mtr

Pressure drop in catridge filter = 2.54 mtr

Static Head = 22.50 mtr

Residual pressure = 10 mtr

Head avilable in the suction side due to to the height of water coumn in the tank = 3.5 mtr Catridge Filter SS-12 - three set being used for filteration

12 catridges in two layers inside the housing

Pressure drop (attached document) =0.042psi/gpm

- Total Pump Head required = 57.42 mtr Presure drop for 88 Gpm (one third of the total flow-264 gpm) =3.69psi= 2.54 mtr

Selected pump of 20m3/hr @ 65 mtr head is sufficient

Page 8: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 17/9/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Booster Pump BP-3 Sizing SJNReference Calculations Output

Booster Pump BP-3Location: Basement at -9.53 Level Water Tank BuildingApplication: To pump water from basement to Residential building Pumps set : 3 pumps in one set are working each pump capacity is 20 m3/hr '@ 65 Mtr Head(1 Set is working 1 Set standby)- Static Head = 22.50 m- Residual Pressure = 10 m

ρ = 1000 Kg/m³- Friction Losses:- ɡ = 9.8

C = 150 For copper pipes

Nodes Pipe Size(mm) Distance- L (m) Flow Rate (gpm) Velocity(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

A -B 100 4 132 1.06

E-90 0

5.37 101.44 0.54TEE 0

1 G.V 1.37C.V 0

B-C 150 11.5 132 0.47

E-90 0

20.6 14.08 0.291 TEE 9.1

G.VC.V

C-D 150 19.5 264 0.94

E-90 0

39.8 50.81 2.022 TEE 18.21 G.V 2.1

C.V

D-E 150 1 176 0.63

E-90 0

10.1 23.98 0.241 TEE 9.1

G.VC.V

E-F 150 1 88 0.31

E-90 0

19.2 6.64 0.132 TEE 18.2

G.VC.V

F-G 100 2 88 0.70

E-90 0

16.93 47.87 0.81TEE 0

2 G.V 2.741 C.V 12.19

G-H 150 1 88 0.31

E-90 0

19.2 6.64 0.132 TEE 18.2

G.VC.V

H-I 150 1 176 0.63

E-90 0

10.1 23.98 0.241 TEE 9.1

G.VC.V

I-J 150 2 264 0.94

1 E-90 6.1

28.4 50.81 1.442 TEE 18.21 G.V 2.1

C.V

Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C)1.852 x (1 / D)1.167 x ( r g)

m/sec2

C17
da:
Page 9: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 17/9/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Booster Pump BP-3 Sizing SJNReference Calculations Output

J-K 150 1 176 0.63

E-90 0

10.1 23.98 0.241 TEE 9.1

G.V

C.V

K-L 150 1 88 0.31

E-90 0

19.2 6.64 0.132 TEE 18.2

G.VC.V

L-M 100 2 88 0.70

E-90 0

4.74 47.87 0.23TEE 0

2 G.V 2.74C.V

M-N 150 1 88 0.31

E-90 0

10.1 6.64 0.071 TEE 9.1

G.VC.V

N-O 150 1 176 0.63

E-90 0

10.1 23.98 0.241 TEE 9.1

G.VC.V

O-P 150 2 264 0.94

E-90 0

20.2 50.81 1.032 TEE 18.2

G.VC.V

15 -14 150 775 264 0.94

27 E-90 132.3

936.8 50.81 47.601 TEE 9.11 G.V 2.11 C.V 18.3

14-13 150 173 264 0.94

4 E-90 19.6

201.7 50.81 10.251 TEE 9.1

G.VC.V

13 - 12 100 147 255 2.04

15 E-90 45.6

199 343.40 68.341 TEE 6.4

G.VC.V

12 - 11 100 9.7 255 2.04

4 E-90 12.16

28.26 343.40 9.701 TEE 6.4

G.V 0

C.V

11 - 10 75 22.1 155 2.20

3 E-90 6.9

33.6 554.58 18.631 TEE 4.6

G.V 0

C.V

10- 9 65 3 130 2.46

E-90

6.65 803.92 5.351 TEE 3.65

G.V

C.V

Page 10: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 17/9/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Booster Pump BP-3 Sizing SJNReference Calculations Output

9 - 8 65 2 124 2.35

E-90

5.65 736.56 4.161 TEE 3.65

G.VC.V

8 -7 65 6.5 112 2.12

E-90

10.15 610.02 6.191 TEE 3.65

G.V

C.V

7 -6 65 2 102 1.93

E-90

5.65 513.00 2.901 TEE 3.65

G.VC.V

6 - 5 65 6.5 94 1.78

E-90

10.15 440.98 4.481 TEE 3.65

G.VC.V

5 -4 65 2 84 1.59

E-90 0

5.65 358.06 2.021 TEE 3.65

G.V 0C.V

4- 3 65 6.5 74 1.40

E-90 0

10.15 283.14 2.871 TEE 3.65

G.V 0C.V

3- 2 40 1 29 1.45

E-90 0

4.04 531.64 2.151 TEE 3.04

G.V 0C.V

2- 1 20 12 3 0.60

2 E-90 1.2

13.48 232.92 3.14TEE 0

1 G.V 0.28C.V

195.57

* -The mentioned fitting are the fittings on this pipe segment.

- G.V: Gate Valve, E-90: ninety degree Elbow.

** - LE : Equivelent Length for each fitting.

- Total Length= LE+ Pipe Distance.

- Pressure drop in catridge filter = 7psi = 5 mtr

- Total Friction Losses in pipes and fittings = 195.57 Kpa = 1.96 Bar = 19.56 m

- Total Pump Head required = 22.50 + 10 + 19.56 + 5= 57.06 m = 5.71 Bar

Selected pump of 20m3/hr @ 65 mtr head is sufficient

Page 11: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 17/9/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Booster Pump BP-4 TO BP-8 Sizing SJNReference Calculations Output

Booster Pump BP-4 TO BP-8 (TYPICAL)Location: Basement Application: To pump water from Tower 60 Level to 35 LevelPumps set : 2 pumps in one set are working ,each pump capacity is 29 m3/hr '@35 mtr Head(1 Set is working 1 Set standby)- Static Head = 5 m- Residual Pressure = 10 m

ρ = 1000 Kg/m³- Friction Losses:- ɡ = 9.8

C = 150 For pipes

Nodes Pipe Size(mm) Velocity(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

1 - 2 100 1.5 256 2.05

E-90

21.47 345.90 7.431 TEE 6.4

1 G.V 1.381 C.V 12.19

2 -3 100 19 256 2.05

3 E-90 9.12

35.9 345.90 12.421 TEE 6.41 G.V 1.38

C.V

3 -4 25 2 5 0.64

E-90

4.52 202.31 0.911 TEE 1.521 G.V 1

C.V

4 - 5 20 6.5 4 0.80

E-90 0

7.71 396.82 3.061 TEE 1.21

G.V 0C.V

5 - 6 15 25 3 1.07

3 E-90 1.44

26.71 945.76 25.26TEE 0

1 G.V 0.27C.V

49.08

* -The mentioned fitting are the fittings on this pipe segment.- G.V: Gate Valve, E-90: ninety degree Elbow.

** -LE : Equivelent Length for each fitting.- Total Length= LE+ Pipe Distance.

Pressure drop in catridge filter = 7psi = 5 mtr- Total Friction Losses in pipes and fittings = 49.08 Kpa = 0.49 Bar = 4.91 m

'- Total Pump Head required = 5 + 10 + 4.91 + 5= 24.91 m = 2.49 Bar

Selected pump of 29m3/hr @ 35 mtr head is sufficient

Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C)1.852 x (1 / D)1.167 x ( r g)

m/sec2

Distance- L (m)

Flow Rate (gpm)

C17
da:
Page 12: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEET

Project Name: JABER HOSPITAL Date: Job No.

Shelter Building 8/8/2011 05020

Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Booster Pump BP-1 & 2 Sizing SJN

Reference Calculations Output

Booster Pump BP-1 & BP-2Location: Basement Application: To pump water from basement to Shelter Area at -5.0 LevelPumps set : 2 pumps in one set each pump capacity is 17 m3/hr @45 mtr Head(One Working One Standby)- Static Head = 4.00 m- Residual Pressure = 15 m

ρ = 990 Kg/m@45° C

- Friction Losses:- ɡ = 9.8C = 150 For pipes

Nodes Pipe Size(mm) Distance- L (m) Flow Rate (gpm) Velocity(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

1 -2 65 15 75 1.42

3 E-90 5.46

32.58 287.37 9.361 TEE 3.651 G.V 0.851 C.V 7.62

2 - 3 65 1 75 1.42

E-90

4.65 287.37 1.341 TEE 3.65

G.VC.V

3 -4 65 8.5 44 0.83

E-90 0

12.15 107.03 1.301 TEE 3.65

G.V 0C.V

4- 5 65 19.5 43 0.81

1 E-90 1.82

24.97 102.57 2.561 TEE 3.65

G.V 0C.V

5- 6 25 11.5 5 0.64

1 E-90 0.8

14.82 200.29 2.971 TEE 1.521 G.V 1

C.V

6- 7 25 3.6 4 0.51

2 E-90 1.6

6.2 132.49 0.82TEE 0

1 G.V 1C.V

18.35

* -The mentioned fitting are the fittings on this pipe segment.- G.V: Gate Valve, E-90: ninety degree Elbow.

** -LE : Equivelent Length for each fitting.- Total Length= LE+ Pipe Distance.Pressure drop in catridge filter = 7psi = 5 mtr

- Total Friction Losses in pipes and fittings = 18.35 Kpa = 0.18 Bar = 1.83 m

m/sec2

C19
da:
Page 13: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

'- Total Pump Head required = 4.00 + 15 + 1.83 + 5= 25.83 m = 2.58 Bar

Selected pump of 17m3/hr @ 45 mtr head is sufficient

Page 14: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEETProject Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 27/07/2011 090512Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Lifting Pump LPS-02 Sizing SJNReference Calculations Output

Liftingr PumpLPS-02Location: Basement (-9.53 level)Application: To pump water from Potable Water tank(-9.53 level) to GRP water Tank at Tower C,D& E(+60.0level)

Pumps set :- Static Head = 73 m- Residual Pressure = 10 m

ρ = 990 Kg/m³ @45° C

- Friction Losses:- ɡ = 9.8C = 150 For pipes

Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

1 - 2 100 754 225 1.80

30 E-90 91.44

868.41 306.38 266.06

1 TEE 6.44 G.V 1.372 E-45 3.21 C.V 12

266.06

* -The mentioned fitting are the fittings on this pipe segment.- G.V: Gate Valve, E-90: ninety degree Elbow.

** -LE : Equivelent Length for each fitting.- Total Length= LE+ Pipe Distance.Pressure drop in catridge filter = 7psi = 5 mtr

- Total Friction Losses in pipes and fittings = 266.06 Kpa = 2.66 Bar = 26.61 m'- Total Pump Head required = 73 + 10 + 26.61 = 5

= 114.61 m = 11.46 Bar= 114.61 Say 112 mtr=

Selected pump is 17m3/hr @ 113 mtr head is sufficient

3 pumps in one set, Three working ,each pump capacity is 22 m3/hr(1 Set is working 1 Set standby)

Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C)1.852 x (1 / D)1.167 x ( r g)

m/sec2

Pipe Size-D(mm)

Total Length***

C26
da:
Page 15: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

CALCULATION SHEET

Project Name: JABER HOSPITAL Date: Job No.

Main Hospital Building 4/9/2011 090512

Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:

Lifting Pump LPS-01 Sizing SJNReference Calculations Output

Lifting Pump LPS-01

Location: Basement at -9.53 Level Water Tank Building

Application: To pump water from Potable Water tank(-9.53 level) to GRP water Tank at Tower A& B(+60.0level)

Pumps set :- Static Head = 73.00 m- Residual Pressure = 4 m

- Friction Losses:-

Nodes Pipe Size(mm) Distance- L (m) Flow Rate (gpm) Velocity(m/sec) Fittings* LE/fitting** Friction Losses(kpa/ 100mtr) Friction Losses in Pipe (Kpa)

1 - 2 100 4 113 0.90

1 E-90 2.04

7.41 8.20 0.61TEE 0

1 G.V 1.37C.V 0

2- 3 150 6 113 0.60

E-90 0

15.14 2.30 0.351 TEE 9.14

G.VC.V

3 - 4 150 1.5 225 0.80

E-90

12.77 3.95 0.501 TEE 9.141 G.V 2.13

C.V

4 - 5 150 1 150 0.60

E-90 0

10.14 2.30 0.231 TEE 9.14

G.V 0C.V

5 - 6 150 1 75 0.60

E-90

10.14 2.30 0.231 TEE 9.14

G.V 0

C.V

6 - 7 100 2 75 0.65

E-90 0

16.93 3.85 0.65

TEE 0

2 G.V 2.74

1 C.V 12.19

7- 8 100 1 75 0.65

E-90

7.4 3.85 0.281 TEE 6.4

G.V

C.V

3 pumps in one set, Three working ,each pump capacity is 17 m3/hr(1 Set is working 1 Set standby)

Total Length***

C19
da:
Page 16: Head Calculation

BMBJaber Hospital

PlumbingPumps Calculations

8 - 9 100 1 150 1.20

E-90

7.4 14.00 1.041 TEE 6.4

G.V 0

C.V 0

9 -10 100 3 225 1.80

1 E-90 2.04

12.81 30.00 3.841 TEE 6.41 G.V 1.37

C.V 0

10 -11 100 1 225 1.80

E-90 0

7.4 30.00 2.221 TEE 6.4

G.V 0C.V 0

11 - 12 100 1 150 1.20

E-90

7.4 14.00 1.041 TEE 6.4

G.VC.V

12 - 13 100 1 75 0.65

E-90 0

7.4 3.85 0.281 TEE 6.4

G.V 0C.V

13 - 14 100 2 75 0.65

E-90 0

4.74 3.85 0.18TEE 0

2 G.V 2.74C.V

14 - 15 100 1 75 0.65

E-90 0

7.4 3.85 0.281 TEE 6.4

G.VC.V

15 - 16 100 1 150 1.20

E-90 0

7.4 14.00 1.041 TEE 6.4

G.V 0C.V

16 - 17 100 1 225 1.80

E-90 0

7.4 30.00 2.221 TEE 6.4

G.V 0C.V

17 - 18 100 748 225 1.80

35 E-90 71.4

831.28 30.00 249.381 TEE 6.44 G.V 5.48

C.V

18- 19 100 8.5 113 0.90

2 E-90 4.08

20.35 8.20 1.671 TEE 6.41 G.V 1.37

C.V- Total Length= LE+ Pipe Distance.

266.06Pressure drop in catridge filter = 7psi = 5 mtr= 266.06 Kpa = 2.66 Bar = 26.61 m

'- Total Pump Head required = 73.00 + 4 + 26.61 + 5- Total Friction Losses in pipes and fittings = 108.61 m = 10.86 Bar

= 108.61 mtrSelected pump of 17m3/hr @ 112 mtr head is sufficient