Page 1 of 101 PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2 J3 PROJECT JAMNAGAR GASIFICATION PROGRAM Status as : 2nd Shipmen PT.HANJUNG INDONESIA Date : Mar. 11 201 Rev : D PACK NO. DRAWING NO. MARKING NO. PACKAGE TYPE DESCRIPTION QTY WEIGHT (ton) DIMENSION (mm) CBM (m3) BARGE/ CONTAINER REMARK No. NETT. GROSS HEIGHT WIDTH LENGTH 3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82 7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53 11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53 12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34 16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07 23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57 32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31 36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41 41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43 46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66 50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28 53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49 59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99 61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53 65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88 67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49 73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33 74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61 79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01 84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68 91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60 95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17 97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77 101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 7.23 1192 1450 8437 14.58 H220-550-FPGC16 H220-550-FPGC16 RIL/PTH-J3-0102 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66 H220-550-FPGC28 H220-550-FPGC28 RIL/PTH-J3-0103 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66 H361-013-VB5 H361-013-VB5 BUNDLE SUB PIPE RACK ACR 001 4 1.10 1.28 649 505 2130 2.79 H361-013-VB6 H361-013-VB6 SUB PIPE RACK ACR 001 4 1.18 1.36 649 506 2397 3.15 H361-013-VB7 H361-013-VB7 SUB PIPE RACK ACR 001 4 1.18 1.36 653 508 2456 3.26 285 H361-013-B50 H361-013-B50 BUNDLE SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673 289 H361-013-B56 H361-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607
101

Hanjung Packing List 2nd Shipment

Dec 21, 2015

Download

Documents

Duong Truong

Packing list of steel structures
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:02

Page 1 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82

7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53

11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53

12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34

16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07

23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57

32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31

36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41

41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43

46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66

50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28

53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49

59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99

61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53

65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88

67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49

73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33

74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61

79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01

84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68

91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60

95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17

97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77

101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 7.23 1192 1450 8437 14.58

H220-550-FPGC16 H220-550-FPGC16 RIL/PTH-J3-0102 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66

H220-550-FPGC28 H220-550-FPGC28 RIL/PTH-J3-0103 SKID ROD MILL STRUCTURE 1 5.67 5.74 1540 995 5000 7.66

H361-013-VB5 H361-013-VB5

BUNDLE

SUB PIPE RACK ACR 001 4 1.10 1.28 649 505 2130 2.79

H361-013-VB6 H361-013-VB6 SUB PIPE RACK ACR 001 4 1.18 1.36 649 506 2397 3.15

H361-013-VB7 H361-013-VB7 SUB PIPE RACK ACR 001 4 1.18 1.36 653 508 2456 3.26

285 H361-013-B50 H361-013-B50BUNDLE

SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673

289 H361-013-B56 H361-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

Page 2: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:02

Page 2 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

8 2.71 3.30 670 1050 5720 32.19

A. H210-550 ROOD MILL STRUCTURE

1 H210-550-FPGB1 H210-550-FPGB1 RIL/PTH-J3-0001 SKID ROOD MILL STRUCTURE 1 2.36 2.42 700 780 5470 2.99

2 H210-550-FPGB2 H210-550-FPGB2 RIL/PTH-J3-0002 SKID ROOD MILL STRUCTURE 1 2.36 2.42 759 846 5470 3.51

4 H210-550-FPGC2 H210-550-FPGC2 RIL/PTH-J3-0004 SKID ROOD MILL STRUCTURE 1 10.13 10.36 1134 1815 10370 21.34

5 H210-550-FPGC3 H210-550-FPGC3 RIL/PTH-J3-0005 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1106 1406 11955 18.59

6 H210-550-FPGC4 H210-550-FPGC4 RIL/PTH-J3-0006 SKID ROOD MILL STRUCTURE 1 3.88 3.97 958 1439 2571 3.54

8 H210-550-FPGC6 H210-550-FPGC6 RIL/PTH-J3-0008 SKID ROOD MILL STRUCTURE 1 9.68 10.05 881 3117 10300 28.28

9 H210-550-FPGC7 H210-550-FPGC7 RIL/PTH-J3-0009 SKID ROOD MILL STRUCTURE 1 10.92 11.10 968 1402 10900 14.79

10 H210-550-FPGC8 H210-550-FPGC8 RIL/PTH-J3-0010 SKID ROOD MILL STRUCTURE 1 9.57 9.75 708 1402 9800 9.73

13 H210-550-FPGC11 H210-550-FPGC11 RIL/PTH-J3-0013 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

14 H210-550-FPGC12 H210-550-FPGC12 RIL/PTH-J3-0014 SKID ROOD MILL STRUCTURE 1 10.25 10.44 1131 1406 10400 16.54

15 H210-550-FPGC13 H210-550-FPGC13 RIL/PTH-J3-0015 SKID ROOD MILL STRUCTURE 1 9.99 10.17 511 1406 10300 7.40

17 H210-550-FPGC15 H210-550-FPGC15 RIL/PTH-J3-0017 SKID ROOD MILL STRUCTURE 1 7.42 7.56 885 1401 8425 10.45

18 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0018 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78

19 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0019 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78

20 H210-550-FPGC17 H210-550-FPGC17 RIL/PTH-J3-0020 SKID ROOD MILL STRUCTURE 1 10.05 10.21 610 1241 10400 7.87

21 H210-550-FPGC18 H210-550-FPGC18 RIL/PTH-J3-0021 SKID ROOD MILL STRUCTURE 1 9.76 9.93 706 1259 10300 9.16

22 H210-550-FPGC19 H210-550-FPGC19 RIL/PTH-J3-0022 SKID ROOD MILL STRUCTURE 1 6.40 6.54 861 1405 6176 7.47

24 H210-550-FPGC21 H210-550-FPGC21 RIL/PTH-J3-0024 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

25 H210-550-FPGC22 H210-550-FPGC22 RIL/PTH-J3-0025 SKID ROOD MILL STRUCTURE 1 7.41 7.54 1129 1239 6525 9.13

26 H210-550-FPGC23 H210-550-FPGC23 RIL/PTH-J3-0026 SKID ROOD MILL STRUCTURE 1 7.07 7.19 661 1242 6800 5.58

27 H210-550-FPGC24 H210-550-FPGC24 RIL/PTH-J3-0027 SKID ROOD MILL STRUCTURE 1 7.78 7.92 696 1407 7375 7.22

28 H210-550-FPGC25 H210-550-FPGC25 RIL/PTH-J3-0028 SKID ROOD MILL STRUCTURE 1 6.27 6.39 875 1240 6176 6.70

29 H210-550-FPGC26 H210-550-FPGC26 RIL/PTH-J3-0029 SKID ROOD MILL STRUCTURE 1 7.56 7.69 1164 1401 8425 13.74

30 H210-550-FPGC27 H210-550-FPGC27 RIL/PTH-J3-0030 SKID ROOD MILL STRUCTURE 1 11.58 11.76 1128 1402 11700 18.50

31 H210-550-FPGC28 H210-550-FPGC28 RIL/PTH-J3-0031 SKID ROOD MILL STRUCTURE 1 9.06 9.20 808 1402 9000 10.20

33 H210-550-FPGC30 H210-550-FPGC30 RIL/PTH-J3-0033 SKID ROOD MILL STRUCTURE 1 7.34 7.48 1311 1401 8425 15.47

34 H210-550-FPGC31 H210-550-FPGC31 RIL/PTH-J3-0034 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

35 H210-550-FPGC32 H210-550-FPGC32 RIL/PTH-J3-0035 SKID ROOD MILL STRUCTURE 1 10.84 11.03 821 1408 11900 13.76

37 H210-550-FPGC35 H210-550-FPGC35 RIL/PTH-J3-0037 SKID ROOD MILL STRUCTURE 1 7.30 7.44 737 1401 8425 8.70

38 H210-550-FPGC36 H210-550-FPGC36 RIL/PTH-J3-0038 SKID ROOD MILL STRUCTURE 1 10.19 10.55 695 3117 10300 22.31

39 H210-550-FPGC37 H210-550-FPGC37 RIL/PTH-J3-0039 SKID ROOD MILL STRUCTURE 1 11.22 11.40 968 1402 11900 16.15

40 H210-550-FPGC38 H210-550-FPGC38 RIL/PTH-J3-0040 SKID ROOD MILL STRUCTURE 1 11.16 11.35 711 1438 11726 11.99

42 H210-550-FPGC41 H210-550-FPGC41 RIL/PTH-J3-0042 SKID ROOD MILL STRUCTURE 1 9.68 10.04 881 3110 10300 28.22

43 H210-550-FPGC42 H210-550-FPGC42 RIL/PTH-J3-0043 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1022 1408 11900 17.12

44 H210-550-FPGC43 H210-550-FPGC43 RIL/PTH-J3-0044 SKID ROOD MILL STRUCTURE 1 11.13 11.32 904 1442 11726 15.29

45 H210-550-FPGC44 H210-550-FPGC44 RIL/PTH-J3-0045 SKID ROOD MILL STRUCTURE 1 7.15 7.30 1141 1486 8425 14.28

47 H210-550-FPGC46 H210-550-FPGC46 RIL/PTH-J3-0047 SKID ROOD MILL STRUCTURE 1 8.30 8.44 1101 1406 7250 11.22

48 H210-550-FPGC47 H210-550-FPGC47 RIL/PTH-J3-0048 SKID ROOD MILL STRUCTURE 1 6.83 6.98 1141 1486 8425 14.28

49 H210-550-FPGC48 H210-550-FPGC48 RIL/PTH-J3-0049 SKID ROOD MILL STRUCTURE 1 9.50 9.69 1132 1432 10380 16.83

51 H210-550-FPGC50 H210-550-FPGC50 RIL/PTH-J3-0051 SKID ROOD MILL STRUCTURE 1 3.96 4.05 949 1395 2629 3.48

52 H210-550-FPGC51 H210-550-FPGC51 RIL/PTH-J3-0052 SKID ROOD MILL STRUCTURE 1 7.35 7.49 1312 1401 8425 15.49

Page 3: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 3 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

54 H210-550-FPGC53 H210-550-FPGC53 RIL/PTH-J3-0054 SKID ROOD MILL STRUCTURE 1 9.86 10.03 1006 1241 9700 12.11

55 H210-550-FPGC54 H210-550-FPGC54 RIL/PTH-J3-0055 SKID ROOD MILL STRUCTURE 1 9.81 9.97 720 1241 9950 8.89

56 H210-550-FPGC55 H210-550-FPGC55 RIL/PTH-J3-0056 SKID ROOD MILL STRUCTURE 1 6.53 6.66 849 1407 6256 7.47

57 H210-550-FPGC56 H210-550-FPGC56 RIL/PTH-J3-0057 SKID ROOD MILL STRUCTURE 1 7.20 7.34 586 1486 8425 7.34

58 H210-550-FPGC57 H210-550-FPGC57 RIL/PTH-J3-0058 SKID ROOD MILL STRUCTURE 1 5.01 5.10 511 1406 4210 3.02

60 H210-550-FPGC59 H210-550-FPGC59 RIL/PTH-J3-0060 SKID ROOD MILL STRUCTURE 1 9.13 9.31 695 1406 9200 8.99

62 H210-550-FPGC61 H210-550-FPGC61 RIL/PTH-J3-0062 SKID ROOD MILL STRUCTURE 1 7.15 7.29 878 1482 8425 10.96

63 H210-550-FPGC62 H210-550-FPGC62 RIL/PTH-J3-0063 SKID ROOD MILL STRUCTURE 1 9.43 9.63 881 1506 10500 13.93

64 H210-550-FPGC63 H210-550-FPGC63 RIL/PTH-J3-0064 SKID ROOD MILL STRUCTURE 1 9.75 9.93 1127 1402 10200 16.12

66 H210-550-FPGC65 H210-550-FPGC65 RIL/PTH-J3-0066 SKID ROOD MILL STRUCTURE 1 6.33 6.47 909 1426 6244 8.09

68 H210-550-FPGC67 H210-550-FPGC67 RIL/PTH-J3-0068 SKID ROOD MILL STRUCTURE 1 9.60 9.79 1131 1406 9700 15.42

69 H210-550-FPGC68 H210-550-FPGC68 RIL/PTH-J3-0069 SKID ROOD MILL STRUCTURE 1 10.16 10.42 1131 2056 10000 23.25

70 H210-550-FPGC69 H210-550-FPGC69 RIL/PTH-J3-0070 SKID ROOD MILL STRUCTURE 1 6.97 7.11 660 1407 6660 6.18

71 H210-550-FPGC70 H210-550-FPGC70 RIL/PTH-J3-0071 SKID ROOD MILL STRUCTURE 1 7.73 7.87 694 1404 7500 7.31

72 H210-550-FPGC71 H210-550-FPGC71 RIL/PTH-J3-0072 SKID ROOD MILL STRUCTURE 1 6.36 6.51 876 1430 6244 7.82

75 H210-550-FPGC74 H210-550-FPGC74 RIL/PTH-J3-0075 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99

76 H210-550-FPGC75 H210-550-FPGC75 RIL/PTH-J3-0076 SKID ROOD MILL STRUCTURE 1 9.20 9.37 811 1241 9250 9.31

77 H210-550-FPGC76 H210-550-FPGC76 RIL/PTH-J3-0077 SKID ROOD MILL STRUCTURE 1 6.52 6.66 862 1396 6244 7.51

78 H210-550-FPGC77 H210-550-FPGC77 RIL/PTH-J3-0078 SKID ROOD MILL STRUCTURE 1 7.15 7.29 1311 1486 8425 16.41

80 H210-550-FPGC79 H210-550-FPGC79 RIL/PTH-J3-0080 SKID ROOD MILL STRUCTURE 1 9.39 9.57 971 1406 10000 13.65

81 H210-550-FPGC80 H210-550-FPGC80 RIL/PTH-J3-0081 SKID ROOD MILL STRUCTURE 1 9.66 9.84 843 1402 10500 12.41

82 H210-550-FPGC81 H210-550-FPGC81 RIL/PTH-J3-0082 SKID ROOD MILL STRUCTURE 1 3.94 4.03 876 1422 2994 3.73

83 H210-550-FPGC82 H210-550-FPGC82 RIL/PTH-J3-0083 SKID ROOD MILL STRUCTURE 1 7.30 7.44 738 1486 8425 9.24

85 H210-550-FPGC84 H210-550-FPGC84 RIL/PTH-J3-0085 SKID ROOD MILL STRUCTURE 1 7.14 7.28 688 1407 7140 6.91

86 H210-550-FPGC85 H210-550-FPGC85 RIL/PTH-J3-0086 SKID ROOD MILL STRUCTURE 1 9.50 9.68 661 1406 10100 9.39

87 H210-550-FPGC86 H210-550-FPGC86 RIL/PTH-J3-0087 SKID ROOD MILL STRUCTURE 1 4.11 4.20 709 1419 2994 3.01

88 H210-550-FPGC87 H210-550-FPGC87 RIL/PTH-J3-0088 SKID ROOD MILL STRUCTURE 1 7.46 7.60 1308 1482 8425 16.33

89 H210-550-FPGC88 H210-550-FPGC88 RIL/PTH-J3-0089 SKID ROOD MILL STRUCTURE 1 9.92 10.11 1131 1406 9700 15.42

90 H210-550-FPGC90 H210-550-FPGC90 RIL/PTH-J3-0090 SKID ROOD MILL STRUCTURE 1 11.57 11.76 674 1403 11794 11.15

92 H210-550-FPGC92 H210-550-FPGC92 RIL/PTH-J3-0092 SKID ROOD MILL STRUCTURE 1 9.41 9.57 965 1241 10385 12.44

93 H210-550-FPGC93 H210-550-FPGC93 RIL/PTH-J3-0093 SKID ROOD MILL STRUCTURE 1 8.24 8.36 658 1237 7165 5.83

94 H210-550-FPGC94 H210-550-FPGC94 RIL/PTH-J3-0094 SKID ROOD MILL STRUCTURE 1 5.50 5.58 659 1239 4910 4.01

96 H210-550-FPGC96 H210-550-FPGC96 RIL/PTH-J3-0096 SKID ROOD MILL STRUCTURE 1 9.61 9.79 1131 1406 9700 15.42

98 H210-550-FPGC98 H210-550-FPGC98 RIL/PTH-J3-0098 SKID ROOD MILL STRUCTURE 1 9.80 9.97 968 1237 9680 11.59

99 H210-550-FPGC99 H210-550-FPGC99 RIL/PTH-J3-0099 SKID ROOD MILL STRUCTURE 1 5.74 5.84 701 1597 5380 6.02

SUB TOTAL A. H210-550 ROOD MILL STRUCTURE 76 634.55 647.59 905.65

B. H220-550 ROOD MILL STRUCTURE

100 H220-550-FPGC1 H220-550-FPGC1 RIL/PTH-J3-0100 SKID ROOD MILL STRUCTURE 1 4.58 4.69 1316 1351 6036 10.73

102 H220-550-FPGC3 H220-550-FPGC3 RIL/PTH-J3-0102 SKID ROOD MILL STRUCTURE 1 5.59 5.75 1440 1495 5000 10.76

103 H220-550-FPGC4 H220-550-FPGC4 RIL/PTH-J3-0103 SKID ROOD MILL STRUCTURE 1 11.87 12.20 1400 1540 12000 25.87

104 H220-550-FPGC5 H220-550-FPGC5 RIL/PTH-J3-0104 SKID ROOD MILL STRUCTURE 1 11.48 11.77 1540 1250 10500 20.21

105 H220-550-FPGC6 H220-550-FPGC6 RIL/PTH-J3-0105 SKID ROOD MILL STRUCTURE 1 7.16 7.41 1547 1608 8437 20.99

106 H220-550-FPGC7 H220-550-FPGC7 RIL/PTH-J3-0106 SKID ROOD MILL STRUCTURE 1 5.44 5.59 1540 1180 5000 9.09

107 H220-550-FPGC8 H220-550-FPGC8 RIL/PTH-J3-0107 SKID ROOD MILL STRUCTURE 1 11.97 12.27 2259 1271 12000 34.45

Page 4: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 4 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

108 H220-550-FPGC9 H220-550-FPGC9 RIL/PTH-J3-0108 SKID ROOD MILL STRUCTURE 1 10.08 10.35 1524 961 10500 15.38

109 H220-550-FPGC10 H220-550-FPGC10 RIL/PTH-J3-0109 SKID ROOD MILL STRUCTURE 1 6.32 6.57 1125 1540 6036 10.46

110 H220-550-FPGC11 H220-550-FPGC11 RIL/PTH-J3-0110 SKID ROOD MILL STRUCTURE 1 7.12 7.31 1550 885 8437 11.57

111 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0111 SKID ROOD MILL STRUCTURE 2 11.33 11.60 1540 995 5000 15.32

SUB TOTAL B. H220-550 ROOD MILL STRUCTURE 12 92.96 7.23 184.84

C. H360-013 SUB PIPE RACK ACR 001

112 H360-013-VB19 H360-013-VB19

RIL/PTH-J3-0112 BUNDLE

SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526 0.27

113 H360-013-VB20 H360-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151 0.21

114 H360-013-VB21 H360-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862 0.31

115 H360-013-VB22 H360-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898 0.08

116 H360-013-VB23 H360-013-VB23 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760 0.07

10 0.16 0.52 361 375 1526 2.07

117 H360-013-HB1 H360-013-HB1

RIL/PTH-J3-0113 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334 0.11

118 H360-013-HB2 H360-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450 0.12

119 H360-013-HB3 H360-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484 0.12

120 H360-013-HB4 H360-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536 0.13

121 H360-013-HB5 H360-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987 2.67

122 H360-013-HB6 H360-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698 0.14

123 H360-013-VB16 H360-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870 0.07

124 H360-013-VB17 H360-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652 0.28

125 H360-013-VB18 H360-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455 0.12

25 0.49 1.63 461 545 1987 12.48

126 H360-013-CT6 H360-013-CT6

RIL/PTH-J3-0114 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150 0.09

127 H360-013-CT7 H360-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150 0.18

128 H360-013-CT8 H360-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150 0.19

129 H360-013-CT9 H360-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150 0.88

130 H360-013-CT10 H360-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150 0.18

131 H360-013-CT11 H360-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150 0.45

132 H360-013-CT12 H360-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935 0.14

133 H360-013-CT13 H360-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045 0.08

13 0.19 1.42 1270 871 1150 16.54

134 H360-013-B67 H360-013-B67

RIL/PTH-J3-0115 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

135 H360-013-B68 H360-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

136 H360-013-B69 H360-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

137 H360-013-B70 H360-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

138 H360-013-B71 H360-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461 0.84

139 H360-013-B72 H360-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461 0.28

140 H360-013-B73 H360-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

141 H360-013-B74 H360-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

142 H360-013-B75 H360-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

143 H360-013-B76 H360-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

Page 5: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 5 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

144 H360-013-B77 H360-013-B77

RIL/PTH-J3-0115 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

145 H360-013-B78 H360-013-B78 SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334 0.67

146 H360-013-B79 H360-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962 0.29

147 H360-013-B88 H360-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211 0.15

20 0.58 2.72 461 1020 2962 27.86

148 H360-013-B82 H360-013-B82 RIL/PTH-J3-0116 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461 0.64

4 0.14 0.26 400 275 1461 0.64

149 H360-013-CT1 H360-013-CT1RIL/PTH-J3-0117 BUNDLE

SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388 0.36

150 H360-013-CT2 H360-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388 0.66

8 0.11 0.53 1110 658 388 2.27

151 H360-013-B19 H360-013-B19

RIL/PTH-J3-0118 BUNDLE

SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461 0.20

152 H360-013-B80 H360-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461 0.39

153 H360-013-B81 H360-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657 0.77

4 0.23 0.38 436 378 4657 3.07

154 H360-013-B7 H360-013-B7

RIL/PTH-J3-0119 BUNDLE

SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673 0.99

155 H360-013-B8 H360-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142 0.18

156 H360-013-B9 H360-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942 0.94

157 H360-013-B10 H360-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102 0.34

158 H360-013-B11 H360-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102 0.30

5 0.59 0.78 874 399 5942 10.36

159 H360-013-B4 H360-013-B4 RIL/PTH-J3-0120 BUNDLE SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827 1.45

1 0.16 0.20 856 352 4827 1.45

160 H360-013-B5 H360-013-B5 RIL/PTH-J3-0121 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944 5.92

1 0.58 0.63 1722 578 5944 5.92

161 H360-013-B6 H360-013-B6 RIL/PTH-J3-0122 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944 5.90

1 0.58 0.63 1718 578 5944 5.90

162 H360-013-CT4 H360-013-CT4 RIL/PTH-J3-0123 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684 0.66

1 0.12 0.19 380 1031 1684 0.66

163 H360-013-B1 H360-013-B1 RIL/PTH-J3-0124 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904 0.39

1 0.11 0.15 399 336 2904 0.39

164 H360-013-B2 H360-013-B2 RIL/PTH-J3-0125 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673 10.68

11 1.91 2.58 971 833 5673 50.47

165 H360-013-B3 H360-013-B3 RIL/PTH-J3-0126 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827 3.64

Page 6: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 6 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

6 0.87 1.13 397 503 4827 5.78

166 H360-013-VB1 H360-013-VB1 RIL/PTH-J3-0127 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389 0.70

4 0.17 0.32 397 413 1389 0.91

167 H360-013-B55 H360-013-B55 RIL/PTH-J3-0128 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673 1.78

1 0.21 0.27 358 876 5673 1.78

168 H360-013-CT3 H360-013-CT3 RIL/PTH-J3-0129 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442 1.48

3 0.20 0.35 900 649 1442 2.53

169 H360-013-CT5 H360-013-CT5 RIL/PTH-J3-0130 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684 0.91

1 0.13 0.23 380 1420 1684 0.91

170 H360-013-CT14 H360-013-CT14 RIL/PTH-J3-0131 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684 0.53

1 0.12 0.16 826 380 1684 0.53

171 H360-013-FR1 H360-013-FR1 RIL/PTH-J3-0132 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790 4.62

1 0.38 0.46 777 1242 4790 4.62

172 H360-013-B12 H360-013-B12

RIL/PTH-J3-0133 BUNDLE

SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236 0.63

173 H360-013-B13 H360-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236 0.30

174 H360-013-B17 H360-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086 0.27

175 H360-013-B20 H360-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673 0.94

176 H360-013-B21 H360-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94

177 H360-013-B23 H360-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142 0.25

178 H360-013-B25 H360-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142 0.29

179 H360-013-B27 H360-013-B27 SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181 0.20

180 H360-013-B37 H360-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731 0.12

10 1.31 1.79 750 587 5673 24.98

181 H360-013-B29 H360-013-B29

RIL/PTH-J3-0134 BUNDLE

SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617 1.31

182 H360-013-B33 H360-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594 1.30

183 H360-013-B38 H360-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912 0.97

184 H360-013-B41 H360-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201 0.41

185 H360-013-B50 H360-013-B50 SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673 6.61

186 H360-013-B51 H360-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94

187 H360-013-B52 H360-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

188 H360-013-B53 H360-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

189 H360-013-B56 H360-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

190 H360-013-B84 H360-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593 1.30

191 H360-013-SC1 H360-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530 0.98

20 5.55 6.91 1142 966 5673 125.17

Page 7: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 7 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

192 H360-013-B14 H360-013-B14 RIL/PTH-J3-0135 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942 5.63

1 0.85 0.89 1821 520 5942 5.63

193 H360-013-B15 H360-013-B15 RIL/PTH-J3-0136 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942 3.81

1 0.63 0.67 1233 520 5942 3.81

194 H360-013-B16 H360-013-B16 RIL/PTH-J3-0137 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944 4.98

1 0.78 0.83 1615 519 5944 4.98

195 H360-013-B18 H360-013-B18 RIL/PTH-J3-0138 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673 1.49

1 0.37 0.42 410 642 5673 1.49

196 H360-013-B22 H360-013-B22 RIL/PTH-J3-0139 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594 1.86

1 0.36 0.41 609 666 4594 1.86

197 H360-013-B24 H360-013-B24 RIL/PTH-J3-0140 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607 3.61

1 0.73 0.77 1584 406 5607 3.61

198 H360-013-B26 H360-013-B26 RIL/PTH-J3-0141 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181 0.49

1 0.09 0.15 633 662 1181 0.49

199 H360-013-B28 H360-013-B28 RIL/PTH-J3-0142 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617 6.33

2 0.69 0.82 793 864 4617 6.33

200 H360-013-B30 H360-013-B30 RIL/PTH-J3-0143 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594 3.72

1 0.36 0.43 846 958 4594 3.72

201 H360-013-B31 H360-013-B31 RIL/PTH-J3-0144 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617 4.89

2 0.70 0.82 610 868 4617 4.89

202 H360-013-B32 H360-013-B32 RIL/PTH-J3-0145 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617 2.10

1 0.37 0.42 610 745 4617 2.10

203 H360-013-B34 H360-013-B34 RIL/PTH-J3-0146 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607 2.25

1 0.73 0.76 1165 344 5607 2.25

204 H360-013-B35 H360-013-B35 RIL/PTH-J3-0147 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942 3.06

1 0.87 0.91 1284 401 5942 3.06

205 H360-013-B36 H360-013-B36 RIL/PTH-J3-0148 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731 0.20

1 0.06 0.10 659 406 731 0.20

206 H360-013-B39 H360-013-B39 RIL/PTH-J3-0149 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951 1.60

1 0.37 0.42 410 657 5951 1.60

Page 8: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 8 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

207 H360-013-B40 H360-013-B40 RIL/PTH-J3-0150 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951 1.61

1 0.37 0.43 410 660 5951 1.61

208 H360-013-B42 H360-013-B42 RIL/PTH-J3-0151 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961 1.76

1 0.32 0.38 410 867 4961 1.76

209 H360-013-B43 H360-013-B43 RIL/PTH-J3-0152 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961 3.38

3 0.95 1.11 344 660 4961 3.38

210 H360-013-B44 H360-013-B44 RIL/PTH-J3-0153 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961 1.77

1 0.32 0.39 410 868 4961 1.77

211 H360-013-B45 H360-013-B45 RIL/PTH-J3-0154 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961 1.77

1 0.33 0.40 410 868 4961 1.77

SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001 176 25.15 35.77 363.58

D. H361-013 SUB PIPE RACK ACR 001

212 H361-013-VB19 H361-013-VB19

RIL/PTH-J3-0155BUNDLE

SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526 0.27

213 H361-013-VB20 H361-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151 0.21

214 H361-013-VB21 H361-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862 0.31

215 H361-013-VB22 H361-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898 0.08

216 H361-013-VB23 H361-013-VB23 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760 0.07

10 0.16 0.52 361 375 1526 2.07

217 H361-013-HB1 H361-013-HB1

RIL/PTH-J3-0156 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334 0.11

218 H361-013-HB2 H361-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450 0.12

219 H361-013-HB3 H361-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484 0.12

220 H361-013-HB4 H361-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536 0.13

221 H361-013-HB5 H361-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987 2.67

222 H361-013-HB6 H361-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698 0.14

223 H361-013-VB16 H361-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870 0.07

224 H361-013-VB17 H361-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652 0.28

225 H361-013-VB18 H361-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455 0.12

25 0.49 1.63 461 545 1987 12.48

226 H361-013-CT6 H361-013-CT6

RIL/PTH-J3-0157 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150 0.09

227 H361-013-CT7 H361-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150 0.18

228 H361-013-CT8 H361-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150 0.19

229 H361-013-CT9 H361-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150 0.88

230 H361-013-CT10 H361-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150 0.18

231 H361-013-CT11 H361-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150 0.45

232 H361-013-CT12 H361-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935 0.14

233 H361-013-CT13 H361-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045 0.08

Page 9: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 9 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

13 0.19 1.42 1270 871 1150 16.54

234 H361-013-B67 H361-013-B67

RIL/PTH-J3-0158 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

235 H361-013-B68 H361-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

236 H361-013-B69 H361-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

237 H361-013-B70 H361-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

238 H361-013-B71 H361-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461 0.84

239 H361-013-B72 H361-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461 0.28

240 H361-013-B73 H361-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

241 H361-013-B74 H361-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

242 H361-013-B75 H361-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

243 H361-013-B76 H361-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

244 H361-013-B77 H361-013-B77 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461 0.14

245 H361-013-B78 H361-013-B78 SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334 0.67

246 H361-013-B79 H361-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962 0.29

247 H361-013-B88 H361-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211 0.15

20 0.58 2.72 461 1020 2962 27.86

248 H361-013-B82 H361-013-B82 RIL/PTH-J3-0159 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461 0.64

4 0.14 0.26 400 275 1461 0.64

249 H361-013-CT1 H361-013-CT1RIL/PTH-J3-0160 BUNDLE

SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388 0.36

250 H361-013-CT2 H361-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388 0.66

8 0.11 0.53 1110 658 388 2.27

251 H361-013-B19 H361-013-B19

RIL/PTH-J3-0161 BUNDLE

SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461 0.20

252 H361-013-B80 H361-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461 0.39

253 H361-013-B81 H361-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657 0.77

4 0.23 0.38 436 378 4657 3.07

254 H361-013-B7 H361-013-B7

RIL/PTH-J3-0162 BUNDLE

SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673 0.99

255 H361-013-B8 H361-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142 0.18

256 H361-013-B9 H361-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942 0.94

257 H361-013-B10 H361-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102 0.34

258 H361-013-B11 H361-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102 0.30

5 0.59 0.78 874 399 5942 10.36

259 H361-013-B4 H361-013-B4 RIL/PTH-J3-0163 SKID SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827 1.45

1 0.16 0.20 856 352 4827 1.45

260 H361-013-B5 H361-013-B5 RIL/PTH-J3-0164 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944 5.92

1 0.58 0.63 1722 578 5944 5.92

261 H361-013-B6 H361-013-B6 RIL/PTH-J3-0165 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944 5.90

Page 10: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 10 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.58 0.63 1718 578 5944 5.90

262 H361-013-CT4 H361-013-CT4 RIL/PTH-J3-0166 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684 0.66

1 0.12 0.19 380 1031 1684 0.66

263 H361-013-B1 H361-013-B1 RIL/PTH-J3-0167 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904 0.39

1 0.11 0.15 399 336 2904 0.39

264 H361-013-B2 H361-013-B2 RIL/PTH-J3-0168 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673 10.68

11 1.91 2.58 971 833 5673 50.47

265 H361-013-B3 H361-013-B3 RIL/PTH-J3-0169 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827 3.64

6 0.87 1.13 397 503 4827 5.78

266 H361-013-VB1 H361-013-VB1 RIL/PTH-J3-0170 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389 0.70

4 0.17 0.32 397 413 1389 0.91

267 H361-013-B55 H361-013-B55 RIL/PTH-J3-0171 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673 1.78

1 0.21 0.27 358 876 5673 1.78

268 H361-013-CT3 H361-013-CT3 RIL/PTH-J3-0172 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442 1.48

3 0.20 0.35 900 649 1442 2.53

269 H361-013-CT5 H361-013-CT5 RIL/PTH-J3-0173 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684 0.91

1 0.13 0.23 380 1420 1684 0.91

270 H361-013-CT14 H361-013-CT14 RIL/PTH-J3-0174 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684 0.53

1 0.12 0.16 826 380 1684 0.53

271 H361-013-FR1 H361-013-FR1 RIL/PTH-J3-0175 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790 4.62

1 0.38 0.46 777 1242 4790 4.62

272 H361-013-B12 H361-013-B12

RIL/PTH-J3-0176 BUNDLE

SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236 0.63

273 H361-013-B13 H361-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236 0.30

274 H361-013-B17 H361-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086 0.27

275 H361-013-B20 H361-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673 0.94

276 H361-013-B21 H361-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94

277 H361-013-B23 H361-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142 0.25

278 H361-013-B25 H361-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142 0.29

279 H361-013-B27 H361-013-B27 SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181 0.20

280 H361-013-B37 H361-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731 0.12

10 1.31 1.79 750 587 5673 24.98

281 H361-013-B29 H361-013-B29 RIL/PTH-J3-0177 BUNDLE SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617 1.31

Page 11: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 11 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

282 H361-013-B33 H361-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594 1.30

283 H361-013-B38 H361-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912 0.97

284 H361-013-B41 H361-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201 0.41

286 H361-013-B51 H361-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640 0.94

287 H361-013-B52 H361-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

288 H361-013-B53 H361-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607 0.93

290 H361-013-B84 H361-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593 1.30

291 H361-013-SC1 H361-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530 0.98

12 2.83 3.65 1142 966 5640 74.66

292 H361-013-B14 H361-013-B14 RIL/PTH-J3-0178 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942 5.63

1 0.85 0.89 1821 520 5942 5.63

293 H361-013-B15 H361-013-B15 RIL/PTH-J3-0179 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942 3.81

1 0.63 0.67 1233 520 5942 3.81

294 H361-013-B16 H361-013-B16 RIL/PTH-J3-0180 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944 4.98

1 0.78 0.83 1615 519 5944 4.98

295 H361-013-B18 H361-013-B18 RIL/PTH-J3-0181 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673 1.49

1 0.37 0.42 410 642 5673 1.49

296 H361-013-B22 H361-013-B22 RIL/PTH-J3-0182 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594 1.86

1 0.36 0.41 609 666 4594 1.86

297 H361-013-B24 H361-013-B24 RIL/PTH-J3-0183 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607 3.61

1 0.73 0.77 1584 406 5607 3.61

298 H361-013-B26 H361-013-B26 RIL/PTH-J3-0184 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181 0.49

1 0.09 0.15 633 662 1181 0.49

299 H361-013-B28 H361-013-B28 RIL/PTH-J3-0185 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617 6.33

2 0.69 0.82 793 864 4617 6.33

300 H361-013-B30 H361-013-B30 RIL/PTH-J3-0186 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594 3.72

1 0.36 0.43 846 958 4594 3.72

301 H361-013-B31 H361-013-B31 RIL/PTH-J3-0187 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617 4.89

2 0.70 0.82 610 868 4617 4.89

302 H361-013-B32 H361-013-B32 RIL/PTH-J3-0188 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617 2.10

1 0.37 0.42 610 745 4617 2.10

303 H361-013-B34 H361-013-B34 RIL/PTH-J3-0189 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607 2.25

Page 12: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 12 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.73 0.76 1165 344 5607 2.25

304 H361-013-B35 H361-013-B35 RIL/PTH-J3-0190 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942 3.06

1 0.87 0.91 1284 401 5942 3.06

305 H361-013-B36 H361-013-B36 RIL/PTH-J3-0191 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731 0.20

1 0.06 0.10 659 406 731 0.20

306 H361-013-B39 H361-013-B39 RIL/PTH-J3-0192 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951 1.60

1 0.37 0.42 410 657 5951 1.60

307 H361-013-B40 H361-013-B40 RIL/PTH-J3-0193 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951 1.61

1 0.37 0.43 410 660 5951 1.61

308 H361-013-B42 H361-013-B42 RIL/PTH-J3-0194 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961 1.76

1 0.32 0.38 410 867 4961 1.76

309 H361-013-B43 H361-013-B43 RIL/PTH-J3-0195 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961 3.38

3 0.95 1.11 344 660 4961 3.38

310 H361-013-B44 H361-013-B44 RIL/PTH-J3-0196 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961 1.77

1 0.32 0.39 410 868 4961 1.77

311 H361-013-B45 H361-013-B45 RIL/PTH-J3-0197 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961 1.77

1 0.33 0.40 410 868 4961 1.77

SUB TOTAL D. H361-013 SUB PIPE RACK ACR 001 168 22.44 32.51 313.08

D. H360-009 SULPHUR RECOVERY UNIT APR 002

312 H360-009-1HB1 H360-009-1HB1

RIL/PTH-J3-0198 BUNDLE

SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897 1.91

313 H360-009-1HB2 H360-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039 0.40

314 H360-009-1HB3 H360-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797 0.18

315 H360-009-1HB4 H360-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258 0.43

316 H360-009-1HB6 H360-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866 0.57

317 H360-009-1HB7 H360-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671 0.48

318 H360-009-1HB8 H360-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889 0.76

319 H360-009-1HB10 H360-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863 0.25

320 H360-009-1HB11 H360-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891 0.19

321 H360-009-1HB12 H360-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828 0.25

322 H360-009-1HB13 H360-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053 0.20

323 H360-009-1HB14 H360-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977 0.20

324 H360-009-1HB15 H360-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203 0.63

325 H360-009-1VB1 H360-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201 0.16

326 H360-009-1VB2 H360-009-1VB2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777 0.05

327 H360-009-1VB3 H360-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899 0.13

328 H360-009-1VB4 H360-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594 0.11

Page 13: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 13 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

329 H360-009-1VB5 H360-009-1VB5

RIL/PTH-J3-0198 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348 0.22

330 H360-009-1VB6 H360-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625 0.21

331 H360-009-1VB7 H360-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940 0.52

332 H360-009-1VB8 H360-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498 0.20

333 H360-009-1VB9 H360-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392 0.09

334 H360-009-1VB10 H360-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481 0.10

335 H360-009-1VB11 H360-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389 0.09

336 H360-009-1VB26 H360-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388 0.09

48 3.00 5.36 698 610 3940 80.52

337 H360-009-1HB16 H360-009-1HB16

RIL/PTH-J3-0199 BUNDLE

SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396 0.38

338 H360-009-1HB17 H360-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230 0.07

339 H360-009-1VB12 H360-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366 0.08

340 H360-009-1VB25 H360-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409 0.26

9 0.13 0.43 326 319 2409 2.25

341 H360-009-1HB5 H360-009-1HB5

RIL/PTH-J3-0200 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934 0.11

342 H360-009-1HB18 H360-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589 0.18

343 H360-009-1HB19 H360-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616 0.09

344 H360-009-1HB20 H360-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753 0.09

345 H360-009-1HB21 H360-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383 0.14

346 H360-009-1HB22 H360-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017 0.12

347 H360-009-1HB23 H360-009-1HB23 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804 0.10

348 H360-009-1HB24 H360-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513 0.15

349 H360-009-1HB25 H360-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967 0.23

350 H360-009-1HB26 H360-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603 0.19

351 H360-009-1HB27 H360-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893 0.22

352 H360-009-1HB28 H360-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914 0.56

353 H360-009-1HB29 H360-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916 0.22

354 H360-009-1HB30 H360-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819 0.11

355 H360-009-1HB31 H360-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959 0.23

356 H360-009-1HB32 H360-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560 0.09

357 H360-009-1HB33 H360-009-1HB33 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895 0.11

358 H360-009-1HB34 H360-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582 0.09

359 H360-009-1HB35 H360-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622 0.09

360 H360-009-1HB36 H360-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578 0.09

361 H360-009-1HB37 H360-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542 0.18

362 H360-009-1HB38 H360-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735 0.10

363 H360-009-1HB39 H360-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690 0.10

364 H360-009-1HB40 H360-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758 0.10

365 H360-009-1HB41 H360-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455 0.08

366 H360-009-1HB42 H360-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208 0.13

367 H360-009-1HB43 H360-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865 0.11

368 H360-009-1HB44 H360-009-1HB44 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960 0.11

Page 14: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 14 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

369 H360-009-1HB45 H360-009-1HB45

RIL/PTH-J3-0200 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756 0.10

370 H360-009-1HB46 H360-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576 0.09

371 H360-009-1HB47 H360-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503 0.09

372 H360-009-1HB48 H360-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872 0.11

373 H360-009-1HB49 H360-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591 0.09

374 H360-009-1HB50 H360-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439 0.08

375 H360-009-1HB51 H360-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816 0.21

376 H360-009-1HB52 H360-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626 0.09

377 H360-009-1HB53 H360-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864 0.33

378 H360-009-1HB54 H360-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787 0.10

379 H360-009-1HB55 H360-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235 0.07

380 H360-009-1HB56 H360-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260 0.07

381 H360-009-1HB57 H360-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953 0.11

382 H360-009-1HB58 H360-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476 0.09

383 H360-009-1HB59 H360-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783 0.10

384 H360-009-1HB60 H360-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416 0.08

385 H360-009-1HB61 H360-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387 0.08

386 H360-009-1HB62 H360-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938 0.11

387 H360-009-1HB63 H360-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803 0.10

388 H360-009-1HB64 H360-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749 0.10

389 H360-009-1HB65 H360-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227 0.14

390 H360-009-1HB66 H360-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979 0.23

391 H360-009-1HB67 H360-009-1HB67 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763 0.10

392 H360-009-1HB68 H360-009-1HB68 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351 0.08

393 H360-009-1HB69 H360-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921 0.11

394 H360-009-1HB70 H360-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445 0.20

395 H360-009-1HB71 H360-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378 0.08

396 H360-009-1HB72 H360-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005 0.12

397 H360-009-1HB73 H360-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954 0.11

398 H360-009-1HB74 H360-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638 0.10

399 H360-009-1HB75 H360-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946 0.11

400 H360-009-1HB76 H360-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463 0.08

401 H360-009-1HB77 H360-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809 0.10

402 H360-009-1HB78 H360-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517 0.09

403 H360-009-1HB79 H360-009-1HB79 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366 0.08

404 H360-009-1HB80 H360-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437 0.08

405 H360-009-1HB81 H360-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085 0.06

406 H360-009-1VB23 H360-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480 0.20

407 H360-009-1VB24 H360-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580 0.03

83 1.58 7.79 585 624 3480 105.44

408 H360-009-1B123 H360-009-1B123RIL/PTH-J3-0201 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084 0.16

409 H360-009-1B124 H360-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099 0.16

4 0.04 0.16 330 229 1099 0.33

Page 15: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 15 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

410 H360-009-1B254 H360-009-1B254RIL/PTH-J3-0202 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876 0.08

411 H360-009-1B255 H360-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969 0.09

2 0.03 0.09 386 254 969 0.19

412 H360-009-1B166 H360-009-1B166

RIL/PTH-J3-0203 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464 0.16

413 H360-009-1B168 H360-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563 0.17

414 H360-009-1B171 H360-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

415 H360-009-1B172 H360-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

416 H360-009-1B173 H360-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

417 H360-009-1B175 H360-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

418 H360-009-1B179 H360-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164 0.13

419 H360-009-1B180 H360-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

420 H360-009-1B181 H360-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

421 H360-009-1B182 H360-009-1B182 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

422 H360-009-1B187 H360-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461 0.16

423 H360-009-1B189 H360-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61

424 H360-009-1B191 H360-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61

425 H360-009-1B192 H360-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411 0.16

426 H360-009-1B196 H360-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31

427 H360-009-1B197 H360-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31

428 H360-009-1B199 H360-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960 0.33

429 H360-009-1B200 H360-009-1B200 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860 0.31

430 H360-009-1B204 H360-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

431 H360-009-1B206 H360-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363 0.15

432 H360-009-1B208 H360-009-1B208 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

433 H360-009-1B209 H360-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

36 2.39 4.76 950 920 2961 93.16

434 H360-009-1B167 H360-009-1B167

RIL/PTH-J3-0204 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563 0.34

435 H360-009-1B169 H360-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464 1.61

436 H360-009-1B170 H360-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463 0.80

437 H360-009-1B174 H360-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

438 H360-009-1B176 H360-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32

439 H360-009-1B177 H360-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964 0.33

440 H360-009-1B178 H360-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

441 H360-009-1B183 H360-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874 0.10

442 H360-009-1B184 H360-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240 0.14

443 H360-009-1B185 H360-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96

444 H360-009-1B186 H360-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96

445 H360-009-1B188 H360-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961 1.30

446 H360-009-1B190 H360-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961 1.63

447 H360-009-1B193 H360-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16

448 H360-009-1B194 H360-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16

Page 16: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 16 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

449 H360-009-1B195 H360-009-1B195RIL/PTH-J3-0204 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836 0.09

450 H360-009-1B198 H360-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960 0.65

451 H360-009-1B201 H360-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857 0.09

452 H360-009-1B202 H360-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459 0.16

453 H360-009-1B203 H360-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

454 H360-009-1B205 H360-009-1B205 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363 0.15

455 H360-009-1B207 H360-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32

456 H360-009-1B210 H360-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178 0.13

457 H360-009-1B211 H360-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

458 H360-009-1B212 H360-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

459 H360-009-1B213 H360-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860 0.09

460 H360-009-1B214 H360-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260 0.14

461 H360-009-1B215 H360-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964 0.32

462 H360-009-1B216 H360-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

463 H360-009-1B217 H360-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494 0.16

464 H360-009-1B218 H360-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

465 H360-009-1B219 H360-009-1B219 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954 0.32

68 2.67 11.36 1087 1278 2964 279.99

466 H360-009-1CT27 H360-009-1CT27 RIL/PTH-J3-0205 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312 0.13

4 0.05 0.18 352 289 312 0.13

467 H360-009-1B115 H360-009-1B115

RIL/PTH-J3-0206 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30

468 H360-009-1B116 H360-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30

469 H360-009-1B118 H360-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585 0.82

470 H360-009-1B119 H360-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547 0.32

471 H360-009-1B120 H360-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547 0.32

472 H360-009-1B121 H360-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596 0.43

473 H360-009-1B128 H360-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959 0.40

474 H360-009-1B133 H360-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413 0.19

475 H360-009-1B134 H360-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463 0.20

476 H360-009-1B135 H360-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462 0.73

477 H360-009-1B136 H360-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712 0.10

478 H360-009-1B138 H360-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23

479 H360-009-1B139 H360-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23

480 H360-009-1B140 H360-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461 0.20

481 H360-009-1B141 H360-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40

482 H360-009-1B142 H360-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40

483 H360-009-1B143 H360-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40

484 H360-009-1B145 H360-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40

485 H360-009-1B146 H360-009-1B146 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961 0.40

486 H360-009-1B147 H360-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176 0.16

487 H360-009-1B151 H360-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960 0.40

488 H360-009-1B154 H360-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73

Page 17: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 17 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

489 H360-009-1B157 H360-009-1B157

RIL/PTH-J3-0206 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80

490 H360-009-1B158 H360-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80

491 H360-009-1B161 H360-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764 0.24

492 H360-009-1B163 H360-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514 0.20

493 H360-009-1B164 H360-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463 0.39

494 H360-009-1B165 H360-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763 0.10

495 H360-009-1FR10 H360-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355 0.18

496 H360-009-1SC2 H360-009-1SC2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07

497 H360-009-1SC3 H360-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07

33 2.09 6.41 1372 1314 5964 354.81

498 H360-009-1CT28 H360-009-1CT28

RIL/PTH-J3-0207 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988 0.27

499 H360-009-1CT29 H360-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778 0.21

500 H360-009-1CT30 H360-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548 0.22

501 H360-009-1CT31 H360-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548 0.15

502 H360-009-1CT32 H360-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188 0.16

9 0.32 1.60 1180 1457 1988 30.76

503 H360-009-1B114 H360-009-1B114 RIL/PTH-J3-0208 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463 0.37

1 0.05 0.09 680 375 1463 0.37

504 H360-009-1B117 H360-009-1B117 RIL/PTH-J3-0209 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093 1.25

1 0.11 0.16 682 591 3093 1.25

505 H360-009-1B122 H360-009-1B122 RIL/PTH-J3-0210 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463 0.20

1 0.05 0.08 403 333 1463 0.20

506 H360-009-1B125 H360-009-1B125 RIL/PTH-J3-0211 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899 0.39

1 0.08 0.12 403 333 2899 0.39

507 H360-009-1B126 H360-009-1B126 RIL/PTH-J3-0212 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963 0.40

1 0.08 0.12 403 333 2963 0.40

508 H360-009-1B127 H360-009-1B127 RIL/PTH-J3-0213 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20

1 0.05 0.09 403 333 1459 0.20

509 H360-009-1B129 H360-009-1B129 RIL/PTH-J3-0214 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964 0.40

1 0.10 0.13 403 333 2964 0.40

510 H360-009-1B130 H360-009-1B130 RIL/PTH-J3-0215 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.13 403 333 2964 0.40

511 H360-009-1B131 H360-009-1B131 RIL/PTH-J3-0216 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.12 403 333 2964 0.40

Page 18: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 18 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

512 H360-009-1B132 H360-009-1B132 RIL/PTH-J3-0217 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.12 403 333 2964 0.40

513 H360-009-1B137 H360-009-1B137 RIL/PTH-J3-0218 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20

1 0.05 0.09 403 333 1459 0.20

514 H360-009-1B144 H360-009-1B144 RIL/PTH-J3-0219 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411 0.19

1 0.04 0.08 403 333 1411 0.19

515 H360-009-1B148 H360-009-1B148 RIL/PTH-J3-0220 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860 0.38

1 0.10 0.13 403 333 2860 0.38

516 H360-009-1B149 H360-009-1B149 RIL/PTH-J3-0221 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860 0.38

1 0.09 0.13 403 333 2860 0.38

517 H360-009-1B150 H360-009-1B150 RIL/PTH-J3-0222 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461 0.39

2 0.10 0.17 403 333 1461 0.39

518 H360-009-1B152 H360-009-1B152 RIL/PTH-J3-0223 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348 0.18

1 0.06 0.09 403 333 1348 0.18

519 H360-009-1B153 H360-009-1B153 RIL/PTH-J3-0224 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093 0.42

1 0.12 0.15 403 333 3093 0.42

520 H360-009-1B155 H360-009-1B155 RIL/PTH-J3-0225 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73

1 0.15 0.19 403 333 5464 0.73

521 H360-009-1B156 H360-009-1B156 RIL/PTH-J3-0226 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964 0.80

1 0.17 0.20 403 333 5964 0.80

522 H360-009-1B159 H360-009-1B159 RIL/PTH-J3-0227 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364 0.32

1 0.07 0.11 403 333 2364 0.32

523 H360-009-1B160 H360-009-1B160 RIL/PTH-J3-0228 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364 0.32

1 0.08 0.11 403 333 2364 0.32

524 H360-009-1B162 H360-009-1B162 RIL/PTH-J3-0229 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882 1.06

1 0.23 0.27 403 333 7882 1.06

525 H360-009-1B259 H360-009-1B259 RIL/PTH-J3-0230 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062 0.41

1 0.09 0.13 403 333 3062 0.41

526 H360-009-1FR6 H360-009-1FR6 RIL/PTH-J3-0231 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744 0.23

Page 19: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 19 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.35 0.39 403 333 1744 0.23

527 H360-009-1FR7 H360-009-1FR7 RIL/PTH-J3-0232 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647 0.09

1 0.19 0.22 403 333 647 0.09

528 H360-009-1FR8 H360-009-1FR8 RIL/PTH-J3-0233 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647 0.09

1 0.18 0.21 403 333 647 0.09

529 H360-009-1FR9 H360-009-1FR9 RIL/PTH-J3-0234 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850 0.25

1 0.16 0.19 403 333 1850 0.25

530 H360-009-1B40 H360-009-1B40

RIL/PTH-J3-0235 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834 0.45

531 H360-009-1B42 H360-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963 3.13

532 H360-009-1B43 H360-009-1B43 SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963 2.50

533 H360-009-1B44 H360-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963 0.63

534 H360-009-1B45 H360-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963 0.97

535 H360-009-1B49 H360-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963 0.47

536 H360-009-1B50 H360-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963 0.63

537 H360-009-1B52 H360-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962 0.63

538 H360-009-1B56 H360-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585 4.42

539 H360-009-1B57 H360-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463 0.18

21 3.37 6.03 1218 1262 5963 192.48

540 H360-009-1B41 H360-009-1B41

RIL/PTH-J3-0236 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834 0.71

541 H360-009-1B58 H360-009-1B58 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463 0.57

542 H360-009-1B59 H360-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38

543 H360-009-1B60 H360-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38

544 H360-009-1B72 H360-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160 0.43

545 H360-009-1B78 H360-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460 0.57

546 H360-009-1B81 H360-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461 1.21

547 H360-009-1B85 H360-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659 0.61

548 H360-009-1B90 H360-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394 0.48

549 H360-009-1B69 H360-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949 0.50

550 H360-009-1B74 H360-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963 0.47

551 H360-009-1B73 H360-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963 2.34

552 H360-009-1B75 H360-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963 0.50

553 H360-009-1B76 H360-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63

554 H360-009-1B77 H360-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63

555 H360-009-1B82 H360-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461 0.89

556 H360-009-1B84 H360-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659 0.52

557 H360-009-1SC4 H360-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332 0.42

24 2.56 7.11 1121 2042 5461 300.02

558 H360-009-1B46 H360-009-1B46 RIL/PTH-J3-0237 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464 0.76

Page 20: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 20 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

2 0.14 0.24 456 566 1464 0.76

559 H360-009-1B47 H360-009-1B47 RIL/PTH-J3-0238 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460 1.96

1 0.22 0.28 456 787 5460 1.96

560 H360-009-1B48 H360-009-1B48 RIL/PTH-J3-0239 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460 2.20

1 0.23 0.29 455 885 5460 2.20

561 H360-009-1B51 H360-009-1B51 RIL/PTH-J3-0240 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462 2.10

1 0.25 0.31 455 845 5462 2.10

562 H360-009-1B53 H360-009-1B53 RIL/PTH-J3-0241 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962 1.25

1 0.18 0.23 455 696 3962 1.25

563 H360-009-1B54 H360-009-1B54 RIL/PTH-J3-0242 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963 1.26

1 0.18 0.23 456 699 3963 1.26

564 H360-009-1B55 H360-009-1B55 RIL/PTH-J3-0243 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585 8.07

5 1.19 1.39 634 456 5585 8.07

565 H360-009-1B61 H360-009-1B61 RIL/PTH-J3-0244 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462 4.69

1 0.28 0.35 851 1010 5462 4.69

566 H360-009-1B62 H360-009-1B62 RIL/PTH-J3-0245 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462 3.82

1 0.23 0.29 850 822 5462 3.82

567 H360-009-1B63 H360-009-1B63 RIL/PTH-J3-0246 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462 2.84

1 0.23 0.28 850 612 5462 2.84

568 H360-009-1B64 H360-009-1B64 RIL/PTH-J3-0247 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462 6.06

5 1.07 1.25 641 346 5462 6.06

569 H360-009-1B65 H360-009-1B65 RIL/PTH-J3-0248 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462 2.03

1 0.22 0.28 456 817 5462 2.03

570 H360-009-1B66 H360-009-1B66 RIL/PTH-J3-0249 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462 2.02

1 0.23 0.29 455 814 5462 2.02

571 H360-009-1B67 H360-009-1B67 RIL/PTH-J3-0250 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462 1.43

1 0.22 0.27 456 574 5462 1.43

572 H360-009-1B68 H360-009-1B68 RIL/PTH-J3-0251 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462 2.11

1 0.23 0.29 456 847 5462 2.11

Page 21: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 21 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

573 H360-009-1B70 H360-009-1B70 RIL/PTH-J3-0252 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462 6.34

3 0.67 0.86 456 849 5462 6.34

SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88

E. H361-009 SULPHUR RECOVERY UNIT APR 002

574 H361-009-1HB1 H361-009-1HB1

RIL/PTH-J3-0253 BUNDLE

SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897 1.91

575 H361-009-1HB2 H361-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039 0.40

576 H361-009-1HB3 H361-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797 0.18

577 H361-009-1HB4 H361-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258 0.43

578 H361-009-1HB6 H361-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866 0.57

579 H361-009-1HB7 H361-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671 0.48

580 H361-009-1HB8 H361-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889 0.76

581 H361-009-1HB10 H361-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863 0.25

582 H361-009-1HB11 H361-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891 0.19

583 H361-009-1HB12 H361-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828 0.25

584 H361-009-1HB13 H361-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053 0.20

585 H361-009-1HB14 H361-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977 0.20

586 H361-009-1HB15 H361-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203 0.63

587 H361-009-1VB1 H361-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201 0.16

588 H361-009-1VB2 H361-009-1VB2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777 0.05

589 H361-009-1VB3 H361-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899 0.13

590 H361-009-1VB4 H361-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594 0.11

591 H361-009-1VB5 H361-009-1VB5 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348 0.22

592 H361-009-1VB6 H361-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625 0.21

593 H361-009-1VB7 H361-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940 0.52

594 H361-009-1VB8 H361-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498 0.20

595 H361-009-1VB9 H361-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392 0.09

596 H361-009-1VB10 H361-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481 0.10

597 H361-009-1VB11 H361-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389 0.09

598 H361-009-1VB26 H361-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388 0.09

48 3.00 5.36 698 610 3940 80.52

599 H361-009-1HB16 H361-009-1HB16

RIL/PTH-J3-0254 BUNDLE

SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396 0.38

600 H361-009-1HB17 H361-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230 0.07

601 H361-009-1VB12 H361-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366 0.08

602 H361-009-1VB25 H361-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409 0.26

9 0.13 0.43 326 319 2409 2.25

603 H361-009-1HB5 H361-009-1HB5

RIL/PTH-J3-0255 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934 0.11

604 H361-009-1HB18 H361-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589 0.18

605 H361-009-1HB19 H361-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616 0.09

606 H361-009-1HB20 H361-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753 0.09

607 H361-009-1HB21 H361-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383 0.14

608 H361-009-1HB22 H361-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017 0.12

Page 22: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 22 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

609 H361-009-1HB23 H361-009-1HB23

RIL/PTH-J3-0255 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804 0.10

610 H361-009-1HB24 H361-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513 0.15

611 H361-009-1HB25 H361-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967 0.23

612 H361-009-1HB26 H361-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603 0.19

613 H361-009-1HB27 H361-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893 0.22

614 H361-009-1HB28 H361-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914 0.56

615 H361-009-1HB29 H361-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916 0.22

616 H361-009-1HB30 H361-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819 0.11

617 H361-009-1HB31 H361-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959 0.23

618 H361-009-1HB32 H361-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560 0.09

619 H361-009-1HB33 H361-009-1HB33 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895 0.11

620 H361-009-1HB34 H361-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582 0.09

621 H361-009-1HB35 H361-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622 0.09

622 H361-009-1HB36 H361-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578 0.09

623 H361-009-1HB37 H361-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542 0.18

624 H361-009-1HB38 H361-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735 0.10

625 H361-009-1HB39 H361-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690 0.10

626 H361-009-1HB40 H361-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758 0.10

627 H361-009-1HB41 H361-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455 0.08

628 H361-009-1HB42 H361-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208 0.13

629 H361-009-1HB43 H361-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865 0.11

630 H361-009-1HB44 H361-009-1HB44 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960 0.11

631 H361-009-1HB45 H361-009-1HB45 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756 0.10

632 H361-009-1HB46 H361-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576 0.09

633 H361-009-1HB47 H361-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503 0.09

634 H361-009-1HB48 H361-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872 0.11

635 H361-009-1HB49 H361-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591 0.09

636 H361-009-1HB50 H361-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439 0.08

637 H361-009-1HB51 H361-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816 0.21

638 H361-009-1HB52 H361-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626 0.09

639 H361-009-1HB53 H361-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864 0.33

640 H361-009-1HB54 H361-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787 0.10

641 H361-009-1HB55 H361-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235 0.07

642 H361-009-1HB56 H361-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260 0.07

643 H361-009-1HB57 H361-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953 0.11

644 H361-009-1HB58 H361-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476 0.09

645 H361-009-1HB59 H361-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783 0.10

646 H361-009-1HB60 H361-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416 0.08

647 H361-009-1HB61 H361-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387 0.08

648 H361-009-1HB62 H361-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938 0.11

649 H361-009-1HB63 H361-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803 0.10

650 H361-009-1HB64 H361-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749 0.10

651 H361-009-1HB65 H361-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227 0.14

652 H361-009-1HB66 H361-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979 0.23

Page 23: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 23 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

653 H361-009-1HB67 H361-009-1HB67

RIL/PTH-J3-0255 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763 0.10

654 H361-009-1HB68 H361-009-1HB68 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351 0.08

655 H361-009-1HB69 H361-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921 0.11

656 H361-009-1HB70 H361-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445 0.20

657 H361-009-1HB71 H361-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378 0.08

658 H361-009-1HB72 H361-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005 0.12

659 H361-009-1HB73 H361-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954 0.11

660 H361-009-1HB74 H361-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638 0.10

661 H361-009-1HB75 H361-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946 0.11

662 H361-009-1HB76 H361-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463 0.08

663 H361-009-1HB77 H361-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809 0.10

664 H361-009-1HB78 H361-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517 0.09

665 H361-009-1HB79 H361-009-1HB79 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366 0.08

666 H361-009-1HB80 H361-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437 0.08

667 H361-009-1HB81 H361-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085 0.06

668 H361-009-1VB23 H361-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480 0.20

669 H361-009-1VB24 H361-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580 0.03

83 1.58 7.79 585 624 3480 105.44

670 H361-009-1B123 H361-009-1B123RIL/PTH-J3-0256 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084 0.16

671 H361-009-1B124 H361-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099 0.16

4 0.04 0.16 330 229 1099 0.33

672 H361-009-1B254 H361-009-1B254RIL/PTH-J3-0257 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876 0.08

673 H361-009-1B255 H361-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969 0.09

2 0.03 0.09 386 254 969 0.19

674 H361-009-1B166 H361-009-1B166

RIL/PTH-J3-0258 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464 0.16

675 H361-009-1B168 H361-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563 0.17

676 H361-009-1B171 H361-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

677 H361-009-1B172 H361-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

678 H361-009-1B173 H361-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

679 H361-009-1B175 H361-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

680 H361-009-1B179 H361-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164 0.13

681 H361-009-1B180 H361-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

682 H361-009-1B181 H361-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

683 H361-009-1B182 H361-009-1B182 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464 0.16

684 H361-009-1B187 H361-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461 0.16

685 H361-009-1B189 H361-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61

686 H361-009-1B191 H361-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961 2.61

687 H361-009-1B192 H361-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411 0.16

688 H361-009-1B196 H361-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31

689 H361-009-1B197 H361-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860 0.31

690 H361-009-1B199 H361-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960 0.33

Page 24: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 24 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

691 H361-009-1B200 H361-009-1B200

RIL/PTH-J3-0258 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860 0.31

692 H361-009-1B204 H361-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

693 H361-009-1B206 H361-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363 0.15

694 H361-009-1B208 H361-009-1B208 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

695 H361-009-1B209 H361-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463 0.16

36 2.39 4.76 950 920 2961 93.16

696 H361-009-1B167 H361-009-1B167

RIL/PTH-J3-0259 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563 0.34

697 H361-009-1B169 H361-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464 1.61

698 H361-009-1B170 H361-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463 0.80

699 H361-009-1B174 H361-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

700 H361-009-1B176 H361-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32

701 H361-009-1B177 H361-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964 0.33

702 H361-009-1B178 H361-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

703 H361-009-1B183 H361-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874 0.10

704 H361-009-1B184 H361-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240 0.14

705 H361-009-1B185 H361-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96

706 H361-009-1B186 H361-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461 0.96

707 H361-009-1B188 H361-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961 1.30

708 H361-009-1B190 H361-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961 1.63

709 H361-009-1B193 H361-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16

710 H361-009-1B194 H361-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476 0.16

711 H361-009-1B195 H361-009-1B195 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836 0.09

712 H361-009-1B198 H361-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960 0.65

713 H361-009-1B201 H361-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857 0.09

714 H361-009-1B202 H361-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459 0.16

715 H361-009-1B203 H361-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

716 H361-009-1B205 H361-009-1B205 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363 0.15

717 H361-009-1B207 H361-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463 0.32

718 H361-009-1B210 H361-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178 0.13

719 H361-009-1B211 H361-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

720 H361-009-1B212 H361-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463 0.16

721 H361-009-1B213 H361-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860 0.09

722 H361-009-1B214 H361-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260 0.14

723 H361-009-1B215 H361-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964 0.32

724 H361-009-1B216 H361-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

725 H361-009-1B217 H361-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494 0.16

726 H361-009-1B218 H361-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164 0.13

727 H361-009-1B219 H361-009-1B219 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954 0.32

68 2.67 11.36 1087 1278 2964 279.99

728 H361-009-1CT27 H361-009-1CT27 RIL/PTH-J3-0260 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312 0.13

4 0.05 0.18 352 289 312 0.13

Page 25: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 25 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

729 H361-009-1B115 H361-009-1B115

RIL/PTH-J3-0261 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30

730 H361-009-1B116 H361-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163 0.30

731 H361-009-1B118 H361-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585 0.82

732 H361-009-1B119 H361-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547 0.32

733 H361-009-1B120 H361-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547 0.32

734 H361-009-1B121 H361-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596 0.43

735 H361-009-1B128 H361-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959 0.40

736 H361-009-1B133 H361-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413 0.19

737 H361-009-1B134 H361-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463 0.20

738 H361-009-1B135 H361-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462 0.73

739 H361-009-1B136 H361-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712 0.10

740 H361-009-1B138 H361-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23

741 H361-009-1B139 H361-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746 0.23

742 H361-009-1B140 H361-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461 0.20

743 H361-009-1B141 H361-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40

744 H361-009-1B142 H361-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40

745 H361-009-1B143 H361-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961 0.40

746 H361-009-1B145 H361-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961 0.40

747 H361-009-1B146 H361-009-1B146 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961 0.40

748 H361-009-1B147 H361-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176 0.16

749 H361-009-1B151 H361-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960 0.40

750 H361-009-1B154 H361-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73

751 H361-009-1B157 H361-009-1B157 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80

752 H361-009-1B158 H361-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964 0.80

753 H361-009-1B161 H361-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764 0.24

754 H361-009-1B163 H361-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514 0.20

755 H361-009-1B164 H361-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463 0.39

756 H361-009-1B165 H361-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763 0.10

757 H361-009-1FR10 H361-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355 0.18

758 H361-009-1SC2 H361-009-1SC2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07

759 H361-009-1SC3 H361-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508 0.07

33 2.09 6.41 1372 1314 5964 354.81

760 H361-009-1CT28 H361-009-1CT28

RIL/PTH-J3-0262 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988 0.27

761 H361-009-1CT29 H361-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778 0.21

762 H361-009-1CT30 H361-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548 0.22

763 H361-009-1CT31 H361-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548 0.15

764 H361-009-1CT32 H361-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188 0.16

9 0.32 1.60 1180 1457 1988 30.76

765 H361-009-1B114 H361-009-1B114 RIL/PTH-J3-0263 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463 0.37

1 0.05 0.09 680 375 1463 0.37

766 H361-009-1B117 H361-009-1B117 RIL/PTH-J3-0264 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093 1.25

Page 26: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 26 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.11 0.16 682 591 3093 1.25

767 H361-009-1B122 H361-009-1B122 RIL/PTH-J3-0265 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463 0.20

1 0.05 0.08 403 333 1463 0.20

768 H361-009-1B125 H361-009-1B125 RIL/PTH-J3-0266 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899 0.39

1 0.08 0.12 403 333 2899 0.39

769 H361-009-1B126 H361-009-1B126 RIL/PTH-J3-0267 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963 0.40

1 0.08 0.12 403 333 2963 0.40

770 H361-009-1B127 H361-009-1B127 RIL/PTH-J3-0268 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20

1 0.05 0.09 403 333 1459 0.20

771 H361-009-1B129 H361-009-1B129 RIL/PTH-J3-0269 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964 0.40

1 0.10 0.13 403 333 2964 0.40

772 H361-009-1B130 H361-009-1B130 RIL/PTH-J3-0270 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.13 403 333 2964 0.40

773 H361-009-1B131 H361-009-1B131 RIL/PTH-J3-0271 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.12 403 333 2964 0.40

774 H361-009-1B132 H361-009-1B132 RIL/PTH-J3-0272 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964 0.40

1 0.09 0.12 403 333 2964 0.40

775 H361-009-1B137 H361-009-1B137 RIL/PTH-J3-0273 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459 0.20

1 0.05 0.09 403 333 1459 0.20

776 H361-009-1B144 H361-009-1B144 RIL/PTH-J3-0274 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411 0.19

1 0.04 0.08 403 333 1411 0.19

777 H361-009-1B148 H361-009-1B148 RIL/PTH-J3-0275 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860 0.38

1 0.10 0.13 403 333 2860 0.38

778 H361-009-1B149 H361-009-1B149 RIL/PTH-J3-0276 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860 0.38

1 0.09 0.13 403 333 2860 0.38

779 H361-009-1B150 H361-009-1B150 RIL/PTH-J3-0277 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461 0.39

2 0.10 0.17 403 333 1461 0.39

780 H361-009-1B152 H361-009-1B152 RIL/PTH-J3-0278 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348 0.18

1 0.06 0.09 403 333 1348 0.18

Page 27: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 27 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

781 H361-009-1B153 H361-009-1B153 RIL/PTH-J3-0279 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093 0.42

1 0.12 0.15 403 333 3093 0.42

782 H361-009-1B155 H361-009-1B155 RIL/PTH-J3-0280 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464 0.73

1 0.15 0.19 403 333 5464 0.73

783 H361-009-1B156 H361-009-1B156 RIL/PTH-J3-0281 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964 0.80

1 0.17 0.20 403 333 5964 0.80

784 H361-009-1B159 H361-009-1B159 RIL/PTH-J3-0282 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364 0.32

1 0.07 0.11 403 333 2364 0.32

785 H361-009-1B160 H361-009-1B160 RIL/PTH-J3-0283 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364 0.32

1 0.08 0.11 403 333 2364 0.32

786 H361-009-1B162 H361-009-1B162 RIL/PTH-J3-0284 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882 1.06

1 0.23 0.27 403 333 7882 1.06

787 H361-009-1B259 H361-009-1B259 RIL/PTH-J3-0285 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062 0.41

1 0.09 0.13 403 333 3062 0.41

788 H361-009-1FR6 H361-009-1FR6 RIL/PTH-J3-0286 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744 0.23

1 0.35 0.39 403 333 1744 0.23

789 H361-009-1FR7 H361-009-1FR7 RIL/PTH-J3-0287 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647 0.09

1 0.19 0.22 403 333 647 0.09

790 H361-009-1FR8 H361-009-1FR8 RIL/PTH-J3-0288 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647 0.09

1 0.18 0.21 403 333 647 0.09

791 H361-009-1FR9 H361-009-1FR9 RIL/PTH-J3-0289 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850 0.25

1 0.16 0.19 403 333 1850 0.25

792 H361-009-1B40 H361-009-1B40

RIL/PTH-J3-0290 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834 0.45

793 H361-009-1B42 H361-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963 3.13

794 H361-009-1B43 H361-009-1B43 SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963 2.50

795 H361-009-1B44 H361-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963 0.63

796 H361-009-1B45 H361-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963 0.97

797 H361-009-1B49 H361-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963 0.47

798 H361-009-1B50 H361-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963 0.63

799 H361-009-1B52 H361-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962 0.63

800 H361-009-1B56 H361-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585 4.42

801 H361-009-1B57 H361-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463 0.18

21 3.37 6.03 1218 1262 5963 192.48

Page 28: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 28 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

802 H361-009-1B41 H361-009-1B41

RIL/PTH-J3-0291 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834 0.71

803 H361-009-1B58 H361-009-1B58 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463 0.57

804 H361-009-1B59 H361-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38

805 H361-009-1B60 H361-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463 0.38

806 H361-009-1B72 H361-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160 0.43

807 H361-009-1B78 H361-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460 0.57

808 H361-009-1B81 H361-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461 1.21

809 H361-009-1B85 H361-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659 0.61

810 H361-009-1B90 H361-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394 0.48

811 H361-009-1B69 H361-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949 0.50

812 H361-009-1B74 H361-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963 0.47

813 H361-009-1B73 H361-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963 2.34

814 H361-009-1B75 H361-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963 0.50

815 H361-009-1B76 H361-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63

816 H361-009-1B77 H361-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962 0.63

817 H361-009-1B82 H361-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461 0.89

818 H361-009-1B84 H361-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659 0.52

819 H361-009-1SC4 H361-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332 0.42

24 2.56 7.11 1121 2042 5461 300.02

820 H361-009-1B46 H361-009-1B46 RIL/PTH-J3-0292 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464 0.76

2 0.14 0.24 456 566 1464 0.76

821 H361-009-1B47 H361-009-1B47 RIL/PTH-J3-0293 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460 1.96

1 0.22 0.28 456 787 5460 1.96

822 H361-009-1B48 H361-009-1B48 RIL/PTH-J3-0294 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460 2.20

1 0.23 0.29 455 885 5460 2.20

823 H361-009-1B51 H361-009-1B51 RIL/PTH-J3-0295 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462 2.10

1 0.25 0.31 455 845 5462 2.10

824 H361-009-1B53 H361-009-1B53 RIL/PTH-J3-0296 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962 1.25

1 0.18 0.23 455 696 3962 1.25

825 H361-009-1B54 H361-009-1B54 RIL/PTH-J3-0297 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963 1.26

1 0.18 0.23 456 699 3963 1.26

826 H361-009-1B55 H361-009-1B55 RIL/PTH-J3-0298 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585 8.07

5 1.19 1.39 634 456 5585 8.07

827 H361-009-1B61 H361-009-1B61 RIL/PTH-J3-0299 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462 4.69

1 0.28 0.35 851 1010 5462 4.69

Page 29: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 29 of 83

PRELIMINARY - PROFORMA PACKING LIST - VOYAGE R2J3 PROJECT

JAMNAGAR GASIFICATION PROGRAM Status as : 2nd ShipmentPT.HANJUNG INDONESIA Date : Mar. 11 2015

Rev : D

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

828 H361-009-1B62 H361-009-1B62 RIL/PTH-J3-0300 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462 3.82

1 0.23 0.29 850 822 5462 3.82

829 H361-009-1B63 H361-009-1B63 RIL/PTH-J3-0301 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462 2.84

1 0.23 0.28 850 612 5462 2.84

830 H361-009-1B64 H361-009-1B64 RIL/PTH-J3-0302 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462 6.06

5 1.07 1.25 641 346 5462 6.06

831 H361-009-1B65 H361-009-1B65 RIL/PTH-J3-0303 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462 2.03

1 0.22 0.28 456 817 5462 2.03

832 H361-009-1B66 H361-009-1B66 RIL/PTH-J3-0304 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462 2.02

1 0.23 0.29 455 814 5462 2.02

833 H361-009-1B67 H361-009-1B67 RIL/PTH-J3-0305 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462 1.43

1 0.22 0.27 456 574 5462 1.43

834 H361-009-1B68 H361-009-1B68 RIL/PTH-J3-0306 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462 2.11

1 0.23 0.29 456 847 5462 2.11

835 H361-009-1B70 H361-009-1B70 RIL/PTH-J3-0307 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462 6.34

3 0.67 0.86 456 849 5462 6.34

SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88

GRAND TOTAL 1224 829.15 847.90 4766.90

I2466
Design Engineer: Summary Edit
Page 30: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 30 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

A. H210-550 ROOD MILL STRUCTURE

1 H210-550-FPGB1 H210-550-FPGB1 RIL/PTH-J3-0001 SKID ROOD MILL STRUCTURE 1 2.36 2.42 700 780 5470 2.99 ###

2 H210-550-FPGB2 H210-550-FPGB2 RIL/PTH-J3-0002 SKID ROOD MILL STRUCTURE 1 2.36 2.42 759 846 5470 3.51 ###

3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82 ###

4 H210-550-FPGC2 H210-550-FPGC2 RIL/PTH-J3-0004 SKID ROOD MILL STRUCTURE 1 10.13 10.36 1134 1815 10370 21.34 ###

5 H210-550-FPGC3 H210-550-FPGC3 RIL/PTH-J3-0005 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1106 1406 11955 18.59 ###

6 H210-550-FPGC4 H210-550-FPGC4 RIL/PTH-J3-0006 SKID ROOD MILL STRUCTURE 1 3.88 3.97 958 1439 2571 3.54 ###

7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53 ###

8 H210-550-FPGC6 H210-550-FPGC6 RIL/PTH-J3-0008 SKID ROOD MILL STRUCTURE 1 9.68 10.05 881 3117 10300 28.28 ###

9 H210-550-FPGC7 H210-550-FPGC7 RIL/PTH-J3-0009 SKID ROOD MILL STRUCTURE 1 10.92 11.10 968 1402 10900 14.79 ###

10 H210-550-FPGC8 H210-550-FPGC8 RIL/PTH-J3-0010 SKID ROOD MILL STRUCTURE 1 9.57 9.75 708 1402 9800 9.73 ###

11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53 ###

12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34 ###

13 H210-550-FPGC11 H210-550-FPGC11 RIL/PTH-J3-0013 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35 ###

14 H210-550-FPGC12 H210-550-FPGC12 RIL/PTH-J3-0014 SKID ROOD MILL STRUCTURE 1 10.25 10.44 1131 1406 10400 16.54 ###

15 H210-550-FPGC13 H210-550-FPGC13 RIL/PTH-J3-0015 SKID ROOD MILL STRUCTURE 1 9.99 10.17 511 1406 10300 7.40 ###

Page 31: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 31 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07 ###

17 H210-550-FPGC15 H210-550-FPGC15 RIL/PTH-J3-0017 SKID ROOD MILL STRUCTURE 1 7.42 7.56 885 1401 8425 10.45 ###

18 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0018 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78 ###

19 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0019 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78 ###

20 H210-550-FPGC17 H210-550-FPGC17 RIL/PTH-J3-0020 SKID ROOD MILL STRUCTURE 1 10.05 10.21 610 1241 10400 7.87 ###

21 H210-550-FPGC18 H210-550-FPGC18 RIL/PTH-J3-0021 SKID ROOD MILL STRUCTURE 1 9.76 9.93 706 1259 10300 9.16 ###

22 H210-550-FPGC19 H210-550-FPGC19 RIL/PTH-J3-0022 SKID ROOD MILL STRUCTURE 1 6.40 6.54 861 1405 6176 7.47 ###

23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57 ###

24 H210-550-FPGC21 H210-550-FPGC21 RIL/PTH-J3-0024 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35 ###

25 H210-550-FPGC22 H210-550-FPGC22 RIL/PTH-J3-0025 SKID ROOD MILL STRUCTURE 1 7.41 7.54 1129 1239 6525 9.13 ###

26 H210-550-FPGC23 H210-550-FPGC23 RIL/PTH-J3-0026 SKID ROOD MILL STRUCTURE 1 7.07 7.19 661 1242 6800 5.58 ###

27 H210-550-FPGC24 H210-550-FPGC24 RIL/PTH-J3-0027 SKID ROOD MILL STRUCTURE 1 7.78 7.92 696 1407 7375 7.22 ###

28 H210-550-FPGC25 H210-550-FPGC25 RIL/PTH-J3-0028 SKID ROOD MILL STRUCTURE 1 6.27 6.39 875 1240 6176 6.70 ###

29 H210-550-FPGC26 H210-550-FPGC26 RIL/PTH-J3-0029 SKID ROOD MILL STRUCTURE 1 7.56 7.69 1164 1401 8425 13.74 ###

30 H210-550-FPGC27 H210-550-FPGC27 RIL/PTH-J3-0030 SKID ROOD MILL STRUCTURE 1 11.58 11.76 1128 1402 11700 18.50 ###

31 H210-550-FPGC28 H210-550-FPGC28 RIL/PTH-J3-0031 SKID ROOD MILL STRUCTURE 1 9.06 9.20 808 1402 9000 10.20 ###

32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31 ###

33 H210-550-FPGC30 H210-550-FPGC30 RIL/PTH-J3-0033 SKID ROOD MILL STRUCTURE 1 7.34 7.48 1311 1401 8425 15.47 ###

34 H210-550-FPGC31 H210-550-FPGC31 RIL/PTH-J3-0034 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35 ###

35 H210-550-FPGC32 H210-550-FPGC32 RIL/PTH-J3-0035 SKID ROOD MILL STRUCTURE 1 10.84 11.03 821 1408 11900 13.76 ###

36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41 ###

37 H210-550-FPGC35 H210-550-FPGC35 RIL/PTH-J3-0037 SKID ROOD MILL STRUCTURE 1 7.30 7.44 737 1401 8425 8.70 ###

38 H210-550-FPGC36 H210-550-FPGC36 RIL/PTH-J3-0038 SKID ROOD MILL STRUCTURE 1 10.19 10.55 695 3117 10300 22.31 ###

39 H210-550-FPGC37 H210-550-FPGC37 RIL/PTH-J3-0039 SKID ROOD MILL STRUCTURE 1 11.22 11.40 968 1402 11900 16.15 ###

40 H210-550-FPGC38 H210-550-FPGC38 RIL/PTH-J3-0040 SKID ROOD MILL STRUCTURE 1 11.16 11.35 711 1438 11726 11.99 ###

41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43 ###

42 H210-550-FPGC41 H210-550-FPGC41 RIL/PTH-J3-0042 SKID ROOD MILL STRUCTURE 1 9.68 10.04 881 3110 10300 28.22 ###

43 H210-550-FPGC42 H210-550-FPGC42 RIL/PTH-J3-0043 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1022 1408 11900 17.12 ###

44 H210-550-FPGC43 H210-550-FPGC43 RIL/PTH-J3-0044 SKID ROOD MILL STRUCTURE 1 11.13 11.32 904 1442 11726 15.29 ###

45 H210-550-FPGC44 H210-550-FPGC44 RIL/PTH-J3-0045 SKID ROOD MILL STRUCTURE 1 7.15 7.30 1141 1486 8425 14.28 ###

46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66 ###

47 H210-550-FPGC46 H210-550-FPGC46 RIL/PTH-J3-0047 SKID ROOD MILL STRUCTURE 1 8.30 8.44 1101 1406 7250 11.22 ###

48 H210-550-FPGC47 H210-550-FPGC47 RIL/PTH-J3-0048 SKID ROOD MILL STRUCTURE 1 6.83 6.98 1141 1486 8425 14.28 ###

49 H210-550-FPGC48 H210-550-FPGC48 RIL/PTH-J3-0049 SKID ROOD MILL STRUCTURE 1 9.50 9.69 1132 1432 10380 16.83 ###

50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28 ###

Page 32: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 32 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

51 H210-550-FPGC50 H210-550-FPGC50 RIL/PTH-J3-0051 SKID ROOD MILL STRUCTURE 1 3.96 4.05 949 1395 2629 3.48 ###

52 H210-550-FPGC51 H210-550-FPGC51 RIL/PTH-J3-0052 SKID ROOD MILL STRUCTURE 1 7.35 7.49 1312 1401 8425 15.49 ###

53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49 ###

54 H210-550-FPGC53 H210-550-FPGC53 RIL/PTH-J3-0054 SKID ROOD MILL STRUCTURE 1 9.86 10.03 1006 1241 9700 12.11 ###

55 H210-550-FPGC54 H210-550-FPGC54 RIL/PTH-J3-0055 SKID ROOD MILL STRUCTURE 1 9.81 9.97 720 1241 9950 8.89 ###

56 H210-550-FPGC55 H210-550-FPGC55 RIL/PTH-J3-0056 SKID ROOD MILL STRUCTURE 1 6.53 6.66 849 1407 6256 7.47 ###

57 H210-550-FPGC56 H210-550-FPGC56 RIL/PTH-J3-0057 SKID ROOD MILL STRUCTURE 1 7.20 7.34 586 1486 8425 7.34 ###

58 H210-550-FPGC57 H210-550-FPGC57 RIL/PTH-J3-0058 SKID ROOD MILL STRUCTURE 1 5.01 5.10 511 1406 4210 3.02 ###

59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99 ###

60 H210-550-FPGC59 H210-550-FPGC59 RIL/PTH-J3-0060 SKID ROOD MILL STRUCTURE 1 9.13 9.31 695 1406 9200 8.99 ###

61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53 ###

62 H210-550-FPGC61 H210-550-FPGC61 RIL/PTH-J3-0062 SKID ROOD MILL STRUCTURE 1 7.15 7.29 878 1482 8425 10.96 ###

63 H210-550-FPGC62 H210-550-FPGC62 RIL/PTH-J3-0063 SKID ROOD MILL STRUCTURE 1 9.43 9.63 881 1506 10500 13.93 ###

64 H210-550-FPGC63 H210-550-FPGC63 RIL/PTH-J3-0064 SKID ROOD MILL STRUCTURE 1 9.75 9.93 1127 1402 10200 16.12 ###

65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88 ###

66 H210-550-FPGC65 H210-550-FPGC65 RIL/PTH-J3-0066 SKID ROOD MILL STRUCTURE 1 6.33 6.47 909 1426 6244 8.09 ###

67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49 ###

68 H210-550-FPGC67 H210-550-FPGC67 RIL/PTH-J3-0068 SKID ROOD MILL STRUCTURE 1 9.60 9.79 1131 1406 9700 15.42 ###

69 H210-550-FPGC68 H210-550-FPGC68 RIL/PTH-J3-0069 SKID ROOD MILL STRUCTURE 1 10.16 10.42 1131 2056 10000 23.25 ###

70 H210-550-FPGC69 H210-550-FPGC69 RIL/PTH-J3-0070 SKID ROOD MILL STRUCTURE 1 6.97 7.11 660 1407 6660 6.18 ###

71 H210-550-FPGC70 H210-550-FPGC70 RIL/PTH-J3-0071 SKID ROOD MILL STRUCTURE 1 7.73 7.87 694 1404 7500 7.31 ###

72 H210-550-FPGC71 H210-550-FPGC71 RIL/PTH-J3-0072 SKID ROOD MILL STRUCTURE 1 6.36 6.51 876 1430 6244 7.82 ###

73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33 ###

74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61 ###

75 H210-550-FPGC74 H210-550-FPGC74 RIL/PTH-J3-0075 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99 ###

76 H210-550-FPGC75 H210-550-FPGC75 RIL/PTH-J3-0076 SKID ROOD MILL STRUCTURE 1 9.20 9.37 811 1241 9250 9.31 ###

77 H210-550-FPGC76 H210-550-FPGC76 RIL/PTH-J3-0077 SKID ROOD MILL STRUCTURE 1 6.52 6.66 862 1396 6244 7.51 ###

78 H210-550-FPGC77 H210-550-FPGC77 RIL/PTH-J3-0078 SKID ROOD MILL STRUCTURE 1 7.15 7.29 1311 1486 8425 16.41 ###

79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01 ###

80 H210-550-FPGC79 H210-550-FPGC79 RIL/PTH-J3-0080 SKID ROOD MILL STRUCTURE 1 9.39 9.57 971 1406 10000 13.65 ###

81 H210-550-FPGC80 H210-550-FPGC80 RIL/PTH-J3-0081 SKID ROOD MILL STRUCTURE 1 9.66 9.84 843 1402 10500 12.41 ###

82 H210-550-FPGC81 H210-550-FPGC81 RIL/PTH-J3-0082 SKID ROOD MILL STRUCTURE 1 3.94 4.03 876 1422 2994 3.73 ###

83 H210-550-FPGC82 H210-550-FPGC82 RIL/PTH-J3-0083 SKID ROOD MILL STRUCTURE 1 7.30 7.44 738 1486 8425 9.24 ###

84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68 ###

85 H210-550-FPGC84 H210-550-FPGC84 RIL/PTH-J3-0085 SKID ROOD MILL STRUCTURE 1 7.14 7.28 688 1407 7140 6.91 ###

Page 33: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 33 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

86 H210-550-FPGC85 H210-550-FPGC85 RIL/PTH-J3-0086 SKID ROOD MILL STRUCTURE 1 9.50 9.68 661 1406 10100 9.39 ###

87 H210-550-FPGC86 H210-550-FPGC86 RIL/PTH-J3-0087 SKID ROOD MILL STRUCTURE 1 4.11 4.20 709 1419 2994 3.01 ###

88 H210-550-FPGC87 H210-550-FPGC87 RIL/PTH-J3-0088 SKID ROOD MILL STRUCTURE 1 7.46 7.60 1308 1482 8425 16.33 ###

89 H210-550-FPGC88 H210-550-FPGC88 RIL/PTH-J3-0089 SKID ROOD MILL STRUCTURE 1 9.92 10.11 1131 1406 9700 15.42 ###

90 H210-550-FPGC90 H210-550-FPGC90 RIL/PTH-J3-0090 SKID ROOD MILL STRUCTURE 1 11.57 11.76 674 1403 11794 11.15 ###

91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60 ###

92 H210-550-FPGC92 H210-550-FPGC92 RIL/PTH-J3-0092 SKID ROOD MILL STRUCTURE 1 9.41 9.57 965 1241 10385 12.44 ###

93 H210-550-FPGC93 H210-550-FPGC93 RIL/PTH-J3-0093 SKID ROOD MILL STRUCTURE 1 8.24 8.36 658 1237 7165 5.83 ###

94 H210-550-FPGC94 H210-550-FPGC94 RIL/PTH-J3-0094 SKID ROOD MILL STRUCTURE 1 5.50 5.58 659 1239 4910 4.01 ###

95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17 ###

96 H210-550-FPGC96 H210-550-FPGC96 RIL/PTH-J3-0096 SKID ROOD MILL STRUCTURE 1 9.61 9.79 1131 1406 9700 15.42 ###

97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77 ###

98 H210-550-FPGC98 H210-550-FPGC98 RIL/PTH-J3-0098 SKID ROOD MILL STRUCTURE 1 9.80 9.97 968 1237 9680 11.59 ###

99 H210-550-FPGC99 H210-550-FPGC99 RIL/PTH-J3-0099 SKID ROOD MILL STRUCTURE 1 5.74 5.84 701 1597 5380 6.02 ###

SUB TOTAL A. H210-550 ROOD MILL STRUCTURE 99 807.81 824.20 1149.16 ###

B. H220-550 ROOD MILL STRUCTURE

100 H220-550-FPGC1 H220-550-FPGC1 RIL/PTH-J3-0100 SKID ROOD MILL STRUCTURE 1 4.58 4.69 1316 1351 6036 10.73 ###

101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 6.99 1192 1450 8437 14.58 ###

102 H220-550-FPGC3 H220-550-FPGC3 RIL/PTH-J3-0102 SKID ROOD MILL STRUCTURE 1 5.59 5.75 1440 1495 5000 10.76 ###

103 H220-550-FPGC4 H220-550-FPGC4 RIL/PTH-J3-0103 SKID ROOD MILL STRUCTURE 1 11.87 12.20 1400 1540 12000 25.87 ###

104 H220-550-FPGC5 H220-550-FPGC5 RIL/PTH-J3-0104 SKID ROOD MILL STRUCTURE 1 11.48 11.78 1540 1250 10500 20.21 ###

105 H220-550-FPGC6 H220-550-FPGC6 RIL/PTH-J3-0105 SKID ROOD MILL STRUCTURE 1 7.16 7.42 1547 1608 8437 20.99 ###

106 H220-550-FPGC7 H220-550-FPGC7 RIL/PTH-J3-0106 SKID ROOD MILL STRUCTURE 1 5.44 5.59 1540 1180 5000 9.09 ###

107 H220-550-FPGC8 H220-550-FPGC8 RIL/PTH-J3-0107 SKID ROOD MILL STRUCTURE 1 11.97 12.27 2259 1271 12000 34.45 ###

108 H220-550-FPGC9 H220-550-FPGC9 RIL/PTH-J3-0108 SKID ROOD MILL STRUCTURE 1 10.08 10.35 1524 961 10500 15.38 ###

109 H220-550-FPGC10 H220-550-FPGC10 RIL/PTH-J3-0109 SKID ROOD MILL STRUCTURE 1 6.32 6.57 1125 1540 6036 10.46 ###

110 H220-550-FPGC11 H220-550-FPGC11 RIL/PTH-J3-0110 SKID ROOD MILL STRUCTURE 1 7.12 7.32 1550 885 8437 11.57 ###

111 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0111 SKID ROOD MILL STRUCTURE 1 5.67 5.80 1540 995 5000 7.66 ###

112 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0112 SKID ROOD MILL STRUCTURE 1 5.67 5.80 1540 995 5000 7.66

SUB TOTAL B. H220-550 ROOD MILL STRUCTURE 13 99.95 102.56 199.42 ###

C. H360-013 SUB PIPE RACK ACR 001

113 H360-013-VB19 H360-013-VB19

RIL/PTH-J3-0113 BUNDLE

SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526

114 H360-013-VB20 H360-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151

115 H360-013-VB21 H360-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862

116 H360-013-VB22 H360-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898

Page 34: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 34 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

117 H360-013-VB23 H360-013-VB23

RIL/PTH-J3-0113 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760

10 0.16 0.19 361 375 1526 0.21 ###

118 H360-013-HB1 H360-013-HB1

RIL/PTH-J3-0114 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334

119 H360-013-HB2 H360-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450

120 H360-013-HB3 H360-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484

121 H360-013-HB4 H360-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536

122 H360-013-HB5 H360-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987

123 H360-013-HB6 H360-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698

124 H360-013-VB16 H360-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870

125 H360-013-VB17 H360-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652

126 H360-013-VB18 H360-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455

25 0.49 0.53 461 545 1987 0.50 ###

127 H360-013-CT6 H360-013-CT6

RIL/PTH-J3-0115 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150

128 H360-013-CT7 H360-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150

129 H360-013-CT8 H360-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150

130 H360-013-CT9 H360-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150

131 H360-013-CT10 H360-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150

132 H360-013-CT11 H360-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150

133 H360-013-CT12 H360-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935

134 H360-013-CT13 H360-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045

13 0.19 0.28 1270 871 1150 1.27 ###

135 H360-013-B67 H360-013-B67

RIL/PTH-J3-0116 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

136 H360-013-B68 H360-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

137 H360-013-B69 H360-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

138 H360-013-B70 H360-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

139 H360-013-B71 H360-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461

140 H360-013-B72 H360-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461

141 H360-013-B73 H360-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

142 H360-013-B74 H360-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

143 H360-013-B75 H360-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

144 H360-013-B76 H360-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

145 H360-013-B77 H360-013-B77 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

Page 35: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 35 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

146 H360-013-B78 H360-013-B78

RIL/PTH-J3-0116 BUNDLE

SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334

147 H360-013-B79 H360-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962

148 H360-013-B88 H360-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211

20 0.58 0.69 461 1020 2962 1.39 ###

149 H360-013-B82 H360-013-B82 RIL/PTH-J3-0117 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461

4 0.14 0.17 400 275 1461 0.16 ###

150 H360-013-CT1 H360-013-CT1RIL/PTH-J3-0118 BUNDLE

SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388

151 H360-013-CT2 H360-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388

8 0.11 0.17 1110 658 388 0.28 ###

152 H360-013-B19 H360-013-B19

RIL/PTH-J3-0119 BUNDLE

SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461

153 H360-013-B80 H360-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461

154 H360-013-B81 H360-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657

4 0.23 0.27 436 378 4657 0.77 ###

155 H360-013-B7 H360-013-B7

RIL/PTH-J3-0120 BUNDLE

SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673

156 H360-013-B8 H360-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142

157 H360-013-B9 H360-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942

158 H360-013-B10 H360-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102

159 H360-013-B11 H360-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102

5 0.59 0.63 874 399 5942 2.07 ###

160 H360-013-B4 H360-013-B4 RIL/PTH-J3-0121 BUNDLE SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827

1 0.16 0.20 856 352 4827 1.45 ###

161 H360-013-B5 H360-013-B5 RIL/PTH-J3-0122 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944

1 0.58 0.63 1722 578 5944 5.92 ###

162 H360-013-B6 H360-013-B6 RIL/PTH-J3-0123 BUNDLE SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944

1 0.58 0.63 1718 578 5944 5.90 ###

163 H360-013-CT4 H360-013-CT4 RIL/PTH-J3-0124 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684

1 0.12 0.19 380 1031 1684 0.66 ###

Page 36: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 36 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

164 H360-013-B1 H360-013-B1 RIL/PTH-J3-0125 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904

1 0.11 0.15 399 336 2904 0.39 ###

165 H360-013-B2 H360-013-B2 RIL/PTH-J3-0126 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673

11 1.91 1.97 971 833 5673 4.59 ###

166 H360-013-B3 H360-013-B3 RIL/PTH-J3-0127 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827

6 0.87 0.91 397 503 4827 0.96 ###

167 H360-013-VB1 H360-013-VB1 RIL/PTH-J3-0128 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389

4 0.17 0.21 397 413 1389 0.23 ###

168 H360-013-B55 H360-013-B55 RIL/PTH-J3-0129 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673

1 0.21 0.27 358 876 5673 1.78 ###

169 H360-013-CT3 H360-013-CT3 RIL/PTH-J3-0130 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442

3 0.20 0.25 900 649 1442 0.84 ###

170 H360-013-CT5 H360-013-CT5 RIL/PTH-J3-0131 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684

1 0.13 0.23 380 1420 1684 0.91 ###

171 H360-013-CT14 H360-013-CT14 RIL/PTH-J3-0132 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684

1 0.12 0.16 826 380 1684 0.53 ###

172 H360-013-FR1 H360-013-FR1 RIL/PTH-J3-0133 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790

1 0.38 0.46 777 1242 4790 4.62 ###

173 H360-013-B12 H360-013-B12

RIL/PTH-J3-0134 BUNDLE

SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236

174 H360-013-B13 H360-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236

175 H360-013-B17 H360-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086

176 H360-013-B20 H360-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673

177 H360-013-B21 H360-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640

178 H360-013-B23 H360-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142

179 H360-013-B25 H360-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142

Page 37: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 37 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

180 H360-013-B27 H360-013-B27

RIL/PTH-J3-0134 BUNDLE

SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181

181 H360-013-B37 H360-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731

10 1.31 1.36 750 587 5673 2.50 ###

182 H360-013-B29 H360-013-B29

RIL/PTH-J3-0135 BUNDLE

SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617

183 H360-013-B33 H360-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594

184 H360-013-B38 H360-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912

185 H360-013-B41 H360-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201

186 H360-013-B50 H360-013-B50 SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673

187 H360-013-B51 H360-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640

188 H360-013-B52 H360-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

189 H360-013-B53 H360-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

190 H360-013-B56 H360-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

191 H360-013-B84 H360-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593

192 H360-013-SC1 H360-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530

20 5.55 5.61 1142 966 5673 6.26 ###

193 H360-013-B14 H360-013-B14 RIL/PTH-J3-0136 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942

1 0.85 0.89 1821 520 5942 5.63 ###

194 H360-013-B15 H360-013-B15 RIL/PTH-J3-0137 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942

1 0.63 0.67 1233 520 5942 3.81 ###

195 H360-013-B16 H360-013-B16 RIL/PTH-J3-0138 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944

1 0.78 0.83 1615 519 5944 4.98 ###

196 H360-013-B18 H360-013-B18 RIL/PTH-J3-0139 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673

1 0.37 0.42 410 642 5673 1.49 ###

197 H360-013-B22 H360-013-B22 RIL/PTH-J3-0140 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594

1 0.36 0.41 609 666 4594 1.86 ###

198 H360-013-B24 H360-013-B24 RIL/PTH-J3-0141 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607

1 0.73 0.77 1584 406 5607 3.61 ###

Page 38: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:03

Page 38 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

199 H360-013-B26 H360-013-B26 RIL/PTH-J3-0142 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181

1 0.09 0.15 633 662 1181 0.49 ###

200 H360-013-B28 H360-013-B28 RIL/PTH-J3-0143 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617

2 0.69 0.76 793 864 4617 3.16 ###

201 H360-013-B30 H360-013-B30 RIL/PTH-J3-0144 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594

1 0.36 0.43 846 958 4594 3.72 ###

202 H360-013-B31 H360-013-B31 RIL/PTH-J3-0145 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617

2 0.70 0.76 610 868 4617 2.44 ###

203 H360-013-B32 H360-013-B32 RIL/PTH-J3-0146 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617

1 0.37 0.42 610 745 4617 2.10 ###

204 H360-013-B34 H360-013-B34 RIL/PTH-J3-0147 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607

1 0.73 0.76 1165 344 5607 2.25 ###

205 H360-013-B35 H360-013-B35 RIL/PTH-J3-0148 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942

1 0.87 0.91 1284 401 5942 3.06 ###

206 H360-013-B36 H360-013-B36 RIL/PTH-J3-0149 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731

1 0.06 0.10 659 406 731 0.20 ###

207 H360-013-B39 H360-013-B39 RIL/PTH-J3-0150 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951

1 0.37 0.42 410 657 5951 1.60 ###

208 H360-013-B40 H360-013-B40 RIL/PTH-J3-0151 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951

1 0.37 0.43 410 660 5951 1.61 ###

209 H360-013-B42 H360-013-B42 RIL/PTH-J3-0152 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961

1 0.32 0.38 410 867 4961 1.76 ###

210 H360-013-B43 H360-013-B43 RIL/PTH-J3-0153 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961

3 0.95 1.00 344 660 4961 1.13 ###

Page 39: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 39 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

211 H360-013-B44 H360-013-B44 RIL/PTH-J3-0154 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961

1 0.32 0.39 410 868 4961 1.77 ###

212 H360-013-B45 H360-013-B45 RIL/PTH-J3-0155 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961

1 0.33 0.40 410 868 4961 1.77 ###

SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001 176 25.15 27.45 92.64 ###

D. H361-013 SUB PIPE RACK ACR 001

213 H361-013-VB19 H361-013-VB19

RIL/PTH-J3-0156BUNDLE

SUB PIPE RACK ACR 001 2 0.05 0.05 300 300 1526

214 H361-013-VB20 H361-013-VB20 SUB PIPE RACK ACR 001 2 0.03 0.03 300 300 1151

215 H361-013-VB21 H361-013-VB21 SUB PIPE RACK ACR 001 4 0.05 0.05 300 300 862

216 H361-013-VB22 H361-013-VB22 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 898

217 H361-013-VB23 H361-013-VB23 SUB PIPE RACK ACR 001 1 0.01 0.01 300 300 760

10 0.16 0.19 361 375 1526 0.21 ###

218 H361-013-HB1 H361-013-HB1

RIL/PTH-J3-0157 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 1334

219 H361-013-HB2 H361-013-HB2 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1450

220 H361-013-HB3 H361-013-HB3 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1484

221 H361-013-HB4 H361-013-HB4 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1536

222 H361-013-HB5 H361-013-HB5 SUB PIPE RACK ACR 001 16 0.34 0.34 290 290 1987

223 H361-013-HB6 H361-013-HB6 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1698

224 H361-013-VB16 H361-013-VB16 SUB PIPE RACK ACR 001 1 0.01 0.01 290 290 870

225 H361-013-VB17 H361-013-VB17 SUB PIPE RACK ACR 001 2 0.04 0.04 290 290 1652

226 H361-013-VB18 H361-013-VB18 SUB PIPE RACK ACR 001 1 0.02 0.02 290 290 1455

25 0.49 0.53 461 545 1987 0.50 ###

227 H361-013-CT6 H361-013-CT6

RIL/PTH-J3-0158 BUNDLE

SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1150

228 H361-013-CT7 H361-013-CT7 SUB PIPE RACK ACR 001 1 0.01 0.01 300 531 1150

229 H361-013-CT8 H361-013-CT8 SUB PIPE RACK ACR 001 1 0.01 0.01 300 548 1150

230 H361-013-CT9 H361-013-CT9 SUB PIPE RACK ACR 001 5 0.07 0.07 300 509 1150

231 H361-013-CT10 H361-013-CT10 SUB PIPE RACK ACR 001 1 0.01 0.01 300 529 1150

232 H361-013-CT11 H361-013-CT11 SUB PIPE RACK ACR 001 2 0.04 0.04 300 651 1150

233 H361-013-CT12 H361-013-CT12 SUB PIPE RACK ACR 001 1 0.01 0.01 300 509 935

234 H361-013-CT13 H361-013-CT13 SUB PIPE RACK ACR 001 1 0.01 0.01 250 300 1045

L472
Design Engineer: Summary Edit
Page 40: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 40 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

13 0.19 0.28 1270 871 1150 1.27 ###

235 H361-013-B67 H361-013-B67

RIL/PTH-J3-0159 BUNDLE

SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

236 H361-013-B68 H361-013-B68 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

237 H361-013-B69 H361-013-B69 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

238 H361-013-B70 H361-013-B70 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

239 H361-013-B71 H361-013-B71 SUB PIPE RACK ACR 001 6 0.16 0.16 350 275 1461

240 H361-013-B72 H361-013-B72 SUB PIPE RACK ACR 001 2 0.05 0.05 350 275 1461

241 H361-013-B73 H361-013-B73 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

242 H361-013-B74 H361-013-B74 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

243 H361-013-B75 H361-013-B75 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

244 H361-013-B76 H361-013-B76 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

245 H361-013-B77 H361-013-B77 SUB PIPE RACK ACR 001 1 0.03 0.03 350 275 1461

246 H361-013-B78 H361-013-B78 SUB PIPE RACK ACR 001 1 0.06 0.06 1051 275 2334

247 H361-013-B79 H361-013-B79 SUB PIPE RACK ACR 001 1 0.05 0.05 350 275 2962

248 H361-013-B88 H361-013-B88 SUB PIPE RACK ACR 001 1 0.02 0.02 350 349 1211

20 0.58 0.69 461 1020 2962 1.39 ###

249 H361-013-B82 H361-013-B82 RIL/PTH-J3-0160 BUNDLE SUB PIPE RACK ACR 001 4 0.14 0.14 400 275 1461

4 0.14 0.17 400 275 1461 0.16 ###

250 H361-013-CT1 H361-013-CT1RIL/PTH-J3-0161 BUNDLE

SUB PIPE RACK ACR 001 3 0.04 0.04 890 350 388

251 H361-013-CT2 H361-013-CT2 SUB PIPE RACK ACR 001 5 0.07 0.07 837 408 388

8 0.11 0.17 1110 658 388 0.28 ###

252 H361-013-B19 H361-013-B19

RIL/PTH-J3-0162 BUNDLE

SUB PIPE RACK ACR 001 1 0.04 0.04 403 333 1461

253 H361-013-B80 H361-013-B80 SUB PIPE RACK ACR 001 2 0.07 0.07 403 333 1461

254 H361-013-B81 H361-013-B81 SUB PIPE RACK ACR 001 1 0.12 0.12 404 410 4657

4 0.23 0.27 436 378 4657 0.77 ###

255 H361-013-B7 H361-013-B7

RIL/PTH-J3-0163 BUNDLE

SUB PIPE RACK ACR 001 1 0.21 0.21 457 383 5673

256 H361-013-B8 H361-013-B8 SUB PIPE RACK ACR 001 1 0.04 0.04 456 347 1142

257 H361-013-B9 H361-013-B9 SUB PIPE RACK ACR 001 1 0.22 0.22 456 346 5942

258 H361-013-B10 H361-013-B10 SUB PIPE RACK ACR 001 1 0.06 0.06 705 440 1102

259 H361-013-B11 H361-013-B11 SUB PIPE RACK ACR 001 1 0.06 0.06 620 440 1102

Page 41: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 41 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

5 0.59 0.63 874 399 5942 2.07 ###

260 H361-013-B4 H361-013-B4 RIL/PTH-J3-0164 SKID SUB PIPE RACK ACR 001 1 0.16 0.16 856 352 4827

1 0.16 0.20 856 352 4827 1.45 ###

261 H361-013-B5 H361-013-B5 RIL/PTH-J3-0165 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1722 578 5944

1 0.58 0.63 1722 578 5944 5.92 ###

262 H361-013-B6 H361-013-B6 RIL/PTH-J3-0166 SKID SUB PIPE RACK ACR 001 1 0.58 0.58 1718 578 5944

1 0.58 0.63 1718 578 5944 5.90 ###

263 H361-013-CT4 H361-013-CT4 RIL/PTH-J3-0167 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 380 1031 1684

1 0.12 0.19 380 1031 1684 0.66 ###

264 H361-013-B1 H361-013-B1 RIL/PTH-J3-0168 SKID SUB PIPE RACK ACR 001 1 0.11 0.11 399 336 2904

1 0.11 0.15 399 336 2904 0.39 ###

265 H361-013-B2 H361-013-B2 RIL/PTH-J3-0169 BUNDLE SUB PIPE RACK ACR 001 11 1.91 1.91 358 478 5673

11 1.91 1.97 971 833 5673 4.59 ###

266 H361-013-B3 H361-013-B3 RIL/PTH-J3-0170 BUNDLE SUB PIPE RACK ACR 001 6 0.87 0.87 357 352 4827

6 0.87 0.91 397 503 4827 0.96 ###

267 H361-013-VB1 H361-013-VB1 RIL/PTH-J3-0171 BUNDLE SUB PIPE RACK ACR 001 4 0.17 0.17 358 353 1389

4 0.17 0.21 397 413 1389 0.23 ###

268 H361-013-B55 H361-013-B55 RIL/PTH-J3-0172 SKID SUB PIPE RACK ACR 001 1 0.21 0.21 358 876 5673

1 0.21 0.27 358 876 5673 1.78 ###

269 H361-013-CT3 H361-013-CT3 RIL/PTH-J3-0173 BUNDLE SUB PIPE RACK ACR 001 3 0.20 0.20 900 380 1442

3 0.20 0.25 900 649 1442 0.84 ###

270 H361-013-CT5 H361-013-CT5 RIL/PTH-J3-0174 SKID SUB PIPE RACK ACR 001 1 0.13 0.13 380 1420 1684

1 0.13 0.23 380 1420 1684 0.91 ###

Page 42: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 42 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

271 H361-013-CT14 H361-013-CT14 RIL/PTH-J3-0175 SKID SUB PIPE RACK ACR 001 1 0.12 0.12 826 380 1684

1 0.12 0.16 826 380 1684 0.53 ###

272 H361-013-FR1 H361-013-FR1 RIL/PTH-J3-0176 SKID SUB PIPE RACK ACR 001 1 0.38 0.38 777 1242 4790

1 0.38 0.46 777 1242 4790 4.62 ###

273 H361-013-B12 H361-013-B12

RIL/PTH-J3-0177 BUNDLE

SUB PIPE RACK ACR 001 2 0.17 0.17 623 406 1236

274 H361-013-B13 H361-013-B13 SUB PIPE RACK ACR 001 1 0.08 0.08 605 406 1236

275 H361-013-B17 H361-013-B17 SUB PIPE RACK ACR 001 1 0.07 0.07 623 406 1086

276 H361-013-B20 H361-013-B20 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5673

277 H361-013-B21 H361-013-B21 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640

278 H361-013-B23 H361-013-B23 SUB PIPE RACK ACR 001 1 0.08 0.08 522 416 1142

279 H361-013-B25 H361-013-B25 SUB PIPE RACK ACR 001 1 0.08 0.08 630 405 1142

280 H361-013-B27 H361-013-B27 SUB PIPE RACK ACR 001 1 0.09 0.09 410 406 1181

281 H361-013-B37 H361-013-B37 SUB PIPE RACK ACR 001 1 0.06 0.06 410 407 731

10 1.31 1.36 750 587 5673 2.50 ###

282 H361-013-B29 H361-013-B29

RIL/PTH-J3-0178 BUNDLE

SUB PIPE RACK ACR 001 1 0.33 0.33 610 465 4617

283 H361-013-B33 H361-013-B33 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4594

284 H361-013-B38 H361-013-B38 SUB PIPE RACK ACR 001 2 0.36 0.36 410 406 2912

285 H361-013-B41 H361-013-B41 SUB PIPE RACK ACR 001 2 0.15 0.15 410 416 1201

286 H361-013-B50 H361-013-B50 SUB PIPE RACK ACR 001 7 2.38 2.38 410 406 5673

287 H361-013-B51 H361-013-B51 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5640

288 H361-013-B52 H361-013-B52 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

289 H361-013-B53 H361-013-B53 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

290 H361-013-B56 H361-013-B56 SUB PIPE RACK ACR 001 1 0.34 0.34 410 406 5607

291 H361-013-B84 H361-013-B84 SUB PIPE RACK ACR 001 1 0.33 0.33 609 464 4593

292 H361-013-SC1 H361-013-SC1 SUB PIPE RACK ACR 001 2 0.32 0.32 440 440 2530

20 5.55 5.61 1142 966 5673 6.26 ###

293 H361-013-B14 H361-013-B14 RIL/PTH-J3-0179 SKID SUB PIPE RACK ACR 001 1 0.85 0.85 1821 520 5942

1 0.85 0.89 1821 520 5942 5.63 ###

294 H361-013-B15 H361-013-B15 RIL/PTH-J3-0180 SKID SUB PIPE RACK ACR 001 1 0.63 0.63 1233 520 5942

1 0.63 0.67 1233 520 5942 3.81 ###

Page 43: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 43 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

295 H361-013-B16 H361-013-B16 RIL/PTH-J3-0181 SKID SUB PIPE RACK ACR 001 1 0.78 0.78 1615 519 5944

1 0.78 0.83 1615 519 5944 4.98 ###

296 H361-013-B18 H361-013-B18 RIL/PTH-J3-0182 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 642 5673

1 0.37 0.42 410 642 5673 1.49 ###

297 H361-013-B22 H361-013-B22 RIL/PTH-J3-0183 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 609 666 4594

1 0.36 0.41 609 666 4594 1.86 ###

298 H361-013-B24 H361-013-B24 RIL/PTH-J3-0184 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1584 406 5607 3.61

1 0.73 0.77 1584 406 5607 3.61 ###

299 H361-013-B26 H361-013-B26 RIL/PTH-J3-0185 SKID SUB PIPE RACK ACR 001 1 0.09 0.09 633 662 1181

1 0.09 0.15 633 662 1181 0.49 ###

300 H361-013-B28 H361-013-B28 RIL/PTH-J3-0186 BUNDLE SUB PIPE RACK ACR 001 2 0.69 0.69 793 864 4617

2 0.69 0.76 793 864 4617 3.16 ###

301 H361-013-B30 H361-013-B30 RIL/PTH-J3-0187 SKID SUB PIPE RACK ACR 001 1 0.36 0.36 846 958 4594

1 0.36 0.43 846 958 4594 3.72 ###

302 H361-013-B31 H361-013-B31 RIL/PTH-J3-0188 BUNDLE SUB PIPE RACK ACR 001 2 0.70 0.70 610 868 4617

2 0.70 0.76 610 868 4617 2.44 ###

303 H361-013-B32 H361-013-B32 RIL/PTH-J3-0189 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 610 745 4617 2.10

1 0.37 0.42 610 745 4617 2.10 ###

304 H361-013-B34 H361-013-B34 RIL/PTH-J3-0190 SKID SUB PIPE RACK ACR 001 1 0.73 0.73 1165 344 5607

1 0.73 0.76 1165 344 5607 2.25 ###

305 H361-013-B35 H361-013-B35 RIL/PTH-J3-0191 SKID SUB PIPE RACK ACR 001 1 0.87 0.87 1284 401 5942

1 0.87 0.91 1284 401 5942 3.06 ###

306 H361-013-B36 H361-013-B36 RIL/PTH-J3-0192 SKID SUB PIPE RACK ACR 001 1 0.06 0.06 659 406 731

Page 44: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 44 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.06 0.10 659 406 731 0.20 ###

307 H361-013-B39 H361-013-B39 RIL/PTH-J3-0193 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 657 5951

1 0.37 0.42 410 657 5951 1.60 ###

308 H361-013-B40 H361-013-B40 RIL/PTH-J3-0194 SKID SUB PIPE RACK ACR 001 1 0.37 0.37 410 660 5951

1 0.37 0.43 410 660 5951 1.61 ###

309 H361-013-B42 H361-013-B42 RIL/PTH-J3-0195 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 867 4961

1 0.32 0.38 410 867 4961 1.76 ###

310 H361-013-B43 H361-013-B43 RIL/PTH-J3-0196 BUNDLE SUB PIPE RACK ACR 001 3 0.95 0.95 344 660 4961

3 0.95 1.00 344 660 4961 1.13 ###

311 H361-013-B44 H361-013-B44 RIL/PTH-J3-0197 SKID SUB PIPE RACK ACR 001 1 0.32 0.32 410 868 4961

1 0.32 0.39 410 868 4961 1.77 ###

312 H361-013-B45 H361-013-B45 RIL/PTH-J3-0198 SKID SUB PIPE RACK ACR 001 1 0.33 0.33 410 868 4961

1 0.33 0.40 410 868 4961 1.77 ###

SUB TOTAL D. H361-013 SUB PIPE RACK ACR 001 176 25.15 27.45 92.64

D. H360-009 SULPHUR RECOVERY UNIT APR 002

313 H360-009-1HB1 H360-009-1HB1

RIL/PTH-J3-0199 BUNDLE

SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897

314 H360-009-1HB2 H360-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039

315 H360-009-1HB3 H360-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797

316 H360-009-1HB4 H360-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258

317 H360-009-1HB6 H360-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866

318 H360-009-1HB7 H360-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671

319 H360-009-1HB8 H360-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889

320 H360-009-1HB10 H360-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863

321 H360-009-1HB11 H360-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891

322 H360-009-1HB12 H360-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828

323 H360-009-1HB13 H360-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053

324 H360-009-1HB14 H360-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977

325 H360-009-1HB15 H360-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203

326 H360-009-1VB1 H360-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201

L811
Design Engineer: Summary Edit
Page 45: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 45 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

327 H360-009-1VB2 H360-009-1VB2

RIL/PTH-J3-0199 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777

328 H360-009-1VB3 H360-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899

329 H360-009-1VB4 H360-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594

330 H360-009-1VB5 H360-009-1VB5 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348

331 H360-009-1VB6 H360-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625

332 H360-009-1VB7 H360-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940

333 H360-009-1VB8 H360-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498

334 H360-009-1VB9 H360-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392

335 H360-009-1VB10 H360-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481

336 H360-009-1VB11 H360-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389

337 H360-009-1VB26 H360-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388

48 3.00 3.05 698 610 3940 1.68 ###

338 H360-009-1HB16 H360-009-1HB16

RIL/PTH-J3-0200 BUNDLE

SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396

339 H360-009-1HB17 H360-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230

340 H360-009-1VB12 H360-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366

341 H360-009-1VB25 H360-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409

9 0.13 0.16 326 319 2409 0.25 ###

342 H360-009-1HB5 H360-009-1HB5

RIL/PTH-J3-0201 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934

343 H360-009-1HB18 H360-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589

344 H360-009-1HB19 H360-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616

345 H360-009-1HB20 H360-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753

346 H360-009-1HB21 H360-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383

347 H360-009-1HB22 H360-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017

348 H360-009-1HB23 H360-009-1HB23 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804

349 H360-009-1HB24 H360-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513

350 H360-009-1HB25 H360-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967

351 H360-009-1HB26 H360-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603

352 H360-009-1HB27 H360-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893

353 H360-009-1HB28 H360-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914

354 H360-009-1HB29 H360-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916

355 H360-009-1HB30 H360-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819

356 H360-009-1HB31 H360-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959

357 H360-009-1HB32 H360-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560

Page 46: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 46 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

358 H360-009-1HB33 H360-009-1HB33

RIL/PTH-J3-0201 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895

359 H360-009-1HB34 H360-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582

360 H360-009-1HB35 H360-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622

361 H360-009-1HB36 H360-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578

362 H360-009-1HB37 H360-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542

363 H360-009-1HB38 H360-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735

364 H360-009-1HB39 H360-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690

365 H360-009-1HB40 H360-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758

366 H360-009-1HB41 H360-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455

367 H360-009-1HB42 H360-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208

368 H360-009-1HB43 H360-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865

369 H360-009-1HB44 H360-009-1HB44 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960

370 H360-009-1HB45 H360-009-1HB45 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756

371 H360-009-1HB46 H360-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576

372 H360-009-1HB47 H360-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503

373 H360-009-1HB48 H360-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872

374 H360-009-1HB49 H360-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591

375 H360-009-1HB50 H360-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439

376 H360-009-1HB51 H360-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816

377 H360-009-1HB52 H360-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626

378 H360-009-1HB53 H360-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864

379 H360-009-1HB54 H360-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787

380 H360-009-1HB55 H360-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235

381 H360-009-1HB56 H360-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260

382 H360-009-1HB57 H360-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953

383 H360-009-1HB58 H360-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476

384 H360-009-1HB59 H360-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783

385 H360-009-1HB60 H360-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416

386 H360-009-1HB61 H360-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387

387 H360-009-1HB62 H360-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938

388 H360-009-1HB63 H360-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803

389 H360-009-1HB64 H360-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749

390 H360-009-1HB65 H360-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227

391 H360-009-1HB66 H360-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979

392 H360-009-1HB67 H360-009-1HB67 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763

Page 47: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 47 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

393 H360-009-1HB68 H360-009-1HB68

RIL/PTH-J3-0201 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351

394 H360-009-1HB69 H360-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921

395 H360-009-1HB70 H360-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445

396 H360-009-1HB71 H360-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378

397 H360-009-1HB72 H360-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005

398 H360-009-1HB73 H360-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954

399 H360-009-1HB74 H360-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638

400 H360-009-1HB75 H360-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946

401 H360-009-1HB76 H360-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463

402 H360-009-1HB77 H360-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809

403 H360-009-1HB78 H360-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517

404 H360-009-1HB79 H360-009-1HB79 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366

405 H360-009-1HB80 H360-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437

406 H360-009-1HB81 H360-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085

407 H360-009-1VB23 H360-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480

408 H360-009-1VB24 H360-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580

83 1.58 1.66 585 624 3480 1.27 ###

409 H360-009-1B123 H360-009-1B123RIL/PTH-J3-0202 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084

410 H360-009-1B124 H360-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099

4 0.04 0.07 330 229 1099 0.08 ###

411 H360-009-1B254 H360-009-1B254RIL/PTH-J3-0203 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876

412 H360-009-1B255 H360-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969

2 0.03 0.06 386 254 969 0.10 ###

413 H360-009-1B166 H360-009-1B166

RIL/PTH-J3-0204 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464

414 H360-009-1B168 H360-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563

415 H360-009-1B171 H360-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

416 H360-009-1B172 H360-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

417 H360-009-1B173 H360-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

418 H360-009-1B175 H360-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

419 H360-009-1B179 H360-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164

420 H360-009-1B180 H360-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

421 H360-009-1B181 H360-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

Page 48: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 48 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

422 H360-009-1B182 H360-009-1B182

RIL/PTH-J3-0204 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

423 H360-009-1B187 H360-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461

424 H360-009-1B189 H360-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961

425 H360-009-1B191 H360-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961

426 H360-009-1B192 H360-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411

427 H360-009-1B196 H360-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860

428 H360-009-1B197 H360-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860

429 H360-009-1B199 H360-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960

430 H360-009-1B200 H360-009-1B200 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860

431 H360-009-1B204 H360-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

432 H360-009-1B206 H360-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363

433 H360-009-1B208 H360-009-1B208 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

434 H360-009-1B209 H360-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

36 2.39 2.45 950 920 2961 2.59 ###

435 H360-009-1B167 H360-009-1B167

RIL/PTH-J3-0205 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563

436 H360-009-1B169 H360-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464

437 H360-009-1B170 H360-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463

438 H360-009-1B174 H360-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

439 H360-009-1B176 H360-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463

440 H360-009-1B177 H360-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964

441 H360-009-1B178 H360-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

442 H360-009-1B183 H360-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874

443 H360-009-1B184 H360-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240

444 H360-009-1B185 H360-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461

445 H360-009-1B186 H360-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461

446 H360-009-1B188 H360-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961

447 H360-009-1B190 H360-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961

448 H360-009-1B193 H360-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476

449 H360-009-1B194 H360-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476

450 H360-009-1B195 H360-009-1B195 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836

451 H360-009-1B198 H360-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960

452 H360-009-1B201 H360-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857

453 H360-009-1B202 H360-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459

454 H360-009-1B203 H360-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

Page 49: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 49 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

455 H360-009-1B205 H360-009-1B205

RIL/PTH-J3-0205 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363

456 H360-009-1B207 H360-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463

457 H360-009-1B210 H360-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178

458 H360-009-1B211 H360-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

459 H360-009-1B212 H360-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

460 H360-009-1B213 H360-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860

461 H360-009-1B214 H360-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260

462 H360-009-1B215 H360-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964

463 H360-009-1B216 H360-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

464 H360-009-1B217 H360-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494

465 H360-009-1B218 H360-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

466 H360-009-1B219 H360-009-1B219 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954

68 2.67 2.79 1087 1278 2964 4.12 ###

467 H360-009-1CT27 H360-009-1CT27 RIL/PTH-J3-0206 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312

4 0.05 0.08 352 289 312 0.03 ###

468 H360-009-1B115 H360-009-1B115

RIL/PTH-J3-0207 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163

469 H360-009-1B116 H360-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163

470 H360-009-1B118 H360-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585

471 H360-009-1B119 H360-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547

472 H360-009-1B120 H360-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547

473 H360-009-1B121 H360-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596

474 H360-009-1B128 H360-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959

475 H360-009-1B133 H360-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413

476 H360-009-1B134 H360-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463

477 H360-009-1B135 H360-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462

478 H360-009-1B136 H360-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712

479 H360-009-1B138 H360-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746

480 H360-009-1B139 H360-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746

481 H360-009-1B140 H360-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461

482 H360-009-1B141 H360-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961

483 H360-009-1B142 H360-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961

484 H360-009-1B143 H360-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961

485 H360-009-1B145 H360-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961

Page 50: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 50 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

486 H360-009-1B146 H360-009-1B146

RIL/PTH-J3-0207 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961

487 H360-009-1B147 H360-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176

488 H360-009-1B151 H360-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960

489 H360-009-1B154 H360-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464

490 H360-009-1B157 H360-009-1B157 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964

491 H360-009-1B158 H360-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964

492 H360-009-1B161 H360-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764

493 H360-009-1B163 H360-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514

494 H360-009-1B164 H360-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463

495 H360-009-1B165 H360-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763

496 H360-009-1FR10 H360-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355

497 H360-009-1SC2 H360-009-1SC2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508

498 H360-009-1SC3 H360-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508

33 2.09 2.22 1372 1314 5964 10.75 ###

499 H360-009-1CT28 H360-009-1CT28

RIL/PTH-J3-0208 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988

500 H360-009-1CT29 H360-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778

501 H360-009-1CT30 H360-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548

502 H360-009-1CT31 H360-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548

503 H360-009-1CT32 H360-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188

9 0.32 0.46 1180 1457 1988 3.42 ###

504 H360-009-1B114 H360-009-1B114 RIL/PTH-J3-0209 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463

1 0.05 0.09 680 375 1463 0.37 ###

505 H360-009-1B117 H360-009-1B117 RIL/PTH-J3-0210 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093

1 0.11 0.16 682 591 3093 1.25 ###

506 H360-009-1B122 H360-009-1B122 RIL/PTH-J3-0211 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463

1 0.05 0.08 403 333 1463 0.20 ###

507 H360-009-1B125 H360-009-1B125 RIL/PTH-J3-0212 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899

1 0.08 0.12 403 333 2899 0.39 ###

508 H360-009-1B126 H360-009-1B126 RIL/PTH-J3-0213 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963

Page 51: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 51 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.08 0.12 403 333 2963 0.40 ###

509 H360-009-1B127 H360-009-1B127 RIL/PTH-J3-0214 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459

1 0.05 0.09 403 333 1459 0.20 ###

510 H360-009-1B129 H360-009-1B129 RIL/PTH-J3-0215 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964

1 0.10 0.13 403 333 2964 0.40 ###

511 H360-009-1B130 H360-009-1B130 RIL/PTH-J3-0216 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.13 403 333 2964 0.40 ###

512 H360-009-1B131 H360-009-1B131 RIL/PTH-J3-0217 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.12 403 333 2964 0.40 ###

513 H360-009-1B132 H360-009-1B132 RIL/PTH-J3-0218 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.12 403 333 2964 0.40 ###

514 H360-009-1B137 H360-009-1B137 RIL/PTH-J3-0219 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459

1 0.05 0.09 403 333 1459 0.20 ###

515 H360-009-1B144 H360-009-1B144 RIL/PTH-J3-0220 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411

1 0.04 0.08 403 333 1411 0.19 ###

516 H360-009-1B148 H360-009-1B148 RIL/PTH-J3-0221 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860

1 0.10 0.13 403 333 2860 0.38 ###

517 H360-009-1B149 H360-009-1B149 RIL/PTH-J3-0222 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860

1 0.09 0.13 403 333 2860 0.38 ###

518 H360-009-1B150 H360-009-1B150 RIL/PTH-J3-0223 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461

2 0.10 0.13 403 333 1461 0.20 ###

519 H360-009-1B152 H360-009-1B152 RIL/PTH-J3-0224 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348

1 0.06 0.09 403 333 1348 0.18 ###

Page 52: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 52 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

520 H360-009-1B153 H360-009-1B153 RIL/PTH-J3-0225 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093

1 0.12 0.15 403 333 3093 0.42 ###

521 H360-009-1B155 H360-009-1B155 RIL/PTH-J3-0226 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464

1 0.15 0.19 403 333 5464 0.73 ###

522 H360-009-1B156 H360-009-1B156 RIL/PTH-J3-0227 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964

1 0.17 0.20 403 333 5964 0.80 ###

523 H360-009-1B159 H360-009-1B159 RIL/PTH-J3-0228 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364

1 0.07 0.11 403 333 2364 0.32 ###

524 H360-009-1B160 H360-009-1B160 RIL/PTH-J3-0229 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364

1 0.08 0.11 403 333 2364 0.32 ###

525 H360-009-1B162 H360-009-1B162 RIL/PTH-J3-0230 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882

1 0.23 0.27 403 333 7882 1.06 ###

526 H360-009-1B259 H360-009-1B259 RIL/PTH-J3-0231 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062

1 0.09 0.13 403 333 3062 0.41 ###

527 H360-009-1FR6 H360-009-1FR6 RIL/PTH-J3-0232 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744

1 0.35 0.39 403 333 1744 0.23 ###

528 H360-009-1FR7 H360-009-1FR7 RIL/PTH-J3-0233 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647

1 0.19 0.22 403 333 647 0.09 ###

529 H360-009-1FR8 H360-009-1FR8 RIL/PTH-J3-0234 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647

1 0.18 0.21 403 333 647 0.09 ###

530 H360-009-1FR9 H360-009-1FR9 RIL/PTH-J3-0235 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850

1 0.16 0.19 403 333 1850 0.25 ###

531 H360-009-1B40 H360-009-1B40

RIL/PTH-J3-0236 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834

532 H360-009-1B42 H360-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963

Page 53: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 53 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

533 H360-009-1B43 H360-009-1B43

RIL/PTH-J3-0236 BUNDLE

SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963

534 H360-009-1B44 H360-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963

535 H360-009-1B45 H360-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963

536 H360-009-1B49 H360-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963

537 H360-009-1B50 H360-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963

538 H360-009-1B52 H360-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962

539 H360-009-1B56 H360-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585

540 H360-009-1B57 H360-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463

21 3.37 3.50 1218 1262 5963 9.17 ###

541 H360-009-1B41 H360-009-1B41

RIL/PTH-J3-0237 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834

542 H360-009-1B58 H360-009-1B58 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463

543 H360-009-1B59 H360-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463

544 H360-009-1B60 H360-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463

545 H360-009-1B72 H360-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160

546 H360-009-1B78 H360-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460

547 H360-009-1B81 H360-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461

548 H360-009-1B85 H360-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659

549 H360-009-1B90 H360-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394

550 H360-009-1B69 H360-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949

551 H360-009-1B74 H360-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963

552 H360-009-1B73 H360-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963

553 H360-009-1B75 H360-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963

554 H360-009-1B76 H360-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962

555 H360-009-1B77 H360-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962

556 H360-009-1B82 H360-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461

557 H360-009-1B84 H360-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659

558 H360-009-1SC4 H360-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332

24 2.56 2.75 1121 2042 5461 12.50 ###

559 H360-009-1B46 H360-009-1B46 RIL/PTH-J3-0238 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464

2 0.14 0.19 456 566 1464 0.38 ###

560 H360-009-1B47 H360-009-1B47 RIL/PTH-J3-0239 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460

1 0.22 0.28 456 787 5460 1.96 ###

Page 54: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 54 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

561 H360-009-1B48 H360-009-1B48 RIL/PTH-J3-0240 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460

1 0.23 0.29 455 885 5460 2.20 ###

562 H360-009-1B51 H360-009-1B51 RIL/PTH-J3-0241 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462

1 0.25 0.31 455 845 5462 2.10 ###

563 H360-009-1B53 H360-009-1B53 RIL/PTH-J3-0242 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962

1 0.18 0.23 455 696 3962 1.25 ###

564 H360-009-1B54 H360-009-1B54 RIL/PTH-J3-0243 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963

1 0.18 0.23 456 699 3963 1.26 ###

565 H360-009-1B55 H360-009-1B55 RIL/PTH-J3-0244 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585

5 1.19 1.23 634 456 5585 1.61 ###

566 H360-009-1B61 H360-009-1B61 RIL/PTH-J3-0245 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462

1 0.28 0.35 851 1010 5462 4.69 ###

567 H360-009-1B62 H360-009-1B62 RIL/PTH-J3-0246 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462

1 0.23 0.29 850 822 5462 3.82 ###

568 H360-009-1B63 H360-009-1B63 RIL/PTH-J3-0247 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462

1 0.23 0.28 850 612 5462 2.84 ###

569 H360-009-1B64 H360-009-1B64 RIL/PTH-J3-0248 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462

5 1.07 1.11 641 346 5462 1.21 ###

570 H360-009-1B65 H360-009-1B65 RIL/PTH-J3-0249 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462

1 0.22 0.28 456 817 5462 2.03 ###

571 H360-009-1B66 H360-009-1B66 RIL/PTH-J3-0250 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462

1 0.23 0.29 455 814 5462 2.02 ###

572 H360-009-1B67 H360-009-1B67 RIL/PTH-J3-0251 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462

Page 55: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 55 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.22 0.27 456 574 5462 1.43 ###

573 H360-009-1B68 H360-009-1B68 RIL/PTH-J3-0252 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462

1 0.23 0.29 456 847 5462 2.11 ###

574 H360-009-1B70 H360-009-1B70 RIL/PTH-J3-0253 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462

3 0.67 0.74 456 849 5462 2.11 ###

SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 29.88 89.62

E. H361-009 SULPHUR RECOVERY UNIT APR 002

575 H361-009-1HB1 H361-009-1HB1

RIL/PTH-J3-0254 BUNDLE

SULPHUR RECOVERY UNIT APR 002 10 0.68 0.68 200 330 2897

576 H361-009-1HB2 H361-009-1HB2 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 200 330 3039

577 H361-009-1HB3 H361-009-1HB3 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2797

578 H361-009-1HB4 H361-009-1HB4 SULPHUR RECOVERY UNIT APR 002 2 0.15 0.15 200 330 3258

579 H361-009-1HB6 H361-009-1HB6 SULPHUR RECOVERY UNIT APR 002 3 0.20 0.20 200 330 2866

580 H361-009-1HB7 H361-009-1HB7 SULPHUR RECOVERY UNIT APR 002 2 0.17 0.17 200 330 3671

581 H361-009-1HB8 H361-009-1HB8 SULPHUR RECOVERY UNIT APR 002 4 0.27 0.27 200 330 2889

582 H361-009-1HB10 H361-009-1HB10 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3863

583 H361-009-1HB11 H361-009-1HB11 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2891

584 H361-009-1HB12 H361-009-1HB12 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 200 330 3828

585 H361-009-1HB13 H361-009-1HB13 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 3053

586 H361-009-1HB14 H361-009-1HB14 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 200 330 2977

587 H361-009-1HB15 H361-009-1HB15 SULPHUR RECOVERY UNIT APR 002 3 0.23 0.23 200 330 3203

588 H361-009-1VB1 H361-009-1VB1 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 330 1201

589 H361-009-1VB2 H361-009-1VB2 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 330 777

590 H361-009-1VB3 H361-009-1VB3 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1899

591 H361-009-1VB4 H361-009-1VB4 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 330 1594

592 H361-009-1VB5 H361-009-1VB5 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 200 330 3348

593 H361-009-1VB6 H361-009-1VB6 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 200 330 1625

594 H361-009-1VB7 H361-009-1VB7 SULPHUR RECOVERY UNIT APR 002 2 0.19 0.19 200 330 3940

595 H361-009-1VB8 H361-009-1VB8 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 200 330 1498

596 H361-009-1VB9 H361-009-1VB9 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1392

597 H361-009-1VB10 H361-009-1VB10 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1481

598 H361-009-1VB11 H361-009-1VB11 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1389

599 H361-009-1VB26 H361-009-1VB26 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 330 1388

Page 56: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 56 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

48 3.00 3.05 698 610 3940 1.68 ###

600 H361-009-1HB16 H361-009-1HB16

RIL/PTH-J3-0255 BUNDLE

SULPHUR RECOVERY UNIT APR 002 5 0.06 0.06 200 275 1396

601 H361-009-1HB17 H361-009-1HB17 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1230

602 H361-009-1VB12 H361-009-1VB12 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 275 1366

603 H361-009-1VB25 H361-009-1VB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 275 2409

9 0.13 0.16 326 319 2409 0.25 ###

604 H361-009-1HB5 H361-009-1HB5

RIL/PTH-J3-0256 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1934

605 H361-009-1HB18 H361-009-1HB18 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1589

606 H361-009-1HB19 H361-009-1HB19 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1616

607 H361-009-1HB20 H361-009-1HB20 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 200 290 753

608 H361-009-1HB21 H361-009-1HB21 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2383

609 H361-009-1HB22 H361-009-1HB22 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2017

610 H361-009-1HB23 H361-009-1HB23 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1804

611 H361-009-1HB24 H361-009-1HB24 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 200 290 2513

612 H361-009-1HB25 H361-009-1HB25 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1967

613 H361-009-1HB26 H361-009-1HB26 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1603

614 H361-009-1HB27 H361-009-1HB27 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1893

615 H361-009-1HB28 H361-009-1HB28 SULPHUR RECOVERY UNIT APR 002 5 0.10 0.10 200 290 1914

616 H361-009-1HB29 H361-009-1HB29 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1916

617 H361-009-1HB30 H361-009-1HB30 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1819

618 H361-009-1HB31 H361-009-1HB31 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1959

619 H361-009-1HB32 H361-009-1HB32 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1560

620 H361-009-1HB33 H361-009-1HB33 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1895

621 H361-009-1HB34 H361-009-1HB34 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1582

622 H361-009-1HB35 H361-009-1HB35 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1622

623 H361-009-1HB36 H361-009-1HB36 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1578

624 H361-009-1HB37 H361-009-1HB37 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1542

625 H361-009-1HB38 H361-009-1HB38 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1735

626 H361-009-1HB39 H361-009-1HB39 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1690

627 H361-009-1HB40 H361-009-1HB40 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1758

628 H361-009-1HB41 H361-009-1HB41 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1455

629 H361-009-1HB42 H361-009-1HB42 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2208

630 H361-009-1HB43 H361-009-1HB43 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1865

Page 57: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 57 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

631 H361-009-1HB44 H361-009-1HB44

RIL/PTH-J3-0256 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1960

632 H361-009-1HB45 H361-009-1HB45 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1756

633 H361-009-1HB46 H361-009-1HB46 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1576

634 H361-009-1HB47 H361-009-1HB47 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1503

635 H361-009-1HB48 H361-009-1HB48 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1872

636 H361-009-1HB49 H361-009-1HB49 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1591

637 H361-009-1HB50 H361-009-1HB50 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1439

638 H361-009-1HB51 H361-009-1HB51 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1816

639 H361-009-1HB52 H361-009-1HB52 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1626

640 H361-009-1HB53 H361-009-1HB53 SULPHUR RECOVERY UNIT APR 002 2 0.06 0.06 200 290 2864

641 H361-009-1HB54 H361-009-1HB54 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1787

642 H361-009-1HB55 H361-009-1HB55 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1235

643 H361-009-1HB56 H361-009-1HB56 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1260

644 H361-009-1HB57 H361-009-1HB57 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1953

645 H361-009-1HB58 H361-009-1HB58 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1476

646 H361-009-1HB59 H361-009-1HB59 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1783

647 H361-009-1HB60 H361-009-1HB60 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1416

648 H361-009-1HB61 H361-009-1HB61 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1387

649 H361-009-1HB62 H361-009-1HB62 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1938

650 H361-009-1HB63 H361-009-1HB63 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1803

651 H361-009-1HB64 H361-009-1HB64 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1749

652 H361-009-1HB65 H361-009-1HB65 SULPHUR RECOVERY UNIT APR 002 2 0.03 0.03 200 290 1227

653 H361-009-1HB66 H361-009-1HB66 SULPHUR RECOVERY UNIT APR 002 2 0.04 0.04 200 290 1979

654 H361-009-1HB67 H361-009-1HB67 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1763

655 H361-009-1HB68 H361-009-1HB68 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1351

656 H361-009-1HB69 H361-009-1HB69 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1921

657 H361-009-1HB70 H361-009-1HB70 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3445

658 H361-009-1HB71 H361-009-1HB71 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1378

659 H361-009-1HB72 H361-009-1HB72 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 2005

660 H361-009-1HB73 H361-009-1HB73 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1954

661 H361-009-1HB74 H361-009-1HB74 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1638

662 H361-009-1HB75 H361-009-1HB75 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1946

663 H361-009-1HB76 H361-009-1HB76 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1463

664 H361-009-1HB77 H361-009-1HB77 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1809

665 H361-009-1HB78 H361-009-1HB78 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1517

Page 58: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 58 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

666 H361-009-1HB79 H361-009-1HB79

RIL/PTH-J3-0256 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1366

667 H361-009-1HB80 H361-009-1HB80 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 200 290 1437

668 H361-009-1HB81 H361-009-1HB81 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 1085

669 H361-009-1VB23 H361-009-1VB23 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 200 290 3480

670 H361-009-1VB24 H361-009-1VB24 SULPHUR RECOVERY UNIT APR 002 1 0.01 0.01 200 290 580

83 1.58 1.66 585 624 3480 1.27 ###

671 H361-009-1B123 H361-009-1B123RIL/PTH-J3-0257 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1084

672 H361-009-1B124 H361-009-1B124 SULPHUR RECOVERY UNIT APR 002 2 0.02 0.02 300 250 1099

4 0.04 0.07 330 229 1099 0.08 ###

673 H361-009-1B254 H361-009-1B254RIL/PTH-J3-0258 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 876

674 H361-009-1B255 H361-009-1B255 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 350 275 969

2 0.03 0.06 386 254 969 0.10 ###

675 H361-009-1B166 H361-009-1B166

RIL/PTH-J3-0259 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1464

676 H361-009-1B168 H361-009-1B168 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1563

677 H361-009-1B171 H361-009-1B171 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

678 H361-009-1B172 H361-009-1B172 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

679 H361-009-1B173 H361-009-1B173 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

680 H361-009-1B175 H361-009-1B175 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

681 H361-009-1B179 H361-009-1B179 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1164

682 H361-009-1B180 H361-009-1B180 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

683 H361-009-1B181 H361-009-1B181 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

684 H361-009-1B182 H361-009-1B182 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 400 275 1464

685 H361-009-1B187 H361-009-1B187 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1461

686 H361-009-1B189 H361-009-1B189 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961

687 H361-009-1B191 H361-009-1B191 SULPHUR RECOVERY UNIT APR 002 8 0.67 0.67 400 275 2961

688 H361-009-1B192 H361-009-1B192 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1411

689 H361-009-1B196 H361-009-1B196 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860

690 H361-009-1B197 H361-009-1B197 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 400 275 2860

691 H361-009-1B199 H361-009-1B199 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2960

692 H361-009-1B200 H361-009-1B200 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 400 275 2860

693 H361-009-1B204 H361-009-1B204 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

694 H361-009-1B206 H361-009-1B206 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1363

Page 59: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 59 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

695 H361-009-1B208 H361-009-1B208

RIL/PTH-J3-0259 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

696 H361-009-1B209 H361-009-1B209 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1463

36 2.39 2.45 950 920 2961 2.59 ###

697 H361-009-1B167 H361-009-1B167

RIL/PTH-J3-0260 BUNDLE

SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1563

698 H361-009-1B169 H361-009-1B169 SULPHUR RECOVERY UNIT APR 002 10 0.34 0.34 400 275 1464

699 H361-009-1B170 H361-009-1B170 SULPHUR RECOVERY UNIT APR 002 5 0.17 0.17 400 275 1463

700 H361-009-1B174 H361-009-1B174 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

701 H361-009-1B176 H361-009-1B176 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463

702 H361-009-1B177 H361-009-1B177 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2964

703 H361-009-1B178 H361-009-1B178 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

704 H361-009-1B183 H361-009-1B183 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 874

705 H361-009-1B184 H361-009-1B184 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1240

706 H361-009-1B185 H361-009-1B185 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461

707 H361-009-1B186 H361-009-1B186 SULPHUR RECOVERY UNIT APR 002 6 0.21 0.21 400 275 1461

708 H361-009-1B188 H361-009-1B188 SULPHUR RECOVERY UNIT APR 002 4 0.28 0.28 400 275 2961

709 H361-009-1B190 H361-009-1B190 SULPHUR RECOVERY UNIT APR 002 5 0.35 0.35 400 275 2961

710 H361-009-1B193 H361-009-1B193 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476

711 H361-009-1B194 H361-009-1B194 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1476

712 H361-009-1B195 H361-009-1B195 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 836

713 H361-009-1B198 H361-009-1B198 SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 400 275 2960

714 H361-009-1B201 H361-009-1B201 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 857

715 H361-009-1B202 H361-009-1B202 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1459

716 H361-009-1B203 H361-009-1B203 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

717 H361-009-1B205 H361-009-1B205 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1363

718 H361-009-1B207 H361-009-1B207 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 400 275 1463

719 H361-009-1B210 H361-009-1B210 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1178

720 H361-009-1B211 H361-009-1B211 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

721 H361-009-1B212 H361-009-1B212 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1463

722 H361-009-1B213 H361-009-1B213 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 400 275 860

723 H361-009-1B214 H361-009-1B214 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1260

724 H361-009-1B215 H361-009-1B215 SULPHUR RECOVERY UNIT APR 002 3 0.07 0.07 400 275 964

725 H361-009-1B216 H361-009-1B216 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

726 H361-009-1B217 H361-009-1B217 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 400 275 1494

727 H361-009-1B218 H361-009-1B218 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 400 275 1164

Page 60: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 60 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

728 H361-009-1B219 H361-009-1B219

RIL/PTH-J3-0260 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 400 275 2954

68 2.67 2.79 1087 1278 2964 4.12 ###

729 H361-009-1CT27 H361-009-1CT27 RIL/PTH-J3-0261 BUNDLE SULPHUR RECOVERY UNIT APR 002 4 0.05 0.05 352 289 312

4 0.05 0.08 352 289 312 0.03 ###

730 H361-009-1B115 H361-009-1B115

RIL/PTH-J3-0262 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163

731 H361-009-1B116 H361-009-1B116 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 679 374 1163

732 H361-009-1B118 H361-009-1B118 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 364 5585

733 H361-009-1B119 H361-009-1B119 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 599 343 1547

734 H361-009-1B120 H361-009-1B120 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 601 344 1547

735 H361-009-1B121 H361-009-1B121 SULPHUR RECOVERY UNIT APR 002 2 0.08 0.08 403 333 1596

736 H361-009-1B128 H361-009-1B128 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2959

737 H361-009-1B133 H361-009-1B133 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1413

738 H361-009-1B134 H361-009-1B134 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1463

739 H361-009-1B135 H361-009-1B135 SULPHUR RECOVERY UNIT APR 002 1 0.14 0.14 403 333 5462

740 H361-009-1B136 H361-009-1B136 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 712

741 H361-009-1B138 H361-009-1B138 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746

742 H361-009-1B139 H361-009-1B139 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1746

743 H361-009-1B140 H361-009-1B140 SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1461

744 H361-009-1B141 H361-009-1B141 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961

745 H361-009-1B142 H361-009-1B142 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961

746 H361-009-1B143 H361-009-1B143 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2961

747 H361-009-1B145 H361-009-1B145 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2961

748 H361-009-1B146 H361-009-1B146 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2961

749 H361-009-1B147 H361-009-1B147 SULPHUR RECOVERY UNIT APR 002 1 0.03 0.03 403 333 1176

750 H361-009-1B151 H361-009-1B151 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2960

751 H361-009-1B154 H361-009-1B154 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464

752 H361-009-1B157 H361-009-1B157 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964

753 H361-009-1B158 H361-009-1B158 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5964

754 H361-009-1B161 H361-009-1B161 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1764

755 H361-009-1B163 H361-009-1B163 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1514

756 H361-009-1B164 H361-009-1B164 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 1463

757 H361-009-1B165 H361-009-1B165 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 763

758 H361-009-1FR10 H361-009-1FR10 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 1355

Page 61: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 61 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

759 H361-009-1SC2 H361-009-1SC2

RIL/PTH-J3-0262 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508

760 H361-009-1SC3 H361-009-1SC3 SULPHUR RECOVERY UNIT APR 002 1 0.02 0.02 403 333 508

33 2.09 2.22 1372 1314 5964 10.75 ###

761 H361-009-1CT28 H361-009-1CT28

RIL/PTH-J3-0263 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 1988

762 H361-009-1CT29 H361-009-1CT29 SULPHUR RECOVERY UNIT APR 002 2 0.07 0.07 403 333 778

763 H361-009-1CT30 H361-009-1CT30 SULPHUR RECOVERY UNIT APR 002 3 0.08 0.08 403 333 548

764 H361-009-1CT31 H361-009-1CT31 SULPHUR RECOVERY UNIT APR 002 2 0.05 0.05 403 333 548

765 H361-009-1CT32 H361-009-1CT32 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1188

9 0.32 0.46 1180 1457 1988 3.42 ###

766 H361-009-1B114 H361-009-1B114 RIL/PTH-J3-0264 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 680 375 1463

1 0.05 0.09 680 375 1463 0.37 ###

767 H361-009-1B117 H361-009-1B117 RIL/PTH-J3-0265 SKID SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 682 591 3093

1 0.11 0.16 682 591 3093 1.25 ###

768 H361-009-1B122 H361-009-1B122 RIL/PTH-J3-0266 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1463

1 0.05 0.08 403 333 1463 0.20 ###

769 H361-009-1B125 H361-009-1B125 RIL/PTH-J3-0267 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2899

1 0.08 0.12 403 333 2899 0.39 ###

770 H361-009-1B126 H361-009-1B126 RIL/PTH-J3-0268 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2963

1 0.08 0.12 403 333 2963 0.40 ###

771 H361-009-1B127 H361-009-1B127 RIL/PTH-J3-0269 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459

1 0.05 0.09 403 333 1459 0.20 ###

772 H361-009-1B129 H361-009-1B129 RIL/PTH-J3-0270 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2964

1 0.10 0.13 403 333 2964 0.40 ###

773 H361-009-1B130 H361-009-1B130 RIL/PTH-J3-0271 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.13 403 333 2964 0.40 ###

Page 62: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 62 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

774 H361-009-1B131 H361-009-1B131 RIL/PTH-J3-0272 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.12 403 333 2964 0.40 ###

775 H361-009-1B132 H361-009-1B132 RIL/PTH-J3-0273 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2964

1 0.09 0.12 403 333 2964 0.40 ###

776 H361-009-1B137 H361-009-1B137 RIL/PTH-J3-0274 SKID SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 403 333 1459

1 0.05 0.09 403 333 1459 0.20 ###

777 H361-009-1B144 H361-009-1B144 RIL/PTH-J3-0275 SKID SULPHUR RECOVERY UNIT APR 002 1 0.04 0.04 403 333 1411

1 0.04 0.08 403 333 1411 0.19 ###

778 H361-009-1B148 H361-009-1B148 RIL/PTH-J3-0276 SKID SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 403 333 2860

1 0.10 0.13 403 333 2860 0.38 ###

779 H361-009-1B149 H361-009-1B149 RIL/PTH-J3-0277 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 2860

1 0.09 0.13 403 333 2860 0.38 ###

780 H361-009-1B150 H361-009-1B150 RIL/PTH-J3-0278 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.10 0.10 403 333 1461

2 0.10 0.13 403 333 1461 0.20 ###

781 H361-009-1B152 H361-009-1B152 RIL/PTH-J3-0279 SKID SULPHUR RECOVERY UNIT APR 002 1 0.06 0.06 403 333 1348

1 0.06 0.09 403 333 1348 0.18 ###

782 H361-009-1B153 H361-009-1B153 RIL/PTH-J3-0280 SKID SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 403 333 3093

1 0.12 0.15 403 333 3093 0.42 ###

783 H361-009-1B155 H361-009-1B155 RIL/PTH-J3-0281 SKID SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 403 333 5464

1 0.15 0.19 403 333 5464 0.73 ###

784 H361-009-1B156 H361-009-1B156 RIL/PTH-J3-0282 SKID SULPHUR RECOVERY UNIT APR 002 1 0.17 0.17 403 333 5964

1 0.17 0.20 403 333 5964 0.80 ###

785 H361-009-1B159 H361-009-1B159 RIL/PTH-J3-0283 SKID SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 403 333 2364

1 0.07 0.11 403 333 2364 0.32 ###

Page 63: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 63 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

786 H361-009-1B160 H361-009-1B160 RIL/PTH-J3-0284 SKID SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 403 333 2364

1 0.08 0.11 403 333 2364 0.32 ###

787 H361-009-1B162 H361-009-1B162 RIL/PTH-J3-0285 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 403 333 7882

1 0.23 0.27 403 333 7882 1.06 ###

788 H361-009-1B259 H361-009-1B259 RIL/PTH-J3-0286 SKID SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 403 333 3062

1 0.09 0.13 403 333 3062 0.41 ###

789 H361-009-1FR6 H361-009-1FR6 RIL/PTH-J3-0287 SKID SULPHUR RECOVERY UNIT APR 002 1 0.35 0.35 403 333 1744

1 0.35 0.39 403 333 1744 0.23 ###

790 H361-009-1FR7 H361-009-1FR7 RIL/PTH-J3-0288 SKID SULPHUR RECOVERY UNIT APR 002 1 0.19 0.19 403 333 647

1 0.19 0.22 403 333 647 0.09 ###

791 H361-009-1FR8 H361-009-1FR8 RIL/PTH-J3-0289 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 403 333 647

1 0.18 0.21 403 333 647 0.09 ###

792 H361-009-1FR9 H361-009-1FR9 RIL/PTH-J3-0290 SKID SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 403 333 1850

1 0.16 0.19 403 333 1850 0.25 ###

793 H361-009-1B40 H361-009-1B40

RIL/PTH-J3-0291 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 456 346 2834

794 H361-009-1B42 H361-009-1B42 SULPHUR RECOVERY UNIT APR 002 5 0.76 0.76 456 346 3963

795 H361-009-1B43 H361-009-1B43 SULPHUR RECOVERY UNIT APR 002 4 0.60 0.60 456 346 3963

796 H361-009-1B44 H361-009-1B44 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3963

797 H361-009-1B45 H361-009-1B45 SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 356 5963

798 H361-009-1B49 H361-009-1B49 SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 456 346 2963

799 H361-009-1B50 H361-009-1B50 SULPHUR RECOVERY UNIT APR 002 1 0.16 0.16 456 347 3963

800 H361-009-1B52 H361-009-1B52 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 346 3962

801 H361-009-1B56 H361-009-1B56 SULPHUR RECOVERY UNIT APR 002 5 1.04 1.04 456 347 5585

802 H361-009-1B57 H361-009-1B57 SULPHUR RECOVERY UNIT APR 002 1 0.05 0.05 276 456 1463

21 3.37 3.50 1218 1262 5963 9.17 ###

803 H361-009-1B41 H361-009-1B41

RIL/PTH-J3-0292 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.12 0.12 725 347 2834

Page 64: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 64 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

804 H361-009-1B58 H361-009-1B58

RIL/PTH-J3-0292 BUNDLE

SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 957 406 1463

805 H361-009-1B59 H361-009-1B59 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463

806 H361-009-1B60 H361-009-1B60 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 456 565 1463

807 H361-009-1B72 H361-009-1B72 SULPHUR RECOVERY UNIT APR 002 1 0.09 0.09 1057 347 1160

808 H361-009-1B78 H361-009-1B78 SULPHUR RECOVERY UNIT APR 002 1 0.10 0.10 1121 346 1460

809 H361-009-1B81 H361-009-1B81 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 640 346 5461

810 H361-009-1B85 H361-009-1B85 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 1056 347 1659

811 H361-009-1B90 H361-009-1B90 SULPHUR RECOVERY UNIT APR 002 1 0.07 0.07 734 471 1394

812 H361-009-1B69 H361-009-1B69 SULPHUR RECOVERY UNIT APR 002 1 0.08 0.08 456 565 1949

813 H361-009-1B74 H361-009-1B74 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 347 2963

814 H361-009-1B73 H361-009-1B73 SULPHUR RECOVERY UNIT APR 002 5 0.55 0.55 347 456 2963

815 H361-009-1B75 H361-009-1B75 SULPHUR RECOVERY UNIT APR 002 1 0.11 0.11 456 371 2963

816 H361-009-1B76 H361-009-1B76 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962

817 H361-009-1B77 H361-009-1B77 SULPHUR RECOVERY UNIT APR 002 1 0.15 0.15 456 347 3962

818 H361-009-1B82 H361-009-1B82 SULPHUR RECOVERY UNIT APR 002 1 0.21 0.21 457 357 5461

819 H361-009-1B84 H361-009-1B84 SULPHUR RECOVERY UNIT APR 002 2 0.12 0.12 346 456 1659

820 H361-009-1SC4 H361-009-1SC4 SULPHUR RECOVERY UNIT APR 002 2 0.11 0.11 454 346 1332

24 2.56 2.75 1121 2042 5461 12.50 ###

821 H361-009-1B46 H361-009-1B46 RIL/PTH-J3-0293 BUNDLE SULPHUR RECOVERY UNIT APR 002 2 0.14 0.14 456 566 1464

2 0.14 0.19 456 566 1464 0.38 ###

822 H361-009-1B47 H361-009-1B47 RIL/PTH-J3-0294 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 787 5460

1 0.22 0.28 456 787 5460 1.96 ###

823 H361-009-1B48 H361-009-1B48 RIL/PTH-J3-0295 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 885 5460

1 0.23 0.29 455 885 5460 2.20 ###

824 H361-009-1B51 H361-009-1B51 RIL/PTH-J3-0296 SKID SULPHUR RECOVERY UNIT APR 002 1 0.25 0.25 455 845 5462

1 0.25 0.31 455 845 5462 2.10 ###

825 H361-009-1B53 H361-009-1B53 RIL/PTH-J3-0297 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 455 696 3962

1 0.18 0.23 455 696 3962 1.25 ###

826 H361-009-1B54 H361-009-1B54 RIL/PTH-J3-0298 SKID SULPHUR RECOVERY UNIT APR 002 1 0.18 0.18 456 699 3963

Page 65: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 65 of 83

DETAIL APCKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1,012.12 TONS

Quantity of Cubic Meters : 1,713.09 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA ###

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 17-Mar-15

Rev. 3

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

1 0.18 0.23 456 699 3963 1.26 ###

827 H361-009-1B55 H361-009-1B55 RIL/PTH-J3-0299 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.19 1.19 634 456 5585

5 1.19 1.23 634 456 5585 1.61 ###

828 H361-009-1B61 H361-009-1B61 RIL/PTH-J3-0300 SKID SULPHUR RECOVERY UNIT APR 002 1 0.28 0.28 851 1010 5462

1 0.28 0.35 851 1010 5462 4.69 ###

829 H361-009-1B62 H361-009-1B62 RIL/PTH-J3-0301 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 822 5462

1 0.23 0.29 850 822 5462 3.82 ###

830 H361-009-1B63 H361-009-1B63 RIL/PTH-J3-0302 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 850 612 5462

1 0.23 0.28 850 612 5462 2.84 ###

831 H361-009-1B64 H361-009-1B64 RIL/PTH-J3-0303 BUNDLE SULPHUR RECOVERY UNIT APR 002 5 1.07 1.07 641 346 5462

5 1.07 1.11 641 346 5462 1.21 ###

832 H361-009-1B65 H361-009-1B65 RIL/PTH-J3-0304 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 817 5462

1 0.22 0.28 456 817 5462 2.03 ###

833 H361-009-1B66 H361-009-1B66 RIL/PTH-J3-0305 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 455 814 5462

1 0.23 0.29 455 814 5462 2.02 ###

834 H361-009-1B67 H361-009-1B67 RIL/PTH-J3-0306 SKID SULPHUR RECOVERY UNIT APR 002 1 0.22 0.22 456 574 5462

1 0.22 0.27 456 574 5462 1.43 ###

835 H361-009-1B68 H361-009-1B68 RIL/PTH-J3-0307 SKID SULPHUR RECOVERY UNIT APR 002 1 0.23 0.23 456 847 5462

1 0.23 0.29 456 847 5462 2.11 ###

836 H361-009-1B70 H361-009-1B70 RIL/PTH-J3-0308 BUNDLE SULPHUR RECOVERY UNIT APR 002 3 0.67 0.67 456 849 5462

3 0.67 0.74 456 849 5462 2.11 ###

SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 29.88 89.62

GRAND TOTAL 1256 1012.12 1041.43 1713.09

L2463
Design Engineer: Summary Edit
Page 66: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 66 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

A. H210-550 ROOD MILL STRUCTURE

1 H210-550-FPGB1 H210-550-FPGB1 RIL/PTH-J3-0001 SKID ROOD MILL STRUCTURE 1 2.36 2.42 700 780 5470 2.99

2 H210-550-FPGB2 H210-550-FPGB2 RIL/PTH-J3-0002 SKID ROOD MILL STRUCTURE 1 2.36 2.42 759 846 5470 3.51

3 H210-550-FPGC1 H210-550-FPGC1 RIL/PTH-J3-0003 SKID ROOD MILL STRUCTURE 1 7.05 7.19 1086 1401 8425 12.82

4 H210-550-FPGC2 H210-550-FPGC2 RIL/PTH-J3-0004 SKID ROOD MILL STRUCTURE 1 10.13 10.36 1134 1815 10370 21.34

5 H210-550-FPGC3 H210-550-FPGC3 RIL/PTH-J3-0005 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1106 1406 11955 18.59

6 H210-550-FPGC4 H210-550-FPGC4 RIL/PTH-J3-0006 SKID ROOD MILL STRUCTURE 1 3.88 3.97 958 1439 2571 3.54

7 H210-550-FPGC5 H210-550-FPGC5 RIL/PTH-J3-0007 SKID ROOD MILL STRUCTURE 1 7.30 7.44 1316 1401 8425 15.53

8 H210-550-FPGC6 H210-550-FPGC6 RIL/PTH-J3-0008 SKID ROOD MILL STRUCTURE 1 9.68 10.05 881 3117 10300 28.28

9 H210-550-FPGC7 H210-550-FPGC7 RIL/PTH-J3-0009 SKID ROOD MILL STRUCTURE 1 10.92 11.10 968 1402 10900 14.79

10 H210-550-FPGC8 H210-550-FPGC8 RIL/PTH-J3-0010 SKID ROOD MILL STRUCTURE 1 9.57 9.75 708 1402 9800 9.73

11 H210-550-FPGC9 H210-550-FPGC9 RIL/PTH-J3-0011 SKID ROOD MILL STRUCTURE 1 6.33 6.47 869 1403 6176 7.53

12 H210-550-FPGC10 H210-550-FPGC10 RIL/PTH-J3-0012 SKID ROOD MILL STRUCTURE 1 7.22 7.37 586 1486 8425 7.34

13 H210-550-FPGC11 H210-550-FPGC11 RIL/PTH-J3-0013 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

14 H210-550-FPGC12 H210-550-FPGC12 RIL/PTH-J3-0014 SKID ROOD MILL STRUCTURE 1 10.25 10.44 1131 1406 10400 16.54

15 H210-550-FPGC13 H210-550-FPGC13 RIL/PTH-J3-0015 SKID ROOD MILL STRUCTURE 1 9.99 10.17 511 1406 10300 7.40

Page 67: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 67 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

16 H210-550-FPGC14 H210-550-FPGC14 RIL/PTH-J3-0016 SKID ROOD MILL STRUCTURE 1 6.40 6.54 810 1413 6176 7.07

17 H210-550-FPGC15 H210-550-FPGC15 RIL/PTH-J3-0017 SKID ROOD MILL STRUCTURE 1 7.42 7.56 885 1401 8425 10.45

18 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0018 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78

19 H210-550-FPGC16 H210-550-FPGC16 RIL/PTH-J3-0019 SKID ROOD MILL STRUCTURE 1 10.19 10.43 693 1931 10300 13.78

20 H210-550-FPGC17 H210-550-FPGC17 RIL/PTH-J3-0020 SKID ROOD MILL STRUCTURE 1 10.05 10.21 610 1241 10400 7.87

21 H210-550-FPGC18 H210-550-FPGC18 RIL/PTH-J3-0021 SKID ROOD MILL STRUCTURE 1 9.76 9.93 706 1259 10300 9.16

22 H210-550-FPGC19 H210-550-FPGC19 RIL/PTH-J3-0022 SKID ROOD MILL STRUCTURE 1 6.40 6.54 861 1405 6176 7.47

23 H210-550-FPGC20 H210-550-FPGC20 RIL/PTH-J3-0023 SKID ROOD MILL STRUCTURE 1 7.48 7.62 1164 1486 8425 14.57

24 H210-550-FPGC21 H210-550-FPGC21 RIL/PTH-J3-0024 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

25 H210-550-FPGC22 H210-550-FPGC22 RIL/PTH-J3-0025 SKID ROOD MILL STRUCTURE 1 7.41 7.54 1129 1239 6525 9.13

26 H210-550-FPGC23 H210-550-FPGC23 RIL/PTH-J3-0026 SKID ROOD MILL STRUCTURE 1 7.07 7.19 661 1242 6800 5.58

27 H210-550-FPGC24 H210-550-FPGC24 RIL/PTH-J3-0027 SKID ROOD MILL STRUCTURE 1 7.78 7.92 696 1407 7375 7.22

28 H210-550-FPGC25 H210-550-FPGC25 RIL/PTH-J3-0028 SKID ROOD MILL STRUCTURE 1 6.27 6.39 875 1240 6176 6.70

29 H210-550-FPGC26 H210-550-FPGC26 RIL/PTH-J3-0029 SKID ROOD MILL STRUCTURE 1 7.56 7.69 1164 1401 8425 13.74

30 H210-550-FPGC27 H210-550-FPGC27 RIL/PTH-J3-0030 SKID ROOD MILL STRUCTURE 1 11.58 11.76 1128 1402 11700 18.50

31 H210-550-FPGC28 H210-550-FPGC28 RIL/PTH-J3-0031 SKID ROOD MILL STRUCTURE 1 9.06 9.20 808 1402 9000 10.20

32 H210-550-FPGC29 H210-550-FPGC29 RIL/PTH-J3-0032 SKID ROOD MILL STRUCTURE 1 6.45 6.58 824 1239 6176 6.31

33 H210-550-FPGC30 H210-550-FPGC30 RIL/PTH-J3-0033 SKID ROOD MILL STRUCTURE 1 7.34 7.48 1311 1401 8425 15.47

34 H210-550-FPGC31 H210-550-FPGC31 RIL/PTH-J3-0034 SKID ROOD MILL STRUCTURE 1 10.18 10.55 696 3117 10300 22.35

35 H210-550-FPGC32 H210-550-FPGC32 RIL/PTH-J3-0035 SKID ROOD MILL STRUCTURE 1 10.84 11.03 821 1408 11900 13.76

36 H210-550-FPGC33 H210-550-FPGC33 RIL/PTH-J3-0036 SKID ROOD MILL STRUCTURE 1 11.13 11.31 676 1439 11726 11.41

37 H210-550-FPGC35 H210-550-FPGC35 RIL/PTH-J3-0037 SKID ROOD MILL STRUCTURE 1 7.30 7.44 737 1401 8425 8.70

38 H210-550-FPGC36 H210-550-FPGC36 RIL/PTH-J3-0038 SKID ROOD MILL STRUCTURE 1 10.19 10.55 695 3117 10300 22.31

39 H210-550-FPGC37 H210-550-FPGC37 RIL/PTH-J3-0039 SKID ROOD MILL STRUCTURE 1 11.22 11.40 968 1402 11900 16.15

40 H210-550-FPGC38 H210-550-FPGC38 RIL/PTH-J3-0040 SKID ROOD MILL STRUCTURE 1 11.16 11.35 711 1438 11726 11.99

41 H210-550-FPGC40 H210-550-FPGC40 RIL/PTH-J3-0041 SKID ROOD MILL STRUCTURE 1 7.33 7.47 1312 1486 8425 16.43

42 H210-550-FPGC41 H210-550-FPGC41 RIL/PTH-J3-0042 SKID ROOD MILL STRUCTURE 1 9.68 10.04 881 3110 10300 28.22

43 H210-550-FPGC42 H210-550-FPGC42 RIL/PTH-J3-0043 SKID ROOD MILL STRUCTURE 1 11.45 11.64 1022 1408 11900 17.12

44 H210-550-FPGC43 H210-550-FPGC43 RIL/PTH-J3-0044 SKID ROOD MILL STRUCTURE 1 11.13 11.32 904 1442 11726 15.29

45 H210-550-FPGC44 H210-550-FPGC44 RIL/PTH-J3-0045 SKID ROOD MILL STRUCTURE 1 7.15 7.30 1141 1486 8425 14.28

46 H210-550-FPGC45 H210-550-FPGC45 RIL/PTH-J3-0046 SKID ROOD MILL STRUCTURE 1 9.93 10.18 1136 1937 10300 22.66

47 H210-550-FPGC46 H210-550-FPGC46 RIL/PTH-J3-0047 SKID ROOD MILL STRUCTURE 1 8.30 8.44 1101 1406 7250 11.22

48 H210-550-FPGC47 H210-550-FPGC47 RIL/PTH-J3-0048 SKID ROOD MILL STRUCTURE 1 6.83 6.98 1141 1486 8425 14.28

49 H210-550-FPGC48 H210-550-FPGC48 RIL/PTH-J3-0049 SKID ROOD MILL STRUCTURE 1 9.50 9.69 1132 1432 10380 16.83

50 H210-550-FPGC49 H210-550-FPGC49 RIL/PTH-J3-0050 SKID ROOD MILL STRUCTURE 1 11.15 11.32 1099 1239 11955 16.28

Page 68: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 68 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

51 H210-550-FPGC50 H210-550-FPGC50 RIL/PTH-J3-0051 SKID ROOD MILL STRUCTURE 1 3.96 4.05 949 1395 2629 3.48

52 H210-550-FPGC51 H210-550-FPGC51 RIL/PTH-J3-0052 SKID ROOD MILL STRUCTURE 1 7.35 7.49 1312 1401 8425 15.49

53 H210-550-FPGC52 H210-550-FPGC52 RIL/PTH-J3-0053 SKID ROOD MILL STRUCTURE 1 7.14 7.29 696 1507 7140 7.49

54 H210-550-FPGC53 H210-550-FPGC53 RIL/PTH-J3-0054 SKID ROOD MILL STRUCTURE 1 9.86 10.03 1006 1241 9700 12.11

55 H210-550-FPGC54 H210-550-FPGC54 RIL/PTH-J3-0055 SKID ROOD MILL STRUCTURE 1 9.81 9.97 720 1241 9950 8.89

56 H210-550-FPGC55 H210-550-FPGC55 RIL/PTH-J3-0056 SKID ROOD MILL STRUCTURE 1 6.53 6.66 849 1407 6256 7.47

57 H210-550-FPGC56 H210-550-FPGC56 RIL/PTH-J3-0057 SKID ROOD MILL STRUCTURE 1 7.20 7.34 586 1486 8425 7.34

58 H210-550-FPGC57 H210-550-FPGC57 RIL/PTH-J3-0058 SKID ROOD MILL STRUCTURE 1 5.01 5.10 511 1406 4210 3.02

59 H210-550-FPGC58 H210-550-FPGC58 RIL/PTH-J3-0059 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99

60 H210-550-FPGC59 H210-550-FPGC59 RIL/PTH-J3-0060 SKID ROOD MILL STRUCTURE 1 9.13 9.31 695 1406 9200 8.99

61 H210-550-FPGC60 H210-550-FPGC60 RIL/PTH-J3-0061 SKID ROOD MILL STRUCTURE 1 6.45 6.59 859 1404 6244 7.53

62 H210-550-FPGC61 H210-550-FPGC61 RIL/PTH-J3-0062 SKID ROOD MILL STRUCTURE 1 7.15 7.29 878 1482 8425 10.96

63 H210-550-FPGC62 H210-550-FPGC62 RIL/PTH-J3-0063 SKID ROOD MILL STRUCTURE 1 9.43 9.63 881 1506 10500 13.93

64 H210-550-FPGC63 H210-550-FPGC63 RIL/PTH-J3-0064 SKID ROOD MILL STRUCTURE 1 9.75 9.93 1127 1402 10200 16.12

65 H210-550-FPGC64 H210-550-FPGC64 RIL/PTH-J3-0065 SKID ROOD MILL STRUCTURE 1 9.37 9.54 695 1241 10300 8.88

66 H210-550-FPGC65 H210-550-FPGC65 RIL/PTH-J3-0066 SKID ROOD MILL STRUCTURE 1 6.33 6.47 909 1426 6244 8.09

67 H210-550-FPGC66 H210-550-FPGC66 RIL/PTH-J3-0067 SKID ROOD MILL STRUCTURE 1 7.47 7.61 1311 1402 8425 15.49

68 H210-550-FPGC67 H210-550-FPGC67 RIL/PTH-J3-0068 SKID ROOD MILL STRUCTURE 1 9.60 9.79 1131 1406 9700 15.42

69 H210-550-FPGC68 H210-550-FPGC68 RIL/PTH-J3-0069 SKID ROOD MILL STRUCTURE 1 10.16 10.42 1131 2056 10000 23.25

70 H210-550-FPGC69 H210-550-FPGC69 RIL/PTH-J3-0070 SKID ROOD MILL STRUCTURE 1 6.97 7.11 660 1407 6660 6.18

71 H210-550-FPGC70 H210-550-FPGC70 RIL/PTH-J3-0071 SKID ROOD MILL STRUCTURE 1 7.73 7.87 694 1404 7500 7.31

72 H210-550-FPGC71 H210-550-FPGC71 RIL/PTH-J3-0072 SKID ROOD MILL STRUCTURE 1 6.36 6.51 876 1430 6244 7.82

73 H210-550-FPGC72 H210-550-FPGC72 RIL/PTH-J3-0073 SKID ROOD MILL STRUCTURE 1 7.47 7.62 1308 1482 8425 16.33

74 H210-550-FPGC73 H210-550-FPGC73 RIL/PTH-J3-0074 SKID ROOD MILL STRUCTURE 1 5.40 5.49 661 1407 4960 4.61

75 H210-550-FPGC74 H210-550-FPGC74 RIL/PTH-J3-0075 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1407 7140 6.99

76 H210-550-FPGC75 H210-550-FPGC75 RIL/PTH-J3-0076 SKID ROOD MILL STRUCTURE 1 9.20 9.37 811 1241 9250 9.31

77 H210-550-FPGC76 H210-550-FPGC76 RIL/PTH-J3-0077 SKID ROOD MILL STRUCTURE 1 6.52 6.66 862 1396 6244 7.51

78 H210-550-FPGC77 H210-550-FPGC77 RIL/PTH-J3-0078 SKID ROOD MILL STRUCTURE 1 7.15 7.29 1311 1486 8425 16.41

79 H210-550-FPGC78 H210-550-FPGC78 RIL/PTH-J3-0079 SKID ROOD MILL STRUCTURE 1 9.40 9.58 881 1406 10500 13.01

80 H210-550-FPGC79 H210-550-FPGC79 RIL/PTH-J3-0080 SKID ROOD MILL STRUCTURE 1 9.39 9.57 971 1406 10000 13.65

81 H210-550-FPGC80 H210-550-FPGC80 RIL/PTH-J3-0081 SKID ROOD MILL STRUCTURE 1 9.66 9.84 843 1402 10500 12.41

82 H210-550-FPGC81 H210-550-FPGC81 RIL/PTH-J3-0082 SKID ROOD MILL STRUCTURE 1 3.94 4.03 876 1422 2994 3.73

83 H210-550-FPGC82 H210-550-FPGC82 RIL/PTH-J3-0083 SKID ROOD MILL STRUCTURE 1 7.30 7.44 738 1486 8425 9.24

84 H210-550-FPGC83 H210-550-FPGC83 RIL/PTH-J3-0084 SKID ROOD MILL STRUCTURE 1 6.93 7.07 695 1406 6840 6.68

85 H210-550-FPGC84 H210-550-FPGC84 RIL/PTH-J3-0085 SKID ROOD MILL STRUCTURE 1 7.14 7.28 688 1407 7140 6.91

Page 69: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 69 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

86 H210-550-FPGC85 H210-550-FPGC85 RIL/PTH-J3-0086 SKID ROOD MILL STRUCTURE 1 9.50 9.68 661 1406 10100 9.39

87 H210-550-FPGC86 H210-550-FPGC86 RIL/PTH-J3-0087 SKID ROOD MILL STRUCTURE 1 4.11 4.20 709 1419 2994 3.01

88 H210-550-FPGC87 H210-550-FPGC87 RIL/PTH-J3-0088 SKID ROOD MILL STRUCTURE 1 7.46 7.60 1308 1482 8425 16.33

89 H210-550-FPGC88 H210-550-FPGC88 RIL/PTH-J3-0089 SKID ROOD MILL STRUCTURE 1 9.92 10.11 1131 1406 9700 15.42

90 H210-550-FPGC90 H210-550-FPGC90 RIL/PTH-J3-0090 SKID ROOD MILL STRUCTURE 1 11.57 11.76 674 1403 11794 11.15

91 H210-550-FPGC91 H210-550-FPGC91 RIL/PTH-J3-0091 SKID ROOD MILL STRUCTURE 1 6.86 7.00 731 1397 8425 8.60

92 H210-550-FPGC92 H210-550-FPGC92 RIL/PTH-J3-0092 SKID ROOD MILL STRUCTURE 1 9.41 9.57 965 1241 10385 12.44

93 H210-550-FPGC93 H210-550-FPGC93 RIL/PTH-J3-0093 SKID ROOD MILL STRUCTURE 1 8.24 8.36 658 1237 7165 5.83

94 H210-550-FPGC94 H210-550-FPGC94 RIL/PTH-J3-0094 SKID ROOD MILL STRUCTURE 1 5.50 5.58 659 1239 4910 4.01

95 H210-550-FPGC95 H210-550-FPGC95 RIL/PTH-J3-0095 SKID ROOD MILL STRUCTURE 1 7.14 7.27 696 1242 7140 6.17

96 H210-550-FPGC96 H210-550-FPGC96 RIL/PTH-J3-0096 SKID ROOD MILL STRUCTURE 1 9.61 9.79 1131 1406 9700 15.42

97 H210-550-FPGC97 H210-550-FPGC97 RIL/PTH-J3-0097 SKID ROOD MILL STRUCTURE 1 4.72 4.81 661 1406 4060 3.77

98 H210-550-FPGC98 H210-550-FPGC98 RIL/PTH-J3-0098 SKID ROOD MILL STRUCTURE 1 9.80 9.97 968 1237 9680 11.59

99 H210-550-FPGC99 H210-550-FPGC99 RIL/PTH-J3-0099 SKID ROOD MILL STRUCTURE 1 5.74 5.84 701 1597 5380 6.02

SUB TOTAL A. H210-550 ROOD MILL STRUCTURE 99 807.81 824.20 1149.16

B. H220-550 ROOD MILL STRUCTURE

100 H220-550-FPGC1 H220-550-FPGC1 RIL/PTH-J3-0100 SKID ROOD MILL STRUCTURE 1 4.58 4.69 1316 1351 6036 10.73

101 H220-550-FPGC2 H220-550-FPGC2 RIL/PTH-J3-0101 SKID ROOD MILL STRUCTURE 1 6.99 6.99 1192 1450 8437 14.58

102 H220-550-FPGC3 H220-550-FPGC3 RIL/PTH-J3-0102 SKID ROOD MILL STRUCTURE 1 5.59 5.74 1440 1495 5000 10.76

103 H220-550-FPGC4 H220-550-FPGC4 RIL/PTH-J3-0103 SKID ROOD MILL STRUCTURE 1 11.87 12.17 1400 1540 12000 25.87

104 H220-550-FPGC5 H220-550-FPGC5 RIL/PTH-J3-0104 SKID ROOD MILL STRUCTURE 1 11.48 11.75 1540 1250 10500 20.21

105 H220-550-FPGC6 H220-550-FPGC6 RIL/PTH-J3-0105 SKID ROOD MILL STRUCTURE 1 7.16 7.40 1547 1608 8437 20.99

106 H220-550-FPGC7 H220-550-FPGC7 RIL/PTH-J3-0106 SKID ROOD MILL STRUCTURE 1 5.44 5.57 1540 1180 5000 9.09

107 H220-550-FPGC8 H220-550-FPGC8 RIL/PTH-J3-0107 SKID ROOD MILL STRUCTURE 1 11.97 12.24 2259 1271 12000 34.45

108 H220-550-FPGC9 H220-550-FPGC9 RIL/PTH-J3-0108 SKID ROOD MILL STRUCTURE 1 10.08 10.33 1524 961 10500 15.38

109 H220-550-FPGC10 H220-550-FPGC10 RIL/PTH-J3-0109 SKID ROOD MILL STRUCTURE 1 6.32 6.55 1125 1540 6036 10.46

110 H220-550-FPGC11 H220-550-FPGC11 RIL/PTH-J3-0110 SKID ROOD MILL STRUCTURE 1 7.12 7.30 1550 885 8437 11.57

111 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0111 SKID ROOD MILL STRUCTURE 1 5.67 5.79 1540 995 5000 7.66

112 H220-550-FPGC12 H220-550-FPGC12 RIL/PTH-J3-0112 SKID ROOD MILL STRUCTURE 1 5.67 5.80 1540 995 5000 7.66

SUB TOTAL B. H220-550 ROOD MILL STRUCTURE 13 99.95 102.33 199.42 99951

C. H360-013 SUB PIPE RACK ACR 001

113 H360-013-VB19 ~ 23 H360-013-VB19 ~ 23 RIL/PTH-J3-0113 BUNDLE SUB PIPE RACK ACR 001 H360-013-VB19 ~ 23 10 0.16 0.52 361 375 1526 2.07

114 RIL/PTH-J3-0114 BUNDLE 25 0.49 1.63 461 545 1987 12.48H360-013-HB2 ~ HB6, VB16 ~ VB18

H360-013-HB2 ~ HB6, VB16 ~ VB18

SUB PIPE RACK ACR 001 H360-013-HB2 ~ HB6, VB16 ~ VB18

Page 70: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 70 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

115 H360-013-CT7 ~ CT13 H360-013-CT7 ~ CT13 RIL/PTH-J3-0115 BUNDLE SUB PIPE RACK ACR 001 H360-013-CT7 ~ CT13 13 0.19 1.42 1270 871 1150 16.54

116 H360-013-B67 ~ B79, B88 H360-013-B67 ~ B79, B88 RIL/PTH-J3-0116 BUNDLE SUB PIPE RACK ACR 001 H360-013-B67 ~ B79, B88 20 0.58 2.72 461 1020 2962 27.86

117 H360-013-B82 H360-013-B82 RIL/PTH-J3-0117 BUNDLE SUB PIPE RACK ACR 001 H360-013-B82 4 0.14 0.26 400 275 1461 0.64

118 H360-013-CT1 ~ CT2 H360-013-CT1 ~ CT2 RIL/PTH-J3-0118 BUNDLE SUB PIPE RACK ACR 001 H360-013-CT1 ~ CT2 8 0.11 0.53 1110 658 388 2.27

119 H360-013-B19, B80 ~ B81 H360-013-B19, B80 ~ B81 RIL/PTH-J3-0119 BUNDLE SUB PIPE RACK ACR 001 H360-013-B19, B80 ~ B81 4 0.23 0.38 436 378 4657 3.07

120 H360-013-B7 ~ B11 H360-013-B7 ~ B11 RIL/PTH-J3-0120 BUNDLE SUB PIPE RACK ACR 001 H360-013-B7 ~ B11 5 0.59 0.78 874 399 5942 10.36

121 H360-013-B4 H360-013-B4 RIL/PTH-J3-0121 BUNDLE SUB PIPE RACK ACR 001 H360-013-B4 1 0.16 0.20 856 352 4827 1.45

122 H360-013-B5 H360-013-B5 RIL/PTH-J3-0122 BUNDLE SUB PIPE RACK ACR 001 H360-013-B5 1 0.58 0.63 1722 578 5944 5.92

123 H360-013-B6 H360-013-B6 RIL/PTH-J3-0123 BUNDLE SUB PIPE RACK ACR 001 H360-013-B6 1 0.58 0.63 1718 578 5944 5.90

124 H360-013-CT4 H360-013-CT4 RIL/PTH-J3-0124 SKID SUB PIPE RACK ACR 001 H360-013-CT5 1 0.12 0.19 380 1031 1684 0.66

125 H360-013-B1 H360-013-B1 RIL/PTH-J3-0125 SKID SUB PIPE RACK ACR 001 H30-013-B1 1 0.11 0.15 399 336 2904 0.39

126 H360-013-B2 H360-013-B2 RIL/PTH-J3-0126 BUNDLE SUB PIPE RACK ACR 001 H360-013-B2 11 1.91 2.58 971 833 5673 50.47

127 H360-013-B3 H360-013-B3 RIL/PTH-J3-0128 BUNDLE SUB PIPE RACK ACR 001 H360-013-B3 6 0.87 1.13 397 503 4827 5.78

128 H360-013-VB1 H360-013-VB1 RIL/PTH-J3-0128 BUNDLE SUB PIPE RACK ACR 001 H360-013-VB1 4 0.17 0.32 397 413 1389 0.91

129 H360-013-B55 H360-013-B55 RIL/PTH-J3-0129 SKID SUB PIPE RACK ACR 001 H360-013-B55 1 0.21 0.27 358 876 5673 1.78

130 H360-013-CT3 H360-013-CT3 RIL/PTH-J3-0130 BUNDLE SUB PIPE RACK ACR 001 H360-013-CT3 3 0.20 0.35 900 649 1442 2.53

Page 71: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 71 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

131 H360-013-CT5 H360-013-CT5 RIL/PTH-J3-0131 SKID SUB PIPE RACK ACR 001 H360-013-CT5 1 0.13 0.23 380 1420 1684 0.91

132 H360-013-CT14 H360-013-CT14 RIL/PTH-J3-0132 SKID SUB PIPE RACK ACR 001 H360-013-CT14 1 0.12 0.16 826 380 1684 0.53

133 H360-013-FR1 H360-013-FR1 RIL/PTH-J3-0133 SKID SUB PIPE RACK ACR 001 H360-013-FR1 1 0.38 0.46 777 1242 4790 4.62

134 RIL/PTH-J3-0134 BUNDLE 10 1.31 1.79 750 587 5673 24.98

135 RIL/PTH-J3-0135 BUNDLE 20 5.55 6.91 1142 966 5673 125.17

136 H360-013-B14 H360-013-B14 RIL/PTH-J3-0136 SKID SUB PIPE RACK ACR 001 H360-013-B14 1 0.85 0.89 1821 520 5942 5.63

137 H360-013-B15 H360-013-B15 RIL/PTH-J3-0137 SKID SUB PIPE RACK ACR 001 H360-013-B15 1 0.63 0.67 1233 520 5942 3.81

138 H360-013-B16 H360-013-B16 RIL/PTH-J3-0138 SKID SUB PIPE RACK ACR 001 H360-013-B16 1 0.78 0.83 1615 519 5944 4.98

139 H360-013-B18 H360-013-B18 RIL/PTH-J3-0139 SKID SUB PIPE RACK ACR 001 H360-013-B18 1 0.37 0.42 410 642 5673 1.49

140 H360-013-B22 H360-013-B22 RIL/PTH-J3-0140 SKID SUB PIPE RACK ACR 001 H360-013-B22 1 0.36 0.41 609 666 4594 1.86

141 H360-013-B24 H360-013-B24 RIL/PTH-J3-0141 SKID SUB PIPE RACK ACR 001 H360-013-B24 1 0.73 0.77 1584 406 5607 3.61

142 H360-013-B26 H360-013-B26 RIL/PTH-J3-0142 SKID SUB PIPE RACK ACR 001 H360-013-B26 1 0.09 0.15 633 662 1181 0.49

143 H360-013-B28 H360-013-B28 RIL/PTH-J3-0143 BUNDLE SUB PIPE RACK ACR 001 H360-013-B28 2 0.69 0.82 793 864 4617 6.33

144 H360-013-B30 H360-013-B30 RIL/PTH-J3-0144 SKID SUB PIPE RACK ACR 001 H360-013-B30 1 0.36 0.43 846 958 4594 3.72

145 H360-013-B31 H360-013-B31 RIL/PTH-J3-0145 BUNDLE SUB PIPE RACK ACR 001 H360-013-B31 2 0.70 0.82 610 868 4617 4.89

146 H360-013-B32 H360-013-B32 RIL/PTH-J3-0146 SKID SUB PIPE RACK ACR 001 H360-013-B32 1 0.37 0.42 610 745 4617 2.10

H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B36

H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37

SUB PIPE RACK ACR 001 H360-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37

H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

SUB PIPE RACK ACR 001 H360-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

Page 72: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 72 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

147 H360-013-B34 H360-013-B34 RIL/PTH-J3-0147 SKID SUB PIPE RACK ACR 001 H360-013-B34 1 0.73 0.76 1165 344 5607 2.25

148 H360-013-B35 H360-013-B35 RIL/PTH-J3-0148 SKID SUB PIPE RACK ACR 001 H360-013-B35 1 0.87 0.91 1284 401 5942 3.06

149 H360-013-B36 H360-013-B36 RIL/PTH-J3-0149 SKID SUB PIPE RACK ACR 001 H360-013-B36 1 0.06 0.10 659 406 731 0.20

150 H360-013-B39 H360-013-B39 RIL/PTH-J3-0150 SKID SUB PIPE RACK ACR 001 H360-013-B39 1 0.37 0.42 410 657 5951 1.60

151 H360-013-B40 H360-013-B40 RIL/PTH-J3-0151 SKID SUB PIPE RACK ACR 001 H360-013-B40 1 0.37 0.43 410 660 5951 1.61

152 H360-013-B42 H360-013-B42 RIL/PTH-J3-0152 SKID SUB PIPE RACK ACR 001 H360-013-B42 1 0.32 0.38 410 867 4961 1.76

153 H360-013-B43 H360-013-B43 RIL/PTH-J3-0153 BUNDLE SUB PIPE RACK ACR 001 H360-013-B43 3 0.95 1.11 344 660 4961 3.38

154 H360-013-B44 H360-013-B44 RIL/PTH-J3-0154 SKID SUB PIPE RACK ACR 001 H360-013-B44 1 0.32 0.39 410 868 4961 1.77

155 H360-013-B45 H360-013-B45 RIL/PTH-J3-0155 SKID SUB PIPE RACK ACR 001 H360-013-B45 1 0.33 0.40 410 868 4961 1.77

SUB TOTAL C. H360-013 SUB PIPE RACK ACR 001 176 25.15 35.77 363.58

D. H361-013 SUB PIPE RACK ACR 001

156 H360-013-VB19 ~ 23 H360-013-VB19 ~ 23 RIL/PTH-J3-0113 BUNDLE SUB PIPE RACK ACR 001 H360-013-VB19 ~ 23 10 0.16 0.52 361 375 1526 2.07

157 RIL/PTH-J3-0157 BUNDLE 25 0.49 1.63 461 545 1987 12.48

158 H361-013-CT7 ~ CT13 H361-013-CT7 ~ CT13 RIL/PTH-J3-0158 BUNDLE SUB PIPE RACK ACR 001 H361-013-CT7 ~ CT13 13 0.19 1.42 1270 871 1150 16.54

159 H361-013-B67 ~ B79, B88 H361-013-B67 ~ B79, B88 RIL/PTH-J3-0159 BUNDLE SUB PIPE RACK ACR 001 H360-013-B67 ~ B79, B88 20 0.58 2.72 461 1020 2962 27.86

160 H361-013-B82 H361-013-B82 RIL/PTH-J3-0160 BUNDLE SUB PIPE RACK ACR 001 H361-013-B82 4 0.14 0.26 400 275 1461 0.64

161 H361-013-CT1 ~ CT2 H361-013-CT1 ~ CT2 RIL/PTH-J3-0161 BUNDLE SUB PIPE RACK ACR 001 H361-013-CT1 ~ CT2 8 0.11 0.53 1110 658 388 2.27

162 H361-013-B19, B80 ~ B81 H361-013-B19, B80 ~ B81 RIL/PTH-J3-0162 BUNDLE SUB PIPE RACK ACR 001 H361-013-B19, B80 ~ B81 4 0.23 0.38 436 378 4657 3.07

H361-013-HB2 ~ HB6, VB16 ~ VB18

H361-013-HB2 ~ HB6, VB16 ~ VB18

SUB PIPE RACK ACR 001 H361-013-HB2 ~ HB6, VB16 ~ VB18

L472
Design Engineer: Summary Edit
Page 73: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 73 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

163 H361-013-B7 ~ B11 H361-013-B7 ~ B11 RIL/PTH-J3-0163 BUNDLE SUB PIPE RACK ACR 001 H361-013-B7 ~ B11 5 0.59 0.78 874 399 5942 10.36

164 H361-013-B4 H361-013-B4 RIL/PTH-J3-0164 BUNDLE SUB PIPE RACK ACR 001 H361-013-B4 1 0.16 0.20 856 352 4827 1.45

165 H361-013-B5 H361-013-B5 RIL/PTH-J3-0165 BUNDLE SUB PIPE RACK ACR 001 H361-013-B5 1 0.58 0.63 1722 578 5944 5.92

166 H361-013-B6 H361-013-B6 RIL/PTH-J3-0166 BUNDLE SUB PIPE RACK ACR 001 H361-013-B6 1 0.58 0.63 1718 578 5944 5.90

167 H361-013-CT4 H361-013-CT4 RIL/PTH-J3-0167 SKID SUB PIPE RACK ACR 001 H361-013-CT5 1 0.12 0.19 380 1031 1684 0.66

168 H361-013-B1 H361-013-B1 RIL/PTH-J3-0168 SKID SUB PIPE RACK ACR 001 H31-013-B1 1 0.11 0.15 399 336 2904 0.39

169 H361-013-B2 H361-013-B2 RIL/PTH-J3-0169 BUNDLE SUB PIPE RACK ACR 001 H361-013-B2 11 1.91 2.58 971 833 5673 50.47

170 H361-013-B3 H361-013-B3 RIL/PTH-J3-0170 BUNDLE SUB PIPE RACK ACR 001 H361-013-B3 6 0.87 1.13 397 503 4827 5.78

171 H361-013-VB1 H361-013-VB1 RIL/PTH-J3-0171 BUNDLE SUB PIPE RACK ACR 001 H361-013-VB1 4 0.17 0.32 397 413 1389 0.91

172 H361-013-B55 H361-013-B55 RIL/PTH-J3-0172 SKID SUB PIPE RACK ACR 001 H361-013-B55 1 0.21 0.27 358 876 5673 1.78

173 H361-013-CT3 H361-013-CT3 RIL/PTH-J3-0173 BUNDLE SUB PIPE RACK ACR 001 H361-013-CT3 3 0.20 0.35 900 649 1442 2.53

174 H361-013-CT5 H361-013-CT5 RIL/PTH-J3-0174 SKID SUB PIPE RACK ACR 001 H361-013-CT5 1 0.13 0.23 380 1420 1684 0.91

175 H361-013-CT14 H361-013-CT14 RIL/PTH-J3-0175 SKID SUB PIPE RACK ACR 001 H361-013-CT14 1 0.12 0.16 826 380 1684 0.53

176 H361-013-FR1 H361-013-FR1 RIL/PTH-J3-0176 SKID SUB PIPE RACK ACR 001 H361-013-FR1 1 0.38 0.46 777 1242 4790 4.62

177 RIL/PTH-J3-0177 BUNDLE 10 1.31 1.79 750 587 5673 24.98

178 RIL/PTH-J3-0178 BUNDLE 20 5.55 6.91 1142 966 5673 125.17

H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B36

H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37

SUB PIPE RACK ACR 001 H361-013-B12 ~ B13, B7, B20 ~ B21, B23, B25, B27 and B37

H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

SUB PIPE RACK ACR 001 H361-013-B29, B33, B38, B41, B50 ~ B53, B56, B84 and SC1

Page 74: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 74 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

179 H361-013-B14 H361-013-B14 RIL/PTH-J3-0179 SKID SUB PIPE RACK ACR 001 H361-013-B14 1 0.85 0.89 1821 520 5942 5.63

180 H361-013-B15 H361-013-B15 RIL/PTH-J3-0180 SKID SUB PIPE RACK ACR 001 H361-013-B15 1 0.63 0.67 1233 520 5942 3.81

181 H361-013-B16 H361-013-B16 RIL/PTH-J3-0181 SKID SUB PIPE RACK ACR 001 H361-013-B16 1 0.78 0.83 1615 519 5944 4.98

182 H361-013-B18 H361-013-B18 RIL/PTH-J3-0182 SKID SUB PIPE RACK ACR 001 H361-013-B18 1 0.37 0.42 410 642 5673 1.49

183 H361-013-B22 H361-013-B22 RIL/PTH-J3-0183 SKID SUB PIPE RACK ACR 001 H361-013-B22 1 0.36 0.41 609 666 4594 1.86

184 H361-013-B24 H361-013-B24 RIL/PTH-J3-0184 SKID SUB PIPE RACK ACR 001 H361-013-B24 1 0.73 0.77 1584 406 5607 3.61

185 H361-013-B26 H361-013-B26 RIL/PTH-J3-0185 SKID SUB PIPE RACK ACR 001 H361-013-B26 1 0.09 0.15 633 662 1181 0.49

186 H361-013-B28 H361-013-B28 RIL/PTH-J3-0186 BUNDLE SUB PIPE RACK ACR 001 H361-013-B28 2 0.69 0.82 793 864 4617 6.33

187 H361-013-B30 H361-013-B30 RIL/PTH-J3-0187 SKID SUB PIPE RACK ACR 001 H361-013-B30 1 0.36 0.43 846 958 4594 3.72

188 H361-013-B31 H361-013-B31 RIL/PTH-J3-0188 BUNDLE SUB PIPE RACK ACR 001 H361-013-B31 2 0.70 0.82 610 868 4617 4.89

189 H361-013-B32 H361-013-B32 RIL/PTH-J3-0189 SKID SUB PIPE RACK ACR 001 H361-013-B32 1 0.37 0.42 610 745 4617 2.10

190 H361-013-B34 H361-013-B34 RIL/PTH-J3-0190 SKID SUB PIPE RACK ACR 001 H361-013-B34 1 0.73 0.76 1165 344 5607 2.25

191 H361-013-B35 H361-013-B35 RIL/PTH-J3-0191 SKID SUB PIPE RACK ACR 001 H361-013-B35 1 0.87 0.91 1284 401 5942 3.06

192 H361-013-B36 H361-013-B36 RIL/PTH-J3-0192 SKID SUB PIPE RACK ACR 001 H361-013-B36 1 0.06 0.10 659 406 731 0.20

193 H361-013-B39 H361-013-B39 RIL/PTH-J3-0193 SKID SUB PIPE RACK ACR 001 H361-013-B39 1 0.37 0.42 410 657 5951 1.60

194 H361-013-B40 H361-013-B40 RIL/PTH-J3-0194 SKID SUB PIPE RACK ACR 001 H361-013-B40 1 0.37 0.43 410 660 5951 1.61

195 H361-013-B42 H361-013-B42 RIL/PTH-J3-0195 SKID SUB PIPE RACK ACR 001 H361-013-B42 1 0.32 0.38 410 867 4961 1.76

Page 75: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 75 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

196 H361-013-B43 H361-013-B43 RIL/PTH-J3-0196 BUNDLE SUB PIPE RACK ACR 001 H361-013-B43 3 0.95 1.11 344 660 4961 3.38

197 H361-013-B44 H361-013-B44 RIL/PTH-J3-0197 SKID SUB PIPE RACK ACR 001 H361-013-B44 1 0.32 0.39 410 868 4961 1.77

198 H361-013-B45 H361-013-B45 RIL/PTH-J3-0198 SKID SUB PIPE RACK ACR 001 H361-013-B45 1 0.33 0.40 410 868 4961 1.77

#REF! 176 25.15 35.77 363.58 25155

D. H360-009 SULPHUR RECOVERY UNIT APR 002

199 RIL/PTH-J3-0199 BUNDLE 48 3.00 5.36 698 610 3940 80.52

200 RIL/PTH-J3-0200 BUNDLE 9 0.13 0.43 326 319 2409 2.25

201 RIL/PTH-J3-0201 BUNDLE 83 1.58 7.79 585 624 3480 105.44

202 H360-009-1B123 ~ 1B124 H360-009-1B123 ~ 1B124 RIL/PTH-J3-0202 BUNDLE 4 0.04 0.16 330 229 1099 0.33

203 H360-009-1B254 ~ 1B255 H360-009-1B254 ~ 1B255 RIL/PTH-J3-0203 BUNDLE 2 0.03 0.09 386 254 969 0.19

204 RIL/PTH-J3-0204 BUNDLE 36 2.39 4.76 950 920 2961 93.16

H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

SULPHUR RECOVERY UNIT APR 002 H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

H360-009-1HB16 ~ 1HB17, 1VB12, 1VB25

H360-009-1HB16 ~ 1HB17, 1VB12, 1VB25

SULPHUR RECOVERY UNIT APR 002 H360-009-1HB16 ~ 1HB17, 1VB12, 1VB25

H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

SULPHUR RECOVERY UNIT APR 002 H360-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

SULPHUR RECOVERY UNIT APR 002 H360-009-1B123 ~ 1B124

SULPHUR RECOVERY UNIT APR 002 H360-009-1B254 ~ 1B255

H360-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

H360-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

SULPHUR RECOVERY UNIT APR 002 H360-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

Page 76: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 76 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

205 RIL/PTH-J3-0205 BUNDLE 68 2.67 11.36 1087 1278 2964 279.99

206 H360-009-1CT27 H360-009-1CT27 RIL/PTH-J3-0206 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1CT27 4 0.05 0.18 352 289 312 0.13

207 33 2.09 6.41 1372 1314 5964 354.81

208 H360-009-1CT28 ~ 1CT32 H360-009-1CT28 ~ 1CT32 RIL/PTH-J3-0208 BUNDLE 9 0.32 1.60 1180 1457 1988 30.76

209 H360-009-1B114 H360-009-1B114 RIL/PTH-J3-0209 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B114 1 0.05 0.09 680 375 1463 0.37

210 H360-009-1B117 H360-009-1B117 RIL/PTH-J3-0210 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B117 1 0.11 0.16 682 591 3093 1.25

211 H360-009-1B122 H360-009-1B122 RIL/PTH-J3-0211 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B122 1 0.05 0.08 403 333 1463 0.20

212 H360-009-1B125 H360-009-1B125 RIL/PTH-J3-0212 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B125 1 0.08 0.12 403 333 2899 0.39

213 H360-009-1B126 H360-009-1B126 RIL/PTH-J3-0213 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B126 1 0.08 0.12 403 333 2963 0.40

214 H360-009-1B127 H360-009-1B127 RIL/PTH-J3-0214 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B127 1 0.05 0.09 403 333 1459 0.20

215 H360-009-1B129 H360-009-1B129 RIL/PTH-J3-0215 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B129 1 0.10 0.13 403 333 2964 0.40

216 H360-009-1B130 H360-009-1B130 RIL/PTH-J3-0216 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B130 1 0.09 0.13 403 333 2964 0.40

217 H360-009-1B131 H360-009-1B131 RIL/PTH-J3-0217 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B131 1 0.09 0.12 403 333 2964 0.40

H360-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

H360-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

SULPHUR RECOVERY UNIT APR 002 H360-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

H360-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

H360-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

SULPHUR RECOVERY UNIT APR 002 H360-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

SULPHUR RECOVERY UNIT APR 002 H360-009-1CT28 ~ 1CT32

Page 77: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 77 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

218 H360-009-1B132 H360-009-1B132 RIL/PTH-J3-0218 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B132 1 0.09 0.12 403 333 2964 0.40

219 H360-009-1B137 H360-009-1B137 RIL/PTH-J3-0219 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B137 1 0.05 0.09 403 333 1459 0.20

220 H360-009-1B144 H360-009-1B144 RIL/PTH-J3-0220 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B144 1 0.04 0.08 403 333 1411 0.19

221 H360-009-1B148 H360-009-1B148 RIL/PTH-J3-0221 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B148 1 0.10 0.13 403 333 2860 0.38

222 H360-009-1B149 H360-009-1B149 RIL/PTH-J3-0222 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B149 1 0.09 0.13 403 333 2860 0.38

223 H360-009-1B150 H360-009-1B150 RIL/PTH-J3-0223 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B150 2 0.10 0.17 403 333 1461 0.39

224 H360-009-1B152 H360-009-1B152 RIL/PTH-J3-0224 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B152 1 0.06 0.09 403 333 1348 0.18

225 H360-009-1B153 H360-009-1B153 RIL/PTH-J3-0225 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B153 1 0.12 0.15 403 333 3093 0.42

226 H360-009-1B155 H360-009-1B155 RIL/PTH-J3-0226 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B155 1 0.15 0.19 403 333 5464 0.73

227 H360-009-1B156 H360-009-1B156 RIL/PTH-J3-0227 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B156 1 0.17 0.20 403 333 5964 0.80

228 H360-009-1B159 H360-009-1B159 RIL/PTH-J3-0228 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B159 1 0.07 0.11 403 333 2364 0.32

229 H360-009-1B160 H360-009-1B160 RIL/PTH-J3-0229 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B160 1 0.08 0.11 403 333 2364 0.32

230 H360-009-1B162 H360-009-1B162 RIL/PTH-J3-0230 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B162 1 0.23 0.27 403 333 7882 1.06

231 H360-009-1B259 H360-009-1B259 RIL/PTH-J3-0231 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B259 1 0.09 0.13 403 333 3062 0.41

232 H360-009-1FR6 H360-009-1FR6 RIL/PTH-J3-0232 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR6 1 0.35 0.39 403 333 1744 0.23

233 H360-009-1FR7 H360-009-1FR7 RIL/PTH-J3-0233 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR7 1 0.19 0.22 403 333 647 0.09

234 H360-009-1FR8 H360-009-1FR8 RIL/PTH-J3-0234 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR8 1 0.18 0.21 403 333 647 0.09

Page 78: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 78 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

235 H360-009-1FR9 H360-009-1FR9 RIL/PTH-J3-0235 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1FR9 1 0.16 0.19 403 333 1850 0.25

236 RIL/PTH-J3-0236 BUNDLE 21 3.37 6.03 1218 1262 5963 192.48

237 RIL/PTH-J3-0237 BUNDLE 24 2.56 7.11 1121 2042 5461 300.02

238 H360-009-1B46 H360-009-1B46 RIL/PTH-J3-0238 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B46 2 0.14 0.24 456 566 1464 0.76

239 H360-009-1B47 H360-009-1B47 RIL/PTH-J3-0239 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B47 1 0.22 0.28 456 787 5460 1.96

240 H360-009-1B48 H360-009-1B48 RIL/PTH-J3-0240 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B48 1 0.23 0.29 455 885 5460 2.20

241 H360-009-1B51 H360-009-1B51 RIL/PTH-J3-0241 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B51 1 0.25 0.31 455 845 5462 2.10

242 H360-009-1B53 H360-009-1B53 RIL/PTH-J3-0242 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B53 1 0.18 0.23 455 696 3962 1.25

243 H360-009-1B54 H360-009-1B54 RIL/PTH-J3-0243 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B54 1 0.18 0.23 456 699 3963 1.26

244 H360-009-1B55 H360-009-1B55 RIL/PTH-J3-0244 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B55 5 1.19 1.39 634 456 5585 8.07

245 H360-009-1B61 H360-009-1B61 RIL/PTH-J3-0245 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B61 1 0.28 0.35 851 1010 5462 4.69

246 H360-009-1B62 H360-009-1B62 RIL/PTH-J3-0246 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B62 1 0.23 0.29 850 822 5462 3.82

247 H360-009-1B63 H360-009-1B63 RIL/PTH-J3-0247 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B63 1 0.23 0.28 850 612 5462 2.84

248 H360-009-1B64 H360-009-1B64 RIL/PTH-J3-0248 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B64 5 1.07 1.25 641 346 5462 6.06

249 H360-009-1B65 H360-009-1B65 RIL/PTH-J3-0249 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B65 1 0.22 0.28 456 817 5462 2.03

250 H360-009-1B66 H360-009-1B66 RIL/PTH-J3-0250 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B66 1 0.23 0.29 455 814 5462 2.02

H360-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

H360-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

SULPHUR RECOVERY UNIT APR 002 H360-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

H360-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

H360-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

SULPHUR RECOVERY UNIT APR 002 H360-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

Page 79: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 79 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

251 H360-009-1B67 H360-009-1B67 RIL/PTH-J3-0251 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B67 1 0.22 0.27 456 574 5462 1.43

252 H360-009-1B68 H360-009-1B68 RIL/PTH-J3-0252 SKID SULPHUR RECOVERY UNIT APR 002 H360-009-1B68 1 0.23 0.29 456 847 5462 2.11

253 H360-009-1B70 H360-009-1B70 RIL/PTH-J3-0253 BUNDLE SULPHUR RECOVERY UNIT APR 002 H360-009-1B70 3 0.67 0.86 456 849 5462 6.34

SUB TOTAL D. H360-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88 62400

E. H361-009 SULPHUR RECOVERY UNIT APR 002

254 RIL/PTH-J3-0254 BUNDLE 48 3.00 5.36 698 610 3940 80.52

255 RIL/PTH-J3-0255 BUNDLE 9 0.13 0.43 326 319 2409 2.25

256 RIL/PTH-J3-0256 BUNDLE 83 1.58 7.79 585 624 3480 105.44

257 H361-009-1B123 ~ 1B124 H360-009-1B123 ~ 1B124 RIL/PTH-J3-0257 BUNDLE 4 0.04 0.16 330 229 1099 0.33

258 H361-009-1B254 ~ 1B255 H360-009-1B254 ~ 1B255 RIL/PTH-J3-0258 BUNDLE 2 0.03 0.09 386 254 969 0.19

259 RIL/PTH-J3-0259 BUNDLE 36 2.39 4.76 950 920 2961 93.16

H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

SULPHUR RECOVERY UNIT APR 002 H360-009-1HB1 ~ 1HB4, 1HB6 ~ 1HB8, 1HB10 ~ 1HB15, 1VB1 ~ 1VB11, 1VB26

H361-009-1HB16 ~ 1HB17, 1VB12, 1VB25

H361-009-1HB16 ~ 1HB17, 1VB12, 1VB25

SULPHUR RECOVERY UNIT APR 002 H361-009-1HB16 ~ 1HB17, 1VB12, 1VB25

H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

SULPHUR RECOVERY UNIT APR 002 H361-009-1B5, 1B18 ~ 1B81, 1VB23 ~ 1VB24

SULPHUR RECOVERY UNIT APR 002 H361-009-1B123 ~ 1B124

SULPHUR RECOVERY UNIT APR 002 H361-009-1B254 ~ 1B255

H361-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

H361-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

SULPHUR RECOVERY UNIT APR 002 H361-009-1B166, 1B168, 1B171 ~ 1B73, 1B175, 1B179 ~ 1B182, 1B187, 1B189, 1B191 ~ 1B192, 1B196 ~ 1B197, 1B199 ~ 1B200, 1B204, 1B206, 1B208 ~ 1B209

Page 80: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 80 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

260 RIL/PTH-J3-0260 BUNDLE 68 2.67 11.36 1087 1278 2964 279.99

261 H361-009-1CT27 H361-009-1CT27 RIL/PTH-J3-0261 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1CT27 4 0.05 0.18 352 289 312 0.13

262 RIL/PTH-J3-0262 33 2.09 6.41 1372 1314 5964 354.81

263 H361-009-1CT28 ~ 1CT32 H361-009-1CT28 ~ 1CT32 RIL/PTH-J3-0263 BUNDLE 9 0.32 1.60 1180 1457 1988 30.76

264 H361-009-1B114 H361-009-1B114 RIL/PTH-J3-0264 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B114 1 0.05 0.09 680 375 1463 0.37

265 H361-009-1B117 H361-009-1B117 RIL/PTH-J3-0265 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B117 1 0.11 0.16 682 591 3093 1.25

266 H361-009-1B122 H361-009-1B122 RIL/PTH-J3-0266 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B122 1 0.05 0.08 403 333 1463 0.20

267 H361-009-1B125 H361-009-1B125 RIL/PTH-J3-0267 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B125 1 0.08 0.12 403 333 2899 0.39

268 H361-009-1B126 H361-009-1B126 RIL/PTH-J3-0268 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B126 1 0.08 0.12 403 333 2963 0.40

269 H361-009-1B127 H361-009-1B127 RIL/PTH-J3-0269 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B127 1 0.05 0.09 403 333 1459 0.20

270 H361-009-1B129 H361-009-1B129 RIL/PTH-J3-0270 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B129 1 0.10 0.13 403 333 2964 0.40

271 H361-009-1B130 H361-009-1B130 RIL/PTH-J3-0271 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B130 1 0.09 0.13 403 333 2964 0.40

272 H361-009-1B131 H361-009-1B131 RIL/PTH-J3-0272 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B131 1 0.09 0.12 403 333 2964 0.40

H361-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

H361-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

SULPHUR RECOVERY UNIT APR 002 H361-009-1B167, 1B169 ~ 1B170, 1B174, 1B176 ~ 1B178, 1B183 ~ 1B186, 1B188, 1B190, 1B193 ~ 1B195, 1B198, 1B201 ~ 1B205, 1B207, 1B210 ~ 1B219

H361-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

H361-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

SULPHUR RECOVERY UNIT APR 002 H361-009-1B115 ~ 1B121, 1B128, 1B133 ~ 1B136, 1B138 ~ 1B143, 1B145 ~ 1B147, 1B151, 1B154, 1B157 ~ 1B158, 1B161, 1B163 ~ 1B165, 1FR10, 1SC2 ~ 1SC3

SULPHUR RECOVERY UNIT APR 002 H360-009-1CT28 ~ 1CT32

Page 81: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 81 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

273 H361-009-1B132 H361-009-1B132 RIL/PTH-J3-0273 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B132 1 0.09 0.12 403 333 2964 0.40

274 H361-009-1B137 H361-009-1B137 RIL/PTH-J3-0274 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B137 1 0.05 0.09 403 333 1459 0.20

275 H361-009-1B144 H361-009-1B144 RIL/PTH-J3-0275 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B144 1 0.04 0.08 403 333 1411 0.19

276 H361-009-1B148 H361-009-1B148 RIL/PTH-J3-0276 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B148 1 0.10 0.13 403 333 2860 0.38

277 H361-009-1B149 H361-009-1B149 RIL/PTH-J3-0277 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B149 1 0.09 0.13 403 333 2860 0.38

278 H361-009-1B150 H361-009-1B150 RIL/PTH-J3-0278 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B150 2 0.10 0.17 403 333 1461 0.39

279 H361-009-1B152 H361-009-1B152 RIL/PTH-J3-0279 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B152 1 0.06 0.09 403 333 1348 0.18

280 H361-009-1B153 H361-009-1B153 RIL/PTH-J3-0280 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B153 1 0.12 0.15 403 333 3093 0.42

281 H361-009-1B155 H361-009-1B155 RIL/PTH-J3-0281 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B155 1 0.15 0.19 403 333 5464 0.73

282 H361-009-1B156 H361-009-1B156 RIL/PTH-J3-0282 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B156 1 0.17 0.20 403 333 5964 0.80

283 H361-009-1B159 H361-009-1B159 RIL/PTH-J3-0283 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B159 1 0.07 0.11 403 333 2364 0.32

284 H361-009-1B160 H361-009-1B160 RIL/PTH-J3-0284 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B160 1 0.08 0.11 403 333 2364 0.32

285 H361-009-1B162 H361-009-1B162 RIL/PTH-J3-0285 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B162 1 0.23 0.27 403 333 7882 1.06

286 H361-009-1B259 H361-009-1B259 RIL/PTH-J3-0286 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B259 1 0.09 0.13 403 333 3062 0.41

287 H361-009-1FR6 H361-009-1FR6 RIL/PTH-J3-0287 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR6 1 0.35 0.39 403 333 1744 0.23

288 H361-009-1FR7 H361-009-1FR7 RIL/PTH-J3-0288 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR7 1 0.19 0.22 403 333 647 0.09

289 H361-009-1FR8 H361-009-1FR8 RIL/PTH-J3-0289 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR8 1 0.18 0.21 403 333 647 0.09

Page 82: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 82 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

290 H361-009-1FR9 H361-009-1FR9 RIL/PTH-J3-0290 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1FR9 1 0.16 0.19 403 333 1850 0.25

291 RIL/PTH-J3-0291 BUNDLE 21 3.37 6.03 1218 1262 5963 192.48

292 RIL/PTH-J3-0292 BUNDLE 24 2.56 7.11 1121 2042 5461 300.02

293 H361-009-1B46 H361-009-1B46 RIL/PTH-J3-0293 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B46 2 0.14 0.24 456 566 1464 0.76

294 H361-009-1B47 H361-009-1B47 RIL/PTH-J3-0294 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B47 1 0.22 0.28 456 787 5460 1.96

295 H361-009-1B48 H361-009-1B48 RIL/PTH-J3-0295 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B48 1 0.23 0.29 455 885 5460 2.20

296 H361-009-1B51 H361-009-1B51 RIL/PTH-J3-0296 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B51 1 0.25 0.31 455 845 5462 2.10

297 H361-009-1B53 H361-009-1B53 RIL/PTH-J3-0297 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B53 1 0.18 0.23 455 696 3962 1.25

298 H361-009-1B54 H361-009-1B54 RIL/PTH-J3-0298 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B54 1 0.18 0.23 456 699 3963 1.26

299 H361-009-1B55 H361-009-1B55 RIL/PTH-J3-0299 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B55 5 1.19 1.39 634 456 5585 8.07

300 H361-009-1B61 H361-009-1B61 RIL/PTH-J3-0300 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B61 1 0.28 0.35 851 1010 5462 4.69

301 H361-009-1B62 H361-009-1B62 RIL/PTH-J3-0301 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B62 1 0.23 0.29 850 822 5462 3.82

302 H361-009-1B63 H361-009-1B63 RIL/PTH-J3-0302 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B63 1 0.23 0.28 850 612 5462 2.84

303 H361-009-1B64 H361-009-1B64 RIL/PTH-J3-0303 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B64 5 1.07 1.25 641 346 5462 6.06

304 H361-009-1B65 H361-009-1B65 RIL/PTH-J3-0304 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B65 1 0.22 0.28 456 817 5462 2.03

H361-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

H361-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

SULPHUR RECOVERY UNIT APR 002 H361-009-1B40 ~ 1B45, 1B49 ~ 1B50, 1B52, 1B56 ~ 1B57

H361-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

H361-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

SULPHUR RECOVERY UNIT APR 002 H361-009-1B41, 1B58 ~ 1B60, 1B69, 1B72 ~ 1B78, 1B81 ~ 1B82, 1B84 ~ 1B85, 1B90 and 1SC4

Page 83: Hanjung Packing List 2nd Shipment

04/18/2023 23:19:04

Page 83 of 83

SUMMARY PACKING LIST 2nd SHIPMENTJAMNAGAR 3 (J3) GASIFICATION PROJECT

Purchase Order Number : 1J/3HM/7558812

Item Code : 4500190308

Description : Fabrication Steel Structures

Quantity : 308 Pckgs

Quantity of Weight : 1012.12 TONS

Quantity of Cubic Meters : 5075.49 CBM

Shipped from : Hanjung Private Jetty, Lampung INDONESIA

Shipped to : Kandla, INDIA

Date of Shipment to India : 22-March-2015 11-Mar-15

REV.02

PACK NO. DRAWING NO. MARKING NO.PACKAGE

TYPE DESCRIPTION QTYWEIGHT (ton) DIMENSION (mm)

CBM (m3) BARGE/ CONTAINER REMARKNo. NETT. GROSS HEIGHT WIDTH LENGTH

305 H361-009-1B66 H361-009-1B66 RIL/PTH-J3-0305 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B66 1 0.23 0.29 455 814 5462 2.02

306 H361-009-1B67 H361-009-1B67 RIL/PTH-J3-0306 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B67 1 0.22 0.27 456 574 5462 1.43

307 H361-009-1B68 H361-009-1B68 RIL/PTH-J3-0307 SKID SULPHUR RECOVERY UNIT APR 002 H361-009-1B68 1 0.23 0.29 456 847 5462 2.11

308 H361-009-1B70 H361-009-1B70 RIL/PTH-J3-0308 BUNDLE SULPHUR RECOVERY UNIT APR 002 H361-009-1B70 3 0.67 0.86 456 849 5462 6.34

SUB TOTAL E. H361-009 SULPHUR RECOVERY UNIT APR 002 396 27.02 62.40 1499.88

GRAND TOTAL 1256 1012.12 1122.86 5075.49