Former NAS Moffett Field Hangar 1 Removal Action Update Hangar 1 Removal Action Update Hangar 1 Removal Action Update Hangar 1 Removal Action Update Bryce Bartelma, PG Navy BRAC PMO West May 12, 2011 RAB Meeting 1
18

Hangar One Update to the Moffett RAB

May 17, 2015

Download

Education

Steve Williams

Presentation to the Moffett Restoration Advisory Board May 12, 2011.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hangar One Update to the Moffett RAB

Former NAS Moffett Field

Hangar 1 Removal Action UpdateHangar 1 Removal Action UpdateHangar 1 Removal Action UpdateHangar 1 Removal Action Update

Bryce Bartelma, PGNavy BRAC PMO West

May 12, 2011RAB Meeting

1

Page 2: Hangar One Update to the Moffett RAB

Presentation Overview

P j t Obj ti• Project Objective• Progress Update

Biological Monitoring Scaffolding Installation Biological Monitoring Storm Water Protection Air Monitoring Hi t i Miti ti

Scaffolding Installation Roof, Redwood, Siding &

Window Removal Washing & CM15 Coating Historic Mitigation

Structural Steel Repairs

• Future Activities

Washing & CM15 Coating

• Schedule• Questions

2

Page 3: Hangar One Update to the Moffett RAB

Project Objective

• Control release of PCBs from Hangar 1 in accordance with EE/CA (July 2008) and Action Memorandum (December 2008)(December 2008)Demolition of interior structuresRemoval of contaminated sidingRemoval of contaminated sidingApplication of weather-resistant coating to steel frame

3

Page 4: Hangar One Update to the Moffett RAB

Continued Biological Monitoring

• Weekly observation of Burrowing OwlsI ti f bi l i l ti it i id• Inspection of biological activity inside and outside of hangar

• Weekly reports to NASA and regulatorsWeekly reports to NASA and regulators• No observed impacts to protected

species

Owl Buffer Fence

4

Page 5: Hangar One Update to the Moffett RAB

Continued Storm Water Protection

S di t d• Sediment removed from storm water trench and pluggedp gg

• Plastic liner placed over bare soil areas

l b l d• Silt barriers placed around storm drains

• Paved areas• Paved areas vacuumed prior to storm events

5

Page 6: Hangar One Update to the Moffett RAB

Continued Air Monitoring

• Continuous air monitoring during• Continuous air monitoring during removal action activities

• Three levels of air monitoringW k– Workers

– Work areas– Site perimeter

• Monitoring coordinated with NASA• Weekly reports provided to agencies

and public p• Data demonstrates control of air

emissions• NASA conducting air monitoring at

6

NASA conducting air monitoring at nearby buildings

Page 7: Hangar One Update to the Moffett RAB

Turnover of Historic Artifacts to NASA

7

Page 8: Hangar One Update to the Moffett RAB

Hangar 1 Interactive CD

• Provides interviews andProvides interviews and narrated history

• Navy and NASA working together to develop final CD

• Copies to be available to• Copies to be available to RAB, local schools, and library. Additional copies

il bl f havailable for purchase from the Moffett Field Museum

8

Page 9: Hangar One Update to the Moffett RAB

Structural Steel RepairsStructural Steel Repairs

• Structural engineers inspectStructural engineers inspect and document missing steel

• Replaced 5 steel members• Inspected by Navy, Exeltech

and AMEC on 2/28/11

9

Page 10: Hangar One Update to the Moffett RAB

Scaffolding InstallationScaffolding Installation

10

Page 11: Hangar One Update to the Moffett RAB

Quick DeckQuick Deck®® –– Suspended ScaffoldSuspended Scaffold

• Stable platform for workers to access upperworkers to access upper roof area of hangar

• Better control of contaminants (use of plastic sheeting)

11

Page 12: Hangar One Update to the Moffett RAB

Swing StageSwing Stage®®

• Added safety measure allowing two additional workers to assist interior workers with removal ofworkers with removal of panels, redwood, and windows

l l d• Materials are lowered to ground for ultimate disposal off-sitep

• Wind screens and monitors, air samplers & BMPs at g o nd s face

12

BMPs at ground surface

Page 13: Hangar One Update to the Moffett RAB

Mansard Roof Panels, Redwood Decking, Mansard Roof Panels, Redwood Decking, and Silver Siding Removaland Silver Siding Removalgg

• Mansard RoofFi t d l• First mansard panel removed from Zone 1 on April 21p

• Redwood decking and silver siding removal

13

Page 14: Hangar One Update to the Moffett RAB

Damaged Corrugated WindowsDamaged Corrugated Windows

• NASA determined windows not feasible to keep due to deteriorating conditionkeep due to deteriorating condition

• Navy will salvage a small number of corrugated window panes that are in good g p gcondition for NASA

14

Page 15: Hangar One Update to the Moffett RAB

Washing & Coating Washing & Coating –– CarbomasticCarbomastic 1515

• Initiated Zone 1 washing and icoating

• Capture and treatment of wash water containing PCBwash water containing PCB dust

• Single application of 4-6 mils f d bof CM 15 provides better

service life and encapsulation propertiesp p

15

Page 16: Hangar One Update to the Moffett RAB

Future Activities

• Continued biological & air monitoringmonitoring

• Scaffold installation in northern zones

• Continued siding removal, hi f t l dwashing of steel and

coating • Continued Community

16

Continued Community Outreach

Page 17: Hangar One Update to the Moffett RAB

ScheduleSchedule

• Fieldwork in zones 1 – 6 OngoingC l t fi ld k• Complete fieldwork, confirmation sampling and demobilize Early 20122012

• Submit After Action Completion Report p pSpring/Summer 2012

17

Page 18: Hangar One Update to the Moffett RAB

Questions?

Point of Contact:

Scott Anderson, P.E.BRAC EnvironmentalBRAC Environmental

Coordinator(619) 532-0938( )

[email protected]

18