Short Elliott Hendrickson Inc., 421 Frenette Drive, Chippewa Falls, WI 54729-3374 SEH is an equal opportunity employer | www.sehinc.com | 715.720.6200 | 800.472.5881 | 715.720.6300 fax HASTINGS WAY PROJECT STATUS Re: Hastings Way Date: Thursday, September 8, 2011 City of Eau Claire Project Manager: Randy Sanford, PE Contact Information: 715.720.6200 Phase II – Northbound Lanes of Hastings Way – Clairemont Avenue to Eau Claire River Bridge Southbound lanes are restricted to one lane from Seymour Road to Clairemont Avenue Northbound lanes are restricted to one lane from Clairemont Avenue to Birch Street Grading south of Brackett Avenue continues Sanitary sewer installation south of Kirk Street continues Water main installation south of Kirk Street continues Street light and traffic signal conduit and base installation between Highland Avenue and Kirk Street continues Pedestrian underpass wing wall construction continues Concrete paving preparation begins Fenwick Avenue intersection utility installation begins Fairfax Street intersection scheduled to be closed starting September 12th Clairemont Avenue/NB Hastings Way Ramp scheduled to be closed starting September 19th