This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
INSTITUTE
Step 01
a. Lift
b. Slide
c. Lift
d. Slide
e. Slide
INSTITUTE
Step 02
a. Lift
b. Slide
c. Lift
d. Slide
e. Bolting
INSTITUTE
Step 03
a. Lift
b. Slide
c. Lift
d. Slide
e. Bolting
INSTITUTE
Step 04
a. Slide
b. Bolting
INSTITUTE
Step 05
a. Lift
b. Slide
c. Lift
d. Slide
e. Slide
INSTITUTE
Step 06
a. Lift
b. Slide
c. Lift
d. Slide
e. Bolting
INSTITUTE
Step 07
a. Lift
b. Slide
c. Lift
d. Slide
e. Bolting
INSTITUTE
Step 08
a. Slide
b. Bolting
INSTITUTE
Step 00
a. ...
b. ...
INSTITUTE
Step 01
a. Assembly Girder Section 9-10 on Table
b. Lifting Girder Section 9-10
INSTITUTE
Step 02
Connecting and bolting.
INSTITUTE
Step 03
Install Sling
INSTITUTE
Step 04
Disconnect lifting beam
INSTITUTE
Step 05
Concreting
INSTITUTE
Step 06
Moving and waiting for lift section 10-11
INSTITUTE
Step 07
Lifting Girder Section 7-8
INSTITUTE
Step 08
Connecting and bolting
INSTITUTE
Step 09
Install Sling
INSTITUTE
Step 10
Disconnect lifting beam
INSTITUTE
Step 11
a. Concreting section 7-8.
b. Lifting Girder Section 10-11.
INSTITUTE
Step 12
a. Moving and waiting for lift section 6-7.
b. Connecting and bolting Girder Section 10-11.
INSTITUTE
Step 13
a. Lifting Girder Section 6-7.
b. Install Sling Girder Section 10-11.
INSTITUTE
Step 14
a. Connecting and bolting Girder Section 6-7.
b. Disconnect lifting beam Girder Section 10-11.
INSTITUTE
Step 15
a. Install Sling Girder Section 6-7.
b. Concreting Girder Section 10-11.
INSTITUTE
Step 01
a. Connected section 8 to strand jack.
b. Make sure all connector are save to lift.
INSTITUTE
Step 02
a. Lift the Section 8 until 700 mm up to top of pedestal.