GUIDE TO IEEE 1547-2018 Where Do We Start?
29

GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Mar 24, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

GUIDE TO IEEE 1547-2018Where Do We Start?

Page 2: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Interconnecting Distributed Resources with Electric Power Systems (2003)

16 pp

Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power

Systems Interfaces (2018)

Page 3: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Published April 2018

Page 4: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

➢Starting Point for Applying

Standard

➢Idea From T&D MAG

➢Draft Completed in September

➢Delayed-IEEE Copyright Issues➢NRECA Guide to IEEE 1547-2018 ➢IEEE Standards: 1547-2018

Page 5: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

➢10 MVA Limit is Gone

➢Voltage Regulation Capability

➢Interoperability Capability Required for All DER

➢Clause on Intentional Islands

➢Disturbance Performance

Page 6: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

➢Frequency Droop Requirement

➢Ride-Through (No Trip) Requirements

➢Expanded Ranges of Adjustability

➢Voltage & Frequency Disturbances

Page 7: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

•NERC and a few utilities began to advocate

less-sensitive setpoints for tripping:

➢Keep DERs On-Line forDisturbances on BES.

➢Still enable tripping for Safety on Distribution Systems.

Page 8: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Defaults and Ranges of Adjustability

For

Voltage and Frequency Tripping

Covered in Clauses 6.4 & 6.5 of Standard

Page 9: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

•Cat I Meets most BES Security needs. Includes small synchronous machines.

•Cat II Harmonized w\NERC PRC-024 (protection settings for BES generators)

•Cat III High-Penetration levels where continued DER operation is needed for Distribution System.

Harmonized w\CA Rule 21.

Page 10: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Q:

A: The Authority Governing Interconnection Requirements - the AGIR

Who Or What Is That?

Well, it Depends…

Page 11: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Defined in IEEE 1547-2018➢Can be a:

• Regulatory Agency• Public Utility Commission• Municipality• Co-Op Board of Directors

Page 12: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Defined in IEEE 1547-2018➢Authority may be delegated to the Area EPS operator or bulk power system

operator.

➢Decisions made by an AGIR should consider various stakeholder interests, including but not limited to:➢Load Customers➢Area EPS operators➢DER operator➢Bulk power system operator.

➢Annex B in Standard outlines considerations for Category Selection.

Page 13: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Still not entirely clear, but expect other players:➢Frequency is biggest concern for BES → NERC

➢PJM already working with their members to develop settings

➢Possible that ISOs will mandate frequency settings with no guidance on voltage

➢Voltage Requirements could then fall on Co-Op Board.

Page 14: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

How Close Can You Get?

Considering Voltage Trip…

Pretty Close!

Page 15: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Closest to Original Defaults

Condition Clause 1547-2003 Category I

Voltage Trip Pickup Time

OV2 6.4 1.2 p.u. 0.16 s

OV1 6.4 1.1 p.u. 1.00 s

UV1 6.4 0.88 p.u. 2.00 s

UV2 6.4 0.5 p.u. 0.16 s

Category III

Pickup Time

1.20 p.u. 0.16 s

1.10 p.u. 1.0 s

0.88 p.u. 21.0 s

0.50 p.u. 2.0 s

Category I Category II Category III

Pickup Time Pickup Time

1.20 p.u. 0.16 s 1.20 p.u. 0.16 s

1.10 p.u. 1.0 s 1.10 p.u. 1.0 s

0.88 p.u. 2.0 s 0.88 p.u. 2.0 s

0.50 p.u. 0.16 s 0.50 p.u. 0.16 s

Page 16: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

How Close Can You Get?

Considering Frequency Trip…

Different Story!

Page 17: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Closest to Original Defaults

Condition Clause 1547-2003 Closest to 1547-2003

Frequency Trip

OF2 6.5 n/a n/a

OF1 6.5 60.5 0.16 s

* UF1 6.5 59.3 0.16 s

UF2 6.5 n/a n/a

Category I, II and III

61.8 Hz 0.16 s

61.0 Hz 180.0 s

59.0 Hz 180.0 s

57.0 Hz 0.16 s

Page 18: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

New Default Settings

➢Voltage Trip is Different in Each Category

➢Frequency Trip Same for All Categories

➢Chosen to Support Bulk Electric System

Page 19: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Condition Clause 1547-2003 Category I

Voltage Trip Pickup Time

OV2 6.4 1.2 p.u. 0.16 s

OV1 6.4 1.1 p.u. 1.00 s

UV1 6.4 0.88 p.u. 2.00 s

UV2 6.4 0.5 p.u. 0.16 s

Category I Category II

Pickup Time

1.20 p.u. 0.16 s

1.10 p.u. 2.0 s

0.70 p.u. 2.0 s

0.45 p.u. 0.16 s

Category III

Pickup Time

1.20 p.u. 0.16 s

1.10 p.u. 13.0 s

0.88 p.u. 21.0 s

0.50 p.u. 2.0 s

Category II Category III

Pickup Time

1.20 p.u. 0.16 s

1.10 p.u. 2.0 s

0.70 p.u. 10.0 s

0.45 p.u. 0.16 s

Page 20: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Category I, II and III

62.0 Hz 0.16 s

61.2 Hz 300.0 s

58.5 Hz 300.0 s

56.5 Hz 0.16 s

Condition Clause 1547-2003

Frequency Trip

OF2 6.5 n/a n/a

OF1 6.5 60.5 0.16 s

* UF1 6.5 59.3 0.16 s

UF2 6.5 n/a n/a

Page 21: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

New Ranges of Adjustability

➢V Can Be Set to:✓Effectively Not Trip for Undervoltage (0.0 p.u. @ 21 s); and\or✓Only Trip for Overvoltage >1.20 p.u. @ 13 s)

➢f Can Be Set to Effectively Not Trip- Period.

Question: Volunteers to test 144 V for 13 s in their house?

Page 22: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

➢Frequency-Watt Function

➢As Frequency Drops Output Increases

➢Cannot Be Disabled

➢Pre-Set Parameters Which May be Adjusted Based on Standard.

Page 23: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Advanced Features

➢Volt-VAR Control

➢Trip Settings Beyond Defaults

➢Interoperability

Page 24: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with

Electric Power Systems

➢Needed to Ensure Compliance w\1547 (Base Standard)

➢First Published in 2005

➢63 pp Total

➢Now >265 pp - and Counting!

Page 25: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Encouraging News for Co-Ops

➢Nearly Half is For Manufacturers

➢~75 pp of Evaluation and Commissioning Tests

➢Choose Evaluation & Tests Based On Reference Point of Applicability (RPA)

➢40 pp of Annexes

Page 26: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Article- Overview of IEEE 1547.1

➢Type Testing

➢Production Testing

➢Design Evaluation

➢Installation Evaluation (Pre-Commissioning)

➢Commissioning Tests

➢Periodic Tests

Page 27: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Key Decision for Co-Op:

➢How Much of This Do We Handle In-House?➢Affects Costs in Interconnection Process

➢Borne By DER Owner\Operator?

➢Borne By Co-Op?

Also Affects Interconnection Agreements

Page 28: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Tentative Schedule

➢Early April Final WG Vote

➢Late April Submit Draft to IEEE Standards Assn.

➢May Form Ballot Pool (30 Days)

➢June First Vote

➢July- ? Resolution of Comments & Reballot

➢October Publish IEEE 1547.1-2019

Page 29: GUIDE TO IEEE 1547-2018 - TechAdvantage · 2019-03-21 · Defined in IEEE 1547-2018 Authority may be delegated to the Area EPS operator or bulk power system operator. Decisions made

Questions?