  • 8/13/2019 Gyanesh Presentation

    1/31

    Village Electrification using 100%

    Rice-husk powered GasifierSystem

    Vill

    Tamakuha,

    DisttWest Champaran, Bihar

  • 8/13/2019 Gyanesh Presentation

    2/31

    A Non-Govt Organization registered in 2007

    under the Societies Registration Act 21, 1860

    Based in Patna, Bihar

    Funded by NRIs as well as local residents

  • 8/13/2019 Gyanesh Presentation

    3/31

    MissionEmpowerment of remote and neglected

    rural areas of Bihar through spread of

    Energy and smart Agricultural practices

    Goal for the project

    To provide clean electric lighting to thehouseholds in Tamkuha at a rate cheaper

    than their current expenditure

  • 8/13/2019 Gyanesh Presentation

    4/31

    Site Selection

    UP on 3 sides and the erratic Great Gandak on the fourth

  • 8/13/2019 Gyanesh Presentation

    5/31

    Populationapprox. 1200 excluding migrants + athriving marketplace with over 50 shops

    No. of householdsapprox. 350

    Distance from distt. Headquarter - ~150 km

    Distance from electrical substation82 km

    Distance from nearest railhead47 km

    Paddy production of over 1200 tonnes/year

    Site Selection

  • 8/13/2019 Gyanesh Presentation

    6/31

    Technology

    Has to be non-conventional

    Solar energy is expensive

    Approx. Rs. 400 / W for installation

    Wind energy is not amply available

    Hydel power is not feasible

    High cost of establishment Approx. 7 km from the nearest river

    Biomass energy is practically the only available option

  • 8/13/2019 Gyanesh Presentation

    7/31

    TechnologyBiomass Gasifier

  • 8/13/2019 Gyanesh Presentation

    8/31

  • 8/13/2019 Gyanesh Presentation

    9/31

    TechnologyBiomass Gasifier

    Dual Fuel Mode - Very Commonly Used

    Single Fuel Modewe are the first using rice-husk

  • 8/13/2019 Gyanesh Presentation

    10/31

    A Short Movie

  • 8/13/2019 Gyanesh Presentation

    11/31

    Cost of Establishment

    Electric Cable

    Transportation

    Civil Work

    Piping etcSite visits etc

    Generator

    Gasifier

    Total CostRs 10,00,000 *

    *We teamed up with new suppliers for the gasifier and the generator

    with govt approved suppliers the cost is over Rs 25,00,000

    our system is cheaper even without the govt subsidy

  • 8/13/2019 Gyanesh Presentation

    12/31

    Operating Expenses

    Approx. 50 kg Rice-husk / hour

    One LPG cylinder per 4 starts

    3 personnel Misc. expenses on maintenance of the

    system

  • 8/13/2019 Gyanesh Presentation

    13/31

    Power Distribution

  • 8/13/2019 Gyanesh Presentation

    14/31

    Power supply for 6 hrs in the evening

    Pre-paid power at the rate of Rs. 30 per 15-20 W CFL forhouseholds and Rs. 40 per 15-20 W CFL for businesses Only CFL allowed for lighting

    Total 300 connections

    Avg. less than 2 CFL per connection Approx. Rs. 50 per connection

    Approx. 65 A electricity usage at 210-220V (As read at the plant) Approx. 15% distribution loss

    Power Distribution

  • 8/13/2019 Gyanesh Presentation

    15/31

    BIG PROBLEM

    Power Distribution - Economics

  • 8/13/2019 Gyanesh Presentation

    16/31

  • 8/13/2019 Gyanesh Presentation

    17/31

    Expenditure

    Rice husk

    LPG cylinders

    Human Resources

    Incidentals /

    maintenance + Land

    Rent

    Power Distribution - Economics

    Total expenditure ~ Rs 22,000 per month

    Collection of only Rs. 15,000 per month

  • 8/13/2019 Gyanesh Presentation

    18/31

    Generate own rice-husk Remove the LPG

    Power DistributionEconomics

    Solution

  • 8/13/2019 Gyanesh Presentation

    19/31

    Setup a mini Rice mill in partnership with a local at the plant Milling capacity of ~400 kg paddy per hour using approx. 15 A / phase

    Milling at zero cost to attract consumers Operation and depreciation cost to be recovered by sale of the bran

    Approx. Rs 10,000 per month (Rs. 4000 organizations share)

    Operate the dehusker and polisher alternatively Possible to operate in parallel with the electricity supply to users

    Generation of ~300 kg rice-husk per day

    Daily consumption is approximately the same More than 40% rice-husk generated assuming 6 months operation of the rice mill

    Cost of setting up the rice mill ~ Rs. 70,000 Organizations share Rs 35,000

    Power DistributionEconomics

    Generating Rice-husk

  • 8/13/2019 Gyanesh Presentation

    20/31

    Power Distribution - Economics

    Total Investment ~Rs. 10,35,000

    Expenditure

    Rice husk

    LPG cylinders

    Human

    Resources

    Incidentals /

    maintenance +

    Land Rent

    Total Expense ~Rs. 17500 per month

  • 8/13/2019 Gyanesh Presentation

    21/31

    Power DistributionEconomics

    Removing the need for LPG

    Store the Producer Gas for usage during

    the next start Storage at ~200 psi

    Less than 10% leakage in 24 hours

    Adds Rs 10,000 to the cost

  • 8/13/2019 Gyanesh Presentation

    22/31

    Power Distribution - Economics

    Total Investment ~Rs. 10,45,000

    Total Expense ~Rs. 12500 per month

    Expenditure

    Rice husk

    Human

    Resources

    Incidentals /

    maintenance +Land Rent

  • 8/13/2019 Gyanesh Presentation

    23/31

    Fuses with every connection to check extreme theft of power Not aware of any efficient circuit breakers for 20 W power range

    5-volunteer Gramin Urja Niyantran Samiti formed to check the power

    theft as well as the regular fulfillment of operators responsibilities

    Entire village divided in 4 sectors and 2-volunteer teams formed toassist in timely collection of advance dues Not an easy task

    Need to generate more revenue to keep the operations fairly

    independent of collections from the users

    Power Distribution - Monitoring

  • 8/13/2019 Gyanesh Presentation

    24/31

    approx. 30 A current in one phase still remaining Run a 3 hp water pump for irrigation

    Compare Rs 30 per hour vs Rs 80 per hour for 5 hp pump sets

    Approx. Rs 3000 per month for 5 months

    Adds Rs 15,000 to total investment

    Working to add a wheat grinder to the rice-mill Possible because only the dehusker or the polisher of the rice-

    mill run at one time

    Would add Rs. 15,000 to total investment (7.5K in partnership Would add approx. Rs. 5000 per month in earning (Rs 2500

    being the organizations share

    Power Distribution

    Further Improvements

  • 8/13/2019 Gyanesh Presentation

    25/31

    Winter Economics

    Total ExpenseRs. 12,500 pm

    Collection from the usersRs 15,000 pm

    Income generation from subsidiary activities ~ Rs. 7000pm (very very conservative projection )

    Net saving of approx. Rs. 9,000 pm

    Daytime operation expected to commence in january Primarily for irrigation and operation of the rice-mill / wheat

    grinder

    May expect an additional income of approx. Rs. 9000 pm

  • 8/13/2019 Gyanesh Presentation

    26/31

    Expect the demand to grow 100% Rice-mill wouldnt operate

    Revenue of Rs. 30,000 from evening operations

    Expect at least as much load as winters during the day Revenue of approx. Rs. 15,000

    Opportunity for catering power to threshers

    Operations cost approx. Rs 25,000 pm A saving of over Rs. 20,000

    Need to store husk for the rainy days Ample space (over 4000 sq feet) land for stocking

    Ample husk in the area currently We have verbal contracts with over 6 rice-mills in the area for 100% of their rice-husk

    For the Summer

  • 8/13/2019 Gyanesh Presentation

    27/31

    Timeline

    Decision to go for bio-mass

    gasification

    Order placement

    Euipment Delivery

    Commencement of Operations

    Connections

    Rice-mill

    Elimination of LPG

    IrrigationWheat Grinder

    Oct Nov Dec JanJune July Aug Sep

  • 8/13/2019 Gyanesh Presentation

    28/31

    So Far

    Total Investment of ~11,00,000 Including Rs. 25,000 in maintaining operations in the initial

    months

    Conservatively projected savings of Rs. 15,000 pm

    averaged over a year

    Carbon credit cash from European Agencies worthapprox. Rs. 50,000

    Return of more than 20% p.a. System pays itself off in 5 years only

  • 8/13/2019 Gyanesh Presentation

    29/31

    Future

    Extend the concept to at least 25 villages

    in the rice-rich region in next 2-3 years

  • 8/13/2019 Gyanesh Presentation

    30/31

    Roadblocks

    Political boundaries

    Has to pass through UP to reach thisunfortunate region of Bihar from Bihar

    We dont know of a legal way to transportgoods through the BiharUP and UPBiharborder

    Need fundsa lot of it

    Seeking help from banks, investors anddonors

  • 8/13/2019 Gyanesh Presentation

    31/31

    Acknowledgements

    Mr. S.K. Singh, PSO, MNRE, Patna

    M/s Ganesh Engg. Works, Buxar (Gasifier

    supplier )

    M/s Prakash Diesels, Agra (Generator

    supplier )

    Our Family and Friends for constantly

    doubting and/or encouraging us