Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA-2010-264330-CATHI) CATHI Marie Curie Initial Training Network C ryogenics, A ccelerators and T argets at H IE- I SOLDE Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012
14

Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Jan 19, 2016

Download

Documents

Anaval Anaval

CATHI Marie Curie Initial Training Network C ryogenics, A ccelerators and T argets at H IE- I SOLDE. Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012. Outline. Background Activities at CERN LINAC Other Training Contacts Publications - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN1

* The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA-2010-264330-CATHI)

CATHIMarie Curie Initial Training Network

Cryogenics, Accelerators and Targets at HIE-ISOLDE

Guillaume KAUTZMANN (BE/ABP/SU)*WP4, ESR6

Mid Term Review Meeting, 26 September 2012

Page 2: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN2

Outline

Background

Activities at CERNLINAC

Other

Training

Contacts

Publications

Future Work and Trainings

Page 3: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN3

Background

Previous Education: 2009: Masters of Science in Topography

National Institute of Applied Science, Strasbourg, France

Work Experience: 2010-sep. 2011: Instrumentation Engineer on the

construction of the french nuclear research

facility “Laser MegaJoule”

Soldata, Bordeaux, France

Jan. 2009-Sep. 2009: Master Thesis and working

in GPS and Airborne Surveying Methods

Fugro Geoid, Montpellier, France

Page 4: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN4

Activities at CERN LINAC – Alignment Specifications

• Alignment and monitoring of the Cavities and Solenoids in the Cryomodules• Alignment w.r.to a common nominal beam line (NBL) along the Linac• Permanent system• Precision demanded along radial and height axis at 1 sigma level :

300 microns for the Cavities 150 microns for the Solenoids

NBL

+/-300 micr

+/-150 micr

~16 m

Page 5: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN5

Proposed concept:

Hardware:- BCAM based

observation- Metrological tables- Targets- Viewport crossing

Conditions:- Cryogenic- High Vacuum

Activities at CERN LINAC – Alignment Concept

3D Reconstruction Software

Page 6: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN6

BCAM Studies: Field of view issue

Development of a new BCAM called HBCAM

Technical specification + Technical Visit to Brandeis (USA)

Viewports studies: Tests to check the viewport qualities

Tests to check and validate theoretical models in order to correct the effects on the

optical measurements

Deformation Liberec University (Czech Republic) + CERN TE/MSC-CMI

Target studies: Studies of different target types Two types are going to detailed conception

Cryotest with Mario Herrmann (TE/VSC)

Activities at CERN LINAC – Specific (1/2)

Page 7: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN7

Software: Participation on the reconstruction software done by S.Waniorek

(BE/ABP/SU)

Test bench: Needed to :

- Validate the theoretical foundation of the software

- Test of the different hardware parts

First results promising on the comparison reference measurement/

Reconstructed position by the software

Integration: Implication in several decisions regarding the integration of the

alignmnent system in the tunnel

Integration of the alignment system to the Cryomodule design

Activities at CERN LINAC – Specific (2/2)

Page 8: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN8

Cryomodules Assembly:

Participation on the survey and alignment for:

- Assembly chain of the cryomodules

- Clean room design

Transfer lines:

Participation on Transfer lines Working Group

Special focus on the alignment of elements between magnets

Inter Tank:

Participation on DiagBox Working Group

Activities at CERN Other

Page 9: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN9

Training (1/2)

First months: Familiarization phase with the survey methods and CERN administrative

procedures

Training courses: “Radiological Protection Course”@ CERN;

“Self-Rescue Mask (Biocell)” @ CERN;

“Post-induction training (HRT, EDH, EDMS, INDICO and CDS)” @ CERN;

“Project Engineering” @ CERN;

Page 10: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN10

Training (2/2)

Technical Visit: ATLAS Experiment visit where a BCAM solution is implemented;

Brandeis University (Waltham, Massachusetts, USA);

Open Source Instrument (Waltham, Massachusetts, USA);

Tevatron (Fermilab, Illinois, USA);

Conference, Seminars, Workshop:

“12th International Workshop on Accelerator”

@ Fermilab, Batavia, U.S.A (September 10-14, 2012);

Page 11: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN11

Contacts

Contacts

- with other MC Fellows

- with other CERN Departments, principally TE

- outside CERN: Meca-Test (mechanical company, Switzerland) for the target development;

STPS (mechanical company, France) for the test Bench;

EREO (optics) for the development of tools for window adjustment;

OSI for the development of new BCAM;

Page 12: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN12

Publications

Technical specification: “HIE-ISOLDE Specification for the development

Of HBCAM” EDMS N°: 1231567;

IWAA 2012:

1. “The HIE-ISOLDE Alignment and monitoring system Software and test mock up” (primary author + presentation);

2. “HIE-ISOLDE Alignment and Monitoring System Technical Design and Project Status” (primary author);

Cryomodule design Working Group:

1. “HIE-ISOLDE Cryomodule Technical Review -The Alignment System - April 26th, 2012”, EDMS N°: 1214768, (Participation on the presentation support);

2. “News on BCAM tests – December, 15th, 2012”;

Beam department newsletter: Article in the life section - September 2012

Several presentations for working groups, security, quality…

Page 13: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN13

Work: Extend the test Bench;

HBCAM development;

Participation on metrological table design;

Survey for Cryomodule assembly, clean room, …

Training: “Cern Accelerator School”@ Granada University (October 29th to November 9th, 2012);

Secondment:

- Brandeis University (Waltham, Massachusetts, USA);

Presentation skills; Programming in C++; Travailler en salle propre…

Future Work and Training

Page 14: Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN14

Thanks for your attention