Top Banner
GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: - ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR) - ITU-R: Disaster prediction, detection, mitigation, relief Dr Leo Lehmann, Chairman ITU-T Study Group 13, former vice-chairman ITU-T FG-DR&NRR Colin Langtry, Chief, ITU-R Study Group Department Document No: GSC-19_109 Source: ITU Contact: Dr Leo Lehmann, Colin Langtry Agenda Item: 3.9
11

GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

Dec 24, 2015

Download

Documents

Leona Morton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

Standardization activities in ITU:- ITU-T Focus Group on Disaster Relief Systems, Network

Resilience and Recovery (FG-DR&NRR)- ITU-R: Disaster prediction, detection, mitigation, relief

Dr Leo Lehmann, Chairman ITU-T Study Group 13, former vice-chairman ITU-T FG-DR&NRR

Colin Langtry, Chief, ITU-R Study Group Department

Document No: GSC-19_109

Source: ITUContact: Dr Leo Lehmann, Colin LangtryAgenda Item: 3.9

Page 2: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

FG DR&NRR deliverables

http://www.itu.int/en/ITU-T/focusgroups/drnrr/Pages/default.aspx

Deliverabales Title Transferred SGsRelevant SGs(Information

sharing)

FG-Overview Overview of disaster relief systems, network resilience and recovery

Continue to be examined byITU-T SG2

ITU-T SG13, SG16, SG17,

JCA-AHF, ITU-D Q5/2, ITU-R SG5

FG-FrameDisaster Relief Systems, Network Resilience and Recovery (DR&NRR): Promising technologies and use cases

FG-Gap Gap Analysis of Disaster Relief Systems, Network Resilience and Recovery 

FG-Term Terms and Definitions for disaster relief systems, network resilience and recovery

Transferred to ITU-T SG2 with the aim of making new RecommendationsFG-DR Requirements for disaster relief systems

FG-NRR Requirements for network resilience and Recovery Transferred to ITU-T SG15 with

the aim of making new RecommendationsFG-MDRU

Requirements on the improvement of network resilience and recovery with movable and deployable ICT resource units (MRDU)

FG-TR Technical report on telecommunications and disaster mitigation

Transferred to SG2

Note: all the deliverables above are published at http://www.itu.int/pub/T-FG/e

Page 3: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

Arising activities in ITU-T Study Group 2 Requirements for Disaster Relief Mobile Message Service (text/voice)

Requirements for Disaster Relief Systems (draft E.RDR, under study) Terms and definitions for DR&NRR (draft E.TD-DR, under study) Requirements for Safety Confirmation and Broadcast Message Service

for Disaster Relief (draft E.RDR-SCBM under study)

Determined E.108

Page 4: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

Arising activities in ITU-T Study Group 15 Disaster management for improving network resilience and recovery

with movable and deployable ICT resource units (L.dm-nrr-mdru under study)

Framework of disaster management for network resilience and recovery (L.nrr-frm under study)

Tolerance

Redundancy

Congestion control Repair

Substitute

Infrastructureresources

Complementaryresources

TimeOutbreak of disaster

Resilience Recovery

Page 5: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

Disasterphases

Major radiocommunicationservices involved

Major tasks ofradiocommunication services

Studies carried out by

Radiocommunication

Prediction & Detection•Meteorological services (meteorological aids and meteorological-satellite service) •Earth exploration-satellite service

Weather and climate prediction. Detection and tracking of earthquakes, tsunamis hurricanes, typhoons, forest fires, oil leaks etc. Providing warning information

Study Group 7

Alerting

•Amateur services Receiving and distributing alert messages Study Group 5

•Broadcasting services terrestrial and satellite (radio, television, etc.)

Disseminating alert messages and advice to large sections of the public

Study Group 6

•Fixed services terrestrial and satellite Delivering alert messages and instructions to telecommunication centres for further dissemination to public

Study Group 5Study Group 4

•Mobile services (land, satellite, maritime services, etc.)

Distributing alert messages and advice to individuals

Study Group 5Study Group 4

Relief

•Amateur services Assisting in organizing relief operations in areas (especially when other services are still not operational)

Study Group 5

•Broadcasting services terrestrial and satellite (radio, television, etc.)

Coordination of relief activities by disseminating information from relief planning teams to population

Study Group 6

•Earth exploration-satellite service Assessment of damage and providing information for planning relief activities

Study Group 7

•Fixed services terrestrial and satellite Exchange of information between different teams/groups for planning and coordination relief activities

Study Group 5Study Group 4

•Mobile services (land, satellite, maritime services, etc.)

Exchange of information between individuals and/or groups of people involved in relief activities

Study Group 5Study Group 4

Overview of work in ITU-R Study Groups

Page 6: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

Current activities in Working Party 5ALand Mobile Systems above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

• Draft New Report M.[PPDR] “Public protection and disaster relief communications”.

This report addresses:

the categorization of technical and operational requirements relating to PPDR;

the current use of narrow and wide-band PPDR;

the mobile broadband PPDR services and applications including further developments and the evolution of PPDR through advances in technology;

the needs of developing countries.

The Report is expected to be finalized and approved by ITU-R Study Group 5 on 21 July 2015

Page 7: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

Backup

Page 8: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

Disaster relief by ITU• ITU contributes to disaster prevention and response from

the telecommunication/ICT aspect since many years• Disaster relief activities include preparation for possible

disasters, early detection, rescue, evacuation assistance, safety confirmation, recovery assistance, etc.

• ITU and it’s partners deploy satellite terminals and other emergency telecommunication equipment to affected countries within the first 24 to 48 hours aftermath a disaster to help restore vital communication links.

Page 9: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

Mission of the Focus Group

• Disaster relief for individuals (notify damage situation from victims)

• disaster relief guidance (show victims the routes to evacuation shelters, home)

• Network resilience and recovery capability of infrastructure to cope better with disasters

Page 10: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

Integrated view of networks supportingdisaster relief services

Page 11: GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

GSC-19 Meeting, 15-16 July 2015, Geneva

• Radiocommunications Assembly 2007 (RA-07) approved Resolutions ITU-R 53 and ITU-R 55 instructing all ITU-R Study Groups to carry out studies on the use of radiocommunications in disaster prediction, detection, mitigation and relief.

• In 2012 RA-12 revised and confirmed those Resolutions• WRC-12 agreed upon Agenda Item 1.3 for WRC-15: “to review

and revise Resolution 646 (Rev.WRC 12) for broadband public protection and disaster relief (PPDR), in accordance with Resolution 648 (WRC-12)”. In addition, WRC-12 revised Resolutions 644, 646, and 647.

• Nearly every Study Group within the ITU-R has a role to play in Disaster Relief

ITU-R focus on disaster prediction, detection, mitigation and relief