FÖRSÄKRINGSAKTIEBOLAGET ALANDIA Mariehamn - P.O. Box 121, AX-22101 Mariehamn, phone: +358 18 29 000, Helsinki - Itämerenkatu 1, FI-00180 Helsinki, phone: +358 20 52 52 580 Stockholm - Löjtnantsgatan 17, 6 tr, SE-115 50 Stockholm, phone: +46 8 5058 8480, Business ID 0145065-2, [email protected], www.alandia.com Following setup can be used in applicable parts. Relevant laws and regulations, instructions from authorities and international conventions shall be taken into account. PLANNING Preparations and planning before towage: TOWED OBJECT. • Risk assessment - Seaworthiness. - Manned/Unmanned. - Cargo. - Route planning and timetable with port or place of refuge. Other traffic. Navigational warnings. - Draught, freeboard, bow height, air draught, current, tidal water. - Weather. Restrictions on wind and wave height. - Speed and length of towing line. • Plan for towing arrangements. - Method and connecting arrangements. - Chain bridle is recommended. - Location of connecting point, strength/ adequacy, calculations/to be checked - Navigation lights and shapes. - Emergency tow wire. - Boarding arrangements. - Bilge pumping arrangements. • Contacts with authorities, classification and insurance. • Condition survey of towed object. - Certificates. Control and update if necessary. - Stability. - Water integrity. - Safety (lifesaving appliances, fire safety etc.) • Towage approval. Before departure. • Communication - Contact list and means of contact. - Voyage reporting • Contingency plan for emergency situations. TUG. • Size. Calculation of bollard pull. Check of available tug capacity. • Trading permits and certificates. • Towing equipment. Suitable chains, wires, ropes etc. • Towage agreement. • Bunker and supplies. • Safety in work to be assessed. Guidelines on TOWAGE Planned towage of unmanned smaller vessels and barges in coastal waters. The goal of each towing operation must be a safe implementation with minimum risk for persons, property and the environment. A well-done preparatory PLANNING is a prerequisite for successful IMPLEMENTATION.
4
Embed
Guidelines on towage · TUG. • Size. Calculation of bollard pull. Check of available tug capacity. • Trading permits and certificates. • Towing equipment. Suitable chains, wires,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Stockholm - Löjtnantsgatan 17, 6 tr, SE-115 50 Stockholm, phone: +46 8 5058 8480, Business ID 0145065-2, [email protected], www.alandia.com
Following setup can be used in applicable parts. Relevant laws and regulations, instructions from authorities and international conventions shall be taken into account.
PLANNINGPreparations and planning before towage:
TOWED OBJECT.• Risk assessment
- Seaworthiness. - Manned/Unmanned. - Cargo. - Route planning and timetable with port or place
of refuge. Other traffic. Navigational warnings. - Draught, freeboard, bow height, air draught,
current, tidal water. - Weather. Restrictions on wind and wave height. - Speed and length of towing line.
• Plan for towing arrangements. - Method and connecting arrangements.
- Chain bridle is recommended. - Location of connecting point, strength/
adequacy, calculations/to be checked - Navigation lights and shapes. - Emergency tow wire.
• Contacts with authorities, classification and insurance.• Condition survey of towed object.
- Certificates. Control and update if necessary. - Stability. - Water integrity. - Safety (lifesaving appliances, fire safety etc.)
• Towage approval. Before departure.• Communication
- Contact list and means of contact. - Voyage reporting
• Contingency plan for emergency situations.
TUG.• Size. Calculation of bollard pull. Check of available tug capacity.• Trading permits and certificates.• Towing equipment. Suitable chains, wires, ropes etc.• Towage agreement.• Bunker and supplies.• Safety in work to be assessed.
Guidelines on TOWAGEPlanned towage of unmanned smaller vessels and barges in coastal waters.
The goal of each towing operation must be a safe implementation with minimum risk for persons, property and the environment. A well-done preparatory PLANNING is a prerequisite for successful IMPLEMENTATION.
IMPLEMENTATIONPRE TOWING.
1. Installation of bridles and check of strength of connecting points.2. Stability calculation in actual condition to be performed/checked.3. Secure cargo and all loose equipment.4. Water integrity secured/checked.5. Securing of propeller shaft if applicable.6. Securing of rudder if applicable.7. Tank and bilge sounding. Survey of empty spaces.8. Draught readings.9. Marking of actual water line.10. Emergency pumps installed/checked.11. Navigational lights and shapes rigged/checked.12. Emergency towing installed.13. Anchor and winches checked/tested if applicable. Preparedness for emergency use.14. Gangway/pilot ladder or other boarding arrangements made available for use during voyage.
Connection of tug and checks at departure.
1. Installation of towing bridle.2. Connection of towing line.3. Check of navigational lights and shapes.4. Check of emergency towing arrangement.5. Check of emergency anchoring arrangements.6. Check of tug certificate and permits.7. Check of tug´s towing arrangement and certificates.8. Confirm weather forecast for next 36 and 72 hours.9. Confirm weather, wind and wave height restrictions.10. Check route plan.11. Check procedure for arrival to destination and ports of refuge.12. Check contact details and reporting routines.13. Approval from classification/authorities regarding towage arrangement.14. Review of towage operation with tug master.
TOWING ARRANGEMENTPlanned towage of unmanned smaller vessels and barges in coastal waters.
A. Towing lineB. Intermediate pennantC. Delta plate or equalD. Wire or chain bridleE. Connecting pointsF. Recovery wireG. WinchH. Emergency pennantI. Float lineJ. Buoy
Disclaimer: This is only a recommendation to be used as applicable. Relevant laws and regulations, instructions fromauthorities and international conventions shall be taken into account. Alandia Försäkring/Alandia Marine accept noresponsibility for loss which may result from reliance on these guidelines.
Stockholm - Löjtnantsgatan 17, 6 tr, SE-115 50 Stockholm, phone: +46 8 5058 8480, Business ID 0145065-2, [email protected], www.alandia.com
CERTIFICATES. Checklist.Planned towage of unmanned smaller vessels and barges in coastal waters.
C. Tug certificates. Check Yes/No
Sign. Comments
1. Nationality certificate
2. Tonnage certificate
3. Classification certificate
4. Manning certificate
5. Bollard pull certificate
D. Tow line certificates. Check Yes/No
Sign. Comments
1. Nationality certificate
2. Chain bridle certificate
3. Shackles certificate
E. Towed object certificates. Check Yes/No
Sign. Comments
1. Nationality certificate
2. Tonnage certificate
3. Classification certificate
4. Survey report and/or certificate
Disclaimer: This is only a recommendation to be used as applicable. Relevant laws and regulations, instructions from authorities and international conventions shall be taken into account. Alandia Försäkring / Alandia Marine accept no responsibility for loss which may result from reliance on these guidelines