GULF SPECIALIZED MECHANICAL & ENGG. SERVICES CO. L.L.C. (FORMERLY DEUTSCHE BABCOCK SERVICES CO.) ABU DHABI UNITED ARAB EMIRATES PRESENTATION PRESENTATION
GULF SPECIALIZED MECHANICAL & ENGG. SERVICES CO. L.L.C.
(FORMERLY DEUTSCHE BABCOCK SERVICES CO.)
ABU DHABIUNITED ARAB EMIRATES
PRESENTATIONPRESENTATION
The CompanyThe CompanyHistorical HighlightsHistorical HighlightsMain Business ActivitiesMain Business ActivitiesFields of OperationFields of OperationResources and CapabilitiesResources and CapabilitiesOrganization chartOrganization chartQuality SystemsQuality SystemsCertification & AuthorizationCertification & AuthorizationCompetitive PositionCompetitive Position
EngineeringProcurementCompany FacilitiesPresent WorkloadPhoto PresentationFlagship CompanyOngoing ProjectsExperience List
Presentation Overview
Location Industrial area of Abu Dhabi (Location Industrial area of Abu Dhabi (MussafahMussafah))Established 1992Established 1992Total area 73,000sqmTotal area 73,000sqmCovered area 18,500sqmCovered area 18,500sqmLaydownLaydown areas 18,000sqmareas 18,000sqmLoad out jetty 500 Load out jetty 500 mtmt + + Personnel 780Personnel 780Production 1,200,000 + Production 1,200,000 + MhrsMhrs / annum/ annum
GULF SPECIALIZED MECHANICAL & ENGG. SERVICES CO. L.L.C.
ABU DHABI FACILITIES
The CompanyThe Company
Gulf Specialized Mechanical & Gulf Specialized Mechanical & EnggEngg Services Co. Services Co. (formerly Deutsche Babcock Services Co.)(formerly Deutsche Babcock Services Co.) was established in the Emirate of Abu Dhabi in the year 1972. A Workshop and Repair Facility was set up in Mussafah in 1990 and the process of Manufacturing and servicing equipment in this facility began in 1992.
Gulf Specialized Mechanical & Gulf Specialized Mechanical & EnggEngg Services Co. Services Co. L.L.C., Abu Dhabi, U.A.E. is 100% owned U.A.E. Company, and a member of IMCC Abu Dhabi Group.
Since its initial establishment in 1972 and investment in 1990, the following presentation has been the pattern of steady progress to date:
Historical HighlightsHistorical Highlights70’s Deutsche Babcock enters the Middle East market with the first boilers being delivered to Abu Dhabi
in the United Arab Emirates.80’s Deutsche Babcock is awarded several key maintenance contracts to provide yearly
maintenance support for major equipment and overhauls in all Abu Dhabi’s power stations. This then forms the basis of today’s developments and activities.
90’s Establishment of new manufacturing and repair facility in Abu Dhabi ( Mussafah ) industrialzone 1992 Commencement of manufacturing operations.
1995 Extension of machine shop and installation of Horizontal,Vertical, & Floor boring Mch’s1996 Extension to Pressure Vessel shop & laydown areas ( 6000sqm ) for assembly of large
Vessels, Boilers, Boiler components,Evaporators and Skid modules.1997 Installation of additional overhead gantry cranes ( 140 t ) in tandem. Establishment of
Alloy Steel clean workshops and Mobile shelter systems.1998 Installation of large Lathe and Balancing machine 5m Dia x 20m lg x 70t single shaft weight1999 New workshops at load-out jetty and extensions to workshops 3 & 4 ie additional 4,000 Sqm.2002 Deutsche Babcock Services Co,. comes under IMCC Abu Dhabi Group. The other group companies are
Gulf Piping Company W.L.L., Abu Dhabi Coating Enterprises W.L.L., International Metal & Construction Company.
2003 The company name changed to Gulf Specialized Mechanical & Engineering Services Co. L.L.C from Deutsche Babcock Services Co.
Main Business ActivitiesMain Business Activities
GSMEGSMEOperates ThroughOperates Through
Three MainThree MainActivitiesActivities
Total Plant ServicesTotal Plant ServicesFully integratedFully integrated
plant Services for theplant Services for thepower & power & petropetro chemchem indind
ManufacturingManufacturingIn its own facilitiesIn its own facilities
specialisingspecialising in key plant in key plant componentscomponents
Contracting & ConstructionContracting & ConstructionField erection of plants and Field erection of plants and
infrastructuralinfrastructural projects projects by its Group Companiesby its Group Companies
The companyThe company’’s business activities are carried out in several key areas wits business activities are carried out in several key areas within the G.C.C. hin the G.C.C. States, its activities can be divided into the following areas oStates, its activities can be divided into the following areas of operation.f operation.
Manufacturing of equipment for the power, water, oil & gas induManufacturing of equipment for the power, water, oil & gas industries such as:stries such as:
Evaporators for Desalination plants both M.S.F. & M.E.D.Evaporators for Desalination plants both M.S.F. & M.E.D.Process Equipment ( Skid mounted).Process Equipment ( Skid mounted).Pressure Vessels and Tanks. Pressure Vessels and Tanks. Heat Exchangers and Tube Bundles.Heat Exchangers and Tube Bundles.Power & Industrial Piping.Power & Industrial Piping.Structural Steel Works.Structural Steel Works.
Turnkey Erection Services (by Group Companies).Turnkey Erection Services (by Group Companies).--Machining Works (CS, SS & Alloy Steels)Machining Works (CS, SS & Alloy Steels)--Repair FacilitiesRepair Facilities--Boiler and Other Maintenance SupportsBoiler and Other Maintenance Supports
Main Business Activities Main Business Activities continuedcontinued
BUSINESS SECTORBUSINESS SECTOR PROJECTS AND PRODUCTSPROJECTS AND PRODUCTS
v v
OIL & GASOIL & GAS
PETROCHEMICALPETROCHEMICAL& CHEMICAL& CHEMICAL
INDUSTRIAL PLANTSINDUSTRIAL PLANTS& INFRASTRUCTURES& INFRASTRUCTURES
OFFSHOREOFFSHORE(By Group Companies)(By Group Companies)
REFININGREFINING
GAS/OIL SEPARATION ,DEHYDRATION , GAS TREATMENT ,GAS COMPRESSION , DESALTING , SLUG CATCHING , WATER INJ
PETROCHEMICAL AND CHEMICAL PROCESS PLANTS FOR :AMMONIA / UREA , FERTILIZERS , METHANOL , ETHYLENE,PLASTICS AND OTHER BASIC CHEMICALS.
DESALINATION PLANTS , PROCESS FURNACES & OIL TERMINALS.
GAS / OIL SEPARATION TOPSIDES, GAS LIFT TREATMENT , UTILITIESMODULES , MOORING BUOYS , TERMINAL FACILITIES .
HYDROCRACKING , CATALYTIC REFORMING , DESULPHURIZATION ,MTBE PLANTS , DISTILLATION , TOPPING AND SULPHUR RECOVERY.
Fields of OperationFields of Operation
Resources and CapabilitiesResources and Capabilities
HUMANHUMANRESOURCESRESOURCES
GRANDTOTAL
780
SENIORMANAGERS
SKILLED WORKERS AND STAFF
OFFICE STAFF FABRICATION
92 6808
Project Management
Engineering
Manufacturing
Field construction
Procurement
GULF SPECIALIZED MECHNICAL & ENGG. SERVICES CO. L.L.C.
ORGANIZATION CHART
M. Dobre TBA V. Potas E. Fathy S. Eikmeier S. Ghosh H. Hamid O. Alaina H. Botes B. Sfeir
Workshop Manager Project Manager Project Manager Engg. Manager Proc. Manager Contracts Manager HRD & Admin. Manager Stores Manager IT Manager
Project Coordinators Estimation Engineers G. Kiran A. Jose
W/Shop Coordinator F. Lansdale A. KhanA. Mathew H. Suthan
A. Gautam - HSEP. Anil - QA/QCM. Navish - NDT
Planning Engineer
K. Ramkrishna J. OliverW. OchockiU. KumarAssembly Supervisors Prod. Engineer
K. John
Prefab. Supervisor
Welding Machine Shop Warehouse MaintenanceN. Cristian B. Joseph M. Kaleem M. WaeldeSupervisor Supervisor Supervisor Maint. Superintendent
Rev. 19
N. Subramanian
Est. & Prop. Manager
QHSE Engineers
Head QHSE Engg.N. Subramanian
Acting QHSE Manager
S. Khurshid Ali
R. KerstingTechnical Director
Organization ChartGSME Workshop
F. Hofbauer & J. MehioManaging Directors
H. Jaindeen
K. Mahmoud
Design Engineer
Quality SystemsQuality Systems
ISO 9001:2008ISO 9001:2008QUALITY SYSTEMQUALITY SYSTEM
DESIGN, MANUFACTURE OF PRESSURE VESSELS, FAB. OF DESALINATION PLANT ITEMS SUCH AS EVAPORATORS, HEAT EXCHANGERS, TUBE BUNDLES, TANKS, FILTERS, PROCESS SKID PACKAGES, BOILER PRESSURE PARTS.
CERTIFIED BY:DET NORSKE VERITAS
Quality SystemsQuality Systems
ISO 14001: 2004ISO 14001:2004ISO 14001:2004
ENVIRONMENTAL ENVIRONMENTAL MANAGEMENT SYSTEM MANAGEMENT SYSTEM
DESIGN , FABRICATION AND SUPPLY OF PRESSURE VESSELS , PROCESS SKID PACKAGES, HIGH & LOW PRESSURE PIPING , EVAPORATORS , HEAT EXCHANGERS,
CERTIFIED BY:DET NORSKE VERITAS
Quality SystemsQuality Systems
OHSAS 18001:2007 OHSAS 18001:2007 OCCUPATIONAL HEALTH OCCUPATIONAL HEALTH & SAFETY ASSESSMENT & SAFETY ASSESSMENT
DESIGN , FABRICATION AND SUPPLY OF PRESSURE VESSELS , PROCESS SKID PACKAGES, HIGH & LOW PRESSURE PIPING , EVAPORATORS , HEAT EXCHANGERS,
CERTIFIED BY:DET NORSKE VERITAS
Certification and AuthorizationCertification and AuthorizationASME ASME ‘‘ U U ’’ STAMPSTAMP Design and Manufacturing of Pressure Vessels at GSME Facilities and field
Sites in accordance with ASME Section VIII Div. 1.
Design and Manufacturing of Pressure Vessels at GSME Facilities and fieldSites in accordance with ASME Section VIII Div.2.
Design and Manufacturing of Power Boilers at GSME Facilities and fieldSites in accordance with ASME Section I .
Fabrication and Assembly of Pressure Piping at GSME facilities and Field Sites in accordance with ASME Section B31.
ASME ASME ‘‘ U2 U2 ’’ STAMPSTAMP
Assembly of Power Boilers at GSME facilities and Field Sites in accordance with ASME.
NATNAT’’L BOARDL BOARD‘‘RR’’ STAMPSTAMP
National Board Code Repairs and / or Alterations at GSME Facilities and fieldSites in accordance with National board Inspection code.
ASME ASME ‘‘ S S ’’ STAMPSTAMP
ASME ASME ‘‘ PP PP ’’ STAMPSTAMP
ASME ASME ‘‘ A A ’’ STAMPSTAMP
Competitive PositionCompetitive Position
MAIN FACTORSMAIN FACTORSOFOF
COMPETITIVENESSCOMPETITIVENESS
Workshops and Facilitieslocated in strategic areas
Skilled labour at low costwith high commitment
Diversified products and full service range
GSME‘‘s competitive position is the result of a long s competitive position is the result of a long --term strategic commitment of term strategic commitment of human and financial resources in the Gulf region.human and financial resources in the Gulf region.
Design & Engineering
OUR INOUR IN--HOUSE DESIGN AND ENGINEERING DEPARTMENTHOUSE DESIGN AND ENGINEERING DEPARTMENT IS CAPABLE OF PROVIDING MECHANICAL DESIGNS ANDIS CAPABLE OF PROVIDING MECHANICAL DESIGNS AND FABRICATION DRAWINGS FOR ALL ITS PROJECTSFABRICATION DRAWINGS FOR ALL ITS PROJECTS WE HAVE A TOTAL MANHOUR RESOURCE AT PRESENT FOR WE HAVE A TOTAL MANHOUR RESOURCE AT PRESENT FOR
APPROXIMATELY 100,000 MAN HOURS PER ANNUM APPROXIMATELY 100,000 MAN HOURS PER ANNUM
MechanicalDesign , Stress Analysis ,General Arrangements ,Detailed Shop Drawings ,Construction Drawings
Piping IsometricsReverse Eng.
Pressure VesselsPressure VesselsProcess skidsProcess skids
Power andPower andDesalination PlantsDesalination Plants
HP and LPHP and LPPipingPiping
Structural andStructural andOffshoreOffshore
DESIGN CAPABILITIESDESIGN CAPABILITIES
15 15 No AutoCAD WORK STATIONSNo AutoCAD WORK STATIONS I.T. NETWORK SYSTEMS PROVIDINGI.T. NETWORK SYSTEMS PROVIDING * ISDN + INTERNET COMMUNICATION LINKS* ISDN + INTERNET COMMUNICATION LINKS MECHANICAL DESIGN SOFTWARES :MECHANICAL DESIGN SOFTWARES :
* PV ELITE* PV ELITE * CODECALC* CODECALC * STAAD PRO* STAAD PRO * * CADWorxCADWorx * NOZZLE PRO * NOZZLE PRO * SPOOLGEN* SPOOLGEN * TEKLA XSTEEL* TEKLA XSTEEL
Design & Engineering Continued
Procurement
We are having a Central Procurementfacilities for all the Group Companies.
Local Vendors are listed and regularlyvisited to inspect and update the detailsheld on our files and to maintain awarenessof GSME’s developments
We have long standing experience / relationshipswith Local & International Vendors
20 %20 %Far EastFar East
60 %60 %EuropeEurope
10 %10 %LocalLocal
10 %10 %U.S.AU.S.A
ProcurementSources
A) A) LARGE PLATE ROLLING UPTO 65mm THK. AT 3.0 MTRS WIDELARGE PLATE ROLLING UPTO 65mm THK. AT 3.0 MTRS WIDEB) B) SMALL PLATE ROLLER UPTO 25mm THK. AT 3.0 MTRS WIDESMALL PLATE ROLLER UPTO 25mm THK. AT 3.0 MTRS WIDEC) C) UNDERWATER PLASMA CUTTING MACHINEUNDERWATER PLASMA CUTTING MACHINED) D) DEDE--CLADDING MACHINECLADDING MACHINEE) ELECTROE) ELECTRO--SLAG WELDING MACHINE (SHELL & DISH CLADDING)SLAG WELDING MACHINE (SHELL & DISH CLADDING)F) F) SUBMERGED ARC WELDING MACHINES UPTO 6.5 MTRS IN DIASUBMERGED ARC WELDING MACHINES UPTO 6.5 MTRS IN DIAG) G) MIGMIG--MAG WELDING MACHINEMAG WELDING MACHINEH) H) HORIZONTAL BORING & MILLING MACHINE (MAX. TABLE SIZE UPTO HORIZONTAL BORING & MILLING MACHINE (MAX. TABLE SIZE UPTO
1200 mm x 1200 mm) 1200 mm x 1200 mm) I) HORIZONTAL BORING MACHINE (FLOOR TYPE), SPINDLE DIA. 13I) HORIZONTAL BORING MACHINE (FLOOR TYPE), SPINDLE DIA. 130 mm,0 mm,
FLOOR PLATE: 7000 x 8000 mm, AXIS: X 6000, Y 2500, Z FLOOR PLATE: 7000 x 8000 mm, AXIS: X 6000, Y 2500, Z 1200 mm 1200 mm J) J) VERTICAL TURNING & BORING MACHINE UPTO 3.2 MTRS DIA & VERTICAL TURNING & BORING MACHINE UPTO 3.2 MTRS DIA &
2.5 MTRS. HIGH, MAXIMUM WEIGHT 12 METRIC TONS 2.5 MTRS. HIGH, MAXIMUM WEIGHT 12 METRIC TONS K) K) CNC VERTICAL MACHINING CENTER CNC VERTICAL MACHINING CENTER –– AXIS: X AXIS: X –– 1000mm, Y 1000mm, Y –– 500mm, 500mm,
Z Z –– 500mm500mmL) L) CNC LATHE MACHINE, SWING OVER BED = 1800 mm, SWING OVER CNC LATHE MACHINE, SWING OVER BED = 1800 mm, SWING OVER
CARRIAGE = 1400 mm, MAXIMUM JOB LENGTH = 5000 mm CARRIAGE = 1400 mm, MAXIMUM JOB LENGTH = 5000 mm M) M) LATHE MACHINE: 5.0 MTRS. DIA X 20.0 MTRS. LONG UPTO 70 TONS LATHE MACHINE: 5.0 MTRS. DIA X 20.0 MTRS. LONG UPTO 70 TONS N) N) CNC MILLING AND LATHE MACHINES IN A/C ROOM CNC MILLING AND LATHE MACHINES IN A/C ROOM O) O) SECTION BENDING MACHINES UPTO 300mm `H` BEAM SIZE SECTION BENDING MACHINES UPTO 300mm `H` BEAM SIZE P) P) HEAT TREATMENT FURNACE 36 MTRS L X 6 MTRS W X 6 MTRS H HEAT TREATMENT FURNACE 36 MTRS L X 6 MTRS W X 6 MTRS H Q) Q) LARGE OVERHEAD GANTRY CRANESLARGE OVERHEAD GANTRY CRANES
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Manufacturing Devices & Their CapabilitiesManufacturing Devices & Their CapabilitiesC
OM
PAN
Y FA
CIL
ITIE
SC
OM
PAN
Y FA
CIL
ITIE
S
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesLarge Plate Roller upto 65mm thk at 3.0 mtrs Wide
0r 45mm at 4.0 mtrs wideMUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
PLA
TE R
OLL
ING
PLA
TE R
OLL
ING
Small Plate Roller upto 25mm thk at 3.0 mtrs WideMUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesPL
ATE
RO
LLIN
GPL
ATE
RO
LLIN
G
PLA
SMA
CU
TTIN
GPL
ASM
A C
UTT
ING
Underwater Plasma Cutting Machine Range : C.S. – 100 mm Thick, S.S. – 60 mm Thick
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesMUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
DEDE --
CLA
DD
ING
MA
CH
INE
CLA
DD
ING
MA
CH
INE
De-Cladding Machine Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesMUSSAFAHMUSSAFAH
WORKSHOPWORKSHOP
ELEC
TRO
ELEC
TRO
-- SLA
G
SLA
G
WEL
DIN
G M
AC
HIN
E W
ELD
ING
MA
CH
INE
Electro-Slag Welding Machine - Shell Cladding Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesMUSSAFAHMUSSAFAH
WORKSHOPWORKSHOP
ELEC
TRO
ELEC
TRO
-- SLA
G
SLA
G
WEL
DIN
G M
AC
HIN
E W
ELD
ING
MA
CH
INE
Electro-Slag Welding Machine - Dish Cladding Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesMUSSAFAHMUSSAFAH
WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesSubmerged Arc Welding Machines (upto 6.5mtrs in Dia )
MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
SUB
SU
B --
AR
C W
ELD
ING
AR
C W
ELD
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesMig-Mag Welding Machines
MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
WEL
DIN
GW
ELD
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesHorizontal Boring & Milling Machine
Max. Table size upto 1200 mm x 1200 mm MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
MA
CH
ININ
GM
AC
HIN
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesHorizontal Boring Machine (Floor Type)
Spindle Dia.130 mm, Floor Plate 7000 x 8000 mmAxis X 6000, Y 2500, Z 1200 mm
MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
MA
CH
ININ
GM
AC
HIN
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesVertical Turning & Boring Machine upto 3.2mtrs Dia
& 2.5 mtrs high, maximum weight 12 metric tonsMUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
MA
CH
ININ
GM
AC
HIN
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesCNC Vertical Machining Center
Axis: X -1000mm, Y - 500mm, Z - 500mm MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
MA
CH
ININ
GM
AC
HIN
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesCNC Lathe Machine
Swing over bed =1800 mm, Swing over carriage = 1400 mm, Maximum Job Length = 5000 mm
MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
MA
CH
ININ
GM
AC
HIN
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesLathe Machine, 5.0 mtrs Dia X 20.0 mtrs long upto 70 tonsMUSSAFAHMUSSAFAH
WORKSHOPWORKSHOP
MA
CH
ININ
GM
AC
HIN
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesCNC Milling and Lathe Machines in A/C Room
MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
MA
CH
ININ
GM
AC
HIN
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesSection Bending Machines Upto 300mm ‘H’ Beam size
MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
SEC
TIO
N B
END
ING
SEC
TIO
N B
END
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesHeat Treatment Furnace - 24 m L x 6 m W x 6 m H
MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
P.W
.H.T
.P.
W.H
.T.
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesLarge Gantry Cranes 2 x 70 metric tons each
MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
LIFT
ING
LIFT
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesLarge Overhead Gantry Crane 30/35 tons
MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
LIFT
ING
LIFT
ING
AS A MAIN EVAPORATOR AND PRESSURE VESSELS AS A MAIN EVAPORATOR AND PRESSURE VESSELS MANUFACTURING FACILITY WE OFFER THE FOLLOWING MANUFACTURING FACILITY WE OFFER THE FOLLOWING YEARLY CAPACITY AS FOLLOWS:YEARLY CAPACITY AS FOLLOWS:
WORKING ON A SINGLE SHIFT BASIS WE CAN PRODUCE AWORKING ON A SINGLE SHIFT BASIS WE CAN PRODUCE AYEARLY TOTAL OF SOME 1,400,000 PRODUCTIVE MHRS. YEARLY TOTAL OF SOME 1,400,000 PRODUCTIVE MHRS.
OUR WORKSHOP LOADING FROM OCT 2012 TO SEP 2013 IS OUR WORKSHOP LOADING FROM OCT 2012 TO SEP 2013 IS CURRENTLY AT SOME 1,200,000 MANHOURS BOOKED TILL CURRENTLY AT SOME 1,200,000 MANHOURS BOOKED TILL SEP 2012 AND WITH A SPARE CAPACITY OF SOME 225,000 SEP 2012 AND WITH A SPARE CAPACITY OF SOME 225,000 MANHOURS ON DOUBLE SHIFT BASIS IE :MANHOURS ON DOUBLE SHIFT BASIS IE :--
SINGLE SHIFT PER MTH = 110,000 OR AROUND 880 TONS/MTH SINGLE SHIFT PER MTH = 110,000 OR AROUND 880 TONS/MTH DOUBLE SHIFT PER MTH= 129,000 OR AROUND 1000 TONS/MTH DOUBLE SHIFT PER MTH= 129,000 OR AROUND 1000 TONS/MTH
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Present WorkloadPresent Workload
1 DESIGN & ENGINEERING DEPARTMENT1 DESIGN & ENGINEERING DEPARTMENT 2 ERECTION PROJECTS2 ERECTION PROJECTS 3 BOILER COMPONENTS3 BOILER COMPONENTS 4 PRE4 PRE--FABRICATION OF INDUSTRIAL PIPINGFABRICATION OF INDUSTRIAL PIPING 5 DESALINATION PLANTS ( M.S.F. & M.E.D.)5 DESALINATION PLANTS ( M.S.F. & M.E.D.) 6 MANUFACTURING OF PRESSURE VESSELS6 MANUFACTURING OF PRESSURE VESSELS 7 DESIGN ,ENGINEERING & SUPPLY OF PROCESS SKIDS7 DESIGN ,ENGINEERING & SUPPLY OF PROCESS SKIDS 8 LOAD OUT FACILITIES ( BY SEA )8 LOAD OUT FACILITIES ( BY SEA ) 9 HEAT EXCHANGERS & TUBE BUNDLES9 HEAT EXCHANGERS & TUBE BUNDLES 10 REPAIR & MAINTENANCE MACHINE SHOP FACILITIES10 REPAIR & MAINTENANCE MACHINE SHOP FACILITIES 11 TOTAL MAINTENANCE SERVICES11 TOTAL MAINTENANCE SERVICES
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Selection of Photographs from completed ProjectsSelection of Photographs from completed Projects
Abu Dhabi, United Arab EmiratesAbuAbu Dhabi, Dhabi, United Arab EmiratesUnited Arab Emirates Design Department for Vessels, Boiler Parts & Process Equipment Design Department for Vessels, Boiler Parts & Process Equipment etc.etc.MUSSAFAH MUSSAFAH
WORKSHOPWORKSHOP
DES
IGN
AN
D E
NG
INEE
RIN
G
Project department for erection of mechanical
equipment for the power oil & gas Industries
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab Emirates
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Welding of Air Welding of Air -- Water HeaterWater HeaterMUSSAFAH MUSSAFAH
WORKSHOPWORKSHOP
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Prefabrication of Industrial Piping SystemsPrefabrication of Industrial Piping SystemsPrefabrication of Industrial Piping SystemsMUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates
Detailed engineering,supply,fabrication,erection,testing and maintenancefor both process and utilitypiping systems. Our servicescover the following :
Prefabrication , Pipe Bending,Special Materials,ComponentAssembly,Planning andSite Erection.
Pictures shown here are fromthe Abu Dhabi U.A.E. facilitieswhere both Stainless and Carbonsteels can be handled in separate areas.
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP Desalination Plants
( Evaporators, Brine Heaters, Thermocompressors, Panels, Water Boxes, Tube Sheet Collars)
Desalination Plants( Evaporators, Brine Heaters, Thermocompressors, Panels, Water Boxes, Tube Sheet Collars) ManufacturedManufactured in 1997in 1997
For SIDEM: MEW / Ras Al Khaimah - U.A.E. , (MED Type)2 x 1.5 MIGD; L = 46.5m, Dia = 6m; 2 x 300 tons
For SIDEM: GECOL / Derna- Libya, (MSF Type)1 x 1 MIGD; 26m x 8m x 5.6m; 1 x 350 tons
Manufactured inManufactured in 19981998
For SASAKURA: MEW / Dubai - U.A.E., (MED Type)5 x 1.8 MIGD; L = 20m, Dia = 5m; 5 x 500 tons
For Fisia Italimpinati :ABB/ADNOC Abu Dhabi UAE, (MSF Type)
2 X 3.5 MIGD L=52m x H=4m x W=8m; 2 x 750 tons
Abu Dhabi, United Arab EmiratesAbu Dhabi, Abu Dhabi, UnitedUnited ArabArab EmiratesEmiratesD
ESIG
N
& M
AN
UFA
CTU
RIN
GD
ESIG
N
& M
AN
UFA
CTU
RIN
G
For SIDEM: GECOL / Tobruk - Libya, (MED Type)3 x 3 MIGD; L = 84m Dia = 7.2m; 3 x 534 tons
Manufactured in 2000Manufactured in 2000
For SIDEM: GECOL / Tripoli & Sousa- Libya, (MED Type)4 x 1 MIGD; L = 42m, Dia = 4.8m; 4 x 140 tons
Manufactured inManufactured in 19991999
Contd...Contd...
Desalination Plants( Evaporators, Brine Heaters, Thermocompressors, Panels, Water Boxes, Tube Sheet Collars)
Desalination Plants( Evaporators, Brine Heaters, Thermocompressors, Panels, Water Boxes, Tube Sheet Collars)
ManufacturedManufactured in in 20012001For SASAKURA : MEW / Ajman - U.A.E. , (MED Type)5 x 1.8 MIGD; L = 20m, Dia = 5m; 2 x 400 tons
For FISIA : ADWEA / Mirfa - U.A.E. , (MSF Type)3 x 7.5 MIGD; L = 72m, H = 4.5m, W = 14.6m; 3 x 1050 tons(Prefabricated Panels and Water Boxes for 3 Units of Eaporator)
For FISIA: ADWEA / Shuweihat - U.A.E. , (MSF Type)3 x 16.8 MIGD; L = 110m, H = 5.5m, W = 24m; 3 x 2050 tons(Prefabricated Panels and Tube Sheet Collars for 3 Units of Eaporator)
For FISIA:: ADWEA / Shuweihat - U.A.E. , (MSF Type)3 x 16.8 MIGD; L = 110m, H = 5.5m, W = 24m; 6 x 368 tons(Prefabricated Water Boxes for 6 Units of Eaporator)
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Manufactured inManufactured in 2002/20032002/2003
Abu Dhabi, United Arab EmiratesAbu Dhabi, Abu Dhabi, UnitedUnited ArabArab EmiratesEmirates
Desalination Plants( Evaporators, Brine Heaters, Thermocompressors, Panels, Water Boxes, Tube Sheet Collars)
Desalination Plants( Evaporators, Brine Heaters, Thermocompressors, Panels, Water Boxes, Tube Sheet Collars)
ContractedContracted in in 2003 / 20042003 / 2004
For FISIA : DEWA / Jebel Ali Phase 1 - U.A.E. (MSF Type)5 x 14 MIGD Weight : 261.8 Tons(Prefabricated Water Boxes for 1 Evaporator Unit)
For FISIA : DEWA / Jebel Ali Phase 1 - U.A.E. (MSF Type) 5 x 14 MIGD Weight : 385.8 Tons(Prefabricated 88 No. Tube Sheet Collars for Evaporators)
For WEIR ENTROPIE : SEWA / Kalba Desalination Plant, U.A.E. (MED Type)Dimension: 30.4 m L x 5 m dia - 2 modules
15.2 m L x 4.2 m dia - 1 moduleWeight : 365 MT(Evaporator, Condenser, Heat Exchangers & Ducting)
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, Abu Dhabi, UnitedUnited ArabArab EmiratesEmirates
Desalination Plants( Evaporators, Brine Heaters, Thermocompressors, Panels, Water Boxes, Tube Sheet Collars)
Desalination Plants( Evaporators, Brine Heaters, Thermocompressors, Panels, Water Boxes, Tube Sheet Collars)
ContractedContracted in in 2004 / 20052004 / 2005
For VA TECH WABAG: Benghazi North / Libya Desalination Plant (MED Type) Dimension: 38.7m L x 5 m diaWeight : 256 MT(Evaporator, Condenser, Steel Structure, Vapour Channel, Steam Pipe, GRP Piping & Lifting Device)
For WEIR ENTROPIE : TCD / Abu Dhabi IV Desalination Plant (MED Type)Dimension: 22 m L x 3.6 m dia Weight : 100 MT(Evaporator, Condenser, Ducting & Top Structure)
For Weir Entropie : Ravensthorpe Nickel Project, Australia (MED Type)Dimension: 39 m L x 4.1 m dia Weight : 306 MT(2 Unit Evaporators, associated Heat Exchangers and Ducts)D
ESIG
N
& M
AN
UFA
CTU
RIN
GD
ESIG
N
& M
AN
UFA
CTU
RIN
GAbu Dhabi, United Arab EmiratesAbu Dhabi, Abu Dhabi, UnitedUnited ArabArab EmiratesEmirates
Desalination Plants( Evaporators including Brine Heaters, Water Boxes, Deaerators, Steel Structures etc.)
Desalination Plants( Evaporators including Brine Heaters, Water Boxes, Deaerators, Steel Structures etc.)
For Doosan Heavy Ind. : Sabiya Phase III Desalination Plant for MEW-Kuwait (MSF Type) Dimension: 98.4 m L x 27.0 m W x 4.5 m H (Capacity: 4 x 12.5 MIGD)Weight : 15,200 MT (Total)(4 Units Evaporators – Fabrication, Transportation & Erection)
For Aquatech : Al Khafji Desalination Plant, Saudi Arabia (MSF Type)Dimension: 36 m L x 8 m w X 3 m H (Capacity: 1 x 1.5 MMGPD)Weight : 514 MT (Total)(1 Unit Evaporator – Fabrication only)
For Aquatech : Mukhaizna Steam Flood Project for MEW – Oman) Dimension: 4900 / 3300 mm OD x 34900 mm H x 12.7 / 9.5 mm thk. Total Weight : 1890 MT (135 / MT each)(14 Units Falling Film Evaporator – Fabrication only) D
ESIG
N
& M
AN
UFA
CTU
RIN
GD
ESIG
N
& M
AN
UFA
CTU
RIN
GAbu Dhabi, United Arab EmiratesAbu Dhabi, Abu Dhabi, UnitedUnited ArabArab EmiratesEmirates
Contracted in 2005 / 2006
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of Evaporators for SEWA Manufacturing of Evaporators for SEWA KalbaKalba Desalination Plant (M.E.D.)Desalination Plant (M.E.D.)
Dimensions : 30.4 m L x 5 m Dia.Dimensions : 30.4 m L x 5 m Dia.--2 modules, 15.2 m L x 4.2 m Dia.2 modules, 15.2 m L x 4.2 m Dia.--1 module1 module Total Weight : 365 MTTotal Weight : 365 MT
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of Evaporator for TCD IV Abu Dhabi Desalination PlManufacturing of Evaporator for TCD IV Abu Dhabi Desalination Plant (M.E.D.)ant (M.E.D.)Dimensions : 22.2 m L x 3.6 m Dimensions : 22.2 m L x 3.6 m DiaDia..-- (Evaporator), 8.65 m L x 1.3 m (Evaporator), 8.65 m L x 1.3 m DiaDia. (. (CondensorCondensor))
Total Weight : 100 MTTotal Weight : 100 MT
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of 2 Units Evaporator with Manufacturing of 2 Units Evaporator with ‘‘UU’’ Stamp for Stamp for RavensthorpeRavensthorpe Nickel Project, Nickel Project,
Australia (M.E.D.)Australia (M.E.D.)Dimensions : 39 m L x 4.1 m Dimensions : 39 m L x 4.1 m diadia Total Weight : 306 MTTotal Weight : 306 MT
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of 4 Units (12.5 MIGD) MSF Evaporator for Manufacturing of 4 Units (12.5 MIGD) MSF Evaporator for SabiyaSabiya Phase III Phase III
Desalination Plant, Kuwait Desalination Plant, Kuwait Dimensions : 98.4 m L x 27.0 m W x 4.5 m H Dimensions : 98.4 m L x 27.0 m W x 4.5 m H
Total Weight : 15,600 MT (3900 MT / each)Total Weight : 15,600 MT (3900 MT / each)
MA
NU
FAC
TUR
ING
M
AN
UFA
CTU
RIN
G
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates 4 Units (12.5 MIGD) MSF Evaporator for 4 Units (12.5 MIGD) MSF Evaporator for SabiyaSabiya Phase III Desalination Plant, Kuwait Phase III Desalination Plant, Kuwait
Dimensions : 98.4 m L x 27.0 m W x 4.5 m H Dimensions : 98.4 m L x 27.0 m W x 4.5 m H LOADLOAD--OUT OF EVAPORATOR FROM OUR JETTY TO KUWAIT BY BARGEOUT OF EVAPORATOR FROM OUR JETTY TO KUWAIT BY BARGE
LOA
DLO
AD -
- OU
T FR
OM
JET
TY
OU
T FR
OM
JET
TY
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates 1 Unit (1.5 MMGPD) MSF Evaporator for Al 1 Unit (1.5 MMGPD) MSF Evaporator for Al KhafjiKhafji Desalination Plant, S. Arabia Desalination Plant, S. Arabia
Dimensions : 36 m L x 8 m W x 3 m H Dimensions : 36 m L x 8 m W x 3 m H Total Weight : 514 MT Total Weight : 514 MT
MA
NU
FAC
TUR
ING
M
AN
UFA
CTU
RIN
G
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates 14 No. Falling Film Evaporators for 14 No. Falling Film Evaporators for MukhaiznaMukhaizna Steam Flood Project, Oman Steam Flood Project, Oman
Dimensions :Dimensions : 4900 / 3300 mm OD x 34900 mm H x 12.7 / 9.5 mm thk4900 / 3300 mm OD x 34900 mm H x 12.7 / 9.5 mm thk. . Total Weight : 1890 MT (135 MT / each)Total Weight : 1890 MT (135 MT / each)
MA
NU
FAC
TUR
ING
M
AN
UFA
CTU
RIN
G
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of Evaporators for Desalination Plants (M.S.F.)Manufacturing of Evaporators for Desalination Plants (M.S.F.)MUSSAFAH MUSSAFAH
WORKSHOPWORKSHOP
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of Evaporators for Desalination Plants (M.E.D.)Manufacturing of Evaporators for Desalination Plants (M.E.D.)MUSSAFAH MUSSAFAH
WORKSHOPWORKSHOP
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of Desalination Plants (M.S.F.) 3.5 MGPDManufacturing of Desalination Plants (M.S.F.) 3.5 MGPD
Dimensions 8mtrs Wide x 52mtrs Long x 4mtrs High x 750 TonsDimensions 8mtrs Wide x 52mtrs Long x 4mtrs High x 750 Tons
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of Water Boxes for Desalination Plants (M.S.F.)Manufacturing of Water Boxes for Desalination Plants (M.S.F.)
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of Panels for Desalination Plants (M.S.F.)Manufacturing of Panels for Desalination Plants (M.S.F.)
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Pressure VesselsPressure VesselsPressure VesselsMUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Diameters 5 m +
Lengths 21 m +
Weights 100 tons +More than 400 Vessels manufacturedsince 1995 with dimensions up to
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab EmiratesD
ESIG
N
& M
AN
UFA
CTU
RIN
GD
ESIG
N
& M
AN
UFA
CTU
RIN
G
Pressure VesselPressure VesselPressure VesselMUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Diameters 4.8 m
Length 32 m
Weight 105 tons Snamprogetti – ADCO Bu Hasa Project
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab EmiratesD
ESIG
N
& M
AN
UFA
CTU
RIN
GD
ESIG
N
& M
AN
UFA
CTU
RIN
G
Surge Vessel Technip/Al Jaber – Fujairah WP ProjectSurge Vessel Surge Vessel Technip/Al Jaber Technip/Al Jaber –– Fujairah WP ProjectFujairah WP Project
Diameter 2.8 m
Length 18 m
Weight 96 tons
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab EmiratesMUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Surge Vessel Torishima / ADWEA Shuweihat ProjectSurgeSurge Vessel Vessel Torishima / ADWEA Shuweihat ProjectTorishima / ADWEA Shuweihat Project
Diameter 3.2 m
Length 14 m
Weight 46 tons
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab EmiratesMUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of 8 No. Dual Media Filters for Perth DesalinationManufacturing of 8 No. Dual Media Filters for Perth Desalination PlantPlant
Dimensions : 4 m ID x 12.5 m L x 18/18mm thk. Dimensions : 4 m ID x 12.5 m L x 18/18mm thk. –– Total Weight Total Weight –– 384 MT384 MTMUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab EmiratesContactor towers for SAUDI ARAMCOContactor towers for SAUDI ARAMCOMUSSAFAH MUSSAFAH
WORKSHOPWORKSHOP
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
The Largest Autoclave in UAEThe Largest Autoclave in UAEThe Largest Autoclave in UAEDiameter 5.8 m
Length 24 m
Weight 100 tons
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab EmiratesMUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
The Largest Autoclave in UAEThe Largest Autoclave in UAEThe Largest Autoclave in UAEDiameter 5.8 m
Length 24 m
Weight 100 tons
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab EmiratesMUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
The Largest Autoclave in UAEThe Largest Autoclave in UAEThe Largest Autoclave in UAEDiameter 5.8 m
Length 24 m
Weight 100 tons
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab EmiratesMUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesProcess Skids Supplied To Various Clients
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates 2 No. Glycol Regeneration Skids for ADCO 2 No. Glycol Regeneration Skids for ADCO –– NEB ProjectNEB Project
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Glycol Dehydration Skid for SAUDI ARAMCOGlycol Dehydration Skid for SAUDI ARAMCO
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Glycol Dehydration Skid for SAUDI ARAMCOGlycol Dehydration Skid for SAUDI ARAMCO
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Test Separator Skid for Test Separator Skid for MazagonMazagon Dock Ltd / ONGC IndiaDock Ltd / ONGC India
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Manufacturing of Chemical Injection Skid PackagesManufacturing of Chemical Injection Skid PackagesMUSSAFAH MUSSAFAH
WORKSHOPWORKSHOP
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Micro Scrubber Skids for Bahrain National Oil CompanyMicro Scrubber Skids for Bahrain National Oil Company
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Slug Catcher for Abu Dhabi Onshore Oil Company (ADCO)Slug Catcher for Abu Dhabi Onshore Oil Company (ADCO)
MUSSAFAH MUSSAFAH WORKSHOPWORKSHOP
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP Indirect fired Heater Adco UAE Abu Dhabi
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
1 No H.P. Production Separator Skid P.D.O Oman
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
1 No Low Pressure Production Separator Skid P.D.O Oman
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
4 No Production Separator Skids Mannesmann / Adco UAE Abu Dhabi
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
4 No Production Manifold Skids Mannesmann / Adco UAE Abu Dhabi
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
1 No Crude Stabilizer Skid P.D.O Oman
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates Abu Dhabi United Arab Emirates MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
2 No Gas Dehydration Skids Technip/Bechtel Adnoc OGD II
DES
IGN
&
MA
NU
FAC
TUR
ING
DES
IGN
&
MA
NU
FAC
TUR
ING
Abu Dhabi, United Arab EmiratesAbu Dhabi, United Arab EmiratesLoad out capacity from our own jetty upto 500 metric
tons + using Multi - Axle Trailers MUSSAFAHMUSSAFAHWORKSHOPWORKSHOP
LOA
D LO
AD
-- OUT
JET
TYO
UT J
ETTY
Abu Dhabi, United Arab EmiratesAbu Dhabi,Abu Dhabi, United Arab EmiratesUnited Arab Emirates Heat Exchangers and Tube BundlesHeat Exchangers and Tube BundlesMUSSAFAH MUSSAFAH
WORKSHOPWORKSHOP
MA
NU
FAC
TUR
ING
MA
NU
FAC
TUR
ING
Abu Dhabi,United Arab EmiratesAbu Dhabi,United Arab EmiratesAbu Dhabi,United Arab EmiratesMUSSAFAHMUSSAFAHWORKSHOPWORKSHOP Repair & Maintenance Workshop (MachineshopMachineshop)
REP
AIR
& M
AIN
TEN
AN
CE
REP
AIR
& M
AIN
TEN
AN
CE
FLAGSHIP COMPANYFLAGSHIP COMPANYFLAGSHIP COMPANY
From September 2002 Gulf Specialized Mechanical & Engg. Services Co. (Formerly Deutsche Babcock Services) has come under the Flagship Company IMCC (International Management & Construction Corporation) with following structure:
GSME (Gulf Specialized Mechanical & Engg. Services Co.)
GPC(Gulf Piping Co.)
IMAC(International Metal & Const. Co)
ADCE(Abu Dhabi Coating Enterprises)
The combined operational statistics are provided in the next page.
IMCC (International Management & Construction Corporation.)
MAX. CRANE NO. CRANES LOAD-OUT MACHINING NUMBER OFISO 9001 & ASME TOTAL M² LAYDOWN MANHOURS STEEL FAB. PRESSURE PARTS CAPACITIES OVERHEAD, CAPACITY (MT) CAPACITY EMPLOYEESCERTIFIED YARDS YARD SIZE AREAS - M² PER ANNUM TONS / ANNUM TONS / ANNUM METRIC TONS TOWER & MOBILE SINGLE ITEM MAX. SIZE (PERMANENT)
GSME 73,000 10,000 1,400,000 8,000 15,000 250 25 500
5m Ø x 20m lg 70 ton-single
item 780
IMAC 53,000 5,000 1,200,000 18,000 1,000 100 15 1,100 N/A 650
GULF PIPING 428,400 100,000 5,400,000 60,000 5,000 750 50 5,000 N/A 3,400
TOTALS 554,400 115,000 8,000,000 86,000 21,000 - 90 - - 4,830
Steel Fabrication Product Lines Pressure Parts Other Services not included in above figure's
• Offshore / Onshore Modules • Pressure Vessels & Tanks • Oil / Gas & Power Station Maintenance• Single Buoy Moorings • Heat Exchangers & Tube Bundles • Oil / Gas & Power Station Shutdowns• F.P.S.O. Modules / Turrets • Evaporators (Desalination Plants) • Turnkey Erection Services• Flare Derricks / Booms • Power & Industrial Piping • Instrumentation and Central Services• Large Structural Bridges Process Skid Packages • Preventative Maintenance• Barges • Production & Test Separators • Specialist Rotating Equipment Inspections• Port Container & Overhead Cranes • Glycol Dehydration Units • Container Crane Maintenance
• Molecular Sieve Plants • Machining Works (CS, SS & Alloy Steels)• Fired Heaters (indirect) • Repair Facilities • Fuel Gas Treatment• Chemical Injection• Gas Scrubbers & Filter Separators• Metering Skids• Gathering Manifolds• Pig Launchers / Receivers• Gas Sweetening Plants
INTERNATIONAL MANAGEMENT AND CONSTRUCTION CORPORATION
GSME/ IMAC / GULF PIPING YARD CAPACITIES
CAPACITY (MAX.)
ABU DHABI, U. A. E.
COMBINED OPERATIONAL STATISTICS
Page 1 of 1
GULF SPECIALIZED MECHANICAL & ENGINEERING SERVICES CO. MUSSAFAH WORKSHOP, ABU DHABI
No. Year Emirate/ Country Contract Description Location Client Main or Sub-
Contract
Contract Value UAE Dhs. APPROX.
Contract Period
1 2011 U.A.E. Supply & Fab. of 16 No. FWKO Drums and 4 No. Test Separators for IOEC South Pars Field Dev. Platforms 19, 20 and 21
Iran Millennia Intnl. Gen. Trading
Sub 59,356,000 Jul 11 - Dec 12
2 2011 U.A.E. Fab. of 15 No. Coalescer and Prefilter Vessels for GASCO Habshan FGS Project
Habshan Babcock Borsig Service
Sub 9,640,000 Jul 11 - Sep 12
3 2011 U.A.E. Fab. of 12 No. Drums for PCC Nylon 6.6 Petrochemical and Conversion Project
Al Jubail Jacobs Sub 2,244,300 Oct 11 - Jul 12
4 2011 U.A.E. Fab. of 13 No. Surge Vessels for ADWEA Strategic Water Storage / Recovery Project, Liwa, Abu Dhabi
Liwa, Abu Dhabi
ACC / Posco Sub 7,462,700 Nov 11 - Sep 12
5 2011 U.A.E. Fab. of 13 No. Non-Module Drums for PCC Nylon 6.6 Petrochemical and Conversion Project
Al Jubail Jacobs Sub 1,329,500 Nov 11 - Oct 12
6 2011 U.A.E. Fab. of 4 No. Skids (incl. 8 No. Vessels), Associated Piping and Structurals & Hydro Cyclones for OWT Packages
Abu Dhabi SPG Steiner GmbH Sub 5,308,825 Dec 11 - Oct 12
7 2012 U.A.E. Fab. of 6 No. Air Receivers for PCC Nylon 6.6 Petrochem. & Conver. Project
Al Jubail Jacobs Sub 2,546,700 May 12 - Dec 12
LIST OF MAJOR PURCHASE ORDERS UNDER EXECUTION
Page 17 of 19Rev.23 -
05.01.2012
DESIGNTEMP.
(C)
KOMM NO.CLIENT
VESSELS MANUFACTURED IN GSME MUSSAFAH WORKS
VESSELYEAR CODEDESIGN PRESSURE
2011 CT - 5144Technip - Abu DhabiSaudi Aramco - KhafjiCrude Related Offshore 1 No. - 1200 x 2700 x 8/8 500 kPog 95oC ASME VIIIProject DIV. 1
1 No. - 1200 x 2700 x 8/8 500 kPog 95oC -do-1 No. - 1100 x 2300 x 6/6/6 1050 kPog 95oC -do-1 No. - 1100 x 2300 x 8/8/6 1050 kPog 95oC -do-
Total Weight : 7.75 MT
Material : A 516 Gr. 70 N
2011 CT - 5146Kindasa Water Services Factory Co. -Phase B2 Expansion 3300 x 9000 x 15/13 10 bar.g 50oC ASME VIIIProject, Jeddah, K.S.A. DIV. 1
Total Weight : 46 MT
Material : A 516 Gr. 70
2011 CT - 5148Millennia Intnl.
8 No. - 1540 x 7000 x 58+3 / 58+3 139 bar.g 95oC ASME VIIIDIV. 1
8 No. - 1810 x 9060 x 68+3 / 68+3 139 bar.g 95oC -do-
4 No. - 1850 x 5000 x 70+3 / 70+3 139 bar.g 95oC -do-
Total Weight : 800 MT
Material : BS 1501-225-490B LTSO + 3 mm Inconel 625 clad
2011 CT - 5149Deutsche Babcocki /GASCO Habshan ASME VIII
4 No. - 900 x 2900 x 18+3 / 18+3 45 / FV 105oC DIV. 12 No. - 1100 x 2900 x 22+3 / 22+3 42 / FV 115oC -do-2 No. - 900 x 2800 x 18+3 45 / FV 105oC -do- 500 x 2800 x 12+3 / 11+3 42 / FV 115oC -do-1 No. - 1170 x 3275 x 24+3 / 28+3 42 / FV 130oC -do- 700 x 3000 x 15+3 / 18+3 42 / FV 130oC -do-2 No. - 2600 x 3300 x 45+3 / 45+3 42 / FV 130oC -do-1 No. - 2500 x 5225 x 45+3 / 45+3 42 / FV 130oC -do- 1100 x 5000 x 22+3 / 25+3 42 / FV 130oC -do-1 No. - 1850 x 4150 x 35+3 / 37+3 44 / FV 122oC -do- 750 x 4100 x 15+3 / 14+3 44 / FV 122oC -do-2 No. 1800 x 3000 x 34+3 / 33+3 44.5 / FV 122oC -do-
Total Weight : 214.79 MT
Material : SA 516 Gr.65 + Alloy 825 Clad
(ID mm x TL/TL mm x thk. mm)
Qty. (ID mm x TL/TL mm x thk. mm)
15 No. Coalescer and Prefilter Vessels Qty. (ID mm x TL/TL mm x thk. mm)
(ID mm x TL/TL mm x thk. mm)
2 No. Dual Media Filter Vessels
4 No. Pressure Vessels
Page 18 of 19Rev.23 -
05.01.2012
DESIGNTEMP.
(C)
KOMM NO.CLIENT
VESSELS MANUFACTURED IN GSME MUSSAFAH WORKS
VESSELYEAR CODEDESIGN PRESSURE
2011 CT - 5151JACOBS - PCC Nylon6.6 Petrochem. And Internal ExternalConversion Project - Desi. Pres/Temp. Desi. Pres/Temp.
Al Jubail 2438 x 6096 x 10/10 0.98/kg/cm2 (g) 0.53/kg/cm2(g) ASME VIII388oC 388oC HV DIV. 1
1981 x 6096 x 16/16 10.5/kg/cm2 (g) 0.53/kg/cm2(g) -do-400oC 400oC FV
1220 x 1825 x 12/12 10.5/kg/cm2 (g) 1.03/kg/cm2(g) -do-400oC 400oC FV
Pipe 8" Sch. 40 2440L 10.5/kg/cm2 (g) 1.03/kg/cm2(g) -do-400oC 400oC FV
915 x 1220 x 10/10 3.52/kg/cm2 (g) 1.03/kg/cm2(g) -do-400oC 400oC FV
2000 x 3000 x 10/10 - 2 No. 3.52/kg/cm2 (g) 1.03/kg/cm2(g) -do-125oC 177oC FV
1250 x 2000 x 8/8 10.5/kg/cm2 (g) 1.03/kg/cm2(g) -do-200oC 200oC FV
1750 x 2000 x 12/12 10.5/kg/cm2 (g) 1.03/kg/cm2(g) -do-230oC 230oC FV
1500 x 1520 x 6/6 0(ATM)/kg/cm2 (g) 0 kg/cm2(g) -do-60oC 60oC
3000 x 4000 x 8/8 3.52/kg/cm2 (g) 1.03/kg/cm2(g) -do-121oC 177oC FV
1450 x 1500 x 6/6 3.52/kg/cm2 (g) 12 1.03/kg/cm2(g) -do-1oC 177oC FV
2011 CT - 5153ACC - POSCO JVADWEA Strategic WaterStorage/Recovery 4 No. - 3200 x 12350 x 34/33 (107.5 cum) 25 bar.g 45oC ASME VIIIProject in Liwa DIV. 1
9 No. - 2800 x 9000 x 30/29 (60 cum) 25 bar.g 45oC - do -
Total Weight : 446 MT
Material : SA 516 Gr. 70 N
13 No. Surge Vessels Qty. (ID mm x TL/TL mm x thk. mm)
Total Weight = 38.43 MT
Material : SA 516 Gr. 70 + SA-240-304
(6 No. CS & 6 No. SS) (ID mm x TL/TL mm x thk. mm)
12 No. Module Yard Drums
Page 19 of 19Rev.23 -
05.01.2012
DESIGNTEMP.
(C)
KOMM NO.CLIENT
VESSELS MANUFACTURED IN GSME MUSSAFAH WORKS
VESSELYEAR CODEDESIGN PRESSURE
2011 CT - 5155JACOBS - PCC Nylon6.6 Petrochem. And Internal. ExternalConversion Project -Al Jubail 500 x 1250 x 6/6 10.5 bar.g 1 bar.g ASME VIII
200oC 200oC FV DIV. 1 610 x 915 x 9/9 3.52 bar.g 0.5 bar.g -do-
400oC 400oC HV 915 x 1143 x 9/9 - 2 No 10.5 bar.g 1 bar.g -do-
400oC 400oC FV 1372 x 4572 x 12/12 10.5 bar.g 1 bar.g -do-
400oC 400oC FV10.5 bar.g 1 bar.g -do-
400oC 400oC FV 1070 x 3660 x 10/10 10.5 bar.g 1 bar.g -do-
400oC 400oC FV 610 x 1000 x 10/10 1.05 bar.g 1 bar.g -do-
120oC 177oC FV 1500 x 1500 x 6/6 ATM Barg/ 0 Barg -do-
60oC 60oC 1500 x 4500 x 11/11 10.6 bar.g 0.5 bar.g -do-
60oC 177oC FV 2100 x 6200 x 14/14 10.5 bar.g - -do-
100oC -
+ SA-240-304
2011 CT - 5156SPG Steiner GmbH /Millenia Intnl. forOily Water TreatmentPackages 1400 x 3600 x 14/13 - 4 No. 15.5 bar.g 95oC ASME VIII
DIV. 1 1400 x 3600 x 10/10 - 4 No. 8.62 bar.g 95oC -do-
Vessel weight = 8.2 MT
Piping weight = 1.8 MT
Free Issue Mtl. = 2 MT
Total Weight = 22 MT
2012 CT - 5157JACOBS - PCC Nylon (ID mm x TL/TL mm x thk. mm6.6 Petrochem. AndConversion Project - 2550 x 6210 x 16 10.3 bar.g 177oF ASME VIIIAl Jubail DIV. 1
2950 x 7500 x 18 10.3 bar.g 177oF -do-
3500 x 8850 x 22 10.3 bar.g 177oF -do-
3100 x 7550 x 22 12.75 bar.g 177oF -do-
2900 x 7300 x 18 10.3 bar.g 177oF -do-
3300 x 8100 x 20 10.3 bar.g 177oF -do-
SA 516-70 / SA 275 JR / SA 36
Material : SA 516 Gr. 70, SA 106-B
Pipe 8" Sch. 40 x FOFT 864 - 3 No
13 No. Non-Module Yard Drums (6 No. CS & 6 No. SS) (ID mm x TL/TL mm x thk. mm)
Total Weight = 21.14 MT
6 No. Air Receivers
Total Weight = 105.34 MT
Material : SA 516 Gr. 70, SA 106-B / SA 105,
4 No. Skids (including 8 No. Vessels, Piping,Structures)(ID mm x TL/TL mm x thk. mm)
Structure weight = 10 MT