H-Drive Booster Model HGT-150/90 Max Gas Inlet Pressure Min Gas inlet Pressure Max. rec. Cr Max Gas Outlet Pressure Max Hydraulic Drive Pressure Gas Piston Displacement Psi g Bar g Psi g Bar g CR Psi g Bar g Psi g Bar g Cu Ins Litres 1450 100 50 3.5 36:1 10,000 690 3600 250 329 5.39 0 0 Outlet Flow Nm3/hr (scfm) Gas Supply Pressure Bar g (psig) Minimum Gas inlet : 3.5 Bar g (50 psig) Maximum Gas Inlet : 100 Bar g (1450 psig) Maximum Gas Outlet : 690 Bar g (10,000 psig) Maximum Recommended CR : 36:1 HGD-150/90 PERFORMANCE CHART 20 (290) 100 (1450) 800 (1160) 60 (860) 40 (580) 600 (355) 500 (295) 400 (236) 300 (177) 200 (118) 100 (59) Qo - 20 CPM Qo - 15 CPM Qo - 10 CPM Qo - 5 CPM To determine required cycling speed: 1. Draw horizontal line represenng required outlet flow 2. Draw vercal line represenng the gas supply pressure available 3. Where both lines cross will give the approx. cycling speed of the H-Drive For full operang parameters of H-Drive running at parcular condions including the hydraulic power supply required, contact factory or distributor with following data: • Ps Gas supply pressure • Po Gas outlet pressure • Qo Outlet flow required • Gas being transferred • Details of the applicaon
2
Embed
H-Drive Booster Model HGT-150/90 · 9. torque screws to 8˜ .5 ft-lbs 10. torque cooling connections to 50±10 ft-lbs 11. torque hydraulic connections to 200±10 ft-lbs 12. torque
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
H-Drive Booster Model HGT-150/90Max Gas Inlet
PressureMin Gas inlet
PressureMax. rec.
CrMax Gas Outlet
PressureMax HydraulicDrive Pressure
Gas PistonDisplacement
Psi g Bar g Psi g Bar g CR Psi g Bar g Psi g Bar g Cu Ins Litres1450 100 50 3.5 36:1 10,000 690 3600 250 329 5.39
00
Out
let
Flow
Nm
3/hr
(scf
m)
Gas Supply Pressure Bar g (psig)
Minimum Gas inlet : 3.5 Bar g (50 psig)Maximum Gas Inlet : 100 Bar g (1450 psig) Maximum Gas Outlet : 690 Bar g (10,000 psig)
Maximum Recommended CR : 36:1
HGD-150/90 PERFORMANCE CHART
20(290)
100(1450)
800(1160)
60(860)
40(580)
600(355)
500(295)
400(236)
300(177)
200(118)
100(59)
Qo - 20 CPM
Qo - 15 CPM
Qo - 10 CPM
Qo - 5 CPM
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
A A
B B
C C
D D
THIS DRAWING EMBODIES ACONFIDENTIAL PROPRIETARYDESIGN, ALL RIGHTS FORREPRODUCTION, MANUFACTURINGOR PATENTS ARE RESERVED BYHASKEL INTERNATIONAL, LLC.
THIRD ANGLE PROJECTION
U N L E SS O T H E R W ISE S P E C IF IE D :D IM E N S IO N S A R E IN IN C H E S [M M ]D O N O T S C AL E D R A W IN GR E M O V E B U R R SFILLETS & RADII .005 [.12]-.030 [.76]MACHINE FINISH 125 [3.2]TOLERANCES ARE:
DECIMALS: .XX � .01 [.3]
.XXX � .005 [.13]
FRACTIONS: � 1/16
ANGLES: � 1°
CONCENTRICITY Ø .010 [.25]FABRICATE PER HPS-10.4
NEXT ASSY (REF ONLY)
APPROVALS
DRAWN
CHECKED
APPROVED
CAD FILENAME
DATE TITLE
SIZE
DSCALE:
CAGE CODE
81400DWG NO.
Haskel International, LLCBurbank, California 91502
INVENTOR DRAWING SHEET OF
REV
REVISION
REV DESCRIPTION DATE CHECKED
PM
CW
SDQ
9/27/2016
10/13/2016
11/17/2016
88122 NONEB
1 2
B RELEASE PER ECO32500 7/5/2017 SDQ
88122-TAB
88122-TAB
GAS BOOSTER, H-DRIVE, 12"STROKE, HGT-150/90INFORMATION CONTAINED HEREIN IS SUBJECT TO THE EXPORT ADMINISTRATION REGULATIONS (EAR) OF
THE UNITED STATES OF AMERICA AND EXPORT CLASSIFIED UNDER THOSE REGULATIONS AS (ECCN: EAR99). NO PORTION OF THIS DOCUMENT CAN BE RE-EXPORTED FROM THE RECIPIENT COUNTRY OR RE-TRANSFERRED OR DISCLOSED TO ANY OTHER ENTITY OR PERSON NOT AUTHORIZED TO RECEIVE IT WITHOUT THE PRIOR AUTHORIZATION OF HASKEL INTERNATIONAL, LLC.THIS NOTICE SHALL BE ATTACHED TO ANY REPRODUCED SECTION OF THIS DOCUMENT.
®
REV. 08/15/2013, D. MACH
Parts ListQTYDESCRIPTIONHGT-150/90-2-0HGT-150/90-1-0ITEM
3. VENT TO A CONTROLLED ENVIRONMENT. NOT TO EXCEED 50 PSIG BACK PRESSURE
4. REMOVE PLUG UPON INSTALLATION & DIRECT IT TO AN OIL CATCH TRAY
5. GAS SECTION SEAL KIT - 88138 (150MM), 88139 (90MM)
6. HYDRAULIC CYLINDER SEAL KIT - 88065
7. FLAT SIDE OF WASHERS TO FACE THE NUTS
8. TORQUE TIE RODS TO 410 � 10 FT-LBS, 16 PLACES. APPLY ANTI-SEIZE COMPOUND TO THREADS
LEAVE AT LEAST 3 THREADS OUT OF THE NUTS ON EACH SIDE. TIGHTEN IN 100 FT-LBS INCREMENTS
9. TORQUE SCREWS TO 8� .5 FT-LBS
10. TORQUE COOLING CONNECTIONS TO 50±10 FT-LBS
11. TORQUE HYDRAULIC CONNECTIONS TO 200±10 FT-LBS
12. TORQUE CHECK VALVES TUBES TO 50±10 FT-LBS
13. TORQUE VENT CONNECTIONS TO 50±10 FT-LBS
14. REVERIFY ALL TORQUE VALUES AFTER TESTING
15. DRAIN COOLANT THROUGH THIS PORT BEFORE SHIPPING & FOR MAINTENANCE INTERVALS
TORQUE THE PLUG NO MORE THAN 25 FT-LBS
16. TOUCH UP HYDRAULIC CYLINDER PAINT BEFORE SHIPPING. USE BLACK PAINT RAL 9005.
17. ON EACH GAS SECTION, ONLY ENGAGE ONE SCREW THRU THE BRACKET.
18. PLUG ALL OPEN PORTS WITH PLASTIC CAPS BEFORE SHIPPIN
To determine required cycling speed:
1. Draw horizontal line representing required outlet flow
2. Draw vertical line representing the gas supply pressure available
3. Where both lines cross will give the approx. cycling speed of the H-Drive
For full operating parameters of H-Drive running at particular conditions including the hydraulic power supply required, contact factory or distributor with following data: