Top Banner
HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 • Status of the FE Boards • Parameter Shift Register • Time Schedule • Test Setup Mathias Reinecke
11

HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

Mar 26, 2015

Download

Documents

Alex McLeod
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

HCAL Front End Boards

HCAL – Technical Meeting 24.2.2005

• Status of the FE Boards

• Parameter Shift Register

• Time Schedule

• Test Setup

Mathias Reinecke

Page 2: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

HCAL Base Board - HBAB

Mathias Reinecke HCAL – Technical Meeting 1

Features :

- Base board for 6 Analog Boards (HAB)

- Communication with DAQ (CERC)

- Trigger for CMB board

- Two versions : ECAL left and right populated

Status :

- 2 Boards in production (‚right populated‘), production + assembly : 3-4 weeks

- design of ‚left-populated‘ : finished in 1 week

Page 3: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

HCAL Base Board - HBAB

Mathias Reinecke HCAL – Technical Meeting 2

‚Left-Populated‘

Dimensions :47.5 x 19 cm²

Height (Board + Components) :15.5 mm

Page 4: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

HCAL Analog Board - HAB

Mathias Reinecke HCAL – Technical Meeting 3

Features :

- Carries one LAL ASIC (18 SiPM channels)

- HV filtering and SiPM biasing

- Communication with HCAL Base Board

- Temperature monitor on board

Status :

- 2 Boards fully assembled

- 26 Boards available (not assembled)

Page 5: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

HCAL Analog Board - HAB

Mathias Reinecke HCAL – Technical Meeting 4

Connector to Base Board

Temperature Monitor

Analog Test Output

ASIC

Analog Line Driver

Parameter Shift-Reg

Dimensions :

9 x 6.2 cm²

Page 6: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

HCAL Testboard

Mathias Reinecke HCAL – Technical Meeting 5

Status :

- 2 boards fully assembled

- one board unassembled (spare)

Features :

- Base board for one HAB

- Interfaces 18 SiPMs

- Corresponds to ECAL ‚Left Populated‘

- Charge injection inputs (test)

Page 7: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

HCAL Testboard

SiPM Interface, 18 chns.

Charge Injection

Power CMB Control

Test Outputs (SRIN, TCALIB)

Mathias Reinecke HCAL – Technical Meeting 6

DAQ Interface

Dimensions:

16 x 16 cm²

HAB

Page 8: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

Parameter Shift Register

Mathias Reinecke HCAL – Technical Meeting 7

Task : Definition of operating parameters

Total length : 960 bits (one shift reg. for 6 HABs)

Loading clock : 1..10 kHz

Loading time @ 1 kHz : 1 sec per Base Board Switch : physics /

calibration mode

Page 9: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

Timeline

Mathias Reinecke HCAL – Technical Meeting 8

Risks / Delays :

• Test of series production : board by board till mid August 2005 (500 HABs, 80 HBABs). Manpower for DAQ software and series test ?

• Design errors on HBABs (delay per redesign : 7 weeks)

• A lot of unknown features : Noise, temp.-stability, dynamic range, mechanical interface to SiPM cassette, CMB interface (ground loops etc.)

Page 10: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

Test Setup

Mathias Reinecke HCAL – Technical Meeting 9

Series Board Tests (HAB) :

- Power dissipation

- Loading shift register

- Noise/Pedestal level

- Calibration pulse / Readout

- HV strength

Test of HBABs with HABs :

- Communication with DAQ

- HV strength

ChargeInjection

Page 11: HCAL Front End Boards HCAL – Technical Meeting 24.2.2005 Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.

Summary

Mathias Reinecke HCAL – Technical Meeting 10

• System concept can be tested now !!

• Characterization with SiPMs : 2nd half of March

• First HCAL layer (series production) : July 2005

• Time schedule is tight : no redesigns included, implies full access to manpower and resources,

needed time for series test not clear • Preliminary user manual available : https://www.desy.de/~sefkow/HCALelectronics.html