Gujarat Pollution Control Board Regional Office, Bharuch C-t,lLg /3, GIDC, Phase-2, Narmadanagar, Bharuch-39201S Website: wwwgpcb.gov.in PUBLIC HEARING PROCEEDINGS It is hereby informed that as per the Ministry of Environment and Forests, Government of India, New Delhi vide its notification no. S.O. 1533 dated l4/09/2006 and its subsequent amendment S.O. 3067 (E) dated 01/1212009, Public Hearing is arranged for lws. Agrico organics Limited, plot No. D-2, cIJl12/c' Dahej-II Industrial Estate, Ta. vagra, Dist. Bharuch covered under category ,,A,, as mentioned in their request application. A copy ofthe draft Environment Impact Assessment Report and the Summary of Environment Impact Assessment Report was sent to the following authorities or offices to make available the draft EIA report for inspection to the public during normal office hours, till the public Hearing is over. L The District Collector Office, Bharuch 2. District Development Office, Bharuch 3. District Industry Centre, Bharuch 4. Taluka Development Office, Tal: Vagra, Dist.: Bharuch. 5. The Chief Conservator of Forests, Ministry of Environment and Forest, Gor, Regional office (west Zone), Kendriya paryavaran Bhavan, E-5, Arera Colony, Link Road-3, Ravisankar Colony, Bhopal _ 462016. 6. Regional office, Gujarat Pollution control Board, Shed No. c-1, 1lg/3, clDC, phase-ll. Narmadanagar, Bharuch-3920 I 5. Other concerned persons having plausible stake in environmental aspects were requested to send their responses in writing to the concerned regulatory authorities. The Public Hearing was held on 06/10i2016 at ll:00 hrs. at project site of M/s. Agrico organics Limited, Plot No. D-2, cranlc,Dahej-II Industriar Estate, Ta. vagra, Dist. Bharuch. An advertisement in English was published in ..The Times of India,, on 05/09/2016 and in Gujarati in "Gujarat Samachar', dated 05/09/2016. B G Prajapati (GAS)' Additionar colector & Additional District Magistrate, Bharuch supervised and presided over the entire public hearing process. A statement showing participants present during the public hearing is enclosed as Annexure A. A statement highlighting issues raised by the participants and responded to by the representative of the applicant during the public hearing in English and Gujarati Languages is enclosed as Annexure B and 81 respectively.
80
Embed
Gujarat Pollution Control Board...Gujarat Pollution Control Board :Regional Offi ce-Bharuch As per the provision of Notification No. S.O. I533, dated 1410912006 and its subsequent
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Gujarat Pollution Control BoardRegional Office, Bharuch
PUBLIC HEARING PROCEEDINGSIt is hereby informed that as per the Ministry of Environment and Forests, Government of India,New Delhi vide its notification no. S.O. 1533 dated l4/09/2006 and its subsequent amendment S.O.3067 (E) dated 01/1212009, Public Hearing is arranged for lws. Agrico organics Limited, plot No.D-2, cIJl12/c' Dahej-II Industrial Estate, Ta. vagra, Dist. Bharuch covered under category ,,A,,
as mentioned in their request application.
A copy ofthe draft Environment Impact Assessment Report and the Summary of EnvironmentImpact Assessment Report was sent to the following authorities or offices to make available the draftEIA report for inspection to the public during normal office hours, till the public Hearing is over.
L The District Collector Office, Bharuch2. District Development Office, Bharuch3. District Industry Centre, Bharuch4. Taluka Development Office, Tal: Vagra, Dist.: Bharuch.5. The Chief Conservator of Forests,
Ministry of Environment and Forest, Gor, Regional office (west Zone), Kendriya paryavaranBhavan, E-5, Arera Colony, Link Road-3, Ravisankar Colony, Bhopal _ 462016.
6. Regional office, Gujarat Pollution control Board, Shed No. c-1, 1lg/3, clDC, phase-ll.Narmadanagar, Bharuch-3920 I 5.
Other concerned persons having plausible stake in environmental aspects were requested to sendtheir responses in writing to the concerned regulatory authorities.
The Public Hearing was held on 06/10i2016 at ll:00 hrs. at project site of M/s. Agrico organicsLimited, Plot No. D-2, cranlc,Dahej-II Industriar Estate, Ta. vagra, Dist. Bharuch.
An advertisement in English was published in ..The Times of India,, on 05/09/2016 and in Gujaratiin "Gujarat Samachar', dated 05/09/2016.
B G Prajapati (GAS)' Additionar colector & Additional District Magistrate, Bharuchsupervised and presided over the entire public hearing process.
A statement showing participants present during the public hearing is enclosed as Annexure A.
A statement highlighting issues raised by the participants and responded to by the representative ofthe applicant during the public hearing in English and Gujarati Languages is enclosed as AnnexureB and 81 respectively.
Guiarat Pollution Control BoardRegional Office, Bharuch
Gujarat Pollution Control Board :Regional Offi ce-Bharuch
As per the provision of Notification No. S.O. I533, dated 1410912006 and its subsequent amendments.o. 3067 (E) dated 0111212009, Ministry of Environment and Forest, Govemment of India, NewDelhi, Public Hearing is conducted for NVs. Agrico organics Ltd., plot No. D2lcH112ic, Dahe!-uIndustrial Estate, Ta. Vagra, Dist. Bharuch for proposed manufacturing ofTechnical Grade pesticide3405 MT/month. The Public hearing is held on 06/10i2016 at 1l:00 hrs. at project site of l\rys.Agrico organics Ltd., Plot No. D-2rcwr2/C, Dahej-II Industriar Estate, Ta. vagra, Dist.Bharuch, which is covered under category ,,A,, of above referred Notification.
Shri B G Prajapati crs, Additional Collector & Additional District Magistrate, Bharuch andchairman olPublic Hearing committee has presided over the entire public Hearing process.
Shri H c solanki, Regional officer, GpcB, Bharuch and the representative of the MemberSecretary, GPCB Gandhinagar - a panel member of the public Hearing commiftee; welcomed allpresent to the Public Hearing. He outlined the various provisions of the Notification and briefedabout the procedural details for conducting this pub\ic Hearing, including act'rons taken by GpcBfor wide publicity of this Public Hearing and the advertisement published earlier in the local dailynewspaper. He announced that, as per the provision of Notification, only locally affected personswill be allowed to make their representation in the Pubtic Hearing while others having piausiblestake may submit their representation in writing which would be included in proceedings. He alsomade it clear to the gathering that the Committee is responsible only for preparation ofproceedingsofthe meeting covering all the concerns raised during the public Hearing.
The Regional officer, GPCB, Bharuch further informed the forum that, seven writtenrepresentations were received prior to public Hearing. The first was received from Shri MaheshPandya Paryavaran Mitra, Ahmedabad, second from Shri Dharmesh Mistry, Bharuch, third from H.Madhubabu, Hyderabad, fourth from pratik Shanna, Advocate, Surat, fifth from Miss Kiran verma,Surat, sixth from Jayeshbhai patel, Khedut Samaj Gujarat and seventh from Raj AjitsinhBalawantsinh, Bharatiya Kisan Sangh, vagra at which would be incruded in the proceedings arongwith the reply ofproject proponent.
Then after, with due permission of Additional Collector, Regional officer stalted the proceedings ofPublic Hearing. He then invited the project proponent to give their introduction and to make thepresentation oftheir project in local language.
The representative of the project proponent welcomed the gathering. Then after, he madepresentation in Gujarati language covering introduction of the company, technical information aboutproject, information on baseline environment, impact due to project and its environmental mitigationmeasures, safety measures and benefits due to the proposed project etc.
Ygrv\t77C-1, ll9 I 3, GIDC, Phase-2, Narmadanagar, Bharuch- 392015
Website: www.gpcb.gov.in
ANNEXURE - B (Enetish)
A statement showinE issues raised bv the participants and responses bv the representative ofthe anplicant during the Public Hearins
Gujarat Pollution Control BoardRegional Office-Bharuch YiH'V\I77
After the presentation, Regional Officer, GPCB, Bharuch with due permission of the Additional
Collector & chairman ofpublic hearing, opened the forum for representations/suggestions/objections
from the locally affected people, ifany.
The statement showing issues/suggestions/objections/opinion raised by the participants during
Public Hearing and responded to by the representative of the applicant during Public Hearing are as
under:
Sr.No.
Name andAddress
Point Represented and/orwritten submission
Replies by representativeof Proiect ProDonent
Replies given byPanel Member
I Dabhaibhai C.Makwana,DeputySarapanch,Vill: Vadadala
He is coming to knowabout this Public Hearingjust on today. Priorintimation to the localaffected people aboutPublic Hearing should be
done. So, Local affectedpeople can attend PublicHearing with study olupcoming project.
Is there any officer fromGIDC is present?
GIDC should be
informed to provideemployment to the landlooser as early as
possible.
GIDC is not providingform to land looser.Hence, GIDC shouldprovide details of survey
Advertisement publishedearlier before 30 daysregarding Public Hearingin local daily news paperas per EIA Notification.Executive summary inGujarati with copy ofPublic Notice is
displayed at GramPanchayat/Talati office.Acknowledgement ofreceiving executivesummary by sarpanch/talati of local affectedvillages covered understudy area is also taken.Announcement throughloud speaker in localaffected villages is alsodone for wide publiciffofPublic Hearing.
Regional OfficerGPCB has
informed that NoGIDC officerremained present
during PublicHearing eventhough priorintimation tothem. Even todayno GIDC officeris present.
Chairman ofPublic Hearinghas informed thatCIDC has
developed onesoftware in whichabout 2899 dataentry of landlooser done. Out
Gujarat Pollution Control Board ,,GlRegional Office-Bharuch W
number to locd grampanchayat while allottingthe land to the upcomingindustry and distributeforms to land looserthrough gram panchayatfor their convenience.What about employmentof land looser who losttheir land underPlantation areadeveloped by GIDC?Because no industrieswill be established inthat So,Employment to landlooser should beprovided as early as
possible otherwisecompany cannot providethem employment as pertheir age criteria.
of which ahout1200 to 1300disputed cases
regarding familyinheritance.Recently meetingheld at collectoroffice withpresence of MLAVagra to discussthis matter.Discussionbetween CIDCand companies isunder progress toprovideemployment ofabout 1600 nondisputed landlooser. Thismatter will be
solved shortly.All discussionwas done in thepresence of MLAVagra.Appropriateaction will betaken forproviding theemployment inthe nearbyindustry to landlooser whose landacquired byGIDC fordevelopinginfrastructurefacility like Road,canal, Reservoirand plantation.
2. MaheshbhaiChhatrasinhGohil,Sarpanch Vill:
o Why vehicle arrangementfor local affectedvillagers to reach site ofpublic hearing has beenmade today only? Whyother companies are notproviding such type offacility? He requestedGPCB that such type ofaffangement should be
. There is no provision inthe EIA Notification forproviding conveyance tolocal affected people.But for the sake ofconvenience to localaffected people, theyhave made such type ofarangement.
Regional Officer has informed that, all the suggestion received during public hearing is incorporated
in minutes.
He concluded the Public Hearing and summarized the various issues raised by the public and the
response given by the Project proponent. After due permission of Chairman of Public hearing, finish
the Public Hearing with vote of thanks.
Place: DahejDist.: BharuchDate: 06110/2016
,LN't-
H C SolankiRegional Officer, GPCB, Bharuch as
representative of the Member Secretary,GPCB
B G Prajapati 6agAdditional Collector &
Additional District Magistrate,Bharuch
Website: www.gpcb.gov.in
Sr.No.
Name andAddress
Point Represented and/orwritten submission
Replies by representativeof Proiect ProDonent
Replies given byPanel Memher
made during every PublicHearing.Is there any time limit forlifting unauthorizedhazardous waste whilecomplaint made byVillage sarpanch ormember regarding unauthorized dumped solidwaste or pollution?
Regional Officerhas informed thatat any time 24hrs. in 365 days,they canregistered theircomplaintregardingpollution toRegional OfficeBharuch and itwill be attendedand disposedshortly. NonHazardous glasswool waste inyour area will belifted aftermonsoon periodand restart ofTSDF site.
f
Gujarat Pollution Control Board #;Regional Office-Bharuch
. q'tqqq,1-tl iJa.ia -tse r,iq. u'i. r,iq. U Arii.
,l',:, , t ttdqtitldl't// {ro\t' )W-
rnward No. 6o q6oare - 3\ ',
n tr e,.., .
and Health Awareness SocietyRegd. No: 170?12007
TO,
THE ENVIRONMENTAT ENGINEER,
Bharuch Regional office,Bharuch Dist. GPCB.
RESPECTED SIR,
5UB - revrew of public hearing of M/s Agrico Organics [td. Proposes to Manufacture Technical Gradepesticides 34OS MT/Month with 70 crore in 46560.13 m2 at Plot No D-z,GlDC, Dahej-ll(V) Vagra(Tahsil) Sharuch (Dist)
Gujarat.
i- H.Madhubabu Environmenr Voulenteer {REEHAS, Rural Environment Education and Health Awareness society) R/O ofHyderabad, Most Respectfully submit That;
ln this regard as a Environment Volunteer l'am givinB few suggestio ns td th e proponent
So Please (indly Consider the Below Polnts .
All Environmetalists are opposing the industries but lam supporting the industries why because, in the time oflndependece our countrv population 30 crores bur now it increased to L10 crorcs, every year 50 lakhs Graduates coming
for Employment but Gove!.nment giving employment 5lakhs people only, others are getiing iob opportunites in
private sector so we must welcome to the industries.
Ail a.e discussing about pollution ... pollution... but main pollution of our country is unemployment is most danBerouspollution to all
. The Propooent of M/S Agrico Organics Ltd Proposes to Manufacture Technical Grade Pesticides 3405MT/Nronrh with 70 Crore in 46560.13 m2 at Plot No D-2,GlDC, Dahci(V)Vagra (Tahsil) Bharuch(Dist) Guiarat.
2. The Envii-onrnent consultant 5an Invirotech Pvt.Ltd. of thls prcje.t study area coverd 10 k.m radius
around ure proposed Project area, they studied locations of a ir arnbine nt qua lity , n oise levels recorded ,
water samples collected,soil samples also .oilectcd these all are in |rcrms of CPCB. This is satisfactory.
3. The consultant please take healih states cfvillage people in 10 k|,I! i'adius around is must, why because it isvery useful in future.
4. For operation of ihe pro.ject water requirement is there . lt as takinir from groundwatersource,in summerseason chance to down fallwater level so please arrange rain water harvesting systern.
5 Please utilrse waste water to plantation, sprinkling on roads. lt co,riiols Dust Pollution when your vehicles
tiansport tirne.
tural Environment Education
Da hej,
Date:06.10.2016.
fi ural Environment Educationand Health Awareness Society
Regd. No: 170212007
6 Your taking 33% (15365 m2) for plantation for Green belt is good it is cpcB norms, but I requesting toimprove 50% if any possible.
7. You take avenue plantation to near villages, road side it is useful to save environment. plant frult baringand medicinal value trees.
8. Please give employment oppurtunities to local people first.
9. Give medical facilities to near villages, Conduct Medical Camps Regularly.
10. Give drinking water facility to near villages.
11. Give Bood education to near village children.
12. Developall main roads and street roads of near villages.
13. The proiect will contribute additional revenue to the State & Central Govt.
lam recommendinB authorities of pollution control panel ofMoEF,for granta permissiontothe above proponent.
Thanking you.
Yours faithfully,
H.lvladhubabu (REEHAs, Rural Environment Education and Health Awareness Society)
1) copy to R.O Bharuch, GPCB.
2) copy to Proiect Proponent M/s Agrico OrBanics ttd.3)copy to Project Consultant San Envirotech pvt.Ltd.
t
Ar.:Nur':Qe - c-\Gujarat should be totally free from critically polluted roo"rlun"
First, let us appreciate, tweet, #askvuijayrupani programme was very successful,but some or otherhow, GPCB core issue was not discussed on 23 September2016, MAY BE A TIME CONSTRAINT,
We have a high regards for a good governance of Gujarat Govt, and goodgovernance of GPCB , but, we fail to understand, then how some of the coremandatory requirements of ACCREDITED CERTIFICATE, is loose shunted, andwithout a proper vigilant checks, some, other documentsm which has NO WORDLIKE A CERTIFICATE, are accepted as a CERTIFICATE, without clarirying 'whohas permitted in writing' to accept this, and why this was not incorporated?Details on @ are summarized in table 1.
MoEF has approved -one and only one agency- QCI-NABET, New Delhi, issuingACCREDITED CERTIFICATE , only to those environment consultants, after,satisfying all requirements, & consultant can NOT prepare EIA rcports, if theyDO NOT possess a valid accredited CERTIFICATE. & there is no qp!!g.even mandatory ToR does not specifies this, so GPCB has no voluntarv choice.
MoEF/SLEAC-GUJ, invariably demands under their mandatory ToR; as,proponent has to submit ONLY accredited certificate) in EIA report, onespecimen copy down loaded from one EIA report is attached as a readyreference - pl. refer page 11.
lnvariably, we have been observing 'non conformances' on documents beingaccepted by MS-GPCB, / RO-GPCB, AS A QCI- NABET ACREDITED
Environment clearance process CAN NOT be loose shunted
Date 26 September 2016 r MOST URGENTFrom :
Advocate Pratik sharma,1219,1401, Bhaktidham town ship,Near new L P Savani school,Jhangirabad, Surat, 395005, G ujarat.TO,
all addresses, as marked in to & cc columto,Chief MinisterGujarat
Non conformance observed on authenticity of accredited certificate ,on some documents submitted to GPCB, where we do not find anyword like a CERTIFICATE !!! pl. referto paqe,06,07,10
Gujarat should be totally free from critically polluted zones Environment clearance process CAN NOT be loose shunted Green Gujarat - clean Gujarat svachh Gujarat
do not find any word like a CERTIFICATE on such documents, ref page 6,7,10 And the fact is that , for any statutory requirements, one, can NOT accept any logical OR philosophical explanation, Core question is with whose written permission, MS-GPCB/ RO-GPCB HAS accepted such EIA reports, and also obtain a date for environment public hearings , and up loaded such EIA reports on GPCB web site for public viewing -all over the globe. Supporting documents of so called CERITIFATES , down loaded from EIA reports are attached herewith for a ready reference. just to cite few examples, PL. REFER TO TABLE 1 & subsequent pages. 6,7,10 If CM can re-varify all the EIA reports, probably through some out side, third party, experts, ( because GPCB must have already verified) OR if you refer past MoM of environment public hearings, at least, effective 1 June 2014, there can be many more such examples , on that basis, environment public hearings were conducted and environment clearance also must have issued- projects will be commissioned-and- at later date- GPCB only ,will be issuing a closure notices on account of project is not being environmentally sustainable one !!! Is it not surprising !!!
Just to cite an example, we submit herewith two classical examples of forthcoming environment public hearings, at Dahej, as under Table 1.
San Envirotech Pvt. Ltd. 424, Medicine Market, Nr. Paldi Cross Road, Paldi, Ahmedabad, Gujarat
Ref page, Annex, Page 4,5,6,7, Which is THE CERTIFICATE, page 6,7? OR both?
M/s. Pidilite Industries Limited., at Plot No. D-3/16/2, Dahej Phase-3, GIDC Industrial Estate, Dist. Bharuch. Public hearing date, 28/10/16
Siddhi green excellance pvt ltd, Kamal arcade, Near SBI, GIDC, Ankleshwar, Gujarat
Ref page Annex 8,9,10, Which is THE CERTIFICATE, page 10 ?
THERE CAN BE MANY MORE SUCH CASES- CM- SHOULD ASK CHAIRMAN-GPCB TO VARIFY ALL SUCH CASES, BASED ON EARLIER ENVIRONMENT PUBLIC HEEARING ALREADY HE MoM., at least from 01 June 2014 onwards, He, can check earlier also at random., if he desires so. Rules are good, BUT, the core question is, it is whose responsibility for a VIGILANT check whether EIA report has a VALID ACREDITED CERTIFICATE, is it, GPCB /
page 02 /12
lenovo
Typewritten Text
& 13
Gujarat should be totally free from critically polluted zones Environment clearance process CAN NOT be loose shunted Green Gujarat - clean Gujarat svachh Gujarat
SLEAC / MoEF OR public ( NGO, environmentalists etc ) OR NO BODY ? We also attach a specimen copy of CERTIFICATE, where, we find a word like a CERTIFICATE, page 11 so, you only can visualize ,how CERTIFICATE looks like, We wonder how MS-GPCB / RO GPCB is not aware of this, before accepting such documents, otherwise, such letter would have NOT come to CM directly.. is it known to GPCB, that QCI-NABET has only uploaded a note on their web site, As BEWARE OF FAK pl. refer page A 12, Let us hope, this is not the case in Gujarat- BUT one has to verify and confirm. Sorry to write this letter to you, as , in past, we have been informing GPCB in writing, in advance, but we have not recd. any written reply from GPCB, whether such documents are also a CERTIFICATE, as desired in ToR, , never informed who has permitted in writing to accept it, and never clarified this in minits of meeting, We presume, GPCB has enough well qualified and well experienced staff to ensure, whether all the mandatory ToR has a cent % compliance, and then only must have requested to Dist. Magistrate for a date for environment public hearings and then only must have uploaded the same on GPCB web site for public viewing all over the globe, We strongly appeal, GPCB should confirm in writing to us, with a copy to all as marked, that referred pages ARE ALSO VERY WELL ACCEPTABLE BY MoEF / SLEAC, as a VALID ACCREITED CERTIFICATE, ( duly stamped and signed by MS-GPCB, PROPONENT & CONSULTANT) then only, environment public hearings can be conducted, OTHERWISE, if , this are not the ACCREDITED CERTIFICATE as demanded under a mandatory ToR issued by MoEF / SLEAC, then, there is no point in conducting an environment public hearings, AND it sounds a strong message to all regulatory authorities, MoEF /SLEAC,Guj, to revarify all earlier environment clearances- already issued and in a process to issue, and such process to be with held untill final written confirmation recd. from environment ministry, and CM should initiate an appropriate action on all defaulters, who were responsible to submit and also to accept such documents and issued environment clearances- AS ALL SUCH ACT DIRECTLY AFFECTING ENVIRONMENTAL STATUS OF GUJARAT- OTHERWISE WHY MoEF / SLEAC ToR DEMANDS ONLY ACCREDITED CONSULTANTS POSESSING A VALID ACCREDITED CERTIFICATE ? Can GPCB inform to public, that, they have a written permission from ministry, on what other documents are also VERY WELL ACCEPTABLE , in place of absence of ACCREDITED CERTIFICATE ? - if so, pl. provide a copy to square up our query. We are very much positive, and if you OR MoEF / SLEAC / GPCB feels that ALL IS WELL and all such document are also very well acceptable , then, they should submit
TTING, as apparently, any one can say, red documents, which are
accepted by GPCB as a CERTIFI9CATE, page 6,7,10,has no word like a CERTIFICATE. Apparently- responsibility of QCI-NABET is to issue accredited certificate to desired consultant OR reject the application. , and certainly nothing beyond that. Hope, you all will appreciate our feedback, and pl. excuse for any mistakes. Thanks, Signed- --------- Desired pages down loaded from EIA reports attached here with a s page, 4-12.
nnn
page 03 /12
advocate pratik sharma
lenovo
Typewritten Text
& 13
lenovo
Text Box
lenovo
Typewritten Text
( PAGE 04/13 IS NOT THERE.
lenovo
Typewritten Text
5-13
05/16
lenovo
Text Box
lenovo
Typewritten Text
05/13
06/13
where are CERTIFICATES ? WHICH ARE CERTIFICATES?Are next two pages CERTIFICATES justifying ToR compliance ? pl. get confirmation in writing from MoEF / SLEAC / QCI-ABNET whether these are CERTIFICATES -JUST say 'YES OR NO' and any types of logical / philosophical explanation is NOT required and is NOT ACCEPTABLE.
is this a CERTIFICATE ? HOW SECOND LAST PARA DOES NOT CONFIRM THIS !!! ISSUE POENDING SINCE MAY 2014, AND THIS IS OCT 2016, ALREADY 28 MONTHS PASSED, WHY, QCI-NABET STILL NOT ISSUED ACREDITED CERTIFICATE- CAN MoEF /SLEAC /NABET NOTE THIS?
this is NOT ACCREDITED CERTIFICATEDist. Magistrate & GPCB should note this before conducting env. public hearing and issuing environment clearance, QCI-NABET should note, is this not a submission of a wrong information on accredited CERTIFICATE, ? is it a ToR COMPLIANCE ?
07/07
a specimen copy for to see 'how it looks' s already attached on page 12/13, is QCI-NABET issues different types of CERTIFICATE?
lenovo
Text Box
lenovo
Typewritten Text
07/13
what is a value addition of this document, is it a proposal OR is it a CERTIFICATE? WHERE IS CERTIFICATE AS DEMANDED IN ToR ?
08/13
09/13
10/13
CERTIFICATE IS REQUIRED & NOT THE STATAUS!!! THIS IS NOT THE ToR COMPLIANCE, WHERE IS CERTIFICATE ? ONE SPECIMENT COPY IS ALREADY ATTACHED AT PAGE 12/13
is this a CERTIFICATE- why it differs than page 12/13 ?12/
13is i
t a CE
RTIFI
CATE
? can
QCI-N
ABET
confir
m that
this i
s a CE
RTIFI
CATE
? wh
at was
the sta
tus fro
m Augu
st 14 t
o Nove
mber
15.
VER 0
2 IS AP
LICAB
LE OR
VER 0
3 IS AP
PLICA
BLE?
- ever
y thing
is con
fusing
for thi
s docu
ment.
VER 02 or 03? page 11/13pag
e 11/1
3
page 12/13
page 13/13
QCI-NANET - WHO ARE SUCH FAKE CONSULTANTS, PL. SUBMIT LIST TO OUR E MAIL ID .
AAJNG '^.tRC- - C-5
('ffi, EFd, errfr+r qqtarq at*, gar+rt6yarfis-oo ocT 2016.
er: l{;r. i. d::t 9-,:: rl',trt,f,tqt€., q1+u. ;,r ia .t"lqq[l 'i. {'rlraerlu.reLqla
-ii r
Septe$bcr ?r], S
f'lon confsAcereditatiosubrnitted t0 GA GE&TIFICATE III
Respected $ir,First, let us appreciete; hreet, #a*kvuijayrupani programme \nas very
successfi.rl, but sorne sr other how, GPCB core issue yras not discussod an 23
$eptenber 2016. MAY BE TI{CRE WA$ A TIME COXSTRAI&T,
We have a high regards $or a good govemafice of Gujarat Govt, and goo,)
Sovernance of GPCS , but, we fail to ufidEr$tand, then how some of the ccfemrndatory requirernents of ACCREDTTED CERTIFICATE, is toose shunted, andwithout a proper vigilant checks, some, other documents which has Nb WORD LIKEA CERfifiCATE,: are ascepbd E a CERTIFICATE, without clerirying \pho hasparmitted in writing'ta accept thls, ard why l}is we$ not incorporat6d in MoM?
Oetails on qletu-taryjgl*gg$lqIl[a4gq are summarized in table 1'
illoEF hao approved -{ne and on\r ore agency. QCI-NABET, New D€lh:,
issuing ACCREDITI0 CERTIr!C].TE , only to thr:se environment cgnsutkr*s, afrer,satitfuing all requir"ments, & consultant 6an HOT prepare EIA repo*s, if tley Oc
Gujarat shoult, be toklly free Srom critically polluted xsrlss
T0,
. -,,'Shri viiay Rupenii i- Chiaf lliinistar,
State of Gularat,Cardhinagdr, Grtjtrat
Draft EIA Reportof
M/s. Agrico Organics LimitedPlot No. D 2, CH/12/C, GIDC,
Dahej II Industrial Estate, Tehsil: Vagra,District: Bharuch (Gujarat)
(August, 2016)
San Envirotech Pvt. Ltd.424, Medicine Market, Nr. Paldi Cross Road,
Are next two pages CERTIFICATES justifying ToR compliance ? pl. get confirmation in writing from MoEF / SLEAC / QCI-ABNET whether these are CERTIFICATES -JUST say 'YES OR NO' and any types of logical / philosophical explanation is NOT required and is NOT ACCEPTABLE.
A-244
lenovo
Typewritten Text
is this a CERTIFICATE
lenovo
Sticky Note
lenovo
Sticky Note
lenovo
Typewritten Text
?
lenovo
Typewritten Text
HOW SECOND LAST PARA DOES NOT CONFIRM THIS !!! ISSUE POENDING SINCE MAY 2014, AND THIS IS OCT 2016, ALREADY 28 MONTHS PASSED, WHY, QCI-NABET STILL NOT ISSUED ACREDITED CERTIFICATE- CAN MoEF /SLEAC /NABET NOTE THIS?
lenovo
Sticky Note
lenovo
Sticky Note
lenovo
Sticky Note
lenovo
Typewritten Text
this is NOT ACCREDITED CERTIFICATE
lenovo
Sticky Note
lenovo
Typewritten Text
Dist. Magistrate & GPCB should note this before conducting env. public hearing and issuing environment clearance, QCI-NABET should note, is this not a submission of a wrong information on accredited CERTIFICATE, ? is it a ToR COMPLIANCE ?
lenovo
Typewritten Text
07/07
lenovo
Typewritten Text
a specimen copy for to see 'how it looks' s already attached on page 12/13, is QCI-NABET issues different types of CERTIFICATE?
lenovo
Sticky Note
A-245
lenovo
Sticky Note
lenovo
Underline
lenovo
Typewritten Text
what is a value addition of this document, is it a proposal OR is it a CERTIFICATE? WHERE IS CERTIFICATE AS DEMANDED IN ToR ?
lenovo
Typewritten Text
08/13
DRAFT REPORT DECEMBER2015
Siddhi Green Excellence Pvt. Ltd., Ankleshwar Page1of 193
FORNEWSYNTHETICORGANICCHEMICALSMANUFACTURINGUNIT OF
At Plot No. D-3/16/2, Dahej-III GIDC Industrial Estate,Ta. Vagra, District Bharuch- 393 130 Gujarat State, India
Baseline Study Period : October 2014 to December 2014
EIAConsultant Organization & Analytical Laboratory for Baseline Studies
DRAFTEnvironmental Impact Assessment (EIA) –EMP with Risk Assessment & DMP ReportFor proposedSynthetic Organic Chemicals manufacturing unit of PIDILITE INDUSTRIES LTD.
at Plot No. D-3/16/2, Dahej – III Industrial Estate, Tal – Vagra, Dist - Bharuch, State–Gujarat, IndiaTerms of Reference & their Compliances
Siddhi Green Excellence Pvt. Ltd., Ankleshwar Page21of 193
Sr. No. Terms of reference Compliance43. (b) Does the Environment Policy prescribe for standard operatingprocess/ procedure to bring into focus any infringement/ deviation/violation of the environmental or forest norms/ conditions? If so, it maydetailed in EIA.
formulated after the project isoperational.Existing units have EHS policies incompliance to requirements of EPAact and Factories Act44. What is the hierarchical system or administrative order of to companyto deal with the environmental issues and for ensuring compliance withthe EC conditions? Details of this system may be given.
Figure 6.1of Chapter 6
45. Does the company have a system of reporting of non compliances/violations of environmental norms to the board of directors of thecompany and/ or shareholders or stakeholders at large? This reportingmechanism should be detailed in the EIA report.
Section6.2.1of Chapter 6
46. Certificate of accreditation issued by the NABET, QCI to theenvironmental consultant should be incorporated in the EIA report. NABETaccreditationstatus isannexed in Annexure-1
lenovo
Typewritten Text
10/13
lenovo
Sticky Note
lenovo
Sticky Note
lenovo
Sticky Note
lenovo
Typewritten Text
CERTIFICATE IS REQUIRED & NOT THE STATAUS!!! THIS IS NOT THE ToR COMPLIANCE, WHERE IS CERTIFICATE ? ONE SPECIMENT COPY IS ALREADY ATTACHED AT PAGE 12/13
lenovo
Sticky Note
lenovo
Typewritten Text
is this a CERTIFICATE- why it differs than page 12/13 ?
lenovo
Sticky Note
lenovo
Typewritten Text
12/13
lenovo
Sticky Note
lenovo
Typewritten Text
is it a CERTIFICATE? can QCI-NABET confirm that this is a CERTIFICATE ? what was the status from August 14 to November 15. VER 02 IS APLICABLE OR VER 03 IS APPLICABLE?- every thing is confusing for this document.
lenovo
Sticky Note
lenovo
Typewritten Text
VER 02 or 03?
lenovo
Typewritten Text
page 11/13
lenovo
Text Box
lenovo
Typewritten Text
page 11/13
lenovo
Text Box
lenovo
Typewritten Text
page 12/13
lenovo
Sticky Note
lenovo
Text Box
lenovo
Typewritten Text
page 13/13
lenovo
Typewritten Text
QCI-NANET - WHO ARE SUCH FAKE CONSULTANTS, PL. SUBMIT LIST TO OUR E MAIL ID .
Gujarat Pollution Control BoardRegional Offi ce-Bharuch
C-1, 119/3, GIDC, phase_2, Narmadanagar, Bharuch_392015Website: u $ w.qDcb.eov.in
Annexu re - D
A statement showing written replies given by project proponent of l\{/s. Agrico organics Ltd., plotNo. D2lcEll2lc, Dahej-II Industriar Estate, Ta. vagra, Dist. Bharuch to response and
comments received in written format from others concemed persons in the Environment aspects forM/s. Agrico organics Ltd. for proposed manufacturing of rechnical Grade pesticide * 3405
MTfl\4onth, before Public Hearing held on 06110/2016 at I l:00 Hrs project site D2/CH/l2lC,Dahej-II lndustrial Estate, Ta. vagra, Dist: Bharuch as per the Ministry of Environment and Forests,
Govemment of India, New Delhi vide its Notification No. S.o. 1533 dated 14109/2006 and itsamendment S.O. 3067 (E) dated 0t/1ZlZ0O9.
Sr.
No.Comments Received in writing from Concerned
PersonsAnnexure Reply given by the
Project proponent
I Shri Maheshbhai Pandya, Paryavaran Mitra,Thaltej, Ahmedabad, Dated 29/09 12016
Sub: Reply of EPH of M/s. Agrico Organics Ltd., Plot No. D-2, CH/t2/C, Dahej-II
Industrial Estate, Village: Dahej, Taluka: Vagra, District: Bharuchto be
sched uled on 6thOctober 2016.
Ref: Your letter no. Pl't1/MP/2723/2016, dated 29/09/20t6
We are in receipt of a copy of your letter addressed to Member Secretary, GPCB,
Gandhinagar. We have studied the points given in your letter and would like to give
our reply/cla rification s as under:
CUJARAT
Ql^ RESPONSE BY PROJECT PROPONENT
Q1 How the required land for the project is acquired? Was it a governmentor private land?
Reply We have purchase/lease thisundertaking and we can say itenclosed as Annexure-L
land from GIDC, a unit ofis a Govt. land. Copy of plot
Govt. of Gujaratallotment letter is
Q2 What was the previousIndustry obtained NAdocument.
land use of thePermission for
land for proposed project?the land? PIease provide
Hasthe
Reply Previous land useacqulred by GIDCNotifled Industrialcase.
of the land for proposed project was agriculture and it wasfor development of industrial estate. Project site is located inEstate of Dahej-II so NA permission is not required in our
Q3 How the required land for the project is acquired? Was it a governmentor private land?
Reply We have purchase/lease thisundertaking and we can say itenclosed as Annexure-I.
land from GIDC, a unit ofis a Govt. land. Copy of plot
Govt. oF Gujaratallotment letter ls
Q4 When was environmental clearance for this project in Form I applied?
€--GUJARAT
FouJ
otG-
Ghbal lnwslqs Summrt
2011
AG RICO O RGAN ICS LI M ITE DPLOT NO. D-2ICH/12lC, INDUSTRIAL ESTATE,
RAT)BHARI ICH IGIJ.]Reply We have submitted EC application in Form-I on 09.03.2015_
Qs What is the status of NOC application to GPCB for this project?
Reply Still we have not applled for NOC application of GPCB for this project.
Q6 What types of precautions will be taken for storage and transportationof hazardous material and waste?
Reply Safety precaution at site:. Solvents will be stored in designated area in plant premises with flame
proof fitting.. Storage area will have provision of natural Ventilation.. PPEs will be given to workers.
Safetv Precaution durino Transoortation:. Hazardous chemicals are transpott only in approved tanker by explosive
departments.. Driver is equipped with TREM card and educate with hazardous
characteristics of chemicals.. Follow guideline for transportation given in MSDS for resDective chemicals-
Q7 Please giwe exacf dates of monitoring of each sarnples of arnbierrt airI and noise monitqring.
Rep/y We have done ambient monitoring in i@ 3o'" Mav,201s and noise monitorinq was carried out durinq 15.04.15 to 17.04.15.
Q8 Why baseline monitoring started even before aPproval of roR?Reply nt trre tirne or preparation of Form-I, parallel we have started baseline study as
per the standard ToR published by MoEFCC and same was communicated toEnC and they were agreed to consider baseline data which was started fromMarch.2015 to Mav, 2015 to considering upcoming ralny geqgen'_=-_-
Qe pteaa:ustrry aornestic water requirement for proposed project'
Reply we have calculated domestic water requirement based on 85 lit'/ca pita/shift forIndustrial activity.Please give detailsQ10
Reply ueralts or eacn E tp units are given as Annexure_Ir,Ql1 prease glve name ot suppliers to whom spent catalyst will be sent for
regeneration.Reply AL present, we have hot trnalized the name of suppliers to whom spent catalyst
will be sent for regeneration but it will be buy uaik to supplier of active .utirvrtfor reqeneration.
Q12 rrease glve name ot registered recycler to whom Used Lubricating oilwill be sold.
Reply it rs our pflmary stage to start the industryname of registered recycler to whom usedagency will be GPCB approved recycler.
so still we have notlubricating oil will
finalizedbe sent
thebut
UNIT :(1) Village Barota,Atta Road, PO. Sohna Oistt. Nuh-Mewat (Haryana) Phonr: 0124-2013777
Q13 Please give name of approved recycler/trader to whom discardedcontainers/ liners will be sent.
Reply It is our primary stage to start the industryname of registered recycler/traders to whomsent.
so still we have not finalized thediscarded conta iners/liners will be
Q14 Please provide agreement/MOU with brick manufacturers to whom flyash will be sold.
Reply Still we have not made any agreement/MoU with any brick manufacturer to sellfly ash.
Q14 What types of the socio-economic development activities industry willtake up as a part of CSR activity?
Reply Various CSR activities ldentified & planned are - education, drinkingsanitation, health check-up camps/ women empowerment activities.We have earmark Rs. 35.0 lakhs in the flrst five years for CSR activityof CSR activity will be finalized after discussion with leader of localvillagers.
water &
and areaaffected
Q1s How many local people will get employment through this project?Reply About 150 nos. of persons
We will give preference toour industry.
will be employedB0o/o of unskilled
during operation phase of project.local people for the employment in
UNIT :(1) Village Barota,Atta Road, PO. Sohna Distt. Nuh-l\.4ewat (Haryana) Phond :0124-2013777
Sr'rb: offbr.ar*'Allarcnt of P$ fio.D-2lcH/tzle at Dah€s-II rnciustrial esiate.Ref: Y'our appfraifun datrd B-t{r-2010.
B,4Orl1!/c
Rs,2,56,0810721-
va 4l'4Ml-
ctorgre fts.15i-ts to
sq,mk, for { Rs. 6,9g,40ry-
1.
5 PCP,IR, . Serbe Da
Pmceduie of Sbining pasEs5icfll On receipt of d*s letter, you wili be reguir.edts send ttte oifur.amcunr a6 nuentioned bdew. t*#rrre senJine the orfer amcuJ
l'o+ lnB) plery rW that if-})_offer amount, Z) Form of Agreemeot, :l)*eceatalgqm-$nderhkiB q otrer hfier uru'rrot ,e.*ir*a Of u. wiU.,in iperiod of 30 days from the recerpt.of his letter, ttre "m"-rr*r
stand automat;dc.ncerred Ed you vuilr nst k efltit* to get the rano at ae onereo pnce and wirlalso loose prigrity andyour ap$ifiation saall be auternaficaiV e]osec. ---
f,9sQ;
wi
D€Fr Sir,lVp are, indeed tEFpy tD leEomeyau in our Ua6aI-2 Indssk, egtate andafcordingf v*e ars sen$q tJris ffier-currraffstr.lreft &tter b you, We are enclosing
lT*tT It f.qT.of qree{r(5lt in Ur'pticate, whic}r pu ptease er(ecute and retum to uiduly erecirbtl. rxithin 30 iia!'s. It ls ftot rleeessa.f t# ydu to qearte ti,i, ugr*gtrnil i;
/
;l
nhc.g$srffiit,ftrrffs # raqf,t€d E bE *q.hy Diredirs/tusnrired
ffiffi*ffiffiffixffi"trffirnr= nao u tu'srt'the iry.stit*xt
_t. Equalization/Neutralization Tank 8.0x8.0x4.5 2 2BB
2. Flash M ixer 2.Ox2.Ox2.5 1 103. Flocculator 2.5x2.5x2.O 1 72.54. Lime Dosing'Tank HDPE Tank 1 105. Alum Dosing Tank HDPE Tank 1 5
6. Poly Floc Doslng Tank HDPE Tank 1 1
7. Primary Clarifier 8.50 dia x 3.00 1 L708. Intermediates Holding Tank 5.0x5.0x4.0 1 100q Pressure Sand Filter Standard supply 1 25 m3/hr.10. Activated Carbon Filter Standard supply I 25 mz/hr.11. Sludge sump 2.0x2.0x3.0 1 7272 Filter press 36" x 36 Plats 213. Holding Sump 8.0x8.0x4.5 1 28814. N4 EE Standa rd supply 1 25 mz /hr.
ETP Units (Utilities + Washing effluent)Sr.No.
Name of Unit Dimension(m)
No. ofUnit
Capacity(m3)
1. Equalization Tank 4.0x4.0x3.5 1 562. Neutralization tank 4.0x4.0x3.5 1 563. Primary Settlinq tank 2.5x2.5x2.O 1 12.54. Lime Dosing Tank HDPE Tank 1 105. Intermediates Holding Tank 5.0x5.0x4.0 1 1006. Pressure Sand Filter Standard supply 1 25 m3/hr.7. Holding Sump 4.0x4.0x3.5 1 568. Sludge sump Common for both ETP9. Filter press Common for both ETP
UNIT :(1) Village Barota,Atta Road, PO. Sohna Distt. Nuh-Mewat (Haryana) phoni) :0124-2013777
I
National Accreditation.Boardfor Education and Trainlng
May 12, 2014NABEr/EUy'32ZrA14The Director '
San El lrot€ch Pvt ttd,42d Medidne Market,'.opp. Shehli centre, Paldi Cross Roa4Paldi, Ahdedabbd-38ooo7(lond Attention:. Dr. Mahendra Sadaria)
Dear 9r,
Thanksand best regardg
Ydurs sincerel%
. OCt - NABET SEhome lor AGcredttation of EtA'Consuham OEaihation.:This is with reference to yqur application to QO - NABEI-fdr AccrEdltation a5 EIA Consultant O;ganization.
We are phas€d to inform you that based on Dcument & Office Assessments, the AccreditationCommittee has recommended provisional atcredrtation of yori organlzatlon as per the scope given inAnmxure ll and lll. Also find attachedlErcwith the tollota,ing:
a. Results of va rlous aspects of a$s:essment of you, orBshizauon lAnnemre lt.b. Non-&nformances/Observations/Alerts issued hfter tnitlalAssessthent {Arnexrre lvt.. c. Detailed Terms & Conditions oi accreditation l&tncnlrc Vrjd, Gutdelines for;ddres$nd Non-Confcmances/ Observauons/ elerts Innnqure \h). .
e. Formatto be 6llo$/ed br mentioning the ne;es of tfie ereerts involved in El,l reports prepared by. San Envirotech A^,.Ltd. (Annexure Vll)..
Please confim the correctnesg of spellints ofthe names of the oferts'mentloned in Annc(ure l . pleasealso Ghech the QGI webjite br the Minut€s of the Accreditatbn commlttee lvleeting ,anuary z andFebruary 13, 2014 for observations related to yout appticatlon, for compliince. You are advised to visit' QCl website to check clarificationi on the scheme-lssred from dme to time Ior necessary actions at your 'eltd.
'Tte accreditation ofyour oiEanization will be for a period of thiEe yeals startiry-Decembei 2L 2013, thedate of office assessrneit The continuation of the accreditatim will be €onfimed based on surveillanceassessmett t be carded out after 18 months from the daE of lnithl acareditation. sunreillance' asses$nem will be @nducted to erisure cornpliince with MBEI Scheme lncludinc the Oetails mentbnJ
. ln your Quality Ma;uai and the terms & conditlons mentioned in lnnexure V, . '- - -May. we.request you for your confirmation d acceptince of the terms and conditions attached.Comillanceto abore willenabie us toissue you tha r€qulsl6 accrediddon cer ficate..we thank you for pur esteemed support in makiirgthis scheme successful and for your participation inthls national cause.
OtsIIE)
Name of tl.ie ionsultant sans6dmqcb.R&.Hd;4Z.qf{.grlrdne.M{rll&Qpp. th# l€eEtrE?.ldi'cross Road, 'Pdldi.ihtEdabadaswoT
1
st.No
SectorNo.
,1Nane,rif Sadir 1
Irl
cii(eg6wA/d
I 4 Thermil Powcf. plft{r* r'B
2 9 Cement P.larlts B,
3 17 A
4 2L
Synthetic organlcctt.nrtcalis inA'u*ry lOyes a dye intermeaiates, buifdiugs and lmeUhedlat€r qdirdlng diug fonhutattons; synthetlcrubbers; baiiC O#rIF €henlcals, other lyntheUg orBanic chemicalsand.chemtcal.tnini.me }(r$1 ..'.
A
1 38Buildilu end larde construeltcn go.iects inaGinEEoppiru rn-alts,muhlplexes corilmedal. qDnphEs. houslht . estates, hospltals. B
San Envirbtech Pvt Ltd.r Ahind{aliail
Pesticides ifduFtry, ahd Fesfclde specific ir*ermedidtes {excludlngformulations)
QCI - NABET Schqme tpr AEgledltation of EtA Contultam OGail2ation
This is with reference to yorlrapplication to QCI- NABEffor Accreditation as EIA @nsultant Oiganization.
we are pleased to inform you thal based on Document &. Offige Ass$sments, the Accreditation
Committee has recommended prov'lslonal accreditation of your oBanlzation as per the scope given in
Annexure lland lll. Also find attached herewith the fiollo$rlnB:
a. Results of various aspects of asiessment of your or8ahization (Annemra ll.b. Non-conformances/Observations,/Alerts issued'after lnhlal Assessment (Annenrre lv).
. c- Detailed Terms & Conditions of accreditation (Arn€xure Vl,d, Guidelines for iddressing Non-conformances/ observations/ Alerts (Annsure lh).e. Format to be followed fut mentioning the ndmes of the oQerts lllolved ln EIA reports prepared by
. San Envirotech Pvt. [td. (Annexure Vll).
pleasE confim the correctnesJ of spellirEs of the names of the oeerte mentloned in Annexure lll. Please
al.o Gheck the QCI weblite br the Minut€s of the Accreditatlon Commlttee M.eetinB lanuary 22 and
February 13, 2014 for observations related to your appliiation, for compliance. You ate advised to visit
QCI website to check clarification3 on the scheme.is$ed from time to time for necessary 3ctions at your
end.'The
accteditation ofyour oBanization will be for a period of three years startint December 21, 2013, thedate of offlce assessrnent. The continuation of the accreditation will be @nfimed based on suryeillance
assessment to be €nied out after 18 months from the date of lnithl acareditation. Surveillance
ass$smem will be conducted to erisure complia'nce wlth NABET Sdeme lncludir€ the details rnentioned
. in your Quality Mahuai and the terms & conditions mentioned in Annexure V'
May we. request you for your confirmation of.acceptance of the tetms and conditions attached'comiliance to abo\re witl enab[e us to hsue you the regulsltd accred]tation certlficate'
We thank you for \,our esteemed support in making this Scheme successful and for youl participation in
this national cause.
Thanks.and best regards,
Y6urs sincerely,
,fErrh\r-.'lor l.
ls
Buikling, 2nd Floor, Bahadur Shah Zahr Marg, New Delhi --110.002' lndia
Estate, Taluka: Vagra, District: Bharuch to be scheduled on 6th October 2016.
Ref: Your letter addressed to RO, GPCB, Bharuch, dated 06/10/2016
We are in receipt of a copy of your letter addressed to RO, GPCB, Bharuch. We
would like to thanks for welcome the project and we assure you that, we will positively
focus on your valued suggestions. We have studied the points given in your letter and
would like to give our rep lylclarificatio ns as under:
Sr.No.
Points Reply
1 The proponent of M/s. Agrico Organics Ltd.proposes to Manufacture Technical GradePesticides 3405 MT/Month with 70 Crore in46560.13 m2 at Plot No. D-2, GIDC, Dahej(V) Vagra (Tahsil) Bharuch (Dist) Gujarat.
2 The Environment consultant SanEnvirotech Pvt. Ltd. of this project studyarea covered 10 km radius around theproposed Project area, they studiedlocations of air ambient quality, noiselevels recorded, water samples collected,soil samples also collected these all are innorms of CPCB. This is satisfactory.
3 The consultant please takes health statesof village people in 10 km radius aroundare must, why because it is very useful infuture.
We welcome your suggestionand do needful in this matter.
4 For operation of the project, waterrequirement is there. It is taking fromground water source, in summer seasonchance to down fall water level so pleasearrange rain water harvesting system.
Our source of water supplywill be from GIDC and surfacewater. However, we willinitiate rain water harvestingnearby plant project andstudy a rea.
UNIT : (1) Village Barota, Atta Road, PO. Sohna Distt. Nuh-Mewat (Haryana) Phone :0124-2013777
G UJ RAT)BHARUCH5 Please utilise waste water to plantation,
sprinkling on roads. It controls DustPollution when your vehicles transporttime.
We will utilize treated effluentfor greenbelt development.Paved road up to factory gateconstructed by GIDC.However, if required, we willuse treated wastewater fordust suppression on roadside.
6 Your taking 33% (15365 m2) for ,lantationfor Green belt is good it is CPCB norms,but I requesting to improve 50o/o if anypossible.
If we use 50o/o of total landarea for greenbeltdevelopment then very lessland balance for plant facilityand it is not feasible in ourcase.
7 You take avenue plantation to nearvillages, road. side it is useful to saveenvironment. Plant fruit baring andmedicinal value trees.
Welcome your suggestion andtry to implement it.
B Please give employment opportunities tolocal people first.
Welcome your suggestion andit is in our planning.
9 Give medical facilities to near villages,Conduct Medical Camps Regularly.
Welcome your suggestion andit is in our planning underCSR activities.
10 Give drinking water facility to near villages. Welcome your suggestion andit is in our planning underCSR activities.
11 Give good education to near villagechildren.
Welcome your suggestion andit is in our planning underCSR activities.
L2 Develop all main roads and street roads oJnear villages.
Welcome your suggestion andwe will try to do it.1) The project will contribute additional
revenue to the State & Central Govt.
Thanking you,
For, Agrico Organics Ltd.
Authorised Signatory
UNIT :(1) Village garota,Atta Road, PO. Sohna Distt. Nuh-Mewat (Haryana) Phone :0124-2013777
. OCI - NABET Srheme for Accredltatlon of Ela'Consultant O ailzation':
This ls with refereoce to yquiapplication to QCI- NABEI fdi AccrEdltation a; En Consultant o;ganization.i'
we are pleased to inform you that based on Dcument &. OmFe Aisessments, the AccrcditationCommittee has recommended provisional accreditatbn of your organizatlon as per the scope given in,hnexure ll atid lll. Also find attached lErewith the follo{ing:
. a. Resuhs ofrrarlous espects of asiessment of your ol8anizatlon (Annemre ll.b. Non{onformances/Observatlons/Alerts issued'after tnhlalAssessrhent (Annexrre lVl.
' c. Detailed Terms & Conditions of accreditation (Arnerur.v|,.d. Guldelines for iddrcs$ng on-conformances/ Observatlons/ Aterts (Annexure lh). '
e. Format to be tullorrcd tur'mentioninB the nd;€s of the e)pens involved ln EIA reports prepared ry. San E wirotech h^. Ltd. (annexure Vll),
Please confirm the co.rectnesg of spellings ofthe naines ofthe orperts mentLned in Annexuld lll. pleaiealso Gheck the QGI webjite fur the Mirut€s of the Accreditatlon Commlttee L4eeting lanuary 22 andFrbruary 13, 2014 for obsendtions lelated to your appliiatlon, fo, corhpliame. You are advised to visit
' QCl website to check clarifications on the schEme is ed from time to time tot necessary actions at your 'end.
'The accreditation ofyour organization will be for a period of three years staning.Decembea 2l, 2013, thedate of offfce assessrneirt. The continuation of the accaeditatiofl wtll be confirmed based on suweillanceasjessment to be carried out after 18 months from the daG of lnithl acareditation. Surveillance' assessrnem will be conducted to eniure comptii'nce with !'IABET Scheme lncludirE the deiails mentloned
. in your Quality Mahuaiand the terms & conditions mentioned in Annexure V. . .'Mry we. request you for your confirmation irf aaeptince of the terms and conditlons anached.Comillance to above vrill ellable us to iisue you the requlsl6 acc]edititlon certlficate.
.we thank lou for your este€med support in maki;lg this scheme successful and for your partidpation inthis national cause.
iltE 2? qiifi, 2012, qr.qr. 2ss0 (q) ilts r f(ciq{, zorz, dt 6l.qr.ssz (sr), irtE I crd, zotr gm
tqn Il_?ars 3( ii) l qnd Et{iltl't I smqtia. J
MINISTRY OF ENVJRONMENT AND FORESTSNOTIEICATION
' New Delhi, the 8th April, 2013 '
s.O, 945(E).-ln exercise of the powers confened by clause (b) of sub-section(1) of Section 12 and Section 13 of the Environment (Protection) Act, 1986 (29 of 1986)
read with rule l0 of the Environment (Protection) Rules, 1985, the Central Governmenthereby makes the following further amendments in the notification of the Government oflndia in the Ministry of Environment and Forests, number S.O. lL7+(E), dated the18th July, 2007, namely :-
ln the Table appended to the said notification,-
(a) for serlal numbers 33,42,41i and 5l and the entries relaung thereto, the followingserial numbers and entries shall respectively be substituted, namely :-
(1) (2) (3) (4)'33 M/s Shriram lnstitute for
lndustrial Research,19, University Road,Delhi - 110007.
(1) Dr. V.K. Verma(2) Dr. Jagdish Kumar(3) Dr, Mukesh Garg
(1) Mr. Balkrishna S.Pansare(2) Mrs. RanianaA. Kulkarni(3) 'Dr, Narayan A.Degwekar
08.04.2013to
a.7.04.201
51 . M/s San Envirotech Pvt, Ltd.,324,40t,402,423 &424,Medicine Market Opp; ShetraliCentre, Paldi Cross Road,Ahmedabad -: 380007.(Gujarat)
(1) Dr, Mahendra R, Sadaria(2) Miss. Diti P. Patel(3) Dr. Khyati Thacker
08.04.2013to
07.04.20L8"
I
,|
.tI
i
THE GAZETTE OF INDIA :EXTMORDINARY
(b) after serial number i07 and the entries relating thereto, the following serial
number and entries shall be inserted, namely :'
(1) (2) (3) (4).108 M/s Visiontex Consultancy
Services Pvt. Ltd., Plot -108, District Centre,'ChandrasekharpurBhubaneswar - 751016(Odisha)
(1) Mr. B.K. Mishra(2) Mr; N.L. Agarwalla(3) D/. K,C, Nathsarma
08.04.2013,to07.04.2018"
,/ I F'No' Q' 15018/7/2003'cPW l/,i Dr. RASHID HASAN, Advisor
Note.- The principal notiflcation was luHished in the Gazette of lndia, Extraordinary videnumber S.O. L174 (E), dated the 18th July, 2o07 and subsequently amended videnotification numbers S.O. 1539 (E), dated tre l3hSeBternber,2007, S.O,1811(E), datedthe 24'h October, 2007, S.O.55(E), dated $h January, 2008, S.O.428(E), dated the 4th
March, 2008, S.O.865(E) dated the 1lth April, 2008, S.O.1894(E) dated the 31d July,2008, S,O.2728(E) dated the.25h November, 2008, S.O.1355(E) ,dated the 27h May,2009, S.O.1802(E) dated the 22nd July, 2009 and S,O.2399(E), dated the 18th
September, 2009, S.O,3122(E), dated the 7ft December, 2009 and S.O.3123(E), datedthe 7rh December, 2009, S.O.Na.142(E), dated the 21sr January, 2010, S,O.619(E), 19FMarch, 2010, S.O.1662(E) dated the 13'd Ju1y,2010, S.O.2390(E), dated the 3dhSeptember, 2010, S.O.2904(E), dated the 8rh December, 2010, S,O.181(E), dated the2Bm January, 2011, S.O. 692(E), dated the 5th April, 2011, S.O,153(E), dated the 5ttJuly, 2011, S.O.1754(E), dated the ZSrh .tuty,2011 S,0.2609 (E) dated the 22ndNovember, 2Off; S.O.Z6+ (E), dated the 13th February, 2012, S.O-1150(E), dated the22nd May,2012, S,O.2039(E), dated the 5th September,20!2, S.O. 2802(E) dated the27th November, 2012 and S.O. 2850(E), dated the 7ft December, 2012 and S.O. 592 (E),dated the 8th March, 2013.
Sub: Regarding public hearing of M/s Agrico Organics Limited, held on06/70/20L6.
Respected Sir,
we have received your letter addressed to Gujarat pollution control Board,Bharuch about side effects on agricurtural crops by 2-4-D. rn this regard, we havedecided to drop off our Herbicide product 2-4-D Ethyl Ester technical. we assureyou that we will remove this product from our Final EIA Report to be submitted toMinistry of Environment, Forest & Climate Change, New Delhi.
Thanking You,
Yours Faithfu ily,
For, Agrico Organics Ltd.
Authorized Signatory
U N lT : (1) Viliage Barota, Atta Road, PO. Sohna Distt. Nuh-N4ewat (Haryana) Phone .0124-2013777