Top Banner
GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014
17

GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

Dec 14, 2015

Download

Documents

Earl Brison
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

GS1 @ HL7 WGM demonstration pilot

mHealth – 7 Mai 2014

Page 2: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

© 2013 GS1

Who is GS1?

GS1 is a not-for-profit organisation dedicated to the design and implementation of global standards to improve the efficiency and visibility of supply chains globally and across sectors

GS1 Global OfficeIdentification, creation, development and maintenance of standards and our foundational architecture, coordination with other international bodies, development of training programmes...

GS1 Member OrganisationsLocal offices in 111 countries around the globeImplementation of standards, local regulatory adjustments, community management and relationship management with local governments and regulatory agencies...

Page 3: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

© 2014 GS1

Global reach, local presence

3

Not-for-profit111 Member Organisations1’500’000 user companies

(from SME to global companies)Member driven

150 countries served; 20 different domains2,500 people helping us

Over 6 billion transactions a day

Page 4: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

© 2013 GS1

GS1 Standards

4

Page 5: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

© 2013 GS1

mHealth HL7-GS1

5

• Scope:• The project consists in bringing GS1 closer to HL7

experts by using some useful tool to capture and document their participation to the mHealth WG sessions.

• Ideally, the project should be scalable, so that it grows along the time and continues interesting the experts. If/when successful, the solution could be expanded to the full HL7 Working Groups.

Page 6: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

© 2013 GS1

mHealth HL7-GS1

6

• Boundaries:• To bring GS1 closer to HL7 experts, data capture has to

occur by reading GS1 symbols – ideally GS1 DataMatrix (and not QR Matrix, which could be confused with ordinary tools such as web access for advertisements, etc.).

• The project must be sufficiently simple not to require registering cell phone number of experts or other heavy administrative work.

Page 7: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

© 2013 GS1

mHealth HL7-GS1

7

• A phased approach – to seek sustainability:• The idea is to start the project with the simplest solution,

to raise expert’s awareness and interest. Data capture will then only document expert’s participation to every mHealth WG session (quarter). Participation list will be generated from this information.

Is this sufficient for a first phase?Shall we immediately add the next phase to make the project attractive?

Page 8: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

© 2013 GS1

mHealth HL7-GS1

8

• A phased approach – to seek sustainability:• By developing the tool for a second phase, experts will

have access (by download or by ordering an email) to mHealth’s documents and agenda. Possibly the best is to generate an email with attachments so that the ordering occurs through the mobile device, and the reception on a regular computer.

Meeting ID (by Q)

Participant ID

Email meeting documents to participant’s mail box+

Page 9: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

UC 1

• HL7 members registered to participate in HL7 WGM will be able to obtain meeting material for the WG

Page 10: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

UC 1, phase 1

• Identification management– HL7 WGM participant receives a unique ID on badge (GS1

identifier + GS1 DataMatrix)• Prerequisites:

– Registration database updated • Participant DB generate the GS1 identifier• Participant DB includes GS1 identifier for each participant• Participant DB includes participant’s email address • Participant DB has tables to store participant’s attendance to specific

sessions

– Print• Datamatrix on badge• Print Datamatrix on labels for meeting room doors

Page 11: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

UC 1, phase 1 (GS1 identifier)

GS1 «Company Prefix»

Sequential number, generated by HL7 for

WGM participant identification

Check Digit

Global Service Relationship Number (GSRN)

Page 12: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

UC 1, phase 1 (GS1 DataMatrix)

Page 13: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

UC 1, phase 2

• Capture participation to specific WG session– Participant uses own cell phone, with app loaded.– Using cell phone, participant scans DataMatrix on badge– Using cell phone, participant scans WG session code on door– Using own PC, participant receives validation, documents

(ppt) in mail box.– Session participant list is updated

• Prerequisites :– mHealth WG places a GS1 identifier ( meeting room door)– Stick DataMatrix label on meeting room door– App has to be installed on cell phone

Page 14: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

UC 2 – attendee locator

• I would like to locate John Smith right now, because I have something to give him

• John Smith is currently in a WG meeting session, and has scanned his attendance in that meeting

• By querying the participants DB, John Smith can be located to his meeting room.

Page 15: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

UC 2, phase 1

• Identification management– HL7 WGM participant gets unique ID on badge (GS1

identifier + GS1 DataMatrix)– WG meeting rooms have to be identified with label (GS1

identifier + GS1 DataMatrix)• Pre-requisits:

– Registration database updated • Same as for UC 1

– Print• Same as for UC 1

– App allows possibility to query participant DB

Page 16: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

Illustration

Scanning a location to document «my location»

Page 17: GS1 @ HL7 WGM demonstration pilot mHealth – 7 Mai 2014.

Questions?