COMPANY INTRODUCTION GSEG (Gujarat State Energy Generation Ltd.) is a Special Purpose Vehicle (SPV) formed by GSPC (Gujarat State Petroleum Corporation) to generate power in Gujarat by harnessing the eco-friendly and economical natural gas. GSEG is part of the GSPC Group's overall strategy of establishing a presence in both the upstream and downstream segments of the energy value chain. The company is committed to using innovative, advanced and reliable technology for producing gas-based power. GSEG was set up in 1998 as a power generation company. GSEG owns and operates a gas based power plant in Hazira that was commissioned in 2002. The plant was set up to provide electricity for the Gujarat state grid, with all electricity currently 1
28
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Gseg project

COMPANY INTRODUCTION

GSEG (Gujarat State Energy Generation Ltd.) is a Special Purpose Vehicle (SPV)

formed by GSPC (Gujarat State Petroleum Corporation) to generate power in Gujarat

by harnessing the eco-friendly and economical natural gas.

GSEG is part of the GSPC Group's overall strategy of establishing a presence in both

the upstream and downstream segments of the energy value chain.

The company is committed to using innovative, advanced and reliable technology for

producing gas-based power.

GSEG was set up in 1998 as a power generation company. GSEG owns and operates

a gas based power plant in Hazira that was commissioned in 2002.

The plant was set up to provide electricity for the Gujarat state grid, with all

electricity currently produced at the plant sold to Gujarat Urja Vikas Nigam Limited

(GUVNL), a Government of Gujarat owned electricity company.

 GSEG is in the process of extending the capacity of its Hazira plant. It has entered

into a gas purchase contract with us to provide the gas required for the expanded

plant, effective for 20 years from commissioning, with the gas to be bought at

mutually agreed prices.

1

Page 2: Gseg project

The additional power to be generated will be bought by GUVNL pursuant to a 20 year

procurement contract effective from commissioning.

INDUSTRY OVERVIEW

GEB is the main contributor to the power supply for the State.

Torrent Power AEC, being a licensee caters to power needs of Ahmedabad and

Gandhinagar

Torrent Power SEC distributes power to Surat and surrounding areas

IPPs like Torrent Power AEC, GIPCL, GTEC, GSEC, ESSAR and Central Sector

[ NTPC and NPC ] also are contributing

Demand supply projections

The power requirements of Gujarat are met primarily by GEB, a statutory body,

constituted under the Electricity ( supply ) Act, 1948.

Per capita consumption of power in the state, currently at 786 KWh [ higher than

national avg., of 345 kWh ]

Installed capacity

GEB 4474MW

IPPs  

Torrent Power AEC 490

GIPCL Gas based, Baroda 305

Essar Power Ltd.,Hazira 300

GPEC, Bharuch 655

GSEC- Gandhinagar 210

GSEC-Wanakbori 210

GSEG, Hazira 156

GIPCL, Mangrol 250

Total 2576 MW

CENT SECTOR ( Gujarat Share ) 1532 MW

TOTAL 8582 MW

2

Page 3: Gseg project

ABOUT GSEG

Powering Gujarat

GSEG (Gujarat State Energy Generation Ltd.) is engaged in gas based generation of

electricity, using innovative and dependable technology, in Gujarat.

A Special Purpose Vehicle (SPV) of GSPC for generating power using advanced,

eco-friendly technology, GSEG fits in well with the GSPC Group's overall scheme of

energy business. 

GSEG is committed to deliver true value in efficiency, economy and sustainable

development activities in Gujarat. It presently operates a 156.1 MW Combined Cycle

Power Plant near Hazira, Surat, which is being further expanded in the first phase by

~350 MW.  

Highlight

GSEG achieved commercial operation of this Combined Cycle thermal power plant,

within a record time of 22 months, starting June 1st, 2000. The first phase expansion

by ~350 MW is already underway and is likely to be operational sometime in 2011.

MISSION

Recognizing the need for safe, affordable, secure source of energy in Gujarat, the

primary mission of GSEG is to meet demand with a fuel source that is clean, reliable,

efficient and safe. GSEG is also committed to become a strong strategic partner in the

emerging integrative vision of the GSPC Group, resulting in more energy, economy

and efficiency to individuals and enterprises, and a higher quality of life to everyone.

True to the spirit of the Group's Safety, Health & Environment Policy and practices,

GSEG is committed, responsible and environment conscious in its design, project

planning, building, operating and enhancing the power generation facility business, by

proactively meeting the applicable environmental laws, regulations and stipulations,

and encouraging the development and use of efficient, clean and cost-effective energy

technologies.

3

Page 4: Gseg project

GSEG'S STRENGTHS

• One of the most efficient producers in Gujarat offering reliability and flexibility

• Application of Modern and Efficient Technologies - like CCPP and state-of-the-art

controls for  plant management

• Committed to environment friendly operations

• Excellent domain expertise guaranteeing efficient and economic operation

• Regular modernization to continuously increase energy yields and environmental

performance

GSEG continues to explore synergies with the other companies of GSPC Group - synergies

between gas and electricity with intelligent application of fuel management strategies and

information technology.

HISTORY

Diversifying into power 

GSPC Group decided to move into power generation as a part of its corporate

diversification plan and embarked on a short gestation power project based on the use of

natural gas from its gas fields. The Hazira area of Gujarat was chosen as the site for its first

combined cycle power plant. To implement the project, GSPC promoted a separate company

named Gujarat State Energy Generation Ltd (GSEG).

GSEG, in turn, selected Alstom as contractor for the project through international

competitive bidding. Alstom supplied the plant on a turnkey basis. Its scope included two

4

Page 5: Gseg project

GT8C2 gas turbines with generators, a steam turbine with generator and heat recovery steam

generators as well as the overall power plant control system. The contract also included civil

works, balance-of-plant and buildings. GSEG employed Desein Consulting Engineers of

Delhi as advisors and to supervise the turnkey contractor's compliance with the plant

specification.

GSEG selected Evonik Energy Services (India) Private Ltd erstwhile Steag Encotec as

O&M contractor for the project. The power purchase agreement for the project was signed

with GUVNL (erstwhile GEB). 

Project Development Highlights

Germination 

Gujarat State Petroleum Corporation Ltd. (GSPC), engaged in Oil & Gas E

& P, decided to diversify into downstream activities for value addition in the

energy business and thus, GSEG was incorporated in December 1998.

Contractual Structure of the Hazira project

Abbreviations: GSPC = Gujarat State Petroleum Corporation Ltd.; GSEG = Gujarat

State Energy Generation Ltd;

GUVNL = Gujarat Urja Vikas Nigam Limited; INAP = Alstom Power India; CIF =

Cost insurance, freight; Alstom Power Switzerland

5

Page 6: Gseg project

Plan Project Schedule

• OPEN CYCLE(GT1) in 17 months

• OPEN CYCLE(GT2) in 18 months

• COMBINED CYCLE in 20.6 months

from the Notice to Proceed (NTP) to the EPC contract Plan for a 156.1 MW, two 52

MW Gas Turbine (GT8C2), one 52.1 MW Steam Turbine and two Heat Recovery Steam

Generator - Combined Cycle Power generation project takes shape.

Actualisation

Association with other state sector companies and central sector PSUs like

KRIBHCO & GAIL 

Alstom Power India awarded with EPC for the plant

The plants made available both as modularised, pre-engineered packages (for this

low-gestation project)

Development for a 156.1 MW, two 52 MW Gas Turbine (GT8C2), one 52.1 MW

Steam Turbine and two Heat Recovery Steam Generator-Combined Cycle 

Power generation project begins at Surat

Put in place - electrical equipment, instrumentation and control system, and other

necessary plant equipment as well as the HV switchyard

30th Sept, 2001. Successful initial test firing and synchronizing of the first Gas

Turbine. 

1st Dec, 2001. Plant operational in open cycle mode

"The Plant in Combined Cycle mode (156.1 MW) is commercially operational

since 1st June 2002.

Management

6

Page 7: Gseg project

Sr.

NoName  of Director Office Address

1 Shri S. Jagadeesan, IAS,

Chairman

Principal Secretary, Energy & Petrochemicals Department

Block No. 5, 5th Floor, New Sachivalaya, Gandhinagar.

2. Shri D J Pandian, IAS

Director

Managing Director, Gujarat State Petroleum Corporation

Limited, GSPC Bhavan, B/h Udhyog Bhavan, Sector-11,

Gandhinagar-382011

3. Shri I P Gautam, IAS,

Director

Municipal Commissioner, Sardar Patel Municipal Bhavan,

Raikhad, Ahmedabad 380001

4. Shri L Chuaungo, IAS

Director

Managing Director, Gujarat Urja Vikas Nigam Limited,

Sardar Patel Vidyut Bhavan, Race Course Circle, Alkapuri,

Vadodara

5. Shri N Srivastava 

Director

Addl. Secretary (Budget), Finance Department, Block No. 4,

9th Floor, New Sachivalaya, Gandhinagar

6. Shri Chandrapal Singh

Director

Chairman, Krishak Bharati Co-operative Ltd., A-10, Sector-

1, Noida-201301

7. Shri B. D. Sinha

Director

Managing Director, Krishak Bharati Co-operative Ltd., A-10,

Sector-1, Noida-201301

8. Shri I N Bansal

Director

Operations Director, Krishak Bharti Co-operative Limited,

P.O. Kribhconagar, Surat 394515

9. Shri Santosh Kumar

Director

Director (Projects), GAIL (I) Limited, 16, Bhikaji Cama

Place, R K Puram, Delhi 110066

10. Shri R Kamra (Alternate

Director to Shri B D Sinha)

Director (Finance), Krishak Bharti Co-operative Limited, A-

10, Sector 1, Noida 201301

11. Shri A N Bhatt (Alternate

Director to Shri I N Bansal)

General Manager (Prod.), KRIBHCO, P.O Kribhconagar,

Surat 394515

12. Shri R.K.Dhami (Alternate

Director to Shri C P Singh)

Vice Chairman- Krishak Bharati Co-operative Ltd., A-10,

Sector-1, Noida-201301

Parteners & Affiliations

• Long term Gas Supply Agreement (GSA) with GSPC-Niko

7

Page 8: Gseg project

• Long term Power Purchase Agreement (PPA) with GUVNL (erstwhile GEB)

• Alstom as Erection-Procurement-Construction (EPC) Turnkey Contractor for 156.1 MW

CCPP

• BHEL as Erection-Procurement-Construction (EPC) Turnkey Contractor for 350 MW

CCPP expansion project

• Evonik Energy Services (India) Private Ltd for Operations and Maintenance (O & M) of the

CCPP Generation Plant

• GIDC for land and water arrangements.

Equity Holders: GSPC, GUVNL (erstwhile GEB), GIPCL, GPCL, GIIC, KRIBHCO, GAIL

MD’s Desk

The Gujarat State Energy Generation Ltd. is deployed to develop high efficiency

power generation facilities in the state, with the most advanced and clean technologies

available in the world today.

GSEG is a Special Purpose Vehicle (SPV) for generating power incorporating the

most advanced, eco-friendly science in Gujarat. Through this company, GSPC Group

reiterates its focus on becoming a highly integrated energy company, occupying every

link in the energy value chain. 

The Combined Cycle Power Plant produces power from natural gas provided by

GSPC, the E & P company, through GSPL pipelines, the gas transportation company,

and also houses the earth station of GIPL, the communications affiliate.

The plant has been built with a vision to fuel new power production by supplying

natural gas, which produces more energy at competitive costs for domestic and

industrial sectors.

Clients

8

Page 9: Gseg project

As of now, GSEG CCPP Operations are catering solely to Gujarat Urja Vikas Nigam

Limited (erstwhile GEB).

Contact Us

Company's Name Address Phone Fax

Gujarat State

Energy Generation

Ltd. (GSEG)

GSEG Limited

FF Shed Nos. A/78/3-8, GIDC

Electronic Estate,

Near Patni Computers

(iGATE), Sector 25,

Gandhinagar 382016, Gujarat,

India

079-

23288210/23288250

079-

23288048

  Regd. Office

Block No.15, 3rd floor, Udyog

Bhavan, Sector No.11,

Gandhinagar 382010.

91-79-23236372 23238648

  Project Office :

Village Mora, Post Bhatha,

Surat Hazira Road, Surat.

91-261-2861777

91-261-2861778

2861779

Website: [email protected]

PLANS & PROJECTS

GSEG is repositioning GSPC Group's edge in creating better value in the core gas/

energy business chain through a strong, focused and successful electric utility

business in Gujarat.

GSPC Group's integrated business model combines the physical ownership and

control of power generation and natural gas assets with energy and fuel management.

Helping the Group in effectively managing the energy business risks, which include

demand, technologies, fuel prices, logistics and competencies. 

And optimising the value of our diverse portfolio of generating plants and gas assets. 

GSEG manages the electrical utility with

9

Page 10: Gseg project

Advanced power generation and management practices, and improve the efficiency of

power supply to Gujarat Electricity Board

Operations at least-cost

Full compliance with the health, safety and environmental regulations of Gujarat

Excellent working conditions to optimise the skills and potential of the staff and

managers involved

GSEG has demonstrated that it has the competencies and resources to occupy and

excel in the power generation chain, including design, development, construction and

operations. Soon the chain will be complete with the company's plans to expand capacity

to larger projects and to enter distribution in Gujarat.

Future plans:

350 MW Expansion Plan:

In order to fill the gap of power demand and supply in Gujarat, the Company

has decided to embark upon expansion plan of 1000 MW to be set up in three

stages of 350 MW each at its existing site situated at Village Mora, Taluka:

Choryasi, Surat.

The Company has acquired all the clearance for the expansion like MOEF,

GPCB, water tie up and land availability etc. It already has 28 hactares of land

which can accommodate 350 MW expansions and recently it has acquired

40,000 Sq. Mtr of land adjacent to the existing plant so that in future the

capacity may be further added beyond 350 MW.

For first phase, it floated EPC tender in Nov, 2006 and within 10 months time

it has not only evaluated the tenders submitted by various bidders but has

issued  LOI to the successful bidder which is BHEL (Bharat Heavy Electrical

Ltd.). BHEL will supply the project on EPC basis and would use GE

technology in gas turbine of 9 FA machine. The unit of 350 MW will

comprise of one Gas turbine, one HRSG (Heat Recovery Steam Generator)

and one steam turbine. BHEL is committed to complete the project in 27

months from the date of notice to proceed. The expected cost of project is

around Rs 1150 Crs which is to be financed from debt and equity. 

After implementation of this 350 MW, the total installed capacity of the

Company would go up from 156 MW to 506 MW. 

Existing: 2x52 MW Gas Turbine +1x52 MW Steam Turbine =156 MW

10

Page 11: Gseg project

Expansion: One GT+ One HRSG+ One ST = 350 MW The power generated

by the Company would be free from pollution. The company is committed to

green environment. It will develop green belt in the plant area itself to promote

greenery as per MOEF’s guidelines.

All the power generated by the expansion shall be sold to GUVNL, which will

supply power to various distribution companies of Gujarat meeting the

requirements of industries and people.

Natural Gas to power

GSEG is in the business of building new power generation plants to meet the

energy challenges in Gujarat, with the most advanced and clean technologies

available in the world today.

Its first and foremost demonstrable success is the natural gas powered Combined

Cycle Power Plant at Mora (Surat), Gujarat, with an installed capacity of 156

MW, supplied by Alstom and managed by Steag Encotec, both world leaders in

advanced power technologies. The Plant was designed, developed and led by

highly qualified management and engineering personnel from all facets of the

electric power industry under the auspices of GSEG

Achievements:

In the present scenario, where almost all Power Projects are facing difficulties and

hardly any new capacities are added to the system, GSEG has created a record of its

own by synchronizing the First Gas Turbine in record time of 17 months and the

Second Gas Turbine in 18 months from zero date of EPC contract. Adding true value

to energy needs of Gujarat, through efficiency, economy and environment friendly

operations.

Protecting Nature:

The CCPP Plant generates power on Natural Gas, an environment-friendly fuel with a

provision to use liquid fuels in emergencies. The plant has been built with a vision to

fuel new power production by natural gas, which produces more energy at

competitive costs and also is proven to be benign to the environment. GSEG has

11

Page 12: Gseg project

created this engineering cornerstone for energy in Gujarat, using leading-edge

technology and today, operates the power project in the safest, most environmentally

conscious manner. Meeting the twin goals of efficiency and emission reduction.

THE CONTRACT LABOUR (REGULATION & ABOLITION) ACT, 1970

Introduction:

12

Page 13: Gseg project

Object of the Act

To regulate the employment of contract labor in certain establishments and to

provide for its abolition in certain circumstances and for matters connected therewith.

Applicability

Every establishment in which 20 or more workmen are employed or were employed

on any day of the preceding 12 months as contract labor.

Every contractor who employs or who employed on any day of the preceding twelve

months 20 or more workmen.

Registration of Establishment

Principal employer employing 20 or more workers through the contractor or

the contractor(s) on deposit of required fee in Form 1

Prohibition of Employment of Contract Labour

Only by the appropriate Government through issue of notification after

consultation with the Board (and not Courts) can order the prohibition of employment

of contract labor.

Revocation of Registration

When obtained by Misrepresentation or suppression of material facts etc. after

opportunity to the principal Employer.

Licensing of Contractor

Engaging 20 or more than 20 workers and on deposit of required fee in Form IV.

Valid for specified period.Sec.12, Rule 21

Revocation or Suspension & Amendment of Licences

When obtained by misrepresentation or suppression of material facts.

Failure of the contractor to comply with the conditions or contravention of Act or the

Rules. (Sec. 14)

13

Page 14: Gseg project

Welfare measures to be taken by the Contractor

Contract labor either one hundred or more employed by a contractor for one or more

canteens shall be provided and maintained.

First Aid facilities.

Number of rest-rooms as required under the Act.

Drinking water, latrines and washing facilities. (Sec. 16 & 17)

Laws, Agreement or standing orders inconsistent with the Act-Not Permissible

Unless the privileges in the contract between the parties or more favorable

than the prescribed in the Act, such contract will be invalid and the workers will

continue to get more favorable benefits.

Liability of Principal Employer

To ensure provision for canteen, restrooms, sufficient supply of drinking water,

latrines and urinals, washing facilities.

Principal employer entitled to recover from the contractor for providing such

amenities or to make deductions from amount payable. Sec. 20

Registers of Contractors

Principal employer

To maintain a register of contractor in respect of every establishment in Form XII.

Contractor (Rule 74)

To maintain register of workers for each registered establishment in Form XIII.

To issue an employment card to each worker in Form XIV.

To issue service certificate to every workman on his termination in Form XV.

Rules 75, 76 and 77

Muster Roll, Wages Register, Deduction Register and Overtime Register by

Contractor

Every contractor shall:

Maintain Muster Roll and a Register of Wages in Form XVI and Form XVII

respectively when combined.

14

Page 15: Gseg project

Register or wage-cum-Muster Roll in Form XVII where the wage period is a fortnight

or less.

Maintain a Register of Deductions for damage or loss, Register or Fines and Register

of Avances in Form XX, from XXI and Form XXII respectively.

Maintain a Register of Overtime in Form XXIII.

To issue wage slips in Form XIX, to the workmen at least a day prior to the

disbursement of wages.

Obtain the signature or thumb impression of the worker concerned against the entries

relating to him on the Register of wages or Muster Roll-Cum-Wages Register.

When covered by Payment of Wages Act, register and records to be maintained under

the rules

Muster Roll, Register of wages, Register of Deductions, Register of Overtime,

Register of Fines, Register of Advances, Wage slip. (Rule 79)

To display an abstract of the act and Rules in English and Hindi and in the language

spoken by the Majority of workers in such forms as may be approved by appropriate

authority. (Rule 80)

To display notices showing rates of wages, hours of work, wage period, dates of

payment, names and addresses of the inspector and to send copy to the inspector and

any change forwithwith. (Rule 81)

Penalties

Sec. Offence Punishment

Sec. 22 Obstructions For obstructing the inspector or

failing to produce registers etc.- 3

15

Page 16: Gseg project

months’ imprisonment or fine upto

Rs.500, or both.

Sec.23 Violation For violation of the provisions of Act

or the Rules, imprisonment of 3

Months or fine upto Rs.1000. On

continuing contravention, additional

fine upto Rs.100 per day

General Information of the company:

Total Number of Workers:

Employees : 85

Officers : 50

Female : Nil

Children : Nil

16

Page 17: Gseg project

Rate of Turnover is average 3% per annum

Rate of absenteeism is Nil.

The Contract Labour (Regulation & Abolition) Act, 1970 at GSEG is described

below:

The name of contractor for GSEG is STEAG India Pvt. Ltd., Geaman subsidiary.

GSEG provides all types welfare amenities for contract labour.They are

mentioned below:

Drinking Water

First aid Facilities Rest rooms

Canteen

Latrines & Urinals

Lockers

The Contract Labour Act applies to every establishment in which 20 or more

workmen are employed. There are 85 numbers of employees employed as

contractor’s workmen in this company.

Nature of workman employed in organization:

Skilled : 35

Semi-skilled : Nil

Un-skilled manual : Nil

Supervisory : Nil

Technical : 35

Clerical :Nil

The company is registered under the labor department of Gujarat Government.

Licensing

Labor dept, Government of Gujarat issued the License for the

organization.

The Amount of fees paid to the licensing Authority by the company is Rs.

100/Llabor/year.

The location of the establishment in the license is Village Mora, Hazira.

17

Page 18: Gseg project

The Continuous Process is followed by the company.

The Operations done by the company:

Generation of Electronic Power from Natural Gas.

The license is valid for One year.

The fee for Renewal of license is Rs. 30 for each renewal.

There is not any contravention of provisions regarding employment of contract

labor up till now in the organization.

Labor Inspector comes to inspect the registers & records etc in the organization

WELFARE FACILITY FOR CONTRACT LABOR

Introduction:

Welfare facility includes different types of facilities provided to the employees

in organization:

o Washing facilities

18

Page 19: Gseg project

o Facilities for Storing & Drying clothing

o Facilities for Sitting

o First-aid appliances

o Canteens

o Shelters, rest rooms and lunch rooms

o Creches

o Welfare Officers

Welfare Facilities for contract labor at GSEG are described below:

For washing place and water GSEG provides Wash room facility in each plant

for workers or officers and there is no separate facility for male & female

workers.

GSEG provides facility of over coat to the technicians to keep clothing not

worn during working hours and for drying wet clothes.

19

Page 20: Gseg project

GSEG provides common sitting in workshop area for workers who work in a

standing position.

GSEG provides First-Aid box & cupboard facility for any emergency situation

to workers. They also provide ambulance facility & the company has also the

contract with surat hospital.

GSEG provides canteen facility to their workers & canteen is run by the

contractor & for maintenance, utensil bid is done by them.

GSEG provide shelters, rest rooms and lunch room facility to their workers.

At GSEG Welfare officer is looking after welfare facilities.

Safety facilities for the employees at GSEG:

o Helmet.

o Hand Gloves.

o Emeregency Alarm system:

GSEG provides the facility of alarm system. When any

emergency situation occurs in the company due to fire or any

other reason, the alarm gives signal to the employees to reach

to the certain point.

20