Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006
13

Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Dec 19, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. KirkBrookhaven National Laboratory

MERIT Installation Issues

CERN Meeting June 20, 2006

Page 2: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

The MERIT Experiment (3/3)

To be installed in the TT2A tunnel upstream of the nTOF target

Data taking: “two-weeks” at the PS startup in 2007

Beam dump (new)

Experiment

Collimator & beam instrumentation

Quads for focusing (new)

Electronics + cryogenics

Access

concrete

blocks

Cryogenics exhaust line to TT10

Page 3: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

Experiment at CERNTT10

TT2

TT2A

ISR Tunnel

MERIT

Hyd Pump& Controls

in TT2

AccessShaft

Page 4: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

The Cold Valve Box

Page 5: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

The Cryo Heater

Page 6: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

Experiment Layout

Hg target is a self-contained module inserted into the magnet bore

Two containment barriers between the Hg and the TT2A tunnel environment

Hydraulic pump will be in TT2, personnel in Bldg 272 remote control room

Page 7: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

The Hg Jet Control Rack

Page 8: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

The Hg Jet Control Rack (cont)

Page 9: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

The MERIT Experiment (2/3)

Target chamberSolenoid

Hg container

Hg-jet hydraulic system

Proton Beam

Page 10: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

Hg Jet Secondary Containment

Page 11: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

The Hg Jet System

HydraulicsInstrumentationOptical diagnosticsHg drain & fill (without opening secondary)Hg extraction (in event of major leak in primary containment)

Passive filtration

Page 12: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

The Pulsed Solenoid

Page 13: Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.

Harold G. Kirk

Rigging the Solenoid at MIT

Movie of moving the solenoid at MIT is found at:

http://198.125.178.188/bnlpulsed/MERITMagRig.mpg