H. Gierhardt EA-1 10.01.00 - 1 Kick Off Meeting “24h Design and Development” January 10th-12th, 2000
Apr 01, 2015
H. Gierhardt EA-110.01.00 - 1
Kick Off Meeting“24h Design and Development”
January 10th-12th, 2000
H. Gierhardt EA-110.01.00 - 2
Goal for Kick Off Meeting
• Know each other
• Cooperation
• Communication
• Consensus
Build Team@work
• Why Distribution
• Design Task
• Design Methodology
Common Understanding
!?
H. Gierhardt EA-110.01.00 - 3
Schedule Kick Off Meeting
Monday, January 10th
Welcome 9.00 -10.00 am (Heiko)
– Project introduction (with Mr. Langen, Dr. Thomson, Prof. Lindemann)
– Task presentation (Heiko, Dieter, Thomas)
Presentation “Team dynamics” 10.00 -10.30 am (Christiane)
Team gaming 10.30 -12.00 am (Christiane, all)
– The Egg Game (Team Design Task)
Lunch break 12.00 am -1.00 pm
Possible evening program:
– Sausolitos
– Pub and club area Schwabing
Task discussion 1.00 - 4.00 pm (Heiko, Dieter, Thomas)
H. Gierhardt EA-110.01.00 - 4
Schedule Kick Off Meeting
Tuesday, January 11th
FIZ-Mile 9.00 -11.30 am
Lunch Break 11.30 -12.30 am
Task discussion 12.30 am - 3.30 pm (all)
– Presentation methodological design (Manfred) 12.30 am - 1 pm
Visit BMW Test Bed Area 4.00 - 5.30 pm (all)
Possible evening program:
– Raclett
– Pub and club area Schwabing
H. Gierhardt EA-110.01.00 - 5
Schedule Kick Off Meeting
Wednesday, January 12th
Task discussion 9.00 - 12.00 am (all)
– Presentation Hyperwave (Barbara) 9.00 am - 9.30 am
Lunch break 12.00 am - 1.00 pm (all)
Possible evening program:
– Andechser
– Pub and club area Schwabing
– Kunstpark Ost
Visit Deutsches Museum (Science and Technology) Guided Tour 1.00 -
6.00 pm (all)
H. Gierhardt EA-110.01.00 - 6
Design and Development Process
Optimized use of resources• knowledge
• capital• human labor
• space
A globally distributed project - Why?
Globalization– fusion of companies – global markets– world wide competition– global flow of capital– global availability of information
Product complexity– complexity of function– complexity of productionMarket pressure
– reduce time to market– optimize quality– minimize cost
Distribution of resources– Chances– Challenge– Problems
H. Gierhardt EA-110.01.00 - 7
Questions to solve
Is it possible to realize 24hr design and development ?
What is the potential of quality, cost and time?
What is the additional effort?
What can we learn for future projects?
Is the distribution methodology a clever approach?
How is the inter cultural impact on team work?
Is the concept for 24hr design and development working?
What tools supporting information logistics are necessary?
What methods supporting information logistics are necessary?
H. Gierhardt EA-110.01.00 - 8
Start of workJan 17
Kick-off-MeetingJan 10-12, Munich
Touch DownMeeting
EndApr 14
Gateway 1Functions
Feb 2
Gateway 2Principal Solutions
Mar 1
Gateway 3Concept Combination
Mar 8
Phase I Phase IIIPhase II
Time Schedule
H. Gierhardt EA-110.01.00 - 9
Distribution of time
8.00 – 12.30 Uhr8.00 – 12.30 Uhr8.00 – 12.30 Uhr8.00 – 12.30 Uhr
Design Team Munich
Central European Time
Design Team Darmstadt
12.00 – 17.00 Uhr12.00 – 17.00 Uhr12.00 – 17.00 Uhr12.00 – 17.00 Uhr
Design Team Clemson
16.30 – 21.30 Uhr16.30 – 21.30 Uhr16.30 – 21.30 Uhr16.30 – 21.30 Uhr
Design Team Munich
21.00 – 21.00 – 21.30 Uhr21.30 Uhr21.00 – 21.00 –
21.30 Uhr21.30 Uhr
H. Gierhardt EA-110.01.00 - 10
Distribution Scenario 1
Design Team Munich
Design Team Darmstadt
Design Team Clemson
Variablestroke
Massbalance Assembly
H. Gierhardt EA-110.01.00 - 11
Distribution Scenario 2
Design Team Munich
Design Team Darmstadt
Design Team Clemson
Variablestroke
Massbalance Assembly
H. Gierhardt EA-110.01.00 - 12
Distribution of Scenario 3
Design Team Munich
Design Team Darmstadt
Design Team Clemson
Variablestroke
Massbalance Assembly
H. Gierhardt EA-110.01.00 - 13
Project roles
Project Management and Distribution Coaching
– Prof. Dr. Georges Fadel – Daniel Fuchs– Hans-Dieter Gaul– Heiko Gierhardt– Thomas Ott
Design – Mirja Beukenberg– Miroslav Filipovich– Manfred Fraenk– Christian Helbig– Christian Koletzko– Jonathan Maier – Joe Mozingo – Falk Petry – Christian Steuer– Chris Szymendera
H. Gierhardt EA-110.01.00 - 14
Focus of Design - System Boundaries
Focus of Design = System• Crank case• Crank shaft• Mass balance (e.g. balance shaft)
System boundaries (engine)• Cylinder (interface)• Cylinder head• Valve train• Piston
System boundaries (test bed)• pallet
H. Gierhardt EA-110.01.00 - 15
Variable Stroke
?Why?• Reduce design time• Improve flexibility in testing• Minimize cost
Why?• Reduce design time• Improve flexibility in testing• Minimize cost
Approach• Analyze KinematicsApproach• Analyze Kinematics
H. Gierhardt EA-110.01.00 - 16
Mass Balance
Why?• Functionality• Low vibrations• Weak point
Why?• Functionality• Low vibrations• Weak point
Forces andmoment of inertia
Excitationforces
Machinevibrations
Approach• Analyze Dynamics
Approach• Analyze Dynamics
Sample• Motorbike engine
H. Gierhardt EA-110.01.00 - 17
Design for Ease of Assembly
Why?• Easy integration in test bed• easy assembling• reduce change time
Why?• Easy integration in test bed• easy assembling• reduce change time
?
Approach• Analyze boundaries• Analyze design guide lines
Approach• Analyze boundaries• Analyze design guide lines
System boundaries (engine)• Cylinder (interface)• Valve train• Piston
System boundaries (test bed)• pallet