Hayden Ferry Lakeside Corporate Campus Tempe, Arizona United States Owner: SunCor Development, Tempe, Arizona Architect of Record: DAVIS, Tempe, Arizona Contractor: McCarthy Construction, Phoenix, Arizona Total Construction Cost: 150 Million 950,000 Total Square Feet 3 Mid-Rise ‘Class A’ Office Buildings Mixed Use Retail – 8-Level Parking Structure