Top Banner
Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects Texas Groundwater Summit August 26, 2015 1 Texas Groundwater Summit James Lee Murphy, Esq. Executive Manager for Water Resources & Utility Operations Guadalupe-Blanco River Authority
20

Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Apr 07, 2018

Download

Documents

trankhue
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Guadalupe-Blanco River Authority

Mid-Basin Water Supply Projects

Texas Groundwater Summit

August 26, 20151

Texas Groundwater SummitJames Lee Murphy, Esq.

Executive Manager for Water Resources & Utility Operations

Guadalupe-Blanco River Authority

Page 2: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Mid-Basin Water Supply Project is Part of the

South Central Texas Regional Water Plan

Page 3: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

South Central Texas Planning Region (Region L)

Page 4: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

• Groundwater

• Edwards Aquifer

• Carrizo-Wilcox Aquifer

• Trinity Aquifer

• Gulf Coast Aquifer

Sources of Regional Water Supply

Surface Water

•Canyon Reservoir

•Power Supply Reservoirs•Coleto Creek Reservoir

•Lake Dunlap, etc.

•Calaveras Lake• Gulf Coast Aquifer

• Others

•Calaveras Lake

•Lake Braunig

•Run-of-River Water Rights

Reuse of Municipal Wastewater is a Reallocation of Existing Water Supply

and is emphatically NOT a New Source of Water for Region L

HB 2031 – Seawater from the Gulf of

Mexico is now a viable source of

water supply for Region L

Page 5: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

GBRA Water Supply Projects

Recommended Water Management Strategies (WMS)1

• Mid-Basin Water Supply Project (MBWSP)

• Lower Basin Off-Channel Storage (LB OCR)

• Integrated Water Power Project (IWPP)

Alternative Water Management Strategies2

• MBWSP/TWA/HCPUA Shared Facilities• MBWSP/TWA/HCPUA Shared Facilities

• Lower Basin Water Supply Project with Mid-Basin Delivery

1 Strategies in the South Central Texas Regional Water Planning Group Include Additional Recommended WMS: Conservation, Western Canyon WTP Expansion, Victoria County Steam-Electric Project, Wimberley/Woodcreek Project, & Lower Basin New Appropriation2 Additional Alternative WMS include: Luling ASR, Storage Above Canyon Reservoir (ASR)

All infrastructure and project costs were developed using Texas Water Development Board (TWDB) Unified Costing Model (UCM) for 2016 Regional Planning assumptions and associated cost curves.

Texas Groundwater Summit (August 26, 2015)5

Page 6: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Mid-Basin Water Supply Project (MBWSP)

6Texas Groundwater Summit (August 26, 2015)

Page 7: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Potential Instream Flow Changes

Guadalupe River at Gonzales

7DRAFT (1-27-2015)

Page 8: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Integrated Regional Mid-Basin Project

Page 9: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

MBWSP Engineering Feasibility Study

9DRAFT (1-27-2015)

Page 10: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

MBWSP/TWA/HCPUA Shared Facilities

10Texas Groundwater Summit (August 26, 2015)

Page 11: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

MBWSP/TWA/HCPUA Shared Facilities

MAG Limited• Sources and Firm Supply (86,513 acft/yr):

– 50,000 acft/yr firm supply from Guadalupe River and ASR in GCUWCD• Surface Water = 31,100 acft/yr (Average)

• ASR = 18,900 acft/yr (Average)

– 21,833 acft/yr firm supply from HCPUA Wellfield, Carrizo Aquifer in GCUWCD and Plum Creek

– 14,680 acft/yr firm supply from TWA Wellfield, Carrizo Aquifer in GCUWCD

• Operations:• Operations:– Treated groundwater and surface water delivered to participants and ASR

storage with stored surface water as back-up supply

• Facilities (1.5 peaking factor): – 27 production wells (1073 gpm – 2910 gpm)

– 28 dual purpose wells (1,533 gpm peak/ 418 gpm average)

– 140 cfs river intake

– Groundwater Treatment Plant (48.9 MGD) & Surface WTP (67 MGD)

– 6 mile 60-IN diameter raw water pipeline

– 129 miles, 8-IN to 78-IN diameter finished water pipelines11

DRAFT (1-27-2015)

Page 12: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

MBWSP Engineering Feasibility Study*

12Texas Groundwater Summit (August 26, 2015)

* Unit costs based on MBWSP 2013 estimates and assumptions

Page 13: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

MBWSP/TWA/HCPUA Shared Facilities

Estimated Costs

Capital Costs $725,465,000

Project Costs $1,123,541,000

13

Annual Costs $150,227,000

Yield (acft/yr) 86,513

Unit Costs

( $/acft)$1,736

Note: Project analyzed

using MAG Limited

groundwater only.

DRAFT (1-27-2015)

Page 14: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Project Yields and Unit Costs

(MAG Limited)

14

Page 15: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Surface Water w/ ASR (Option 3C)

• Sources and Firm Supply:– 50,000 acft/yr from Guadalupe River and ASR in GCUWCD

– Sources of Supply (Average): Surface Water = 31,100 acft/yr and Recovery = 18,900 acft/yr

• Operations:– Treated surface water delivered to participants and ASR storage

with stored surface water as back-up supply

– Interim back-up supply needed in early years– Interim back-up supply needed in early years

• Facilities (2.0 peaking factor): – 40 dual purpose wells (1,533 gpm peak/ 348 gpm average)

– 140 cfs river intake

– Water Treatment Plant (89 MGD)

– 6 mile 66-IN diameter raw water pipeline

– 45 mile, 66-IN, 36-IN diameter finished water pipelines

– Two delivery locations and potential for tie-ins along the route

• Unit Cost: $1,467/acft/yr15

$1,637/acft/yr (2016 SCTRWP)

Page 16: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Mid-Basin Surface/ASR to SAWS

16

Page 17: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

MBWSP ASR to San Antonio

The MBWSP ASR to San Antonio option includes uniform delivery of

50,000 acre-feet/year to the proposed San Antonio Water System

(SAWS) Vista Ridge Project delivery location. Facilities include a pump

station and 66-inch diameter pipeline to deliver raw water 6 miles

from an intake on the Guadalupe River to a 79 MGD water treatment

plant (WTP) prior to delivery to SAWS or aquifer storage for plant (WTP) prior to delivery to SAWS or aquifer storage for

subsequent recovery. A 71-mile, 48-inch diameter transmission

system delivers treated supplies from the WTP or ASR to SAWS.

Preliminary conceptual unit cost of water from this project is

estimated at $1891/acre-foot.

17

Page 18: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Mid-Basin Surface/ASR to Austin

18

Page 19: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

MBWSP ASR to Austin

The MBWSP ASR to Austin option includes the uniform delivery of

50,000 acre-feet/year to an Austin area delivery location near the

intersection of IH-35 and SH-45. Facilities include a pump station and

66-inch diameter pipeline to deliver water 6 miles from an intake on

the Guadalupe River to a 79 MGD WTP prior to delivery to Austin or the Guadalupe River to a 79 MGD WTP prior to delivery to Austin or

ASR wells. The 49 mile, 48-inch diameter transmission system which

generally follows a cross country route to Maxwell WSC used in the

recent MBWSP Study and then turns north to the assumed Austin

delivery location. Preliminary conceptual unit cost of water from this

project is estimated at $1674/acre-foot.

19

Page 20: Guadalupe-Blanco River Authority Mid-Basin Water …€¦ · Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects ... Guadalupe-Blanco River Authority . ... MBWSP ASR

Texas Groundwater Summit (August 26, 2015)20