Hancock Prospecting
Hancock’s Pilbara Projects
Strengthening Australia
Presented by Tad Watroba - Director
on behalf of
Gina RinehartChairman
Hancock Prospecting Pty Ltd
Metal Bulletin’s China Iron Ore Conference in Association with China Minmetals Corp28 March 2006
China World Hotel, Beijing
2
Hancock Prospecting
Rio Tinto’s New Shiploader, Parker Point – Dampier Port Upgrade Phase A
Pho
to c
ourte
sy R
io T
into
3
Hancock Prospecting
Lang Hancock, Gina Rinehart and Bianca Rinehart, Hong Kong
4
Hancock Prospecting
The Hope Downs Project area
5
Hancock ProspectingHPPL Iron Ore Deposits and Rail Infrastructure
6
Hancock Prospecting
Hope Downs will benefit from experience gained at the West Angelas Marra Mamba mine
Phot
o co
urte
sy R
io T
into
7
Hancock Prospecting
The Lang Hancock Railway will connect to Rio Tinto Iron Ore’s rail line to West Angelas
Phot
o co
urte
sy R
io T
into
8
Hancock Prospecting
Exploration/Construction camp in progress at Hope Downs 1
9
Hancock Prospecting
Signing of Letter of Intent with a leading Steel Mill, October 2005
10
Hancock Prospecting
Rio Tinto’s Stockyard Extension – Parker Point, Dampier Port Upgrade Phase A
Pho
to c
ourte
sy R
io T
into
11
Hancock Prospecting
Lang HancockThe discoverer of the Iron Ore (Wittenoom) Agreement tenements
12
Hancock Prospecting
• Hancock is a party to several Iron Ore State Agreements, including:-
• Iron Ore (Hope Downs) Agreement Act 1992
• Iron Ore (Wittenoom) Agreement Act 1972
And has additional tenements and applications outside of these State Agreements
13
Hancock Prospecting
14
Hancock Prospecting
Prospectivity of the Hancock Wittenoom State Agreement and Mulga Downs Tenements
Lease Number Geographical Name
Prospective Tonnage
Comments
E47/1244 Mulga Downs East 500 MT Current coverage 17 drill holes over a 18.5km strike length. Shows good, semi-continuous outcropping mineralisation, with majority of drill intersecting mineralisation. Includes Homestead Hill. Surrounds M47/206.
M47/206 Murray's Hill ~35 MT Current coverage 105 drill holes over a 2km strike length.
E47/1314 Mulga Downs West 150 MT Current coverage 10 drill holes over a 25km strike length..
E47/1315 Carboy Well 150 MT Current coverage 14 drill holes over a 15km strike length.
* TR70/5615HMt King ? A potential 14km channel strike length. Potential based on
mapping and assumption that paleo-channel exists beneath current drainage system. Highly dependent on width and depth of paleo-channel.
* TR70/5616HDrillers Ridge 430 MT
230 MT Drilled Mineralisation
200 MT Potential Mineralisation
Current coverage 486 drill holes, targeting both detrital and bedrock mineralisation. Additional prospective areas include untested detrital areas and extensions to known bedrock mineralisation.
* TR70/5621HYampire ? Prospectivity evaluated from outcropping bedded ore and detrital
deposits
* TR70/5622HDales ? Prospectivity evaluated from outcropping bedded ore and detrital
deposits
* Iron Ore (Wittenoom) State Agreement
15
Hancock Prospecting
16
Hancock Prospecting
17
Hancock Prospecting
18
Hancock Prospecting
19
Hancock Prospecting
Roy Hill Location
20
Hancock Prospecting
Roy Hill 1 Prefeasibility Study Update
Roy Hill currently has 850MT of identified mineralisation, 545MT of which is a classified resource
This significant resource has been identified in the ChichesterRanges, hosted by the Nammuldi Member of the Marra Mamba Iron Formation, and within this resource is a significant amount of Microplaty Hematite
Grades vary from mid 50’s Fe for goethitic detrital material to 68% Fe for microplaty hematite mineralisation
Phosphorous grades are good, ranging from 0.025 – 0.055% P
Steel mills in Asia up-dated on Roy Hill Project in 2005
21
Hancock ProspectingRoy Hill 1 Prefeasibility Study Update (cont.)
Reverse Circulation Drilling on a 400x400m extensional grid has been completed at Roy Hill.
Based on the results from 400x400m grid, areas are currently being infilled to 200x200m for better definition, expected completion 1st half 2006 – subject to weather
Drilling Summary – March 2006
Leases Area RC HQ WDC
E46/334E46/335E46/592
47.5km2
47.6km2
177.5km2
190.0km2
221.5km2
952 holes48 757metres
26 holes790 metres
Used for density work
and ore classification
9 holes 377metres
Used for lump:fines and metallurgical
work
E46/586 E47/1326
Planning dependent on E46/592
22
Hancock ProspectingCurrent Roy Hill 1 Drill Coverage March 2006
Extension areas drilled out to 400x400m drill spacing, completed November 2005. Infill to 200x200 in progress, now 55% complete.
Drill spacing at 200x200m over initial exploration area
4 km
NorthScout lines testing for mineralisation up to 8km from outcrop
23
Hancock ProspectingRoy Hill 1 Infill Drilling to 200x200m, Projected June 2006
Preliminary results from 400x400m scout drilling shows mineralisation continuing undercover from microplaty hematite outcrop at ‘Red Hill’
Both detrital and bedrock mineralisation found under Tertiary alluvial cover, warrants further investigation
4 km
North
24
Hancock ProspectingRoy Hill 1 Prefeasibility Surveys and Drilling
ONGOING PROGRAM
Hydrogeological field-work completed during 2005, groundwater monitoring and modelling ongoing
Initial flora and fauna baseline surveys completed during 2005, reports prepared and ongoing environmental program
Aboriginal Heritage surveys completed prior to each drilling campaign, full survey planned during 2006 and discussions commencing on Native Title Agreement in 2006
Infill drilling, database compilation and resource modelling ongoing
Up-date market during 2006 as work progressesInvestigate infrastructure options and continue to seek multi-user or toll
service terms; (Note: Only a short spur line of approx 80km would be required to the BHP/B line)
25
Hancock Prospecting
Roy Hill 1 Mine Planning
o MINE PLANNING TASKS, 2007Selectivity/Dilution and ore reserves estimation
Ore blending and mining schedule
Detailed pit design, overburden storage, and backfill options