Top Banner
MIDDLE EAST FORUM DUBAI, UNITED ARAB EMIRATES 6 – 7 APRIL 2016 Case Study: Successful Implementation Of PCI DSS In A Large Bank Presenter : Fareed Hosain, CIO Habib Bank Ltd
7

HBL PCI DSS Remediation Case Study

Jan 23, 2017

Download

Technology

Fareed Hosain
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HBL PCI DSS Remediation Case Study

MIDDLE EAST FORUMDUBAI, UNITED ARAB EMIRATES 6 – 7 APRIL 2016

Case Study: Successful

Implementation Of PCI DSS In A Large Bank

Presenter :

Fareed Hosain, CIO

Habib Bank Ltd

Page 2: HBL PCI DSS Remediation Case Study

Pakistan’s largest bank

• Incorporated in 1941

• Deposits > PKR 2 Trillion

• 1600+ branches

• 1900+ ATMs

• 5+ million Debit & Credit Card holders

• Over 500k card based transactions daily

Major systems

• Core banking

• Debit Cards

• Credit cards

• ATM Switches

• Branchless Banking

• Card Production

• Call Centre

HBL Profile

Page 3: HBL PCI DSS Remediation Case Study

• Scope• Project initiated in 2013, work started in earnest from Jan 2015• Remediated over 52 Applications, 270+ servers, 26 network devices• 4 data centers ready for ISO 27001 certification• Updated over 1000+ controls (along with SIEM, FIM, DLP, 2FA, VA, PT etc.)• 25 core business processes changed to comply with the standard• Upgraded card production facility to be compliant

• Challenges• Delivering business solutions in parallel to this effort• Improving systems performance and extending banking hours• Rolling out more products, ATMs, etc.• Decommissioning legacy applications

PCI DSS at HBL

Page 4: HBL PCI DSS Remediation Case Study

Timeline 2015

May

28Mar

15Nov

5Feb

18Dec

20

Performed the scope validation & updated

the scope

Removed assets From all in scope assets to security

controls

Scope Revalidation

De-Scope Revalidate the Gaps

Remediation & Control

Implementation

Final QSA Audit

Performed revalidation of gaps by HBL PCI team & QSA

Evidence finalization & Final QSA audit

Page 5: HBL PCI DSS Remediation Case Study

• People• Training of staff• Hiring of specialized resources for remediation work

• Focus• Deferred all non-critical work• Froze system changes• Aligned staff goals and KPIs with remediation effort• Stakeholder engagement

• Project management discipline• Resources, execution, solve problems

Success Factors

Page 6: HBL PCI DSS Remediation Case Study

• It can be done• No matter size and complexity of one’s systems

• Analysis & Planning• You have to know what you are going to do – and not do

• Focus• Need commitment and focus to achieve results• Project management discipline

• Systemic improvements in Pakistan• Increased awareness in the banking sector• Vendor systems are PA-DSS compliant

Take Aways for other Institutions

Page 7: HBL PCI DSS Remediation Case Study

Thank you

HBL: The only bank in Pakistan that is PCI DSS Certified