Harrisburg Overpass Construction Update September 1, 2015
Harrisburg Overpass Construction Update September 1, 2015
Safety First
10,700 Man hours worked to date
• No lost time accidents to date
• No recordable accidents to date
West Bound Phase I Traffic Control
Traffic Plan Phase 1A
Safety First
East Bound Phase I Traffic Control
Safety First
School began August 24th
LOOK OUT FOR THE KIDS!
Speed limit 20 MPH
Traffic Control
• Traffic moved to middle of Harrisburg (1 lane each way)
• Access from Harrisburg:
• Side streets maintain access
• Some weekend and night intersection closures for utility work
• Advanced coordination with property owners for new driveway construction
Phase 1 – May 2015 to November 2015
Construction Activities
• New waterlines, storm sewers, sanitary sewers
• New private driveways, curbs
• New sidewalks
• New landscape
• New roadways
Union Pacific NE
SE SW
NW
Union Pacific
NE
SE SW
NW
Job Limit
Job Limit
Project Phase 1
Water Line: 900 LF Storm Line: 1100 LF San. Line: 0 LF
Water Line: 900 LF Storm Line: 750 LF San. Line: 130
Water Line: 950 LF Storm Line: 1200 LF San. Line: 0 LF
Water Line: 950 LF Storm Line: 700 LF San. Line: 370 LF
West Side Phase 1 Work SW Quadrant + NW Quadrant
Unexpected/Unknown Underground encounters so far: 31
Gas Lines
Unexpected Water Line
Barziza St. & Harrisburg Blvd. Caylor St. & Harrisburg Blvd.
North West Quadrant
Dorsey Dental
Lot and
House Field Office
Vacant Lot Abandoned
Strip Mall
Linwood St. Caylor St.
Storm Sewer Water Line
Warehouse Demolition Vacant Lot
Ware- House
Bent 1
Union Pacific
Bent 2 Bent 3 Bent 4 Bent 5
Bent 6
Existing Lines
Total Installed % Completed
1100 LF 900 LF
0 LF 0 LF
0% 0%
South West Quadrant
Linwood St. Caylor St.
Key Station #93
Houston Armature C&R Auto Sales Gameroom Warehouse
Union Pacific
Linwood St.
Storm Sewer Water Line Existing Lines
Total
1200 LF 950 LF
Bent 1 Bent 2 Bent 3 Bent 4 Bent 5
Bent 6
Installed % Completed
850 LF 950 LF
71% 100% (Service Taps Remaining)
East Side Phase 1 Work NE Quadrant + SE Quadrant
Unexpected/Unknown Underground encounters so far: 59
In front of Value Village
In front of Tornado Bus
Working under existing power lines
North East Quadrant
Hendrick Grain Co. Storage
Yard
Value Village 65
th S
T.
66
th S
T.
9
Cesar Chavez Blvd.
Popeye’s, Gas Station, Washateria
Tornado Bus Co.
Vacant Lot
8 10 7 6 5
Sanitary Line
Union Pacific
65
th S
T.
66
th S
T.
Hu
ghe
s
ST.
Cesar Chavez Blvd.
Storm Sewer Water Line
Existing Lines
Total Installed % Completed
750 LF 900 LF 130 LF
550 LF 900 LF 110 LF
73 % 100 % (Service Taps Remaining) 85 %
South East Quadrant
65
th S
T.
66
th S
T. Cesar
Chavez Blvd.
Jorge’s Car and Truck
#2
Vacan
t Lo
t Texas
Belting
Pegasso Bus
Tours
Marbella Banquet
Hall
Chonchino Auto Sales
Guanajuato Barber
Shop #2
Taqueria Tierra
Caliente
Family Dollar Store
10 9 8 7 6
5
Union Pacific
Cesar Chavez Blvd. 6
5th
ST.
66
th S
T.
Sanitary Line
Storm Sewer Water Line
Existing Lines
Total Installed % Completed
750 LF 900 LF 240 LF
0 LF 30 LF 0 LF
0 % 1 % 0%
Paving Phase 1 West Side
Fast Track Paving for Intersections Phase 1 Access Roads Sidewalks Asphalt
Paving Phase 1 East Side
Fast Track Paving for Intersections Phase 1 Access Roads Sidewalks Asphalt
MSE Wall Mock-Up
Thank you See you in November