www.hants.gov.uk Hamble Lane Improvements 1. Welcome This consultation is an opportunity for local residents and businesses to provide their views on the existing issues, the scope of possible improvements, and the potential travel-planning initiatives for the wider Hamble Peninsula. Please take a look at the exhibition boards, ask questions and complete a questionnaire. Hampshire County Council is developing a scheme for improvements to Hamble Lane This exhibition aims to: Provide information on the existing issues Seek local views to inform the design process Present some initial highway improvement options Describe potential travel planning initiatives Outline the next steps for the scheme
9
Embed
Hamble Lane Improvements - Hampshiredocuments.hants.gov.uk/transport-projects/HambleLaneExhibition... · Hamble Lane Improvements 1. Welcome This consultation is an opportunity for
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
www.hants.gov.uk
Hamble Lane Improvements
1. Welcome
This consultation is an opportunity for local residents and businesses to provide
their views on the existing issues, the scope of possible improvements, and the potential travel-planning initiatives for the
wider Hamble Peninsula.
Please take a look at the exhibition
boards, ask questions and complete
a questionnaire.
Hampshire County Council is developing a scheme for improvements to Hamble Lane This exhibition aims to:
• Traffic turning right into Tesco and right out of
Tesco has priority over traffic on Hamble Lane,
which can cause queues on Hamble Lane. • Traffic heading southbound on Hamble Lane can
only use one lane, which means the nearside lane
on approach to Tesco is often empty and queues
can block back to Windhover and beyond.
• Only one exit from the Tesco car park exacerbates
this problem, with vehicles often queuing in the
Tesco car park.
Portsmouth Road and Pound Road Junction
• A high volume of traffic turns right into Portsmouth
Road from Hamble Lane, in both peak periods.
• These vehicles have to wait for gaps in the traffic and
the small right-turn bay means vehicles waiting to turn
right frequently block vehicles travelling southbound.
• Long queues of traffic build up southbound which can
block back up to and beyond the Tesco access.
• Traffic uses Pound Road to bypass the Portsmouth
Road junction.
Jurd Way Junction
• Right-turning traffic at the Jurd Way junction has
priority over Hamble Lane traffic, which
exacerbates delays on Hamble Lane.
• Jurd Way traffic also has difficulty entering Hamble
Lane.
Hound Road Junction
• Notable PM congestion but mostly due to traffic
queue on Hamble Lane northbound which
prevents vehicles on Hound Road exiting
junction - caused by issues further north. Also
impacts Satchell Lane.
• Some AM issues due to lack of junction capacity
Crown copyright and database rights 2017 Ordnance Survey 10019180
Crown copyright and database rights 2017 Ordnance Survey 10019180
Crown copyright and database rights 2017 Ordnance Survey 10019180
Crown copyright and database rights 2017 Ordnance Survey 10019180
All junctions suffer from a lack of traffic capacity and un-balanced priorities between movements
www.hants.gov.uk
Hamble Lane Improvements
5. What can be done to improve the situation?
Highways England Scheme to Improve M27 Junction 8 and Windhover
An improvement scheme for M27 Junction 8 and Windhover roundabout is
currently being progressed by Highways England as part of their ‘M27
Southampton Junctions Package of works, for which a public consultation has
recently been undertaken. The scheme also includes improvements to the
Bursledon Road / Botley Road junction.
The improvements to both The M27 Junction 8 and Windhover roundabout are
essentially required in advance of improvements to Hamble Lane to ensure that
traffic can get out at the northern end of the peninsula, before attempting to
increase the speed at which that traffic arrives there.
The Improvements to M27 Junction 8 and Windhover form one of two key
components in the package of works needed to improve traffic flows in
this area, with the Hampshire County Council scheme for Hamble Lane
that is currently being developed, forming the second component.
Windhover M27 Junction 8 Bursledon Rd / Botley Rd
www.hants.gov.uk
Hamble Lane Improvements
6. What can be done to improve the situation?
Consideration of revised / improved
access arrangements for Tesco
including signalisation and widening
of the junction with Hamble Lane.
Consideration of capacity
improvements / signalisation and
widening at the Jurd Way junction.
Consideration of widening Hamble
Lane between the Tesco and
Portsmouth Road junctions.
Reconfiguration of the Portsmouth
Road junction, including signalisation,
widening and banned movements.
Consideration of measures to reduce
rat-running at Lowford Hill.
Consideration of improvements at the
Pound Road junction.
Consideration of measures to improve
traffic flow at Hound Rd roundabout.
Potential Measures to Improve Traffic Flow Along Hamble Lane
We want your help to develop a scheme
which seeks to address local issues as far
as possible.
The key issues have been highlighted in
previous slides however these are not
exclusive.
There are a number of improvements which
are likely to be required for Hamble Lane
and before undertaking feasibility design
work to identify a preferred scheme we
would like to ensure that we have a full
understanding of all the issues which we
can then prioritise and seek to address.
The main suggested next steps are
identified on the adjacent map and in the
questionnaire, which includes location
specific questions to seek local views on
the way forward.
The preferred scheme is likely to
involve a combination of junction
improvements and localised widening
where this can be accommodated,
along with other measures outlined in
the following slides.
www.hants.gov.uk
Hamble Lane Improvements
7. What can be done to improve the situation?
How people currently travel
It is recognised that there are a number of important businesses on the Hamble
peninsula and commuting to work is frustrated by delays and congestion.
It is recognised that Hamble is a desirable place to live and many people that live on the
Hamble peninsula commute off the peninsula each day.
Attempting to reduce the reliance on the private car is considered to be
a vital component of any scheme to improve Hamble Lane.
For journeys to work from the
Hamble area approximately
77% of people use a car or
van, 10% travel on foot, 4%
use a bicycle, 4% use a
bus/minibus/coach, 4% use
the train, and 1% use a
motorcycle (Based on 2011
Census).
For journeys to work in the
Hamble area approximately
84% of people use a car or
van, 6% travel on foot, 4% use
a bicycle, 3% use a
bus/minibus/coach, 1% use
the train, and 1.5% use a
motorcycle (Based on 2011
Census).
This is part of the problem.
www.hants.gov.uk
Hamble Lane Improvements
8. What can be done to improve the situation?
How could people travel? What improvements would help?
We can all help solve the problem. Traffic growth associated with new development, compounded with traffic growth generally, increased car ownership and longer commuting journeys all serve to increase the pressure on our road networks.
In areas where the highway network is particularly constrained such as the Hamble peninsula travel and journey planning measures are a fundamental part of the overall solution.
Types of initiatives which could be considered, subject to funding, are:
• A business/community travel-planning forum • Car sharing schemes • Improved information on alternatives to the car • Shuttle bus service between Hamble and Windhover areas • Shuttle Bus service between Hamble Rail station and locations in Hamble • Improved school transport • Better bus provision along Hamble Lane • Improved train service frequency to Hamble station e.g. 2 trains per
hour* • Improved access / facilities at Hamble Rail Station • Car parking at Hamble Rail Station • More cycle parking at Hamble Rail Station • Better cycle provision along the Hamble Lane corridor • Better pedestrian facilities along Hamble Lane
These initiatives may not be new ideas but now is the time to consider how some or all of these measures could be made to work to help improve access to the peninsula for all. If we all reviewed our travel patterns for just one day a week it would help to reduce congestion. * Proposed in the AM peak in the current South Western Railway Timetable Consultation http://goo.gl/bxdbbd