Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA-2010-264330-CATHI) CATHI Marie Curie Initial Training Network C ryogenics, A ccelerators and T argets at H IE- I SOLDE Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012
14
Embed
Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012
CATHI Marie Curie Initial Training Network C ryogenics, A ccelerators and T argets at H IE- I SOLDE. Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012. Outline. Background Activities at CERN LINAC Other Training Contacts Publications - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN1
* The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA-2010-264330-CATHI)
CATHIMarie Curie Initial Training Network
Cryogenics, Accelerators and Targets at HIE-ISOLDE
Guillaume KAUTZMANN (BE/ABP/SU)*WP4, ESR6
Mid Term Review Meeting, 26 September 2012
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN2
Outline
Background
Activities at CERNLINAC
Other
Training
Contacts
Publications
Future Work and Trainings
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN3
Background
Previous Education: 2009: Masters of Science in Topography
National Institute of Applied Science, Strasbourg, France
Work Experience: 2010-sep. 2011: Instrumentation Engineer on the
construction of the french nuclear research
facility “Laser MegaJoule”
Soldata, Bordeaux, France
Jan. 2009-Sep. 2009: Master Thesis and working
in GPS and Airborne Surveying Methods
Fugro Geoid, Montpellier, France
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN4
Activities at CERN LINAC – Alignment Specifications
• Alignment and monitoring of the Cavities and Solenoids in the Cryomodules• Alignment w.r.to a common nominal beam line (NBL) along the Linac• Permanent system• Precision demanded along radial and height axis at 1 sigma level :
300 microns for the Cavities 150 microns for the Solenoids
NBL
+/-300 micr
+/-150 micr
~16 m