Top Banner
Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium – Green Infrastructure: Collaborating with Nature Alliston, Ontario November 16, 2016 Presenter Name: Sheila O’Neal Position Title: Watershed Stewardship Manager, Hamilton Conservation Authority Presenter Name: Kent Rundle Position Title: Watershed Stewardship Coordinator, Conservation Halton
39

Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Aug 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Hamilton Harbour Watershed Stewardship Project

20 Year Summary (1994 – 2014)2016 Latornell Symposium – Green Infrastructure: Collaborating with Nature

Alliston, OntarioNovember 16, 2016

Presenter Name: Sheila O’NealPosition Title: Watershed Stewardship Manager, Hamilton Conservation Authority

Presenter Name: Kent RundlePosition Title: Watershed Stewardship Coordinator, Conservation Halton

Page 2: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

What is Stewardship? It is the act of caring for the land to the best of one’s ability, to maintain it in a healthy state for today and for future generations.

Page 3: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Why create a Watershed Stewardship Project?

The Hamilton Harbour RAP recommended that citizens in urban and rural areas of the Harbour and its watershed take responsibility for restoring and maintaining the quality of the environment in which they live.

This is the foundation upon which the Bay Area Restoration Council (BARC) initiated the Hamilton Harbour Watershed Stewardship Project (HHWSP) together with the Hamilton Region Conservation Authority and Conservation Halton.

Page 4: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium
Page 5: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Stewardship Project Evolved into Four Components…

1. Visiting with Landowners One-on-One at their Properties

2. Collaborating to Develop Education Workshops and Information Sessions for Landowners Encouraging and Showcasing Good Stewardship Practices

3. Developing Water Quality and Habitat Improvement Projects with Landowners

4. Recognizing and Celebrating Landowners who are Exemplary Watershed Stewards with the Watershed Stewardship Award

Page 6: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

One-on-One with Landowners - Stewardship Staff are…

educating rural and urban landowners of natural areas and watercourses about the important role they have to play in the protection of natural heritage features.

a resource to landowners as they take responsibility for the protection and rehabilitation of natural heritage features.

Page 7: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Proactive Methods to Reach Landowners… Landowner Contact Methodology

Natural Heritage Landowner Contact Training ManualS. Hilts, T. Moull, J. Rzadki, M Van Patter, 1991- Focused/targeted/themed contact - take the time to do it

right Postcards Door knocking Mailbox drop offs Press releases Presentations in the community, open houses, display

opportunities Workshops Email

Page 8: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Passive Methods… Conservation authority websites Having a presence at community or partner

meetings Signage Referrals from adjacent conservation authorities

and from other landowners Connections with like-minded organizations Referrals from our own conservation authorities

Page 9: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Stewardship Project Evolved into Four Components…

1. Visiting with Landowners One-on-One at their Properties

2. Collaborating to Develop Education Workshops and Information Sessions for Landowners Encouraging and Showcasing Good Stewardship Practices

3. Developing Water Quality and Habitat Improvement Projects with Landowners

4. Recognizing and Celebrating Landowners who are Exemplary Watershed Stewards with the Watershed Stewardship Award

Page 10: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

• Once we were done contact rural landowner one time we undertook Insert slide of 1996, 1997, 1998 urban initiatives in four neighbourhoods plus urban initiative along the Niagara Escarpment.

Workshops and Presentations Golf Course Pond Wetland Woodlot Septic Awareness Sharing

Experiences Snakes Youth and Nature

Page 11: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

• Once we were done contact rural landowner one time we undertook Insert slide of 1996, 1997, 1998 urban initiatives in four neighbourhoods plus urban initiative along the Niagara Escarpment.

Newsletters, Brochures

Page 12: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

• Once we were done contact rural landowner one time we undertook Insert slide of 1996, 1997, 1998 urban initiatives in four neighbourhoods plus urban initiative along the Niagara Escarpment.

Factsheets, Booklets, Guides

Page 13: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Stewardship Project Evolved into Four Components…

1. Visiting with Landowners One-on-One at their Properties

2. Collaborating to Develop Education Workshops and Information Sessions for Landowners Encouraging and Showcasing Good Stewardship Practices

3. Developing Water Quality and Habitat Improvement Projects with Landowners

4. Recognizing and Celebrating Landowners who are Exemplary Watershed Stewards with the Watershed Stewardship Award

Page 14: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

• Body text goes here

• Please use the font Trebuchet in black. That’s CH’s corporate font, it’s clean and contemporary

Page 15: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Project Category Project TypeAlternate Watering Systems - Trough

Aquatic Habitat Enhancement - Habitat Feature Installation - In-Stream Channel Morphology - Invasive Removal – Pond- Naturalization – Wetland - Nest Box Installation - Planting – Pond, Wetland- Wetland Creation

Clean Ups - Litter

Clean Water Diversion - Eavestrough

Creek Crossing - Improve Existing Crossing - New - Replacement

Education and Outreach - Community Group Assistance - Referral to Other Agency - Restoration Project

Development - Workshop

Page 16: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Project Category Project TypeErosion Control - Runoff Control

- Streambank Stabilization- Tile Drainage

Hazardous Storage - Fuel

Instream Barrier Mitigation - By-Pass Channel- Dam Removal- Perched Culvert Retrofit

Land Securement - Referral to Other Agency

Livestock Access Restriction - Fencing

Manure Management - Manure Storage

On-Line Pond Mitigation - Natural Channel Design- Retrofit

Other -Audubon Recertification

Page 17: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Project Category Project TypeSeptic System Management - Septic System Inspection

- Septic System Upgrade

Signage - Demonstration Signage

Study - Fish Habitat- Temperature- Hydrological

Terrestrial Habitat Enhancement - Invasives Removal – Riparian, Forest, Meadow-Prairie, Windbreak/Hedgerow

- Naturalization – Meadow/Prairie, Riparian, Windbreak/Hedgerow

- Planting – Forest, Riparian, Meadow/Prairie, Windbreak/Hedgerow

- Seeding – Riparian

Water Well Management - Well Decommissioning

Page 18: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Page 19: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Restoration Work as of December 2014

Watersheds Restoration Properties

Riparian Habitat

(m)

Instream Habitat

(m)

Forest (acres)

Wetland (acres)

Prairie / Meadow (acres)

Potential Fish Habitat

Unlocked(km)

Other

Total Borer's Creek 8 2,050.05 779.74 8.67 0.09 0.04 0.00 3

Total Chedoke Creek5 131.74 0.00 0.09 0.25 0.41 0.00 2

Total Spencer Creek 111 16,457.50 4,554.26 146.70 42.36 14.31 18.10 78

Total Red Hill Creek 11 245.82 0.00 2.58 0.00 0.10 0.00 3

Total Urban Hamilton1 70.28 0.00 0.14 0.00 0.00 0.00 0

Total Falcon Creek 1 0.00 0.00 0.00 0.00 0.00 0.00 1

Total Grindstone Creek34 5,492.88 1,125.97 23.52 5.42 4.46 9.22 21

Total North Cootes Paradise

4 186.53 0.00 0.62 0.00 0.13 0.00 3

Total West Aldershot1 78.23 0.00 0.57 0.00 0.00 0.00 0

Total Hamilton Harbour 176 24,713.03 6,459.97 182.89 48.12 19.45 27.32 111

Page 20: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Examples of ProjectsRestoring fish passage in Grindstone Creek – Instant Success!

AfterBefore

Page 21: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Examples of ProjectsRestoring fish passage in Sulphur Creek –Instant Success!

AfterBefore

Before

After

Page 22: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Wetland Creation

Before

After

Page 23: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Successes over the Years!Before or Just After About Five Years After

Page 24: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Successes over the Years!

Before -2002

After 2002 or 2003

After - 2005 After - 2007

Page 25: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Demonstration Signage

Page 26: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Demonstration Signage

Page 27: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Stewardship Project Evolved into Four Components…

1. Visiting with Landowners One-on-One at their Properties

2. Collaborating to Develop Education Workshops and Information Sessions for Landowners Encouraging and Showcasing Good Stewardship Practices

3. Developing Water Quality and Habitat Improvement Projects with Landowners

4. Recognizing and Celebrating Landowners who are Exemplary Watershed Stewards with the Watershed Stewardship Award

Page 28: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Watershed Stewardship AwardIt is offered to landowners who:understand the important role they have to play in protecting the natural features on their land, have been managing their land in a way that protects the health of the watershed, and are willing to enter into a voluntary handshake agreement with the Hamilton-Halton Watershed Stewardship Program (HHWSP) to continue to protect and preserve the natural features and watercourses on their property for as long as they own their property.

Page 29: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Watershed Stewardship AwardLandowners agree to the following in accepting the Watershed Stewardship Award: To continue to maintain and protect their natural area to the best of their ability.To notify the Conservation Authority or Hamilton-Halton Watershed Stewardship Program of any planned land use change that might threaten the natural heritage features.To notify the Hamilton-Halton Watershed Stewardship Program of any intent to sell or transfer ownership of the property. This information enables the Hamilton-Halton Watershed Stewardship Program to contact the new landowners once they have had a chance to settle in.

Page 30: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Proud Watershed Stewards

Page 31: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Page 32: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes hereWatersheds Number of

Agreements

Natural Area Under Agreement

(acres)

Length of Stream Under Agreement

(km)

Total Area Under Agreement

(acres)

Total Borer's Creek 4 167.6 2.5 243.7

Total Chedoke Creek10 10.6 0.2 17.6

Total Spencer Creek 162 3,856.3 82 6,702.2

Total Red Hill Creek 1 0 0 0.3

Total Urban Hamilton1 113.4 1.1 137

Total Grindstone Creek55 1,056.4 24.1 2,061.7

Total North Cootes Paradise3 668.5 6.5 727.8

Total Upper Rambo Creek1 0 0 1.1

Total Hamilton Harbour Watershed 237 5,872.8 116.4 9,891.4

Voluntary Stewardship Agreements as of December 2014

Page 33: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Award Ceremonies for Watershed Stewards

Page 34: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Watershed Stewards Appreciation Day Thanking landowners for the voluntary

commitment they have made. Connecting landowners with each other.

Page 35: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Watershed Stewards Appreciation Day 2014!

Page 36: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

Page 37: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

2014 New Initiatives in Hamilton Harbour Watershed

Page 38: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Header text goes here

New Initiative in Hamilton Harbour Watershed

Page 39: Hamilton Harbour Watershed Stewardship Project 20 Year … · 2016-12-22 · Hamilton Harbour Watershed Stewardship Project 20 Year Summary (1994 – 2014) 2016 Latornell Symposium

Thank you to HHWSP’s 2014 Funders, and to All Landowners, Funders and Partners Over the Years!